Post-treatment plant material object protection partitioning method, device and equipment and storage medium
Through scientific partitioning and hierarchical evaluation methods, the problems of strong subjectivity and insufficient scientific reliability in the physical protection partitioning method of post-processing plants are solved, the scientificity and flexibility of partitioning are improved, safety and operation efficiency are ensured, and illegality is prevented. Invasion.
Patent Information
- Application Number
- CN202411114171.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-14
- Publication Date
- 2024-11-29
AI Technical Summary
The existing physical protection zoning methods in post-processing plants have problems such as strong subjectivity and scientific reliability that need to be improved, resulting in insufficient zoning flexibility and it is difficult to effectively respond to different types of security needs.
By dividing it into pre-plane area, factory area and outside of the plant according to the building structure and functional needs of the post-processing plant, and grading evaluation of radioactive substances, waste and public protection facilities are set up, corresponding protection facilities are combined with comprehensive scores and correction scores. , ensure the scientificity and flexibility of partitioning.
Improve the scientificity and reliability of partitions, enhance flexibility and adaptability, reduce subjectivity, ensure that the layout of various protection facilities meets process flow and safety needs, improves overall safety and operation efficiency, and can be more accurately verified. Alarms and incident severity to prevent illegal intrusion.
Smart Images

Figure SMS_1 
Figure SMS_2 
Figure SMS_3
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of nuclear facility protection zoning, and specifically to a method, device, equipment and storage medium for physical protection zoning in a post-processing plant. Background Art
[0002] With the widespread application of nuclear technology, nuclear safety issues have received more and more attention. In order to prevent major safety accidents that endanger the safety of society and public life and property caused by illegal intrusion into the physical protection perimeter of the reprocessing plant and to gain more time for armed disposal, it is necessary to establish a timely and effective nuclear safety alarm linkage system to verify the accuracy of the alarm and the severity of the incident.
[0003] At present, the physical protection zones of reprocessing plants are generally set up by staff according to safety guidelines and their own experience. This type of zoning method is often too subjective, less flexible, and has problems of scientific reliability that need to be improved. Summary of the invention
[0004] The embodiments of the present application provide a post-processing plant physical protection zoning method, device, equipment and storage medium to improve the current zoning method, which is too subjective and has a low scientific reliability.
[0005] A first aspect of an embodiment of the present application provides a post-processing plant physical protection zoning method, comprising:
[0006] According to the building structure of the post-processing plant, the post-processing plant is divided into a front-plant area, a plant area and an off-plant area;
[0007] According to the different functions of the plant area, the plant area is divided into a post-processing plant area, a three-waste plant area and a public facility plant area. Radioactive material protection facilities are set in the post-processing plant area, waste protection facilities are set in the three-waste plant area, and public protection facilities are set in the public facility plant area;
[0008] Conducting graded assessments on the various radioactive material protection facilities, the various waste protection facilities and the various public protection facilities respectively, and setting up the radioactive material protection facilities in the corresponding sub-areas of the post-processing plant area, the waste protection facilities in the corresponding sub-areas of the three wastes plant area and the public protection facilities in the corresponding sub-areas of the public facilities plant area according to the assessment results;
[0009] Based on the process function requirements of the facilities, the determined physical protection facility zoning results are revised.
[0010] In some embodiments of the present application, the post-processing plant area, the three wastes plant area and the public utility plant area all include critical areas, protection areas and control areas;
[0011] The assessment results of the radioactive material protection facilities, the waste protection facilities and the public protection facilities include first-level physical protection facilities, second-level physical protection facilities, third-level physical protection facilities and non-level physical protection facilities;
[0012] Wherein, in the post-processing plant area, the first-level physical protection facilities are set in the critical area of the post-processing plant area, the second-level physical protection facilities are set in the protection area of the post-processing plant area, and the third-level physical protection facilities are set in the control area of the post-processing plant area; in the three-waste plant area, the first-level physical protection facilities are set in the critical area of the three-waste plant area, the second-level physical protection facilities are set in the protection area of the three-waste plant area, and the third-level physical protection facilities are set in the control area of the three-waste plant area; in the public utility plant area, the first-level physical protection facilities are set in the critical area of the public utility plant area, the second-level physical protection facilities are set in the protection area of the public utility plant area, and the third-level physical protection facilities are set in the control area of the public utility plant area;
[0013] The stepless physical protection facility is arranged in the front area of the factory or the area outside the factory.
[0014] In some embodiments of the present application, the step of performing a hierarchical assessment on the multiple radioactive material protection facilities includes:
[0015] Establishing a scoring system to set score ranges for level 1 physical protection facilities, level 2 physical protection facilities, and level 3 physical protection facilities in the reprocessing plant area;
[0016] Defining weights and scores of the various factors according to their impact on the radioactive material protection facility;
[0017] Each of the factors is scored, and the scores of each factor are summed up to obtain a comprehensive score, and the comprehensive score is compared with the score range to obtain the physical protection facility levels corresponding to the multiple radioactive material protection facilities.
[0018] In some embodiments of the present application, the multiple factors include the type and quantity of radioactive materials, the complexity of the process flow, the frequency of personnel activities, environmental monitoring data, and historical accident records.
