Semi-physical test environment simulation system and method for direct-current energy consumption device
By combining real physical prototypes and real-time digital simulation systems, a semi-physical testing environment for DC energy-consuming devices is built, which solves the problem of poor simulation results in the existing technology, and realizes high-precision simulation and rapid R&D cycle.
Patent Information
- Application Number
- CN202411123040.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-15
- Publication Date
- 2024-12-03
AI Technical Summary
The existing simulation measures The internal valve control model lacks a controllable charging process, and cannot effectively simulate the interaction between the controllable charging process of the flexible direct converter valve and the charging process of the dynamic energy-consuming system, resulting in unsatisfactory simulation results.
A semi-physical test environment simulation system for DC energy-consuming devices, including real physical prototypes and real-time digital simulation systems, uses valve-controlled prototypes to control the converter stations in time, and combines the MMC-HVDC system and FPGA units to build an available one. DBS semi-physical testing environment to achieve high-precision simulation.
It improves simulation effect, shortens the R&D cycle of DBS control and security equipment, provides high-precision simulation conditions, enhances the flexibility and scalability of the system, and ensures the accuracy and safety of the test.
Smart Images

Figure CN119065267A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of flexible direct current transmission of electric power systems, and in particular relates to a semi-physical test environment simulation system and method for direct current energy consumption devices. Background Art
[0002] The new energy power generation system is connected to the grid through the Modular Multilevel Converter High Voltage Direct Current (MMC-HVDC) transmission system. For example, in the scenario of large-scale wind farms passing through the fault through DC transmission, the AC fault has a great impact on the wind farm during the ride-through. In theory, there are two ways to solve this problem: one is to send instructions to the wind turbines to quickly reduce the output power, and the other is to use energy-consuming resistors to dissipate the surplus power. The first method has many problems, and the technical advantages of the AC fault ride-through strategy based on the dynamic braking system (DBS) are relatively obvious. Its principle is simple, the action is fast, the number of equipment is small, the overall equipment investment and land occupation are greatly reduced, and the energy consumption performance is good. In particular, the DC energy-consuming device can be arranged in the onshore converter station, so that the offshore platform can save a lot of valuable space and reduce the impact on the wind farm during the AC fault ride-through.
[0003] For the offshore wind power flexible direct current transmission system, when the AC power grid connected to the onshore converter station fails, before the fault is isolated or eliminated, the offshore wind power energy transmission is blocked, which will cause the DC transmission system to overvoltage, affecting the safe operation of the equipment. In severe cases, it will cause the double-terminal flexible direct current converter station to be locked and shut down, or even damage the equipment. In order to prevent the above situation from causing system shutdown and ensure rapid power supply restoration after fault isolation or elimination, the DBS energy consumption circuit is used to consume part of the power sent by wind power during the AC power grid fault, thereby limiting the increase in DC voltage and ensuring safe and reliable operation of the equipment. After the fault is eliminated, power supply is quickly restored. At present, the real-time digital simulation system (Real Time Digital Simulator, RTDS) is generally used to perform semi-physical tests on DBS; although it can accurately simulate the external characteristics and control performance of actual power electronic cascade equipment, the internal valve control model lacks a controllable charging process, and cannot simulate the interaction between the controllable charging process of the flexible direct current converter valve and the DBS charging process, resulting in unsatisfactory simulation results.
[0004] It can be seen that the existing simulation measures cannot simulate the interaction between the controllable charging process of the flexible DC converter valve and the DBS charging process due to the lack of controllable charging process in the internal valve control model, resulting in unsatisfactory simulation results. Summary of the invention
[0005] The present invention provides a semi-physical test environment simulation system and method for a DC energy consumption device to solve the technical problem that the existing simulation measures cannot simulate the interaction between the controllable charging process of the flexible DC converter valve and the DBS charging process due to the lack of a controllable charging process in the internal valve control model, resulting in unsatisfactory simulation effect.
