Engineering cost scheme intelligent recommendation method and system, electronic equipment and storage medium

By screening and predicting relevant data of engineering projects, combining knowledge graphs and clustering analysis, customized engineering cost solutions are generated, which solves the problems of data redundancy and low accuracy in engineering costs, and improves user experience and project success rate.

CN119048182AInactive Publication Date: 2024-11-29GUANGZHOU YUFENG ENGINEERING CONSULTING CO LTD

Patent Information

Application Number
CN202411065461.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-05
Publication Date
2024-11-29
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During the project cost process, there is data redundancy, low cost accuracy, low efficiency, and lack of customized recommendations, resulting in poor engineering consulting experience.

Method used

By obtaining project information of the project, calculating correlation coefficients to filter target data, using random forest algorithm and support vector machine model to predict project demand information, combining knowledge graph matching and clustering analysis to generate customized cost schemes, and scoring based on project preference information and dynamic updates.

Benefits of technology

Reduce redundant data interference, improve cost prediction accuracy and user experience, ensure that the recommended solutions meet customer needs, and improve engineering consulting experience and project success rate.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119048182A_ABST
    Figure CN119048182A_ABST
Patent Text Reader

Abstract

The invention discloses an intelligent recommendation method for a project cost scheme. The method comprises the following steps: screening out target data of which a correlation coefficient meets a first preset condition from project information; performing feature extraction and selection on target data by adopting a random forest algorithm, inputting the target data to a support vector machine model to predict project demand information of an engineering project, matching the project demand information with a knowledge graph of the engineering project to generate target project information, and clustering the target project information with a historical engineering project case database, screening out a project cost recommendation scheme meeting a second preset condition; and constructing evaluation indexes, endowing different evaluation indexes with weights according to the project preference information, and determining a scheme with the highest score according to a weighting result of each evaluation index to obtain a target recommendation scheme. The project cost scheme is quickly recommended according to the project demand, the knowledge graph and the clustering analysis, and the optimal scheme is screened based on the project preference, so that the efficiency and accuracy of the project cost are improved, and the cost scheme can meet the project demand of a customer.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of engineering cost management, and in particular to an engineering cost scheme intelligent recommendation method, system, electronic equipment and storage medium. Background Art

[0002] In the consulting and management of engineering projects, engineering cost has always been a major problem. Due to the different types, needs, and scales of projects, the dynamic factors are diverse, and the massive amount of data involved, the engineering cost process is difficult and time-consuming. At present, there is a lack of effective processing and screening of data in the engineering cost process. There will be a large amount of redundant data in the cost process that interferes with the evaluation process, which in turn affects the cost efficiency and the accuracy of the plan. In addition, the existing methods are mostly based on manual experience evaluation, and can often only recommend general cost plans, lacking the function of customized recommendations. Therefore, the cost plan cannot meet the needs of different project customers, resulting in a poor engineering consulting experience. Summary of the invention

[0003] In order to solve at least one of the technical problems mentioned above, the present invention provides a method, system, electronic device and storage medium for intelligently recommending engineering cost solutions.

[0004] In a first aspect, the present invention provides a method for intelligently recommending a construction cost solution, the method comprising:

[0005] Acquire project information of the engineering project, including basic project data, historical engineering data and historical evaluation data; calculate the correlation coefficient between each data in the project information and the engineering cost, and select target data whose correlation coefficient meets the first preset condition;

[0006] Use the random forest algorithm to extract features from the target data, determine the target features based on the feature importance score, input the target features into the preset support vector machine model, predict the project demand information of the engineering project, and determine the project preference information based on the project demand information;

[0007] Match the project demand information with the knowledge graph of the engineering project to generate the target project information; perform cluster analysis on the target project information and the historical engineering project case database, select the engineering cost recommendation scheme that meets the second preset condition according to the clustering results, and generate a recommended engineering cost scheme list;

[0008] Construct evaluation indicators, assign weights to different evaluation indicators according to project preference information, determine the highest-scoring plan in the recommended list of engineering cost plans based on the weighted results of each evaluation indicator, and obtain the target recommended plan for engineering cost.

[0009] Preferably, after obtaining the target recommended solution for the project cost, the target recommended solution is also dynamically updated, including:

[0010] Identify the cost planning scheme and engineering schedule planning scheme from the target recommended scheme;

[0011] Determine the critical path of the construction plan based on the project progress planning plan, and obtain the corresponding actual construction data when it is detected that the actual construction status enters any node of the critical path;

[0012] Extract features from actual construction data to obtain material cost, labor cost and construction efficiency; calculate cost growth rate based on material cost and labor cost; determine progress deviation based on construction efficiency;

[0013] Calculate the correlation between cost and progress, input the correlation between cost and progress, cost growth rate and progress deviation into the preset LSTM model, and predict the changing trend of various types of costs in the cost planning scheme; dynamically update the target recommendation scheme according to the changing trend of various types of costs.