[0019] In some embodiments of the present application, the calculation formula of the comprehensive score is:
[0020] S=w1×P+w2×C+w3×F+w4×E+w5×H;
[0021] Among them, S is the comprehensive score; w1, w2, w3, w4, and w5 are the weights of each factor; P is the score for the type and quantity of radioactive materials; C is the score for the complexity of the process; F is the score for the frequency of personnel activities; E is the score for environmental monitoring data; and H is the score for historical accident records.
[0022] In some embodiments of the present application, the calculation formula for the score of the type and quantity of radioactive substances is:
[0023]
[0024] Where P is the score of the type and quantity of radioactive substances; Q i is the amount of the ith radioactive substance; R i is the radioactivity level of the ith radioactive material; n is the number of types of radioactive materials.
[0025] In some embodiments of the present application, the step of modifying the partitioning results of the determined physical protection facilities according to the process function requirements of the facilities includes:
[0026] According to the process function requirements of the facilities, the functional importance of the process facilities and the utilization rate of the process facilities are scored respectively;
[0027] According to the number of process facilities, the scores of the process facilities are summed and averaged to obtain the process score of the process function requirement;
[0028] Assigning a weight to the process score, and summing the weighted process score and the comprehensive score to obtain a revised score;
[0029] The revised score is compared with the score range to revise the physical protection facility level corresponding to the radioactive material protection facility.
[0030] A second aspect of an embodiment of the present application provides a post-processing plant physical protection zoning device, comprising:
[0031] A structural partitioning module, used for dividing the post-processing plant into a front area, a plant area and an outside area according to the building structure of the post-processing plant;
[0032] A functional zoning module is used to divide the plant area into a post-processing plant area, a three-waste plant area and a public facility plant area according to different functions in the plant area, wherein radioactive material protection facilities are set in the post-processing plant area, waste protection facilities are set in the three-waste plant area, and public protection facilities are set in the public facility plant area;
[0033] a hierarchical assessment module, for respectively performing hierarchical assessments on the multiple radioactive material protection facilities, the multiple waste protection facilities, and the multiple public protection facilities, and setting the radioactive material protection facilities in corresponding sub-areas of the post-processing plant area, setting the waste protection facilities in corresponding sub-areas of the three waste plant area, and setting the public protection facilities in corresponding sub-areas of the public facility plant area according to the assessment results;
[0034] The correction module is used to correct the partition results of the determined physical protection facilities according to the process function requirements of the facilities.
[0035] A computer device provided in the third aspect of an embodiment of the present application includes: a processor, a storage medium and a bus, the storage medium stores machine-readable instructions executable by the processor, when the device is running, the processor and the storage medium communicate through the bus, and the processor executes the machine-readable instructions to perform the steps of the post-processing plant physical protection zoning method provided in the first aspect.
[0036] A fourth aspect of the embodiments of the present application further provides a storage medium having a computer program stored thereon. When the computer program is executed by a processor, the steps of the post-processing plant physical protection zoning method provided in the first aspect are executed.
[0037] It can be seen that the method of the embodiment of the present application can bring the following beneficial effects:
[0038] This application is mainly to improve the scientificity and reliability of the zoning, enhance flexibility and adaptability, strengthen the coordination between process function requirements and zoning layout, reduce subjectivity, and establish more effective physical protection zoning through scientific division and hierarchical evaluation. In detail: First, by making a preliminary division according to the building structure of the post-processing plant, the post-processing plant is divided into the front area, the plant area and the outside area of the plant to ensure the scientificity and structural rationality of the zoning. The division of different functional areas (such as the post-processing plant area, the three wastes plant area and the public facility plant area) makes the functions of each area clear, and the management and protection measures are more targeted. Second, by conducting a hierarchical evaluation of various types of protection facilities and setting up zoning according to the evaluation results, the flexibility and adaptability of the zoning are effectively improved. Different types of protection facilities (radioactive material protection facilities, waste protection facilities, public protection facilities) are arranged in the corresponding functional areas, so that each functional area can flexibly respond to different types of safety needs. Third, the determined zoning results are revised according to the process function requirements of the facilities to ensure that the layout of various types of protection facilities meets both the requirements of the process flow and the needs of physical protection. For example, the rational layout of auxiliary facilities such as air supply / exhaust facilities and water treatment facilities improves the overall safety and operating efficiency of the system. Fourth, compared with the method of zoning based on staff experience and safety guidelines, the present invention effectively reduces the influence of subjective factors through detailed hierarchical evaluation and comprehensive scoring methods, improves the scientificity and reliability of zoning, and ensures the accuracy and consistency of zoning results. Fifth, through scientific and reasonable physical protection zoning methods, the accuracy of alarms and the severity of incidents can be verified more accurately, more time for armed disposal can be gained, and the physical protection perimeter of the post-processing plant can be effectively prevented from being illegally invaded, protecting the lives and property of society and the public. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For those skilled in the art, other drawings can be obtained based on these drawings without creative work.
[0040] Figure 1 It is a schematic diagram of an application scenario between a terminal and a server provided in an embodiment of the present application;
[0041] Figure 2 It is a flow chart of a physical protection zoning method for a post-processing plant provided in an embodiment of the present application;
[0042] Figure 3 It is a schematic diagram of the structure of a computer device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0043] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of this application.
[0044] The embodiment of the present application provides a post-processing plant physical protection partition method, device, equipment and storage medium, wherein the equipment may be an Internet of Things device, and the storage medium may be a computer storage medium. The post-processing plant physical protection partition method may be integrated in a device, which may be a server, or a terminal or other device.