[0006] In order to achieve the above object, the present invention adopts the following technical contents:
[0007] A semi-physical test environment simulation system for a DC energy consumption device, comprising:
[0008] A valve-controlled prototype, which uses a real physical prototype and is used to control the power submodule in the converter station;
[0009] At least two converter stations at both ends, each of which is simulated and constructed by a real-time digital simulation system, wherein one converter station is connected to the valve-controlled prototype; the other converter stations are respectively connected to corresponding converter control and protection systems, and all converter control and protection systems are simulated and constructed by a real-time digital simulation system; the terminals of each converter station are respectively connected to an AC system and a new energy power generation system;
[0010] DBS and DBS control and protection system, which are constructed by simulation of a real-time digital simulation system; each end converter station is connected in parallel to the DBS and DBS control and protection system, and is used to access the simulated receiving end system through a DC conversion switch;
[0011] The valve-controlled prototype can perform time-sharing control on the converter station connected thereto, thereby coordinating the start-up, charging and switching processes of the converter station to achieve simulation of the semi-physical test environment of the DC energy consumption device.
[0012] Furthermore, the converter station connected to the valve-controlled prototype is also connected to a control and protection prototype.
[0013] Furthermore, all converter stations at each end adopt MMC-HVDC system.
[0014] Furthermore, the real-time digital simulation system includes multiple FPGA units; when the simulation system adopts the N-end MMC-HVDC system, 5(N-1)+3 FPGA units are used to realize the simulation construction of the N-end converter station and the corresponding converter control and protection system.
[0015] Furthermore, the new energy power generation system adopts an offshore wind power system.
[0016] Furthermore, the terminals of the converter stations at each end are respectively connected to the AC system and the new energy power generation system through a transformer system; wherein the transformer system includes an isolation transformer and a voltage regulating transformer connected in sequence.
[0017] Furthermore, the DBS simulation model in the DBS and DBS control and protection system is constructed by an FPGA unit using a SUBSTEP modeling method; the DBS control and protection system in the DBS and DBS control and protection system is configured with a DC conversion switch, which can achieve equivalent position changes as the converter station switches.
[0018] An operating method of a semi-physical test environment simulation system for a DC energy consuming device, based on the above-mentioned semi-physical test environment simulation system for a DC energy consuming device, comprises the following steps:
[0019] S1: starting a first-end converter station connected to the valve-controlled prototype, performing AC charging for the first-end converter station and the DBS through a first AC system, and forming a first stable DC voltage by the first-end converter station;
[0020] S2: setting second related parameters of the second end converter station according to the first related parameters of the first end converter station, starting the second end converter station, and forming a second stable DC voltage by the first end converter station;
[0021] S3: After the second-end converter station operates stably, the first-end converter station is locked and switched, so that the first-end converter station operates as the system side of the new energy power generation system, and the first-end converter station and the second-end converter station are operated equivalently;
[0022] S4: Repeat S2 and S3, connect the remaining converter stations to the simulation system in turn, and perform dynamic testing on the DBS in the simulation system.
[0023] Furthermore, a voltage difference between the first stable DC voltage and the second stable DC voltage is no more than 0.002 pu.
[0024] Furthermore, the AC charging of the first-end converter station and the DBS by the first AC system specifically includes uncontrolled charging and controllable charging of the DBS.
[0025] Compared with the prior art, the present invention has the following beneficial effects:
[0026] The present invention provides a semi-physical test environment simulation system for a DC energy consumption device. The simulation system includes a valve-controlled prototype and a real-time digital simulation system. The real-time digital simulation system is responsible for simulating at least two converter stations at the ends of the test environment and the corresponding converter control and protection system, DBS and DBS control and protection system. The valve-controlled prototype adopts a real physical prototype and is responsible for time-sharing control of the converter station connected thereto, thereby cooperating with the start-up, charging and switching processes of the converter station to realize the simulation of the semi-physical test environment of the DC energy consumption device. The simulation system only adopts a valve-controlled prototype with one end being a real physical prototype, changes the system topology through AC and DC conversion switches, completes the simulation of the start-up process of converter stations at the two ends or even multiple ends, and constructs a usable DBS semi-physical test environment. The system can effectively simulate the interaction between the controllable charging process of the flexible DC converter valve and the DBS charging process, provides high-precision simulation conditions for the test, improves the simulation effect, and shortens the research and development cycle of DBS control and protection equipment.
