Well site shale gas collection and storage device and method
By using components such as the collection end, piston and sealing plug head to control the gas pressure on the shale gas well, the sample pollution and leakage caused by the inability to control the gas pressure of the gas tank is solved, and the good sealing of the gas tank and shale gas are achieved. Long-term storage of samples.
Patent Information
- Application Number
- CN202310744423.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-06-21
- Publication Date
- 2024-12-24
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the existing on-site collection and storage technology of shale gas wells, gas storage tanks cannot control gas pressure, resulting in sample contamination and gas leakage.
A well site shale gas collection and storage device is designed, including the acquisition end, piston, gas storage tank and sealing plug. The gas pressure and sealing are controlled through components such as on-off valves, gas pressure reducing valves and flexible seals to ensure that the gas pressure and sealing are controlled. Sealing of the gas tank.
It has achieved a pollution-free reduction of shale gas pressure in the well site, ensured the sealing of the gas storage tank, avoided gas leakage and sample pollution, and ensured the long-term storage of shale gas samples.
Smart Images

Figure CN119178096A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of shale gas on-site analysis and testing, and in particular to a well site shale gas collection and storage device and method. Background Art
[0002] As an important clean energy, shale gas has increasingly occupied an important position in my country's energy structure. In particular, in recent years, my country's shale gas exploration and development have made major breakthroughs, and this important position has gradually strengthened. With the increasing attention paid to shale gas, my country's oil fields have to carry out a large amount of shale gas analysis and testing work every year. How to successfully collect and effectively store shale gas samples at the well site has always been a concern and research issue for shale gas workers.
[0003] At present, the technology for collecting and storing shale gas on site in shale gas wells mainly uses a fixed-volume gas storage tank directly connected to the shale gas discharge port at the well site. The filling pressure cannot be controlled, and the original gas in the gas storage tank cannot be discharged. After mixing with the injected shale gas, it will cause contamination to the sample, thereby affecting the results of related analysis and testing. Moreover, in the existing technology, after the shale gas is injected into the gas storage tank, when the gas storage tank is disconnected from the shale gas discharge port, the gas storage tank cannot be in a sealed state, and the injected shale gas is easily leaked out at the moment of disconnection. Summary of the invention
[0004] The purpose of the present invention is to provide a well site shale gas collection and storage device and method to address the above-mentioned deficiencies, and to solve the technical problem of how to conveniently and quickly reduce the shale gas pressure at the well site shale gas discharge port and fill it into a pollution-free sealed gas storage tank. The gas storage tank can maintain good sealing properties, which is convenient for the long-term preservation of shale gas samples.
[0005] The present invention is achieved through the following scheme:
[0006] A shale gas collection and storage device for a well site comprises a collection end, a piston, a gas storage tank and a sealing plug; the collection end is provided with an on-off valve for on-off control of the outlet pressure, the gas storage tank is provided with an air inlet pipe connected to the collection end, and the collection end is provided with a connecting cavity for the air inlet pipe to enter and exit; at least one end of the sealing plug is connected to the air inlet pipe and / or the gas storage tank through an elastic component to seal it; the sealing plug can open the port where the air inlet pipe is located under the action of an external force; a flexible sealing member is provided on the connecting cavity and at least one end of the air inlet pipe, and the piston is arranged in the gas storage tank.
[0007] Based on the structure of the above-mentioned well site shale gas collection and storage device, the outer wall of the air inlet pipe is smoothly arranged, the interior of the air inlet pipe is hollow, one end of the elastic component is fixedly connected to the inner wall of the air inlet pipe, and the other end is connected to the sealing plug.
[0008] Based on the structure of the above-mentioned well site shale gas collection and storage device, the collection end includes a first connecting pipe, a second connecting pipe and a gas pressure reducing valve; the gas pressure reducing valve is arranged between the first connecting pipe and the second connecting pipe, and the gas pressure reducing valve has two pressure gauges, which are respectively arranged on the two ports of the gas pressure reducing valve; the connecting chamber and the on-off valve are arranged on the second connecting pipe.
[0009] Based on the structure of the above-mentioned well site shale gas collection and storage device, a pushing block, a push pin and a guide groove are provided in the connecting cavity; the guide groove is arranged along the length direction of the connecting cavity, the pushing block is slidably arranged in the guide groove, and the push pin is arranged on the pushing block. Under the action of the pushing block, the push pin can contact the end of the sealing plug at a predetermined position and push it.
[0010] Based on the structure of the above-mentioned well site shale gas collection and storage device, a first sealing groove is provided on the second connecting pipe, the flexible seal is provided in the first seal, and one end of the flexible seal contacts the outer wall of the air inlet pipe.