[0014] Preferably, the correlation between the calculation cost and the progress includes:

[0015]

[0016] In the formula, C j , P j Represent the cost data and progress data at the jth time point, respectively. A total of m time points were collected. Respectively represent the average cost and average progress at m time points; r cp Indicates the correlation between cost and schedule.

[0017] Preferably, matching the project demand information with the knowledge graph of the engineering project to generate target project information includes:

[0018] Calculate the matching degree between project requirement information and knowledge graph:

[0019]

[0020] In the formula, s represents the matching degree between project demand information and knowledge graph, n represents the data feature type of project demand information, and x i Represents the semantic information of the i-th type of feature in the project requirement information, y i Represents the semantic information of the i-th type of feature in the knowledge graph;

[0021] The project demand information with a matching degree greater than a preset threshold is filtered out as the target project information.

[0022] In a second aspect, the present invention further provides an intelligent recommendation system for engineering cost solutions, the system comprising:

[0023] The project information acquisition unit is used to acquire the project information of the engineering project, including basic project data, historical engineering data and historical evaluation data; calculate the correlation coefficient between each data in the project information and the engineering cost, and select the target data whose correlation coefficient meets the first preset condition;

[0024] The project demand prediction unit is used to extract features from target data using a random forest algorithm, determine target features based on feature importance scores, input the target features into a preset support vector machine model, predict project demand information for the engineering project, and determine project preference information based on the project demand information;

[0025] The project cluster analysis unit is used to match the project demand information with the knowledge graph of the engineering project to generate target project information; perform cluster analysis on the target project information and the historical engineering project case database, screen out the engineering cost recommendation scheme that meets the second preset condition according to the clustering result, and generate a recommended list of engineering cost schemes;

[0026] The target solution recommendation unit is used to construct evaluation indicators, assign weights to different evaluation indicators according to project preference information, determine the highest-scoring solution in the engineering cost solution recommendation list according to the weighted results of each evaluation indicator, and obtain the target recommended solution for the engineering cost.

[0027] Preferably, the engineering cost scheme intelligent recommendation system further includes a target scheme updating unit, which is used to dynamically update the target recommended scheme, including:

[0028] Identify the cost planning scheme and engineering schedule planning scheme from the target recommended scheme;

[0029] Determine the critical path of the construction plan based on the project progress planning plan, and obtain the corresponding actual construction data when it is detected that the actual construction status enters any node of the critical path;

[0030] Extract features from actual construction data to obtain material cost, labor cost and construction efficiency; calculate cost growth rate based on material cost and labor cost; determine progress deviation based on construction efficiency;

[0031] Calculate the correlation between cost and progress, input the correlation between cost and progress, cost growth rate and progress deviation into the preset LSTM model, and predict the changing trend of various types of costs in the cost planning scheme; dynamically update the target recommendation scheme according to the changing trend of various types of costs.

[0032] Preferably, the correlation between the calculation cost and the progress includes:

[0033]

[0034] In the formula, C j , P j Represent the cost data and progress data at the jth time point, respectively. A total of m time points were collected. Respectively represent the average cost and average progress at m time points; r cp Indicates the correlation between cost and schedule.

[0035] Preferably, the project cluster analysis unit is further used for:

[0036] Calculate the matching degree between project requirement information and knowledge graph:

[0037]

[0038] In the formula, s represents the matching degree between project demand information and knowledge graph, n represents the data feature type of project demand information, and x i Represents the semantic information of the i-th type of feature in the project requirement information, y i Represents the semantic information of the i-th type of feature in the knowledge graph;

[0039] The project demand information with a matching degree greater than a preset threshold is filtered out as the target project information.

[0040] In a third aspect, the present invention further provides an electronic device comprising a processor and a memory, wherein the memory is used to store computer program code, and the computer program code comprises computer instructions. When the processor executes the computer instructions, the electronic device executes the method as described in the first aspect above and any possible implementation thereof.

[0041] In a fourth aspect, the present invention further provides a computer-readable storage medium, wherein a computer program is stored in the computer-readable storage medium, wherein the computer program includes program instructions, and when the program instructions are executed by a processor of an electronic device, the processor executes the method as described in the first aspect above and any possible implementation thereof.