[0027] Preferably, in the present invention, a control and protection system is added to the converter station connected to the valve-controlled prototype. A control and protection prototype independently set up from the valve-controlled prototype can be adopted, or a control and protection system in which the control and protection prototype and the valve-controlled prototype are integrated can be adopted; the setting of the control and protection system enhances the safety and stability of the simulation system; the control and protection system can perform real-time monitoring and protection during the operation of the converter station to ensure the smooth progress of the test process.
[0028] Preferably, in the present invention, an MMC-HVDC (modular multilevel converter high voltage direct current transmission) system is used as a technical solution for converter stations at each end, thereby improving the efficiency and reliability of the converter stations; the MMC-HVDC system has the advantages of good waveform quality, low harmonic content, easy expansion and modularization, and is suitable for the field of high voltage direct current transmission.
[0029] Preferably, in the present invention, multiple FPGA (field programmable gate array) units are configured to realize the simulation construction of the N-end MMC-HVDC system, thereby improving the flexibility and scalability of the system. The FPGA unit can process complex algorithms in parallel at high speed, ensuring the real-time performance and accuracy of the simulation system.
[0030] Preferably, in the present invention, the new energy power generation system is set as an offshore wind power system, so that the test environment is closer to the actual application scenario. As one of the important loads of the DC transmission system, the characteristics and operating status of the offshore wind power system have an important impact on the performance of the DC transmission system.
[0031] Preferably, in the present invention, a transformer system, including an isolation transformer and a voltage regulating transformer, is provided between the terminal of each end converter station and the AC system and the new energy power generation system, thereby realizing flexible conversion and regulation of voltage. This helps to ensure stable operation of the system under different working conditions and improve the adaptability of the system.
[0032] Preferably, in the present invention, the DBS simulation model in the DBS and DBS control and protection system is constructed by an FPGA unit using the SUBSTEP modeling method, which improves the accuracy and real-time performance of the model; at the same time, the DBS control and protection system is equipped with a DC conversion switch, which can achieve equivalent position changes as the converter station switches, thereby enhancing the flexibility and reliability of the system.
[0033] The present invention also provides an operating method for a semi-physical test environment simulation system for a DC energy consuming device. Based on the semi-physical test environment simulation system for a DC energy consuming device, the operating method can effectively simulate the starting, charging and switching functions of a converter station, and realizes a comprehensive test of a DC energy consuming device and its control and protection system by gradually starting and switching the converter station and ensuring the equivalent operation of the DC voltage of the converter station. The method has the advantages of simple operation and good testing effect, and can effectively evaluate the performance and reliability of the DC energy consuming device.
[0034] Preferably, in the present invention, the voltage difference between the first stable DC voltage and the second stable DC voltage is controlled to be no more than 0.002pu, thereby ensuring the voltage stability of the converter station during the switching process, which helps to reduce the impact of voltage fluctuations on the system and improve the stability and reliability of the system.
[0035] Preferably, in the present invention, the specific process of the first AC system performing AC charging for the first-end converter station together with the DBS includes uncontrolled charging and controlled charging stages. This process helps to ensure that the DBS is in a safe state before starting, and gradually establishes a stable DC voltage during the charging process, laying the foundation for subsequent testing work. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] Figure 1 A schematic diagram of the specific structure of a semi-physical test environment simulation system for a DC energy consumption device provided by an embodiment of the present invention;
[0037] Figure 2 An equivalent topological diagram of the startup process of a converter station S1 with a DBS device in a semi-physical test environment simulation system for a DC energy consumption device provided by an embodiment of the present invention;
[0038] Figure 3 An equivalent topological diagram of the startup process of a converter station S2 with a DBS device in a semi-physical test environment simulation system for a DC energy consumption device provided by an embodiment of the present invention;
[0039] Figure 4 An equivalent topological diagram of a converter station S2 in a DC charging unlocking state of a semi-physical test environment simulation system for a DC energy consumption device provided in an embodiment of the present invention;
[0040] Figure 5The DC voltage and power submodule voltage waveforms of the AC circuit breaker closing process provided by the embodiment of the present invention;
[0041] Figure 6 The waveform diagram of the DC voltage and power submodule voltage during the start-up resistor bypass and controllable charging process provided by the embodiment of the present invention;
[0042] Figure 7 Waveform diagram of DC voltage and power submodule voltage during unlocking process provided by an embodiment of the present invention;
[0043] Figure 8 The DC voltage and power submodule voltage waveforms of the DC controllable charging process provided by the embodiment of the present invention;
[0044] Fig. 9 The DC voltage and power submodule voltage waveforms after the DC controllable charging is completed provided by the embodiment of the present invention;
[0045] Fig.10 A schematic diagram of a semi-physical test environment simulation system for a DC energy consumption device provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0046] In order to make the technical problems, technical solutions and beneficial effects solved by the present invention more clearly understood, the present invention is further described in detail in the following specific embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0047] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.