[0045] Among them, the server can be an independent physical server, a server cluster or distributed system composed of multiple physical servers, or a cloud server that provides basic cloud computing services such as cloud services, cloud databases, cloud computing, cloud functions, cloud storage, network services, cloud communications, middleware services, domain name services, security services, network acceleration services (Content Delivery Network, CDN), as well as big data and artificial intelligence platforms.
[0046] The terminal may be a smart phone, a tablet computer, a laptop computer, a desktop computer, a smart speaker, a smart watch, etc., but is not limited thereto. The terminal and the server may be directly or indirectly connected via wired or wireless communication, and this application does not limit this.
[0047] For example, Figure 1 As shown, the server can divide the post-processing plant into a front area, a plant area and an off-plant area based on the building structure of the post-processing plant; according to the different functions in the plant area, the plant area can be divided into a post-processing plant area, a three-waste plant area and a public facility plant area, and radioactive material protection facilities are set in the post-processing plant area, waste protection facilities are set in the three-waste plant area, and public protection facilities are set in the public facility plant area; a graded assessment is conducted on various radioactive material protection facilities, various waste protection facilities and various public protection facilities, and according to the assessment results, the radioactive material protection facilities are set in the corresponding partitions of the post-processing plant area, the waste protection facilities are set in the corresponding partitions of the three-waste plant area, and the public protection facilities are set in the corresponding partitions of the public facility plant area; according to the process function requirements of the facilities, the determined physical protection facility zoning results are corrected.
[0048] It should be noted that the above steps performed in the server may also be performed in the terminal, and this embodiment does not limit this.
[0049] In the embodiments of the present application, "plurality" refers to two or more than two. In the embodiments of the present application, "first" and "second" are used to distinguish descriptions and should not be understood as implying relative importance.
[0050] It should be noted that the description order of the following embodiments is not intended to limit the preferred order of the embodiments.
[0051] See also Figure 2 In this embodiment, a post-processing plant physical protection zoning method is provided, such as Figure 2 As shown, the specific process of the physical protection zoning method of the post-processing plant can be as follows:
[0052] S1. According to the building structure of the post-processing plant, the post-processing plant is divided into the front area, the plant area and the outside area;
[0053] S2. According to the different functions of the plant area, the plant area is divided into a post-processing plant area, a three-waste plant area and a public facility plant area. Radioactive material protection facilities are set up in the post-processing plant area, waste protection facilities are set up in the three-waste plant area, and public protection facilities are set up in the public facility plant area;
[0054] S3. Conduct graded assessments on various radioactive material protection facilities, various waste protection facilities and various public protection facilities, and install radioactive material protection facilities in corresponding zones of the reprocessing plant area, waste protection facilities in corresponding zones of the three wastes plant area and public protection facilities in corresponding zones of the public facilities plant area according to the assessment results;
[0055] S4. Based on the technological and functional requirements of the facilities, the determined physical protection facility zoning results shall be revised.
[0056] The technical solution provided by the embodiment of the present application is mainly to improve the scientificity and reliability of the partition, enhance flexibility and adaptability, strengthen the coordination between process function requirements and partition layout, reduce subjectivity, and establish more effective physical protection partitions through scientific division and hierarchical evaluation. In detail: First, by making a preliminary division according to the building structure of the post-processing plant, the post-processing plant is divided into the front area, the plant area and the outside area of the plant to ensure the scientificity and structural rationality of the partition. The division of different functional areas (such as the post-processing plant area, the three wastes plant area and the public facility plant area) makes the function of each area clear, and the management and protection measures are more targeted. Second, by conducting a hierarchical evaluation of various types of protection facilities and setting up partitions according to the evaluation results, the flexibility and adaptability of the partition are effectively improved. Different types of protection facilities (radioactive material protection facilities, waste protection facilities, public protection facilities) are arranged in the corresponding functional areas respectively, so that each functional area can flexibly respond to different types of safety requirements. Third, the determined partition results are corrected according to the process function requirements of the facilities to ensure that the layout of various types of protection facilities meets both the requirements of the process flow and the needs of physical protection. For example, the rational layout of auxiliary facilities such as air supply / exhaust facilities and water treatment facilities improves the overall safety and operating efficiency of the system. Fourth, compared with the method of zoning based on staff experience and safety guidelines, the present invention effectively reduces the influence of subjective factors through detailed hierarchical evaluation and comprehensive scoring methods, improves the scientificity and reliability of zoning, and ensures the accuracy and consistency of zoning results. Fifth, through scientific and reasonable physical protection zoning methods, the accuracy of alarms and the severity of incidents can be verified more accurately, more time for armed disposal can be gained, and the physical protection perimeter of the post-processing plant can be effectively prevented from being illegally invaded, protecting the lives and property of society and the public.