[0042] Compared with the prior art, the present invention has the following beneficial effects:

[0043] 1) The present invention collects basic project data, historical engineering data and historical evaluation data, and screens target data closely related to project cost by calculating correlation coefficients. By screening massive data, the interference of redundant data can be reduced, the amount of calculation can be reduced, and the operation efficiency can be accelerated. At the same time, this method can ensure that the model used for prediction contains only the most relevant variables, thereby improving the prediction accuracy of the model in predicting project demand.

[0044] 2) The present invention utilizes the random forest algorithm to extract features from the target data, and performs feature selection according to feature importance to determine target features with high importance, which can reduce the situation where irrelevant features interfere with model prediction; by inputting the target features into a preset support vector machine model, the project requirement information of the engineering project can be quickly predicted, and the project preference information can be determined based on the project requirement information. Based on the project requirement information, the cost plan can be matched to better meet the customer's project needs, thereby enhancing the user's engineering consulting experience.

[0045] 3) After obtaining the project demand information, the present invention will match it with the knowledge graph of the engineering project, generate the target project information, perform cluster analysis on the target project information and the historical engineering project case database, screen out the recommended engineering cost scheme that meets the second preset condition according to the clustering results, and generate a recommended engineering cost scheme list; through knowledge graph matching, key information can be extracted during clustering to reduce the amount of data for clustering operations, and through cluster analysis, historical engineering project cases with high similarity to the current project can be found, thereby more accurately recommending engineering cost schemes.

[0046] 4) After obtaining multiple engineering cost solutions, the present invention will construct evaluation indicators based on project preference information and score the engineering cost solutions. This ensures that the final recommended engineering cost solution is more in line with the customer's specific preferences and needs, and improves the engineering cost consulting experience.

[0047] It is to be understood that both the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the disclosure. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the background technology, the drawings required for use in the embodiments of the present invention or the background technology will be described below.

[0049] The drawings herein are incorporated into the specification and constitute a part of the specification. These drawings illustrate embodiments consistent with the present disclosure and are used to illustrate the technical solutions of the present disclosure together with the specification.

[0050] Figure 1 A schematic diagram of a process flow of an intelligent recommendation method for a project cost solution provided by an embodiment of the present invention;

[0051] Figure 2 A schematic diagram of a flow chart of an intelligent recommendation method for a project cost solution provided by another embodiment of the present invention;

[0052] Figure 3 A schematic diagram of the structure of an intelligent recommendation system for engineering cost solutions provided by an embodiment of the present invention;

[0053] Figure 4 A schematic diagram of the structure of an intelligent recommendation system for engineering cost solutions provided in another embodiment of the present invention. DETAILED DESCRIPTION

[0054] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0055] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present invention. The appearance of the phrase in various places in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.

[0056] The current engineering cost process still has problems such as data redundancy, low cost accuracy, low efficiency, lack of customized recommendations, etc. To this end, the present invention aims to provide an intelligent recommendation method for engineering cost solutions, which can comprehensively recommend the best cost solution through knowledge graph matching, cluster analysis and index evaluation in combination with the project requirements of engineering project customers, so as to enhance the customer's engineering consulting experience.

[0057] See also Figure 1 , Figure 1 The following is a flow chart of a method for intelligently recommending a construction cost solution according to an embodiment of the present invention. Figure 1 As shown, the method includes:

[0058] S10, obtaining project information of the engineering project, including basic project data, historical engineering data and historical evaluation data; calculating the correlation coefficient between each data in the project information and the engineering cost, and screening out target data whose correlation coefficient meets the first preset condition.

[0059] It should be noted that the data of engineering projects is usually massive. The data included in the basic project data, historical engineering data and historical evaluation data are as follows:

[0060] Basic project data: project name, location, scale, type (e.g. residential, commercial, industrial, etc.); project design drawings, technical specifications, material specifications, etc.; information of construction units, design units, supervision units and other participating parties; estimated start and end dates of the project; and other data directly related to the project.

[0061] Historical project data: cost information of similar projects; construction progress, change records, completion settlement, etc. of past projects; historical price trends of materials and equipment used; contract documents and payment records of historical projects.

[0062] Historical evaluation data: customer satisfaction survey results; performance evaluation of construction units and design units; problems and solutions in the project management process.

[0063] After obtaining these project information, it is necessary to process these data. First, outliers can be removed, missing values ​​can be filled, etc., to complete data cleaning. In order to facilitate subsequent calculations, the data format is usually normalized and converted into a form that is easy to calculate. Since the data involved is massive and not all data are related to the project cost, the present embodiment will calculate the correlation coefficient between each data in the processed project information and the project cost, preferably using the Pearson correlation coefficient for calculation. Meeting the first preset condition can be achieved by setting a threshold value, thereby determining the relationship between the calculated correlation coefficient and the threshold value. The threshold value can be set according to project requirements and data analysis results, so that target data with high correlation that meets the conditions can be screened out according to the threshold value.