[0048] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0049] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
[0050] In the description of the embodiments of the present invention, it should be noted that if the terms "upper", "lower", "horizontal", "inner", etc. indicate an orientation or positional relationship based on the orientation or positional relationship shown in the drawings, or the orientation or positional relationship in which the product of the invention is usually placed when in use, it is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first", "second", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.
[0051] In addition, if the term "horizontal" appears, it does not mean that the component must be absolutely horizontal, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", which does not mean that the structure must be completely horizontal, but can be slightly tilted.
[0052] In the description of the embodiments of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal connection of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0053] Example 1
[0054] Combined with what is mentioned in the background technology, currently, there is no model for controlling the controllable charging process of the converter valve in the existing software library of the RTDS real-time simulation platform, and it cannot fully reflect the whole process of controllable charging of the MMC valve body. Therefore, it is necessary to adopt the converter valve simulated by the time-sharing control simulation of the valve control prototype, so as to realize the DBS semi-physical test of the dynamic energy consumption system during the whole startup process of the system; for example: Chinese patent CN112327082B discloses a test method, device and system for a complete set of energy consumption devices for flexible DC engineering. The test process includes: building a primary test loop for a complete set of energy consumption devices; obtaining the test function type and test configuration information, determining the theoretical protection action data of the energy consumption valve control protection unit, generating the grid operation parameters that meet the operating characteristics of the complete set of energy consumption devices for flexible DC engineering, and transmitting them to the energy consumption valve control protection unit; collecting the energy consumption valve control The actual protection action information data of the control protection unit is compared with the theoretical protection action data to determine whether the function of the complete set of energy-consuming devices corresponding to the test function type is normal; the present invention generates virtual power grid operation parameters by simulating the power grid operation environment, and performs a whole set of tests on the complete set of energy-consuming devices, and can perform more comprehensive tests on its basic state, fault ride-through function, cooling locking function and protection function, so as to ensure that the complete set of energy-consuming devices can play an effective protective role during system debugging and DC operation; however, the pre-constructed flexible direct current power grid operation model and flexible direct current control protection model both need to be simulated by simulation equipment, and no emphasis is placed on examining the differences between the simulation equipment control protection model and the actual control protection device when simulating the actual control protection system, especially during the startup process, as well as the interaction between the charging process of the energy-consuming device and the operation system.
[0055] It can be seen that the current simulation method using RTDS is completely unsuccessful. Since the valve control model lacks a controllable charging process, it is impossible to simulate the interaction between the controllable charging process of the flexible DC converter valve and the DBS charging process, resulting in the inability to achieve an ideal simulation state.
[0056] In order to solve the above problems, the present invention provides a semi-physical test environment simulation system for a DC energy consuming device. The system is based on analyzing the working principle of the MMC-HVDC system to which the DC energy consuming device is connected during its startup process. By changing the system topology through AC and DC conversion switches, the system simulates the startup process at both ends or even multiple ends, and constructs a usable DBS semi-physical test environment. This achieves high-precision simulation of the test environment and shortens the R&D cycle of DBS control and protection equipment.
[0057] The present invention is further described in detail below with reference to the accompanying drawings and embodiments:
[0058] like Fig.10 As shown, this embodiment provides a semi-physical test environment simulation system for a DC energy consumption device, specifically comprising:
[0059] A valve-controlled prototype using a real physical prototype is capable of time-sharing control of the converter station simulated by the real-time simulator. It is specifically used to control the power sub-module in the converter, thereby testing the changes in various electrical quantities of the dynamic energy consumption system under different starting modes.