[0057] In some embodiments, the reprocessing plant area, the three wastes plant area and the public utility plant area all include critical areas, protection areas and control areas; the assessment results of the radioactive material protection facilities, the waste protection facilities and the public protection facilities all include first-level physical protection facilities, second-level physical protection facilities, third-level physical protection facilities and non-level physical protection facilities; wherein, in the reprocessing plant area, the first-level physical protection facilities are located in the critical areas of the reprocessing plant area, the second-level physical protection facilities are located in the protection areas of the reprocessing plant area, and the third-level physical protection facilities are located in the control areas of the reprocessing plant area. The facilities are located in the control area of the post-treatment plant; in the three-waste plant area, the first-level physical protection facilities are located in the key area of the three-waste plant area, the second-level physical protection facilities are located in the protection area of the three-waste plant area, and the third-level physical protection facilities are located in the control area of the three-waste plant area; in the public facility plant area, the first-level physical protection facilities are located in the key area of the public facility plant area, the second-level physical protection facilities are located in the protection area of the public facility plant area, and the third-level physical protection facilities are located in the control area of the public facility plant area; the stepless physical protection facilities are located in the front area or outside the plant.
[0058] In this embodiment, according to the different functions in the plant area, the plant area is further subdivided into: a post-processing plant area, which mainly processes radioactive materials and sets up radioactive material protection facilities; a three-waste plant area, which mainly processes waste and sets up waste protection facilities; and a public utility plant area, which mainly provides support services and sets up public protection facilities. Various types of protection facilities in different functional areas are graded and evaluated, and the evaluation results are divided into first-level physical protection facilities, second-level physical protection facilities, third-level physical protection facilities, and non-level physical protection facilities. In the post-processing plant area, according to the evaluation results, the first-level physical protection facilities are set in the critical area, the second-level physical protection facilities are set in the protection area, and the third-level physical protection facilities are set in the control area. In the three-waste plant area, according to the evaluation results, the first-level physical protection facilities are set in the critical area, the second-level physical protection facilities are set in the protection area, and the third-level physical protection facilities are set in the control area. In the public utility plant area, according to the evaluation results, the first-level physical protection facilities are set in the critical area, the second-level physical protection facilities are set in the protection area, and the third-level physical protection facilities are set in the control area. The non-step physical protection facilities are set up in the front area or outside the factory. It should be noted that the first-level physical protection facilities, second-level physical protection facilities and third-level physical protection facilities are set up in the post-processing plant area, the three-waste plant area and the public utility plant area, but the first-level physical protection facilities, second-level physical protection facilities and third-level physical protection facilities in each area do not refer to the same physical protection facilities, that is, different plant areas are equipped with different first-level physical protection facilities, second-level physical protection facilities and third-level physical protection facilities, and the post-processing plant area, the three-waste plant area and the public utility plant area are all equipped with critical areas, protection areas and control areas, and the critical areas, protection areas and control areas set up in each plant area do not refer to the same partition, and the three partitions in each plant area are independent partitions.
[0059] The first-level physical protection facilities are set in the critical area, the second-level physical protection facilities are set in the protection area, and the third-level physical protection facilities are set in the control area. Through this hierarchical zoning method, high-risk facilities are ensured to be under more stringent protection, safety hazards are reduced, and the safety and manageability of the zoning are enhanced. The stepless physical protection facilities are set in the front area or outside the plant, so that these facilities can handle and respond more quickly in the event of an emergency, optimize resource allocation, and improve emergency response efficiency. Through scientific hierarchical evaluation of protection facilities and zoning settings based on the evaluation results, the influence of subjective factors is effectively reduced and the reliability of zoning settings is improved. Clear zoning and evaluation between functional areas will help strengthen coordination and linkage between regions, ensure that resources can be deployed and response measures can be taken quickly and effectively in an emergency, and further improve the overall safety level of the spent fuel reprocessing plant.
[0060] Specifically, the reprocessing plant area is equipped with facilities for handling radioactive materials, such as spent fuel storage pools and fuel reprocessing facilities. The three wastes plant area is equipped with facilities for handling wastes, such as wastewater treatment stations and waste gas treatment devices. The public utility plant area is equipped with facilities for supporting services, such as power supply stations and control rooms. In the reprocessing plant area, the first-level physical protection facilities (such as spent fuel storage pools) are set up in critical areas, the second-level physical protection facilities (such as fuel reprocessing facilities) are set up in protection areas, and the third-level physical protection facilities (such as auxiliary equipment) are set up in control areas. In the three wastes plant area, the first-level physical protection facilities (such as wastewater treatment stations) are set up in critical areas, the second-level physical protection facilities (such as waste gas treatment devices) are set up in protection areas, and the third-level physical protection facilities (such as waste storage facilities) are set up in control areas. In the public utility plant area, the first-level physical protection facilities (such as power supply stations) are set up in critical areas, the second-level physical protection facilities (such as control rooms) are set up in protection areas, and the third-level physical protection facilities (such as office areas) are set up in control areas. The non-step physical protection facilities (such as visitor reception centers) are set up in the front area of the plant.
[0061] In some embodiments, the step of performing a graded assessment on multiple radioactive material protection facilities includes:
[0062] A scoring system is established to set score ranges for the first-level physical protection facilities, second-level physical protection facilities, and third-level physical protection facilities in the reprocessing plant area. It is assumed that the score range for the first-level physical protection facilities is not less than 4.5 points, the score range for the second-level physical protection facilities is greater than or equal to 3 points and less than 4.5 points, and the score range for the third-level physical protection facilities is less than 3 points.