[0064] Therefore, this embodiment ensures that the data used for prediction has a high relevance through a strict screening process, thereby improving the accuracy of the prediction model in predicting project demand. By screening and using high-quality data, the noise in the model is reduced, making the model more reliable. Through correlation analysis, it is helpful to identify which factors have a significant impact on the project cost, so as to better manage and control costs and improve the calculation efficiency of the project cost.

[0065] S20. Use the random forest algorithm to extract features from the target data, determine the target features based on the feature importance scores, input the target features into a preset support vector machine model, predict the project demand information of the engineering project, and determine the project preference information based on the project demand information.

[0066] In the previous step, the target data with a strong correlation with the project cost has been screened out. In this step, feature extraction and model prediction are further performed. Random forest is an ensemble learning method composed of multiple decision trees, which can be used to handle classification and regression tasks. Here, the random forest algorithm is preferably used to extract features from the target data, so that the importance score of each feature can be output. According to the feature importance score output by the random forest, several features with the highest scores are selected as target features. The number of selected features can be adjusted according to actual conditions, but usually those features with significantly higher scores than other features are selected. Feature selection through the random forest algorithm helps to identify which features are most critical to the prediction results.

[0067] Furthermore, the target features are input into the preset support vector machine model to predict the project demand information of the engineering project. SVM is a supervised learning model that is good at handling classification and regression problems. During the training process, SVM attempts to find an optimal hyperplane to maximize the interval between different categories. In the historical training process, it is also necessary to train SVM based on a large number of target features involved in historical engineering cases to predict project requirements, and continuously iterate the training until the prediction accuracy of the model can meet the requirements. When applied, it is only necessary to input the target features into the preset support vector machine model to quickly and accurately predict the project demand information of the engineering project. The project demand information may include but is not limited to construction period forecasting, cost estimation, material requirements, etc. This information will serve as the basis for determining project preference information. That is, based on the project demand information, the project preference information can be further determined, such as cost budget, time schedule, quality requirements, etc. Project preference information reflects the customer's expectations for the project and can be used to guide the project implementation plan and resource allocation.

[0068] Therefore, this embodiment uses the random forest algorithm to perform feature selection, which can effectively improve the prediction accuracy of the SVM model, because the model only focuses on the most important features. Feature selection reduces the complexity of the model, helps to reduce the occurrence of overfitting, and makes the model more robust on new data. By inputting the target features into the preset support vector machine model, the project demand information of the engineering project can be quickly predicted, and the project preference information can be determined based on the project demand information. Based on the project demand information, when matching the cost plan, it can better meet the customer's project needs, thereby enhancing the user's engineering consulting experience and improving the success rate of the project.

[0069] S30. Match the project demand information with the knowledge graph of the engineering project to generate target project information; perform cluster analysis on the target project information and the historical engineering project case database, screen out the recommended engineering cost schemes that meet the second preset condition based on the clustering results, and generate a recommended engineering cost scheme list.

[0070] First, this embodiment will build a knowledge graph containing project-related entities, attributes, and relationships based on the existing project information. Entities may include project types, building materials, engineering standards, etc.; attributes may include cost, duration, quality grade, etc.; relationships may involve associations between entities, such as a certain material is suitable for a certain type of project. Then, key information is extracted from the project requirements document, such as project scale, expected cost, duration requirements, etc. Natural language processing technology is usually used to automatically extract this information. Finally, a graph matching process is performed, using the knowledge graph query language or graph database query function to map the project requirements information to the relevant entities and attributes in the knowledge graph. Through the graph matching algorithm, the entity combination that best matches the project requirements is found to generate the target project information.

[0071] In a preferred embodiment, matching the project demand information with the knowledge graph of the engineering project to generate target project information includes:

[0072] Calculate the matching degree between project requirement information and knowledge graph:

[0073]

[0074] In the formula, S represents the matching degree between project demand information and knowledge graph, n represents the data feature type of project demand information, and x i Represents the semantic information of the i-th type of feature in the project requirement information, y i Represents the semantic information of the i-th type of feature in the knowledge graph;

[0075] The project demand information with a matching degree greater than a preset threshold is filtered out as the target project information.

[0076] The semantic information matching method can help quickly identify the knowledge points that best match the project requirements, thereby reducing the time of searching for suitable solutions in a large amount of unrelated information and improving the decision-making efficiency during cluster analysis.