[0060] The real-time digital simulation system (RTDS) is used to simulate at least two converter stations and the converter control and protection systems corresponding to each converter station, wherein the converter control and protection system includes a valve control system; and simulated DBS and DBS control and protection system; each end converter station is connected in parallel to the DBS and DBS control and protection system, and is used to access the simulated receiving end system through a DC conversion switch.
[0061] Among them, the converter stations at each end adopt the MMC-HVDC system.
[0062] In this embodiment, the terminals of each converter station are respectively connected to the AC system and the new energy power generation system, wherein the new energy power generation system can adopt an offshore wind power system ( Figure 1 WF in the figure).
[0063] In this embodiment, the valve control prototype can be independent of the control and protection prototype or the control and protection prototype can be integrated into a control and protection system, which is connected to and controlled by the converter station simulated by the real-time digital simulation system; the control and protection prototype can adopt a real physical prototype or be constructed by RTDS simulation.
[0064] In this embodiment, the valve-controlled prototype selects a matching simulated converter station, and after the converter station is started up, it is switched with the converter station simulated by the full digital simulation (i.e., RTDS) inside the real-time simulator. The switching is achieved by using a conversion switch and changing global variables.
[0065] In this embodiment, in the DBS and DBS control and protection system, the DBS simulation model in the real-time simulator adopts the SUBSTEP modeling method in the FPGA unit, and is configured with a DC conversion switch to achieve equivalent position changes as the converter station switches.
[0066] Specifically, for the N-end MMC-HVDC system, the number of FPGAs in the real-time simulator needs to be 5(N-1)+3, of which 5(N-1) FPGA units can realize the simulation of the converter valves and valve control systems of the N-1-end DC system, and 3 FPGA units can realize the simulation of the converter station selected and matched by the valve control prototype.
[0067] The real-time digital simulation system is responsible for simulating at least two converter stations and the corresponding converter control and protection systems, DBS and DBS control and protection systems in the test environment; the valve-controlled prototype adopts a real physical prototype, which is responsible for time-sharing control of the converter station connected to it, so as to cooperate with the startup, charging and switching process of the converter station to realize the simulation of the semi-physical test environment of the DC energy consumption device; this simulation system only uses a valve-controlled prototype with a real physical prototype at one end, and changes the system topology through AC and DC conversion switches to complete the simulation of the startup process of converter stations at both ends or even multiple ends, and construct a usable DBS semi-physical test environment. This system can effectively simulate the interaction between the controllable charging process of the flexible DC converter valve and the DBS charging process, provide high-precision simulation conditions for the test, improve the simulation effect, and shorten the development cycle of DBS control and protection equipment.
[0068] Example 2
[0069] This embodiment further provides an operation method of a semi-physical test environment simulation system for a DC energy consumption device, based on the semi-physical test environment simulation system for a DC energy consumption device provided in Embodiment 1, comprising:
[0070] S1: starting a first-end converter station connected to the valve-controlled prototype, performing AC charging for the first-end converter station and the DBS through a first AC system, and forming a first stable DC voltage by the first-end converter station;
[0071] S2: setting second related parameters of the second end converter station according to the first related parameters of the first end converter station, starting the second end converter station, and forming a second stable DC voltage by the first end converter station;
[0072] S3: After the second-end converter station operates stably, the first-end converter station is locked and switched, so that the first-end converter station operates as the system side of the new energy power generation system, and the first-end converter station and the second-end converter station are operated equivalently;
[0073] S4: Repeat S2 and S3, connect the remaining converter stations to the simulation system in turn, and perform dynamic testing on the DBS in the simulation system.
[0074] In order to facilitate understanding of the technical solution of this operation method, further description is given below in conjunction with the accompanying drawings:
[0075] like Figure 1As shown in the figure, taking the three-terminal MMC-HVDC system as an example, according to its structure, it can be roughly divided into an MMC-HVDC system with two AC system switching functions (S1), S1 control and protection system (i.e., control and protection system), an MMC-HVDC system with two AC system switching functions (S2), S2 control and protection system (simulated inside the simulator), an MMC-HVDC system with two AC system switching functions (S3), S3 control and protection system (simulated inside the simulator), a DBS with position conversion switch, and a DBS control and protection system (control and protection system); among them, only the valve control prototype in the control and protection system corresponding to S1 adopts a real physical prototype; the rest are constructed by simulation of the real-time digital simulation system.