[0063] The weights and scores of various factors are defined according to their impact on the radioactive material protection facilities. The influencing factors include the type and quantity of radioactive materials, the complexity of the process flow, the frequency of personnel activities, environmental monitoring data and historical accident records. Assume that the weight of the type and quantity of radioactive materials is 50%, the weight of the complexity of the process flow is 20%, the weight of the frequency of personnel activities is 15%, the weight of environmental monitoring data is 10%, and the weight of historical accident records is 5%.
[0064] Each factor is scored, and the scores of each factor are summed up to obtain a comprehensive score. The comprehensive score is compared with the score range to obtain the physical protection facility level corresponding to various radioactive material protection facilities. Assuming the scoring standard is 0-5 points, the score of each factor is multiplied by its weight and summed up to obtain a comprehensive score.
[0065] A score range is set for the primary, secondary and tertiary physical protection facilities in the reprocessing plant area. The comprehensive score is compared with the set score range to determine the level of the radioactive material protection facility. For example, if a facility has a comprehensive score of 4.8 points, it is a primary physical protection facility.
[0066] By conducting a scientific hierarchical assessment of the protection facilities and setting up zoning according to the assessment results, the influence of subjective factors is effectively reduced and the reliability of the zoning setting is improved. By establishing a scoring system, different types of protection facilities are graded and subdivided into zones, and a more accurate nuclear safety protection system is established to ensure that resources can be deployed and response measures can be taken quickly and effectively in emergencies. The clear zoning and assessment between functional areas will help strengthen coordination and linkage between regions, ensure that resources can be deployed and response measures can be taken quickly and effectively in emergencies, and further improve the overall safety level of the spent fuel reprocessing plant.
[0067] In some embodiments, the multiple factors include the type and quantity of radioactive materials, the complexity of the process flow, the frequency of personnel activities, environmental monitoring data, and historical accident records. In this embodiment, the weight of the type and quantity of radioactive materials is 50%, the weight of the complexity of the process flow is 20%, the weight of the frequency of personnel activities is 15%, the weight of environmental monitoring data is 10%, and the weight of historical accident records is 5%. Of course, in other embodiments, the weights can also be set to other values, mainly based on actual conditions, to improve the universality and flexibility of the zoning method and adapt to a variety of different post-processing plants.
[0068] It should be noted that the above embodiment only describes the steps of graded evaluation of multiple radioactive material protection facilities. The steps of graded evaluation of multiple waste protection facilities and multiple public protection facilities are the same as the steps of graded evaluation of multiple radioactive material protection facilities, and the multiple factors are also the same, which can be the type and quantity of radioactive materials, the complexity of the process flow, the frequency of personnel activities, environmental monitoring data, and historical accident records. The weights of various factors in waste protection facilities and public protection facilities can be set to be the same or different, and can be preset according to actual conditions to adapt to post-processing plants in different situations.
[0069] The calculation formula for the comprehensive score is:
[0070] S=w1×P+w2×C+w3×F+w4×E+w5×H;
[0071] Among them, S is the comprehensive score; w1, w2, w3, w4, and w5 are the weights of each factor; P is the score for the type and quantity of radioactive materials; C is the score for the complexity of the process; F is the score for the frequency of personnel activities; E is the score for environmental monitoring data; and H is the score for historical accident records.
[0072] Furthermore, the calculation formula for the score of the type and quantity of radioactive substances is:
[0073]
[0074] Where P is the score of the type and quantity of radioactive substances; Q i is the amount of the ith radioactive substance; R i is the radioactivity level of the ith radioactive material. For example, the radioactivity level can be divided into high level, medium level and low level. The high level is 5 points, the medium level is 3 points, and the low level is 1 point. n is the number of types of radioactive materials.
[0075] The calculation formula for the process complexity score is:
[0076]
[0077] Where C is the score of process complexity. j is the complexity weight of the jth process flow. For example, the complexity level may include complex, medium, and simple. Complex is 5 points, medium is 3 points, and simple is 1 point. j is the operational difficulty of the jth process flow. For example, the operational difficulty can include high difficulty, medium difficulty and low difficulty. High difficulty is 5 points, medium difficulty is 3 points, and low difficulty is 1 point. m is the number of process flows. The complexity score of the process flow in the area is obtained by multiplying the complexity weight of each process flow by its operational difficulty and taking the average value.
[0078] The calculation formula for the score of personnel activity frequency is:
[0079]
[0080] Among them, F is the score of the frequency of personnel activities. k is the frequency of the k-th activity. For example, the frequency level can be divided into high frequency, medium frequency and low frequency. High frequency is 5 points, medium frequency is 3 points, and low frequency is 1 point. k is the type of the kth activity. For example, the types of activities can be divided into key activities, general activities, and other activities. Key activities are 5 points, general activities are 3 points, and other activities are 1 point. t is the number of activity types. The frequency score of personnel activities in the area is obtained by multiplying the frequency of each activity by its type weight and taking the average.
[0081] The calculation formula for the score of environmental monitoring data is:
[0082]
[0083] Where E is the score of environmental monitoring data. lIt is the risk level of the first monitoring data. The risk level can include high-level risk, medium-level risk and low-level risk. The high-level risk is 5 points, the medium-level risk is 3 points, and the low-level risk is 1 point. l is the rate of change of the lth monitoring data, which can include a large change with a score of 5, a medium change with a score of 3, and a small change with a score of 1. p is the number of monitoring data items. The environmental monitoring data score of the area is obtained by multiplying the risk level of each monitoring data item by its rate of change and taking the average value.