[0077] Furthermore, clustering analysis mainly uses clustering algorithms, such as K-means, DBSCAN algorithm, etc., to cluster historical cases based on the extracted target project information. The purpose is to classify similar engineering projects into one category so as to find a collection of cases that are most similar to the current project requirements. According to the clustering results, the cases that meet the second preset condition are screened out. The second preset condition can be a combination of one or more factors such as cost range, construction period limit, project scale, etc. For example, the cost range and construction period limit can be considered at the same time, and the closest historical cases can be screened out, so as to refer to their engineering cost plan to plan the cost plan for the current project.

[0078] After obtaining the project demand information, this embodiment can quickly generate the target project information by matching it with the knowledge graph of the engineering project, perform cluster analysis on the target project information and the historical engineering project case database, screen out the recommended engineering cost schemes that meet the second preset condition based on the clustering results, and generate a recommended engineering cost scheme list; through knowledge graph matching, key information can be extracted during clustering to reduce the amount of data for clustering operations, and through cluster analysis, historical engineering project cases with a high degree of similarity to the current project can be found, thereby more accurately recommending engineering cost schemes.

[0079] S40, constructing evaluation indicators, assigning weights to different evaluation indicators according to project preference information, determining the highest-scoring plan in the engineering cost plan recommendation list according to the weighted results of each evaluation indicator, and obtaining a target recommended plan for the engineering cost.

[0080] First, a comprehensive and specific evaluation index system needs to be defined. These indicators should cover key aspects of the engineering cost plan, such as cost, time, quality, safety, sustainability, etc. For example, cost-effectiveness ratio, construction cycle, technical feasibility, material quality, energy efficiency, environmental impact, regulatory compliance, safety performance, maintenance convenience, etc.

[0081] Furthermore, understand the importance of the above indicators to the customers from the project preference information and assign a weight to each evaluation indicator. The weight can be in the form of a percentage, and the sum of the weights of all indicators should be equal to 100%. The higher the weight, the more the project preference attaches importance to the indicator. For example, three evaluation indicators can be used: cost-effectiveness ratio, construction period, and technical feasibility, and they are weighted 40%, 30%, and 30% respectively according to customer preferences. Then calculate the weighted scores of different schemes on these three indicators in the recommended list of engineering cost schemes, and take the scheme with the highest score as the target recommendation scheme.

[0082] Therefore, after obtaining multiple engineering cost solutions, this embodiment will construct evaluation indicators based on project preference information and score the engineering cost solutions. This can ensure that the final recommended engineering cost solution is more in line with the customer's specific preferences and needs, improve the engineering cost consulting experience and increase the project success rate.

[0083] It is understandable that the above embodiment considers the situation in the process of one-time construction cost. In actual application, since the construction cost will change with external factors including weather, market cost, construction progress, etc., it is necessary to provide a method for dynamically updating the construction cost to match the actual construction project and market factors to ensure the rationality and reliability of the solution.

[0084] See also Figure 2In one embodiment, after obtaining the target recommended solution for the project cost, the method further includes step S50 of dynamically updating the target recommended solution, including:

[0085] S501. Identify a cost planning scheme and a project schedule planning scheme from the target recommended schemes.

[0086] Extract the parts related to cost and schedule based on the target recommendation plan. The cost planning plan may include information such as expected cost and cost allocation; the project schedule planning plan may include expected completion time and milestones of each stage.

[0087] S502: Determine the critical path of the construction plan based on the project progress planning plan, and when it is detected that the actual construction status enters any node of the critical path, obtain the corresponding actual construction data.

[0088] Use project management tools such as CPM and critical path method to determine the critical path of the construction plan. The critical path refers to a collection of activities in the project that determine the shortest completion time of the project. When the actual construction status is detected to enter any node of the critical path, the corresponding actual construction data is recorded and obtained.

[0089] S503. Extract features from actual construction data to obtain material cost, labor cost and construction efficiency; calculate cost growth rate based on material cost and labor cost; and determine progress deviation based on construction efficiency.

[0090] The details are as follows:

[0091] Material Cost: Collect and calculate the actual cost of materials used.

[0092] Labor cost: record the actual labor cost consumed.

[0093] Construction efficiency: Construction efficiency is measured based on the ratio of work completed to expected work.

[0094] Cost growth rate: Calculate the cost growth rate based on material cost and labor cost.

[0095] Schedule deviation: Determine the deviation between actual progress and planned progress based on construction efficiency.