[0076] Specifically, the DBS control and protection prototype mainly uses FPGA boards, which can realize the trigger control of 524 power sub-modules; it contains a set of MMC-HVDC system control and protection prototypes, which adopts dual-system hot standby redundancy mode and are connected to dual sets of converter-level control protection (Converter Control and Protection A&B, CCP-A, CCP-B) of control and protection respectively, without cross redundancy. Each valve control panel includes a valve control host chassis (Valve Control and Monitoring Interface, VCMI), a monitoring host, a switch and other devices. The RTDS used in this embodiment mainly completes two parts of the simulation: one part is Figure 1 The other part is the simulation of the corresponding control and protection systems of the other two sets of MMC-HVDC (i.e. S2 and S3).
[0077] The first step is that when the converter station S1 is operated as an onshore station, during the construction of the RTDS simulation model, the AC system connected to the converter station S1 is selected as System 1 by configuring the AC conversion switch. Therefore, the circuit breaker Q1 is closed (the circuit breaker in the attached figure is displayed in red to represent the closed state) and Q2 is disconnected; when the converter station S1 is charged with DBS AC, the DC conversion switch is configured to select the location of the DBS access system to be close to S1, and the corresponding DC circuit breakers Q7, Q8, Q13, and Q14 are closed. At this time, the system equivalent topology is as follows: Figure 2 shown.
[0078] In the second step, the AC uncontrolled charging and controllable charging process of converter station S1 with DBS device is completed through the control and protection prototype operation interface. After the system is unlocked normally and runs stably, the converter station S2 and the connected AC system are set online to be consistent with the relevant parameters and topology of S1 (that is, AC system System 2 is selected). Therefore, circuit breaker Q4 is closed and Q3 is disconnected. While keeping the DC circuit breakers Q9 and Q10 disconnected, the converter station S2 is unlocked through the simulator's internal simulation control and protection system, so that the converter station S2 establishes a DC voltage, and the DC voltage fluctuations of converter stations S1 and S2 are no more than 0.002pu. After the operation is stable, the DC circuit breakers Q9, Q10, Q15, and Q16 are closed online, and the DC circuit breakers Q7, Q8, Q13, and Q14 are disconnected at the same time. This switching process is simulated by a real-time simulation system to ensure consistency and continuity. After the system switching is stable, lock the converter station S1 and open the corresponding circuit breaker, and finally disconnect the AC circuit breaker Q1. At this time, the system equivalent topology is as follows: Figure 3 shown.
[0079] The third step is Figure 3 As shown in the figure, the converter station S2 (simulated control and protection system inside the simulator) and the connected AC system System 2 realize the equivalent operation of the converter station S1 system by configuring the conversion switch; the relevant parameters and topology of the converter station S1 are set online to make it an offshore wind power system (i.e. Figure 4 The system side of WF1 in the figure is running. Close the DC circuit breakers Q7 and Q8, and control the converter station S1 to charge and unlock the DC through the control and protection prototype. At this time, the system equivalent topology is as follows: Figure 4 shown.
[0080] For the N-terminal MMC-HVDC system, when N is greater than 2, starting from the 3rd-terminal MMC-HVDC system, the charging in the simulation system adopts the DC charging method, and the charging process is the same as Figure 4 The converter station S2 in the example remains the same and will not be described here. This operation method, i.e., the above-mentioned semi-physical test system configuration mode, can fully verify the impact of the multi-terminal flexible DC starting process on the DBS when there is only one set of valve-controlled prototype of the flexible DC transmission system. In order to further verify the feasibility and effectiveness of the present invention, a simulation test loop of the flexible DC system is established.