[0084] The calculation formula for the score of historical accident records is:
[0085]
[0086] Where H is the score of historical accident records. m S is the severity of the mth accident, which can be divided into severe, moderate and minor. Severity is 5 points, moderate is 3 points and minor is 1 point. m is the frequency of the mth accident. The frequency of accidents can be divided into frequent, general and rare. Frequent is 5 points, general is 3 points, and rare is 1 point. q is the number of historical accidents. The historical accident record score of the area is obtained by multiplying the severity of each accident by its frequency and taking the average value.
[0087] In some embodiments, the step of revising the partition results of the determined physical protection facilities according to the facility process function requirements includes:
[0088] According to the process function requirements of the facilities, the functional importance of the process facilities and the utilization rate of the process facilities are scored separately.
[0089] First, the functional importance of each process facility is scored. The functional importance score is based on the criticality of the facility in the entire process flow. For example, if a process facility is indispensable, the score should be high; conversely, if it is a secondary auxiliary facility, the score should be low. Second, the frequency of use of the process facility is scored. The frequency of use score is based on how often the facility is used. For example, frequently used facilities should be scored high, while facilities that are used occasionally should be scored low.
[0090] According to the number of process facilities, the scores of the process facilities are summed and averaged to obtain the process score of the process function requirement. According to the number of process facilities, the function importance score and the frequency of use score of each process facility are summed and averaged to obtain the process score of the process function requirement.
[0091] Assign a weight to the process score, and sum the weighted process score with the comprehensive score to get the revised score.
[0092] Compare the revised score with the score range and revise the physical protection facility level corresponding to the radioactive material protection facility.
[0093] The process scores obtained above are given a certain weight, and the importance of the scores in the overall partition is comprehensively considered. The weight is set as Wc.
[0094] Add the weighted value of the process score to the previously obtained comprehensive score S to obtain the revised score S'. The formula is: S' = S + Wc × process score
[0095] Finally, the revised score S' is compared with the pre-set score range to revise the physical protection facility level corresponding to the radioactive material protection facility.
[0096] For example: the air supply / exhaust facilities themselves have no physical protection classification, but considering the needs of the service process system, the air supply / exhaust facilities need to be arranged around the service object. Accordingly, the modified layout position improves the zoning level of the air supply / exhaust facilities, which not only meets the operation and management needs of the spent fuel reprocessing plant, but also meets the requirements of the physical protection classification and zoning of nuclear facilities. The zoning level of the air supply / exhaust facilities depends on the zoning level of the service object.
[0097] This embodiment ensures the scientificity and rationality of the physical protection zoning setting by calculating the comprehensive score and modifying the process function requirements. This method avoids the subjectivity of the traditional zoning method, enhances the flexibility and reliability of the zoning setting, and thus effectively improves the safety management level and accident prevention capability of the post-processing plant.
[0098] The embodiment of the present application also provides a post-processing plant physical protection partition device, including:
[0099] The structural partitioning module is used to divide the post-processing plant into the front area, the plant area and the outside area according to the building structure of the post-processing plant. This module divides the plant area into the front area, the plant area and the outside area according to the building structure of the post-processing plant. The structural partitioning module identifies the function and location of each area by analyzing the layout of the plant building, and performs preliminary regional division. This division is mainly based on the physical structure and purpose of the building. For example, the office area and storage area are divided into the front area, the processing and production area are divided into the plant area, and the surrounding protection and monitoring area is divided into the outside area.
[0100] The functional zoning module is used to divide the plant area into a post-processing plant area, a three-waste plant area and a public facility plant area according to the different functions in the plant area. Radioactive material protection facilities are set in the post-processing plant area, waste protection facilities are set in the three-waste plant area, and public protection facilities are set in the public facility plant area. On the basis of the structural zoning, the functional zoning module is further divided in detail according to the different functions in the plant area. The plant area is divided into a post-processing plant area, a three-waste plant area and a public facility plant area: Post-processing plant area: specially used for processing radioactive materials, and equipped with radioactive material protection facilities. Three-waste plant area: used for processing waste, and equipped with waste protection facilities. Public facility plant area: used for the management of public facilities in the plant area, and equipped with public protection facilities. In each functional area, more detailed zoning is carried out according to the actual function and layout of the facilities.
[0101] The hierarchical assessment module is used to conduct hierarchical assessments on the various radioactive material protection facilities, the various waste protection facilities, and the various public protection facilities, and to place the radioactive material protection facilities in the corresponding sub-areas of the post-processing plant area, the waste protection facilities in the corresponding sub-areas of the three wastes plant area, and the public protection facilities in the corresponding sub-areas of the public facilities plant area according to the assessment results. This module is responsible for conducting hierarchical assessments on various radioactive material protection facilities, waste protection facilities, and public protection facilities. The assessment process includes establishing a scoring system, defining weights and scores for various assessment factors, scoring each facility, calculating a comprehensive score, and determining the protection level of the facility based on the score range. The hierarchical assessment ensures that each facility is evaluated scientifically and objectively to prevent excessive or insufficient protective measures.
[0102] The correction module is used to revise the determined physical protection facility zoning results according to the process function requirements of the facilities. The correction module adjusts and optimizes the zoning results according to the actual process flow and operation requirements to ensure that the zoning meets the safety requirements and does not affect normal production and operation. The correction process includes scoring the functional importance and frequency of use of the process facilities, comparing the revised score with the comprehensive score, and finally determining the protection level of the facility based on the score range.