[0096] S504. Calculate the correlation between cost and progress, input the correlation between cost and progress, cost growth rate and progress deviation into the preset LSTM model, and predict the changing trend of various types of costs in the cost planning scheme; dynamically update the target recommendation scheme according to the changing trend of various types of costs.

[0097] Preferably, the correlation between the calculation cost and the progress includes:

[0098]

[0099] In the formula, C j , P j Represent the cost data and progress data at the jth time point, respectively. A total of m time points were collected. Respectively represent the average cost and average progress at m time points; r cp Indicates the correlation between cost and schedule.

[0100] Furthermore, the correlation between cost and schedule, cost growth rate and schedule deviation are input into the preset LSTM model to predict the changing trend of each type of cost in the cost planning scheme, and the cost plan is adjusted dynamically according to the predicted cost change trend. For example, analyze the prediction results to determine which types of costs may increase or decrease. For types where the cost is predicted to increase, consider increasing the budget or looking for alternatives. For types where the cost is predicted to decrease, consider optimizing the cost structure or reallocating the budget. Finally, based on the adjusted cost planning scheme, update the target recommendation plan for the project cost to achieve dynamic update.

[0101] Therefore, this embodiment can effectively identify the changing trends of costs and schedules through real-time monitoring and prediction mechanisms, so as to take timely measures to make adjustments. By calculating the correlation between cost and schedule, we can better understand the interaction between the two, which helps to coordinate cost and schedule management. The LSTM model is used to predict the trend of cost changes, which improves the accuracy of the prediction. The cost planning scheme is dynamically adjusted according to the prediction results to ensure the rationality and reliability of the cost plan, making it more in line with the actual situation, and improving the economic benefits of the project while ensuring proper control of project costs.

[0102] See also Figure 3 In one embodiment, the present invention further provides an intelligent recommendation system for engineering cost solutions, the system comprising:

[0103] The project information acquisition unit 100 is used to acquire the project information of the engineering project, including basic project data, historical engineering data and historical evaluation data; calculate the correlation coefficient between each data in the project information and the engineering cost, and select the target data whose correlation coefficient meets the first preset condition;

[0104] The project demand prediction unit 200 is used to extract features from target data using a random forest algorithm, determine target features according to feature importance scores, input the target features into a preset support vector machine model, predict project demand information for the engineering project, and determine project preference information based on the project demand information;

[0105] The project cluster analysis unit 300 is used to match the project demand information with the knowledge graph of the engineering project to generate target project information; perform cluster analysis on the target project information and the historical engineering project case database, filter out the engineering cost recommendation scheme that meets the second preset condition according to the clustering result, and generate a recommended engineering cost scheme list;

[0106] The target solution recommendation unit 400 is used to construct evaluation indicators, assign weights to different evaluation indicators according to project preference information, determine the highest-scoring solution in the engineering cost solution recommendation list according to the weighted results of each evaluation indicator, and obtain the target recommended solution for the engineering cost.

[0107] See also Figure 4 In one embodiment, the engineering cost solution intelligent recommendation system further includes a target solution updating unit 500, which is used to dynamically update the target recommendation solution, including:

[0108] Identify the cost planning scheme and engineering schedule planning scheme from the target recommended scheme;

[0109] Determine the critical path of the construction plan based on the project progress planning plan, and obtain the corresponding actual construction data when it is detected that the actual construction status enters any node of the critical path;

[0110] Extract features from actual construction data to obtain material cost, labor cost and construction efficiency; calculate cost growth rate based on material cost and labor cost; determine progress deviation based on construction efficiency;

[0111] Calculate the correlation between cost and progress, input the correlation between cost and progress, cost growth rate and progress deviation into the preset LSTM model, and predict the changing trend of various types of costs in the cost planning scheme; dynamically update the target recommendation scheme according to the changing trend of various types of costs.

[0112] In one embodiment, the correlation between the calculation cost and the progress includes:

[0113]

[0114] In the formula, C j , P j Represent the cost data and progress data at the jth time point, respectively. A total of m time points were collected. Respectively represent the average cost and average progress at m time points; r cp Indicates the correlation between cost and schedule.

[0115] In one embodiment, the project cluster analysis unit 300 is further used for:

[0116] Calculate the matching degree between project requirement information and knowledge graph:

[0117]

[0118] In the formula, s represents the matching degree between project demand information and knowledge graph, n represents the data feature type of project demand information, and x i Represents the semantic information of the i-th type of feature in the project requirement information, y i Represents the semantic information of the i-th type of feature in the knowledge graph;

[0119] The project demand information with a matching degree greater than a preset threshold is filtered out as the target project information.

