Real-time management mine field roadway crane dispatching management system
By designing a real-time managed mine tunnel crane scheduling and management system, the high labor intensity and safety risks brought about by manual driving are solved, real-time status monitoring and automatic path planning of monorail cranes are realized, and the safety and efficiency of mine transportation are improved. , enhances the level of automation.
Patent Information
- Application Number
- CN202411172020.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-26
- Publication Date
- 2024-12-03
AI Technical Summary
In mines, artificially driven monorail cranes have problems such as high labor intensity, safety risks and low transportation efficiency. The existing technology lacks highly integrated scheduling management and real-time monitoring functions, and cannot achieve accurate tracking of vehicle status and automation of material transportation. planning.
A real-time management mine tunnel crane scheduling management system is designed, including the backend scheduling module, home page display module, system management module, equipment management module, task management module and statistical analysis module, using the B/S architecture and MQTT communication protocol. Realize real-time status monitoring and automatic path planning of monorail cranes, and provide multi-user permission management and fault monitoring functions.
It improves the safety and efficiency of mine transportation, realizes unmanned operation, enhances fault monitoring and maintenance capabilities, improves system integration and automation level, reduces labor costs, and avoids the limitations of manual driving.
Smart Images

Figure CN119067394A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of mine tunnel crane dispatching management, and in particular to a real-time mine tunnel crane dispatching management system. Background Art
[0002] In the working environment of a mine, workers often need to face very harsh working conditions. For mine operations, manpower is necessary for the fine mining of precious minerals. Among them, monorail cranes in mine shafts traditionally rely on manual driving. This method is not only labor-intensive, but also has safety risks, because manual operation is affected by many factors, including driver fatigue, experience limitations, and the complexity of the internal environment of the mine. In addition, manual driving cannot achieve efficient resource scheduling and path optimization, resulting in low transportation efficiency. With the development of automation and intelligent technology, the introduction of navigation controllers and background scheduling systems has become the key to improving mine transportation efficiency and safety. In the existing technology, attempts have been made to achieve semi-automatic or fully automatic control of monorail cranes by adding navigation equipment, but these systems usually lack highly integrated scheduling management and real-time monitoring functions, and cannot achieve accurate tracking of vehicle status and automated planning of material transportation. For this reason, we propose a real-time management mine tunnel crane scheduling management system. Summary of the invention
[0003] The present invention mainly solves the technical problems existing in the above-mentioned prior art and provides a real-time management mine tunnel crane dispatching and management system.
[0004] In order to achieve the above-mentioned purpose, the present invention adopts the following technical scheme: a real-time management of mine tunnel crane dispatching and management system, including a background dispatching module, the background dispatching module is electrically connected to a home page display module, a system management module, an equipment management module, a task management module and a statistical analysis module, the background dispatching module adopts a B / S architecture, logs in to the website of the monorail crane background dispatching and management system, enters a user name and password, and displays corresponding routes according to different permissions for different users. User roles are divided into system administrators, mine administrators, material dispatchers, etc. Through the dispatching between these modules and the use of the background dispatching module, automatic distribution of various equipment and materials in the mine is realized.
[0005] Preferably, the home page display module is divided into 4 partitions, and the corresponding content is displayed according to the selected mine (different options are visible to users with different permissions), and the work is displayed in multiple areas. A background scheduling server, database server and MQTT server are built to realize real-time status monitoring of multiple monorail cranes, accurately grasp the location, speed, working status and other information of each monorail crane, and conduct real-time tracking and monitoring.
[0006] Preferably, area one displays the list of monorail cranes of the mine and their idle status, area two displays the track plan of the mine, the track plan displays the location information of each monorail crane and the mission route of the locomotive selected in area one in real time, area three displays the real-time status parameters of the selected locomotive, such as gear status, emergency stop status, braking status, clamping pressure, diesel remaining, running time, alarm information, etc., and area four displays the monitoring video on the monorail crane streamed from the video server.