[0103] It can be seen that the method of the embodiment of the present application can bring the following beneficial effects:
[0104] Through the structural zoning and functional zoning modules, the building layout and actual functions are used to carry out scientific and reasonable regional division, avoiding the problems of strong subjectivity and poor flexibility in traditional methods. The hierarchical assessment module adopts a multi-factor comprehensive assessment method to ensure that the assessment of each facility is scientific and objective, and to improve the reliability and effectiveness of the assessment results. Enhanced flexibility and adaptability: Through the correction module, the zoning results are dynamically adjusted according to the actual process requirements to ensure that the zoning results not only meet the safety requirements, but also can adapt to the needs of production and operation. The dynamic adjustment mechanism makes the zoning setting more flexible, can respond to production changes and safety needs in a timely manner, and improve the overall safety management level of the post-processing plant. The calculation method of the comprehensive score and the revised score ensures that each facility can get the appropriate protection level to avoid excessive or insufficient protection. Through scientific and reasonable zoning and assessment methods, the interference of human factors is reduced, the scientificity and reliability of safety protection are improved, and the safety management level of the post-processing plant is significantly improved.
[0105] Corresponding to the above method embodiment, the embodiment of the present invention further provides a computer device. The computer device described below and the post-processing plant physical protection zoning method described above can refer to each other.
[0106] The computer equipment includes:
[0107] Memory for storing computer programs;
[0108] The processor is used to implement the steps of the physical protection zoning method for a post-processing plant in the above method embodiment when executing a computer program:
[0109] S1. According to the building structure of the post-processing plant, the post-processing plant is divided into the front area, the plant area and the outside area;
[0110] S2. According to the different functions of the plant area, the plant area is divided into a post-processing plant area, a three-waste plant area and a public facility plant area. Radioactive material protection facilities are set up in the post-processing plant area, waste protection facilities are set up in the three-waste plant area, and public protection facilities are set up in the public facility plant area;
[0111] S3. Conduct graded assessments on various radioactive material protection facilities, various waste protection facilities and various public protection facilities, and install radioactive material protection facilities in corresponding zones of the reprocessing plant area, waste protection facilities in corresponding zones of the three wastes plant area and public protection facilities in corresponding zones of the public facilities plant area according to the assessment results;
[0112] S4. Based on the technological and functional requirements of the facilities, the determined physical protection facility zoning results shall be revised.
[0113] Figure 3A schematic diagram of the structure of a computer device provided in an embodiment of the present application, which may be a computing device with data processing capabilities.
[0114] The device may include: a processor 301 and a memory 302 .
[0115] The memory 302 is used to store programs, and the processor 301 calls the programs stored in the memory 302 to execute the above method embodiment. The specific implementation method and technical effect are similar and will not be repeated here.
[0116] The memory 302 stores program codes, and when the program codes are executed by the processor 301, the processor 301 executes various steps of the method according to various exemplary embodiments of the present application described in the above “Exemplary Method” section of this specification.
[0117] The processor 301 may be a general-purpose processor, such as a central processing unit (CPU), a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a field programmable gate array (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components, and may implement or execute the methods, steps and logic block diagrams disclosed in the embodiments of the present application. A general-purpose processor may be a microprocessor or any conventional processor, etc. The steps of the method disclosed in the embodiments of the present application may be directly embodied as being executed by a hardware processor, or may be executed by a combination of hardware and software modules in the processor.
[0118] As a non-volatile storage medium, the memory 302 can be used to store non-volatile software programs, non-volatile computer executable programs and modules. The memory may include at least one type of storage medium, such as flash memory, hard disk, multimedia card, card-type memory, random access memory (R andom Access Memory, RAM), static random access memory (Static Random Access Memory, SRAM), programmable read-only memory (ProgrammableRead Only Memory, PROM), read-only memory (Read Only Memory, ROM), electrically erasable programmable read-only memory (Elect rically Erasable Programmable Read-Only Memory, EEPROM), magnetic memory, disk, optical disk, etc. The memory is any other medium that can be used to carry or store the desired program code in the form of an instruction or data structure and can be accessed by a computer, but is not limited thereto. The memory 302 in the embodiment of the present application can also be a circuit or any other device that can realize a storage function, for storing program instructions and / or data.
[0119] Optionally, the present application also provides a program product, such as a storage medium, including a program, which is used to execute the above method embodiment when executed by a processor.
[0120] In the several embodiments provided in the present application, it should be understood that the disclosed devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0121] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0122] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of hardware plus software functional units.
[0123] The above-mentioned integrated unit implemented in the form of a software functional unit can be stored in a computer-readable storage medium. The above-mentioned software functional unit is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) or a processor (English: processor) to perform some steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (English: Read-Only Memo ry, abbreviated: ROM), random access memory (English: Random Access Memory, abbreviated: RAM), disk or optical disk and other media that can store program codes.