[0120] It can be understood that the functions or modules included in the system provided in this embodiment can be used to execute the method described in the above method embodiment. Its specific implementation can refer to the description of the above method embodiment. For the sake of brevity, it will not be repeated here.

[0121] The present invention also provides an electronic device, including a processor and a memory, wherein the memory is used to store computer program code, and the computer program code includes computer instructions. When the processor executes the computer instructions, the electronic device executes the intelligent recommendation method for engineering cost schemes as described in any one of the above embodiments.

[0122] The present invention also provides a computer-readable storage medium, in which a computer program is stored. The computer program includes program instructions. When the program instructions are executed by a processor of an electronic device, the processor executes the method for intelligently recommending engineering cost schemes as described in any one of the above embodiments.

[0123] Those skilled in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.

[0124] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments, and will not be repeated here. Those skilled in the art can also clearly understand that the descriptions of the various embodiments of the present invention have different focuses. For the convenience and brevity of description, the same or similar parts may not be repeated in different embodiments. Therefore, for parts not described or not described in detail in a certain embodiment, refer to the records of other embodiments.

[0125] In the several embodiments provided by the present invention, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0126] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0127] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.

[0128] In the above embodiments, it can be implemented in whole or in part by software, hardware, firmware or any combination thereof. When implemented by software, it can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions. When the computer program instructions are loaded and executed on a computer, the process or function described in the embodiment of the present invention is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The computer instructions can be stored in a computer-readable storage medium or transmitted through the computer-readable storage medium. The computer instructions can be transmitted from a website site, computer, server or data center to another website site, computer, server or data center by wired (e.g., coaxial cable, optical fiber, digital subscriber line (digital subscriber line, DSL)) or wireless (e.g., infrared, wireless, microwave, etc.) mode. The computer-readable storage medium can be any available medium that can be accessed by a computer or a data storage device such as a server or data center that includes one or more available media integrated. The available medium may be a magnetic medium (eg, a floppy disk, a hard disk, a magnetic tape), an optical medium (eg, a digital versatile disc (DVD)), or a semiconductor medium (eg, a solid state disk (SSD)).

[0129] A person skilled in the art can understand that to implement all or part of the processes in the above-mentioned embodiments, the processes can be completed by a computer program to instruct the relevant hardware, and the program can be stored in a computer-readable storage medium. When the program is executed, it can include the processes of the above-mentioned method embodiments. The aforementioned storage medium includes: a read-only memory (ROM) or a random access memory (RAM), a magnetic disk or an optical disk, and other media that can store program codes.

Claims

1. A method for intelligently recommending engineering cost solutions, characterized in that: The method comprises: Acquire project information of the engineering project, including basic project data, historical engineering data and historical evaluation data; calculate the correlation coefficient between each data in the project information and the engineering cost, and select target data whose correlation coefficient meets the first preset condition; Use the random forest algorithm to extract features from the target data, determine the target features based on the feature importance score, input the target features into the preset support vector machine model, predict the project demand information of the engineering project, and determine the project preference information based on the project demand information; Match the project demand information with the knowledge graph of the engineering project to generate the target project information; perform cluster analysis on the target project information and the historical engineering project case database, select the engineering cost recommendation scheme that meets the second preset condition according to the clustering results, and generate a recommended engineering cost scheme list; Construct evaluation indicators, assign weights to different evaluation indicators according to project preference information, determine the highest-scoring plan in the recommended list of engineering cost plans based on the weighted results of each evaluation indicator, and obtain the target recommended plan for engineering cost.

2. The intelligent recommendation method for engineering cost scheme according to claim 1 is characterized in that: After obtaining the target recommended solution of the engineering cost, the target recommended solution is dynamically updated, including: Identify the cost planning scheme and engineering schedule planning scheme from the target recommended scheme; Determine the critical path of the construction plan based on the project progress planning plan, and obtain the corresponding actual construction data when it is detected that the actual construction status enters any node of the critical path; Extract features from actual construction data to obtain material cost, labor cost and construction efficiency; calculate cost growth rate based on material cost and labor cost; determine progress deviation based on construction efficiency; Calculate the correlation between cost and progress, input the correlation between cost and progress, cost growth rate and progress deviation into the preset LSTM model, and predict the changing trend of various types of costs in the cost planning scheme; dynamically update the target recommendation scheme according to the changing trend of various types of costs.

3. The intelligent recommendation method for engineering cost scheme according to claim 2 is characterized in that: The correlation between the calculation cost and the progress includes: In the formula, C j , P j Represent the cost data and progress data at the jth time point, respectively. A total of m time points were collected. Respectively represent the average cost and average progress at m time points; r cp Indicates the correlation between cost and schedule.