[0007] Preferably, the system management module is used by system administrators and mine administrators, and includes mine management, role management, user management, log management, etc. Users can be assigned mines, roles and permissions. Log management can view problems on production servers in real time and make timely processing.
[0008] Preferably, the equipment management module includes track plan management, monorail crane management, landmark point management, damper equipment management, turnout equipment management, etc. This module manages various equipment related to the monorail crane backend dispatching management system, and needs to complete the addition, deletion, modification and query of various equipment data while ensuring the relationship connection between various equipment modules.
[0009] Preferably, the device management module adopts the MQTT communication protocol and the HTTP protocol to achieve efficient communication and data exchange among various parts of the system, improve system integration, simplify operating procedures, and improve the overall degree of automation.
[0010] Preferably, the task management module is used by material dispatchers. Users can use tablets, PCs, mobile phones and other devices to log in to the task dispatch interface of the background system. When creating a new task, they can select the urgency of the task, the target point for task dispatch, etc. After clicking to send, the system generates the shortest path from the starting point to the target point in real time according to the shortest path algorithm, and dispatches it to the idle monorail crane in the parking lot for execution in a timely manner. During the operation, the execution status of the task can be checked at any time, and the task can be canceled and paused at any time on the interface as needed.
[0011] Preferably, the statistical analysis module includes fault information management, task statistics, fault statistics, etc., can manage various fault information related to the monorail crane, use charts to statistically analyze task execution and fault conditions in different time periods, etc., provide fault monitoring and recording functions, can accurately detect fault conditions of monorail cranes and tracks, record fault information, and facilitate maintenance personnel to carry out repairs in a timely manner, ensure the normal operation of equipment, reduce downtime caused by faults, facilitate centralized data collection, and enhance fault monitoring and maintenance capabilities.
[0012] Beneficial Effects
[0013] The present invention provides a real-time management mine tunnel crane dispatching and management system, which has the following beneficial effects:
[0014] (1) The real-time management of mine tunnel crane dispatching and management system realizes the automatic distribution of various equipment and materials in the mine and the real-time management and status monitoring of the mine monorail crane, thereby improving the safety, efficiency and intelligent level of transportation. Its main advantages include: realizing unmanned operation to avoid the limitations of manual driving, improving task scheduling efficiency, realizing real-time status monitoring of monorail cranes, enhancing fault monitoring and maintenance capabilities, improving system integration, providing task execution analysis and automatic planning of the shortest path, improving transportation safety and efficiency, avoiding the limitations of manual driving, reducing labor costs, and improving the automation and intelligence level of mine operations. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the implementation of the present invention or the technical solution in the prior art, the following is a brief introduction to the drawings required for the implementation or the prior art description. Obviously, the drawings in the following description are only exemplary, and for ordinary technicians in this field, other implementation drawings can be derived from the provided drawings without creative work.
[0016] The structures, proportions, sizes, etc. illustrated in this specification are only used to match the contents disclosed in the specification so as to facilitate understanding and reading by persons familiar with the technology. They are not used to limit the conditions under which the present invention can be implemented, and therefore have no substantial technical significance. Any structural modification, change in proportion or adjustment of size shall still fall within the scope of the technical contents disclosed in the present invention without affecting the effects and purposes that can be achieved by the present invention.