[0081] After the semi-physical test environment simulation system of the DC energy consumption device is built, the specific test method is as follows: the main circuit part of the DC energy consumption device is simulated by RTDS, and the control and protection part is simulated by a real physical prototype. When the MMC-HVDC system is used to build the DC voltage, at least one end of the control and protection system (specifically the valve control prototype) uses a real physical prototype, and the others are simulated by RTDS. When all the wiring is correct and there is no abnormality in the interface signal, the system topology is changed through the AC and DC conversion switches. Figures 5 to 9 As shown in the figure, a screenshot of the RUNTIME monitoring interface recording of the startup process is obtained on the RTDS real-time simulation platform, where UdcP_DBS and UdcN_DBS are the DC positive voltage and DC negative voltage waveforms at the DBS access point respectively; DBS_AVKVLG11, DBS_MINKVLG11 and DBS_MXKVLG11 are the average voltage, minimum voltage and maximum voltage waveforms of the 262 power sub-modules close to the positive DC bus of DBS respectively; DBS_AVKVLG21, DBS_MINKVLG21 and DBS_MX KVLG21 are the average voltage, minimum voltage and maximum voltage waveforms of 262 power sub-modules close to the negative DC bus of DBS; MMC1_AVKVAP, MMC1_AVKVAN, MMC1_AVKVBP, MMC1_AVKVBN, MMC1_AVKVCP and MMC1_AVKVCN are the average voltage waveforms of the six bridge arm power sub-modules of the converter station corresponding to the control and protection prototype; it can be seen that the use of this simulation system and its operation method can highly simulate the dynamic operation status of DC energy-consuming devices, thereby testing them with high precision.
[0082] In summary, the present invention provides a system and method for simulating a semi-physical test environment for a DC energy consumption device, which has the following advantages over existing simulation measures:
[0083] First, high-precision simulation test environment: By combining real physical prototypes (valve-controlled prototypes) with real-time digital simulation systems, a high-precision simulation semi-physical test environment for DC energy-consuming devices is constructed. This hybrid simulation method not only ensures the authenticity of key control links, but also flexibly simulates complex and changeable power grid and load conditions through the simulation system, providing a comprehensive and practical test platform for the testing of DC energy-consuming devices.
[0084] Second, enhanced system flexibility and scalability: With modular design, each end converter station and control and protection system can be flexibly constructed by the real-time digital simulation system, supporting the access of different numbers and types of converter stations. In particular, the high-precision real-time simulation achieved by the FPGA unit enables the system to easily cope with large-scale, multi-terminal simulation requirements, improving the flexibility and scalability of the system.
[0085] Third, improve test efficiency and accuracy: By controlling the startup, charging and switching process of the valve-controlled prototype and the converter station in a time-sharing manner, a comprehensive test of the DC energy consumption device and its control and protection system is achieved. This test method not only improves test efficiency, but also ensures the accuracy and reliability of the test results by precisely controlling each link in the test process.
[0086] Fourth, ensure the safe and stable operation of the system: During the test, the safe and stable operation of the test system was effectively guaranteed by configuring the control and protection prototype and control and protection system, and adopting the transformer system such as isolation transformer and voltage regulating transformer. At the same time, the DC conversion switch in the DBS control and protection system can achieve equivalent position change with the switching process of the converter station, further enhancing the flexibility of the system and its ability to respond to emergencies.
[0087] Fifth, promote technological innovation and product development: This technical solution provides strong support for the development and testing of DC energy consumption devices, and helps promote the innovation and development of related technologies. By verifying and optimizing the design solution in an actual test environment, the launch of new products can be accelerated and the market competitiveness of products can be improved.
[0088] Sixth, reduce testing costs and risks: Compared with the traditional full physical testing method, this technical solution reduces testing costs and risks by introducing a real-time digital simulation system. The simulation system can simulate various extreme and complex working conditions, avoiding the need for high-risk testing in the actual power grid, and also reducing dependence on and loss of actual equipment.
[0089] The present invention only uses a set of valve-controlled prototype time-sharing control real-time simulator to simulate the converter station. By changing the system topology through AC and DC conversion switches, the simulation of the startup process of two or even multiple terminals can be completed, and a DBS semi-physical test environment that meets the requirements can be constructed.