4. The intelligent recommendation method for engineering cost scheme according to claim 1 is characterized in that: The project requirement information is matched with the knowledge graph of the engineering project to generate target project information, including: Calculate the matching degree between project requirement information and knowledge graph: In the formula, s represents the matching degree between project demand information and knowledge graph, n represents the data feature type of project demand information, and x i Represents the semantic information of the i-th type of feature in the project requirement information, y i Represents the semantic information of the i-th type of feature in the knowledge graph; The project demand information with a matching degree greater than a preset threshold is filtered out as the target project information.

5. An intelligent recommendation system for engineering cost solutions, characterized in that: The system comprises: The project information acquisition unit is used to acquire the project information of the engineering project, including basic project data, historical engineering data and historical evaluation data; calculate the correlation coefficient between each data in the project information and the engineering cost, and select the target data whose correlation coefficient meets the first preset condition; The project demand prediction unit is used to extract features from target data using a random forest algorithm, determine target features based on feature importance scores, input the target features into a preset support vector machine model, predict project demand information for the engineering project, and determine project preference information based on the project demand information; The project cluster analysis unit is used to match the project demand information with the knowledge graph of the engineering project to generate target project information; perform cluster analysis on the target project information and the historical engineering project case database, screen out the engineering cost recommendation scheme that meets the second preset condition according to the clustering result, and generate a recommended list of engineering cost schemes; The target solution recommendation unit is used to construct evaluation indicators, assign weights to different evaluation indicators according to project preference information, determine the highest-scoring solution in the engineering cost solution recommendation list according to the weighted results of each evaluation indicator, and obtain the target recommended solution for the engineering cost.

6. The intelligent recommendation system for engineering cost solutions according to claim 5 is characterized in that: It also includes a target solution updating unit, which is used to dynamically update the target recommendation solution, including: Identify the cost planning scheme and engineering schedule planning scheme from the target recommended scheme; Determine the critical path of the construction plan based on the project progress planning plan, and obtain the corresponding actual construction data when it is detected that the actual construction status enters any node of the critical path; Extract features from actual construction data to obtain material cost, labor cost and construction efficiency; calculate cost growth rate based on material cost and labor cost; determine progress deviation based on construction efficiency; Calculate the correlation between cost and progress, input the correlation between cost and progress, cost growth rate and progress deviation into the preset LSTM model, and predict the changing trend of various types of costs in the cost planning scheme; dynamically update the target recommendation scheme according to the changing trend of various types of costs.

7. The intelligent recommendation system for engineering cost solutions according to claim 6 is characterized in that: The correlation between the calculation cost and the progress includes: In the formula, C j , P j Represent the cost data and progress data at the jth time point, respectively. A total of m time points were collected. Respectively represent the average cost and average progress at m time points; r cp Indicates the correlation between cost and schedule.

8. The intelligent recommendation system for engineering cost solutions according to claim 5 is characterized in that: The project cluster analysis unit is also used for: Calculate the matching degree between project requirement information and knowledge graph: In the formula, s represents the matching degree between project demand information and knowledge graph, n represents the data feature type of project demand information, and x i Represents the semantic information of the i-th type of feature in the project requirement information, y i Represents the semantic information of the i-th type of feature in the knowledge graph; The project demand information with a matching degree greater than a preset threshold is filtered out as the target project information.

9. An electronic device, characterized in that: It includes a processor and a memory, the memory is used to store computer program code, the computer program code includes computer instructions, when the processor executes the computer instructions, the electronic device executes the intelligent recommendation method for engineering cost scheme as described in any one of claims 1 to 4.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, which includes program instructions. When the program instructions are executed by a processor of an electronic device, the processor executes the method for intelligently recommending engineering cost solutions as described in any one of claims 1 to 4.

Citation Information

Patent Citations

  • A project cost method and system

    CN109902888A

  • Project engineering cost estimation method and device, electronic equipment and storage medium

    CN113505942A

  • Project cost automatic extraction and analysis method and device based on deep learning

    CN114168716A

  • Demand identification method and device, electronic equipment, medium and computer program

    CN114186555A

  • Intelligent generation method and device of project cost

    CN115545786A

Cited By

  • Project cost control management report generation method and system applied to construction project

    CN119809221A

  • Engineering cost dynamic management and control system based on cloud computing

    CN120634205A

  • Buried pipeline distribution recommendation method based on artificial intelligence

    CN120893154A

  • Importance evaluation method for engineering project standard

    CN121094632A

  • Method for evaluating importance of project standard

    CN121094632B