[0017] Figure 1 It is a schematic diagram of the overall system module of the present invention;
[0018] Figure 2 This is a schematic diagram of a home page display module of the present invention;
[0019] Figure 3 It is a schematic diagram of the system management module of the present invention;
[0020] Figure 4 It is a schematic diagram of a device management module of the present invention;
[0021] Figure 5 It is a schematic diagram of a task management module of the present invention;
[0022] Figure 6 Schematic diagram of the statistical analysis module of the present invention. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0024] Embodiment: A real-time management mine tunnel crane dispatching and management system, such as Figure 1 As shown, it includes a background scheduling module, which is electrically connected to a homepage display module, a system management module, an equipment management module, a task management module and a statistical analysis module. The background scheduling module adopts a B / S architecture. Log in to the website of the monorail crane background scheduling management system, enter the user name and password, and display the corresponding routes according to different permissions of different users. The user roles are divided into system administrators, mine administrators, material dispatchers, etc. Through the scheduling between these modules and the use of the background scheduling module, the automatic distribution of various equipment and materials in the mine is realized, the shortest path is automatically planned, the automatic driving of the monorail crane is realized, the limitations of manual driving are eliminated, and the safety hazards and efficiency reduction caused by driver skills and fatigue are avoided;
[0025] like Figure 2 As shown, the homepage display module is divided into 4 partitions, and the corresponding content is displayed according to the selected mine (users with different permissions have different visible options). Area 1 displays the list of monorail cranes in the mine and their idle status, and Area 2 displays the track plan of the mine. The track plan displays the location information of each monorail crane and the task route of the locomotive selected in Area 1 in real time. Area 3 displays the real-time status parameters of the selected locomotive, such as gear status, emergency stop status, braking status, clamping pressure, diesel residue, running time, alarm information, etc. Area 4 displays the monitoring video on the monorail crane pulled from the video server. In this way, multi-area display work is performed, and a background scheduling server, database server and MQTT server are built to realize real-time status monitoring of multiple monorail cranes, accurately grasp the location, speed, working status and other information of each monorail crane, and conduct real-time tracking and monitoring;
[0026] like Figure 3 As shown in the figure, the system management module is used by system administrators and mine administrators, including mine management, role management, user management, log management, etc. Users can be assigned mines, roles and permissions. Log management can view problems on production servers in real time and make timely processing. It is used by administrators for later maintenance and operation, and avoids misoperation by other personnel.
[0027] like Figure 4As shown, the equipment management module includes track plan management, monorail crane management, landmark management, damper equipment management, turnout equipment management, etc. This module manages various equipment related to the monorail crane backend dispatching management system. It is necessary to complete the addition, deletion, modification and query of various equipment data while ensuring the relationship between various equipment modules, improving system integration, providing task execution analysis and automatic planning of the shortest path. By adopting the MQTT communication protocol and HTTP protocol, efficient communication and data exchange between various parts of the system are achieved, improving system integration, simplifying the operation process, and improving the overall automation level;
[0028] like Figure 5 As shown in the figure, the task management module is used by the material dispatcher. Users can use tablets, PCs, mobile phones and other devices to log in to the task dispatch interface of the background system. When creating a new task, they can select the urgency of the task, the target point of the task dispatch, etc. After clicking to send, the system generates the shortest path from the starting point to the target point in real time according to the shortest path algorithm and dispatches it to the idle monorail crane in the parking lot for execution in a timely manner. In addition, during the operation, the execution status of the task can be checked at any time, and the task can be canceled and paused at any time on the interface as needed, which is convenient for manual rapid operation and use. The task statistics function is added to record and analyze the execution of the task, understand the key indicators such as the execution time, delay and completion rate of the task, and facilitate the evaluation and improvement of the system performance and the optimization of the task scheduling strategy. After the task is sent, the system can automatically plan the shortest transportation route according to the real-time road conditions and task requirements, improve transportation efficiency and reduce energy consumption.
[0029] like Figure 6 As shown, the statistical analysis module includes fault information management, task statistics, fault statistics, etc. It can manage various fault information related to the monorail crane, use charts to statistically analyze the task execution and fault conditions in different time periods, etc., provide fault monitoring and recording functions, can accurately detect the fault conditions of the monorail crane and the track, record fault information, and facilitate maintenance personnel to carry out repairs in time to ensure the normal operation of the equipment and reduce the downtime caused by faults. It is convenient for centralized data collection and enhances fault monitoring and maintenance capabilities. It provides fault monitoring and recording functions, can accurately detect the fault conditions of the monorail crane and the track, record fault information, and facilitate maintenance personnel to carry out repairs in time to ensure the normal operation of the equipment and reduce the downtime caused by faults.