[0090] The above embodiment is only one of the implementation methods that can realize the technical solution of the present invention. The scope of protection claimed by the present invention is not limited only to this embodiment, but also includes changes, replacements and other implementation methods that can be easily thought of by any technician familiar with the technical field within the technical scope disclosed by the present invention.
Claims
1. A semi-physical test environment simulation system for a DC energy consumption device, characterized in that: include: A valve-controlled prototype, which uses a real physical prototype and is used to control the power submodule in the converter station; At least two converter stations at both ends, each of which is simulated and constructed by a real-time digital simulation system, wherein one converter station is connected to the valve-controlled prototype; the other converter stations are respectively connected to corresponding converter control and protection systems, and all converter control and protection systems are simulated and constructed by a real-time digital simulation system; the terminals of each converter station are respectively connected to an AC system and a new energy power generation system; DBS and DBS control and protection system, which are constructed by simulation of a real-time digital simulation system; each end converter station is connected in parallel to the DBS and DBS control and protection system, and is used to access the simulated receiving end system through a DC conversion switch; The valve-controlled prototype can perform time-sharing control on the converter station connected thereto, thereby coordinating the start-up, charging and switching processes of the converter station to achieve simulation of the semi-physical test environment of the DC energy consumption device.
2. A DC energy consumption device semi-physical test environment simulation system according to claim 1, characterized in that: The converter station connected to the valve-controlled prototype is also connected to a control and protection prototype.
3. A DC energy consumption device semi-physical test environment simulation system according to claim 1, characterized in that: All converter stations at each end adopt MMC-HVDC system.
4. A DC energy consumption device semi-physical test environment simulation system according to claim 3, characterized in that: The real-time digital simulation system includes multiple FPGA units; when the simulation system adopts the N-end MMC-HVDC system, 5(N-1)+3 FPGA units are used to realize the simulation construction of the N-end converter station and the corresponding converter control and protection system.
5. A DC energy consumption device semi-physical test environment simulation system according to claim 1, characterized in that: The new energy power generation system adopts an offshore wind power system.
6. A DC energy consumption device semi-physical test environment simulation system according to claim 1, characterized in that: The terminals of the converter stations at each end are respectively connected to the AC system and the renewable energy power generation system through a transformer system; wherein the transformer system includes an isolation transformer and a voltage regulating transformer connected in sequence.
7. A DC energy consumption device semi-physical test environment simulation system according to claim 1, characterized in that: The DBS simulation model in the DBS and DBS control and protection system is constructed by an FPGA unit using the SUBSTEP modeling method; the DBS control and protection system in the DBS and DBS control and protection system is equipped with a DC conversion switch, which can achieve equivalent position changes as the converter station switches.
8. A method for operating a semi-physical test environment simulation system for a DC energy consumption device, characterized in that: A semi-physical test environment simulation system for a DC energy consumption device according to any one of claims 1 to 7 comprises the following steps: S1: starting a first-end converter station connected to the valve-controlled prototype, performing AC charging for the first-end converter station and the DBS through a first AC system, and forming a first stable DC voltage by the first-end converter station; S2: setting second related parameters of the second end converter station according to the first related parameters of the first end converter station, starting the second end converter station, and forming a second stable DC voltage by the first end converter station; S3: After the second-end converter station operates stably, the first-end converter station is locked and switched, so that the first-end converter station operates as the system side of the new energy power generation system, and the first-end converter station and the second-end converter station are operated equivalently; S4: Repeat S2 and S3, connect the remaining converter stations to the simulation system in turn, and perform dynamic testing on the DBS in the simulation system.
9. The operating method of a DC energy consumption device semi-physical test environment simulation system according to claim 8, characterized in that: A voltage difference between the first stable DC voltage and the second stable DC voltage is no greater than 0.002 pu.
10. The operating method of a DC energy consumption device semi-physical test environment simulation system according to claim 8, characterized in that: The AC charging of the first-end converter station and the DBS by the first AC system specifically includes uncontrolled charging and controllable charging of the DBS.
Citation Information
Patent Citations
A testing method, device and system for a complete set of energy dissipation devices for flexible DC engineering
CN112327082B
Cited By
Test method, device and system of energy consumption device and storage medium
CN121027697A