Claims
1. A physical protection zoning method for a post-processing plant, characterized in that: include: According to the building structure of the post-processing plant, the post-processing plant is divided into the front area, the plant area and the outside area; According to the different functions of the plant area, the plant area is divided into a post-processing plant area, a three-waste plant area and a public facility plant area. Radioactive material protection facilities are set in the post-processing plant area, waste protection facilities are set in the three-waste plant area, and public protection facilities are set in the public facility plant area; Conducting graded assessments on the various radioactive material protection facilities, the various waste protection facilities and the various public protection facilities respectively, and setting up the radioactive material protection facilities in the corresponding sub-areas of the post-processing plant area, the waste protection facilities in the corresponding sub-areas of the three wastes plant area and the public protection facilities in the corresponding sub-areas of the public facilities plant area according to the assessment results; Based on the process function requirements of the facilities, the determined physical protection facility zoning results are revised.
2. The post-processing plant physical protection zoning method according to claim 1 is characterized in that: The post-processing plant area, the three wastes plant area and the public utility plant area all include critical areas, protection areas and control areas; The assessment results of the radioactive material protection facilities, the waste protection facilities and the public protection facilities include first-level physical protection facilities, second-level physical protection facilities, third-level physical protection facilities and non-level physical protection facilities; Wherein, in the post-processing plant area, the first-level physical protection facilities are set in the critical area of the post-processing plant area, the second-level physical protection facilities are set in the protection area of the post-processing plant area, and the third-level physical protection facilities are set in the control area of the post-processing plant area; in the three-waste plant area, the first-level physical protection facilities are set in the critical area of the three-waste plant area, the second-level physical protection facilities are set in the protection area of the three-waste plant area, and the third-level physical protection facilities are set in the control area of the three-waste plant area; in the public utility plant area, the first-level physical protection facilities are set in the critical area of the public utility plant area, the second-level physical protection facilities are set in the protection area of the public utility plant area, and the third-level physical protection facilities are set in the control area of the public utility plant area; The stepless physical protection facility is arranged in the front area of the factory or the area outside the factory.
3. The post-processing plant physical protection zoning method according to claim 2 is characterized in that: The step of conducting a hierarchical assessment of the various radioactive material protection facilities comprises: Establishing a scoring system to set score ranges for level 1 physical protection facilities, level 2 physical protection facilities, and level 3 physical protection facilities in the reprocessing plant area; Defining weights and scores of the various factors according to their impact on the radioactive material protection facility; Each of the factors is scored, and the scores of each factor are summed up to obtain a comprehensive score, and the comprehensive score is compared with the score range to obtain the physical protection facility levels corresponding to the multiple radioactive material protection facilities.
4. The post-processing plant physical protection zoning method according to claim 3 is characterized in that: The various factors mentioned include the type and quantity of radioactive materials, the complexity of the process flow, the frequency of personnel activities, environmental monitoring data, and historical accident records.
5. The post-processing plant physical protection zoning method according to claim 4 is characterized in that: The calculation formula of the comprehensive score is: S=w1×P+w2×C+w3×F+w4×E+w5×H; Among them, S is the comprehensive score; w1, w2, w3, w4, and w5 are the weights of each factor; P is the score for the type and quantity of radioactive materials; C is the score for the complexity of the process; F is the score for the frequency of personnel activities; E is the score for environmental monitoring data; and H is the score for historical accident records.
6. The post-processing plant physical protection zoning method according to claim 5, characterized in that: The calculation formula for the score of the type and quantity of radioactive substances is: Where P is the score of the type and quantity of radioactive substances; Q i is the amount of the ith radioactive substance; R i is the radioactivity level of the ith radioactive material; n is the number of types of radioactive materials.
7. The post-processing plant physical protection zoning method according to claim 6 is characterized in that: The step of revising the partition results of the determined physical protection facilities according to the facility process function requirements includes: According to the process function requirements of the facilities, the functional importance of the process facilities and the utilization rate of the process facilities are scored respectively; According to the number of process facilities, the scores of the process facilities are summed and averaged to obtain the process score of the process function requirement; Assigning a weight to the process score, and summing the weighted process score with the comprehensive score to obtain a revised score; The revised score is compared with the score range to revise the physical protection facility level corresponding to the radioactive material protection facility.
8. A physical protection partition device for a post-processing plant, characterized in that: include: A structural partitioning module, used for dividing the post-processing plant into a front area, a plant area and an outside area according to the building structure of the post-processing plant; A functional zoning module is used to divide the plant area into a post-processing plant area, a three-waste plant area and a public facility plant area according to different functions in the plant area, wherein radioactive material protection facilities are set in the post-processing plant area, waste protection facilities are set in the three-waste plant area, and public protection facilities are set in the public facility plant area; a hierarchical assessment module, for respectively performing hierarchical assessments on the multiple radioactive material protection facilities, the multiple waste protection facilities, and the multiple public protection facilities, and setting the radioactive material protection facilities in corresponding sub-areas of the post-processing plant area, setting the waste protection facilities in corresponding sub-areas of the three waste plant area, and setting the public protection facilities in corresponding sub-areas of the public facility plant area according to the assessment results; The correction module is used to correct the partition results of the determined physical protection facilities according to the process function requirements of the facilities.
9. A computer device, characterized in that: include: A processor, a storage medium and a bus, wherein the storage medium stores program instructions executable by the processor, and when the device is running, the processor communicates with the storage medium via the bus, and the processor executes the program instructions to perform the steps of the post-processing plant physical protection zoning method as described in any one of claims 1 to 7.
10. A storage medium, characterized in that: The storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the post-processing plant physical protection zoning method as claimed in any one of claims 1 to 7 are executed.