[0030] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
Claims
1. A real-time management mine tunnel crane dispatching and management system, characterized in that: It includes a background scheduling module, which is electrically connected to the home page display module, system management module, equipment management module, task management module and statistical analysis module. The background scheduling module adopts a B / S architecture. Log in to the website of the monorail crane background scheduling management system, enter the user name and password, and display the corresponding routes according to different permissions for different users. User roles are divided into system administrators, mine administrators, material dispatchers, etc. Through the scheduling between these modules and the use of the background scheduling module, the automatic distribution of various equipment and materials in the mine can be realized.
2. A real-time management mine tunnel crane dispatching and management system according to claim 1, characterized in that: The home page display module is divided into 4 partitions, which display the corresponding content according to the selected mine (different options are visible to users with different permissions), and display work in multiple areas. A background scheduling server, database server and MQTT server are built to realize real-time status monitoring of multiple monorail cranes, accurately grasp the location, speed, working status and other information of each monorail crane, and conduct real-time tracking and monitoring.
3. A real-time management mine tunnel crane dispatching and management system according to claim 2, characterized in that: The area one displays the list of monorail cranes of the mine and their idle status, the area two displays the track plan of the mine, and the track plan displays the location information of each monorail crane and the mission route of the locomotive selected in the area one in real time, the area three displays the real-time status parameters of the selected locomotive, such as gear status, emergency stop status, braking status, clamping pressure, diesel remaining, running time, alarm information, etc., and the area four displays the monitoring video on the monorail crane pulled down from the video server.
4. A real-time management mine tunnel crane dispatching and management system according to claim 3, characterized in that: The system management module is used by system administrators and mine administrators, and includes mine management, role management, user management, log management, etc. Users can be assigned mines, roles and permissions. Log management can view problems on production servers in real time and make timely processing.
5. A real-time management mine tunnel crane dispatching and management system according to claim 4, characterized in that: The equipment management module includes track plan management, monorail crane management, landmark point management, damper equipment management, turnout equipment management, etc. This module manages various equipment related to the monorail crane backend dispatching management system. It is necessary to complete the addition, deletion, modification and query of various equipment data while ensuring the relationship connection between each equipment module.
6. A real-time management mine tunnel crane dispatching and management system according to claim 5, characterized in that: The device management module uses the MQTT communication protocol and HTTP protocol to achieve efficient communication and data exchange among various parts of the system, improve system integration, simplify operating procedures, and improve the overall degree of automation.
7. A real-time management mine tunnel crane dispatching and management system according to claim 6, characterized in that: The task management module is used by material dispatchers. Users can use tablets, PCs, mobile phones and other devices to log in to the task dispatch interface of the background system. When creating a new task, they can select the urgency of the task, the target point for task dispatch, etc. After clicking to send, the system generates the shortest path from the starting point to the target point in real time according to the shortest path algorithm and dispatches it to the idle monorail crane in the parking lot for execution in a timely manner. During the operation, the status of the task execution can be checked at any time, and the task can be canceled and paused at any time on the interface as needed.
8. The real-time management mine tunnel crane dispatching and management system according to claim 7 is characterized by: The statistical analysis module includes fault information management, task statistics, fault statistics, etc. It can manage various fault information related to the monorail crane, use charts to statistically analyze task execution and fault conditions in different time periods, etc., provide fault monitoring and recording functions, and can accurately detect fault conditions of monorail cranes and tracks, record fault information, and facilitate maintenance personnel to carry out repairs in a timely manner, ensure the normal operation of equipment, reduce downtime caused by faults, facilitate centralized data collection, and enhance fault monitoring and maintenance capabilities.
Citation Information
Cited By
Unmanned vehicle path planning method and system based on Internet of Things
CN119779341A
Intelligent dispatching system and method for mining monorail crane
CN121436560A