[0011] Based on the structure of the above-mentioned well site shale gas collection and storage device, the sealing plug includes a contact rod and a sealing cover; the contact rod is arranged at the center position of the sealing cover, an air inlet hole is arranged on the air inlet pipe, the size of the contact rod is adapted to the size of the air inlet hole, and the elastic component is a spring, one end of the spring is connected to the inner wall of the air inlet pipe, and the other end is connected to the end face of the contact rod away from the air inlet hole, or one end of the spring is connected to the inner wall of the air inlet pipe, and the other end is connected to the sealing cover.
[0012] Based on the structure of the above-mentioned well site shale gas collection and storage device, the overall cross-sectional area of the sealing cover is not less than the overall cross-sectional area of the air inlet pipe, and a second sealing groove and a flexible sealing member are provided on the contact portion between the sealing cover and the gas storage tank.
[0013] This solution discloses a method for collecting and storing shale gas in a well site, which comprises the following steps:
[0014] Step 1: Prepare for operation, adjust the output pressure of the gas pressure reducing valve to the minimum, and close the on-off valve at the same time;
[0015] Step 2: docking operation. After completing step 1, connect the first connecting pipe to the shale gas discharge port of the well site, so that the collection end and the shale gas discharge port of the well site are firmly docked;
[0016] Step 3: Emptying operation to discharge the gas in the gas tank;
[0017] Step 4: Connect the air inlet pipe of the gas storage tank to the collection end.
[0018] Step 5: Collecting operation, open the on-off valve, and deliver the gas of the predetermined pressure to the gas storage tank.
[0019] In step three, the specific steps are that the operator pushes the contact rod along the direction of the gas tank to separate the contact rod from the air inlet hole and the sealing cover from the inner wall of the gas tank, and finally opens the air inlet hole and the entire gas flow channel. At this time, the piston is pushed toward the direction close to the air inlet pipe to make the piston contact with the sealing cover to discharge as much gas remaining in the collection chamber as possible.
[0020] In step 4, the specific steps are: inserting the air intake pipe into the connection cavity, so that the flexible sealing member in the first sealing groove contacts the outer wall of the air intake pipe, forming a seal and providing a connection support force;
[0021] In step five, the specific steps are as follows: during collection, the output pressure of the gas pressure reducing valve is adjusted so that the output pressure does not exceed the maximum friction between the air inlet pipe and the connecting cavity; when the on-off valve is opened, the gas will force the push block to move in a predetermined direction, eventually causing the ejector pin to contact the contact rod, and the gas flow channel to be opened, so that the gas to be tested enters the cavity of the gas storage tank for collection; after the piston retreats to the rear end of the gas storage tank, the on-off valve is closed, the output pressure of the gas pressure reducing valve is adjusted to the minimum, the air inlet pipe is pulled out of the connecting cavity of the second connecting pipe, and the sealing plug will automatically seal the end component under the action of the spring to prevent other gases from mixing into the gas storage tank.
[0022] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:
[0023] 1. This scheme connects and fixes the connecting cavity and the air inlet pipe through a flexible seal. When it is necessary to fix them, the air inlet pipe is inserted into the connecting cavity. Due to the presence of the flexible seal, during the insertion process, the outer end of the air inlet pipe and the inner end of the connector squeeze the flexible seal to increase the friction, so that the connecting cavity and the air inlet pipe are fixed to a certain extent. At the same time, the deformed flexible seal seals the gap between the outer end of the air inlet pipe and the inner end of the connector, so that the collection end and the gas storage tank are connected as one. At the same time, the pressure at the air outlet end in the collection end is adjusted by the pressure regulating component to apply pressure to the sealing plug, and finally the channel on the gas storage tank is opened to store the gas on the gas storage tank. This scheme can ensure that the sealing condition is formed in the gas storage tank first, and then it is disconnected from the connecting pipe, thereby avoiding the leakage of gas in the gas storage tank during the disconnection process. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a schematic diagram of the structure of the overall device of the present invention;
[0025] Markings in the figure: 1. Collection end; 2. Piston; 3. Gas storage tank; 4. Sealing plug; 5. On-off valve; 6. Inlet pipe; 11. Connecting chamber; 12. Flexible sealing member; 13. First connecting pipe; 14. Second connecting pipe; 15. Gas pressure reducing valve; 16. Push block; 17. Ejector pin; 18. Guide groove; 19. First sealing groove; 31. Third sealing groove; 41. Contact rod; 42. Sealing cover; 43. Second sealing groove; 61. Inlet hole; 62. Spring. DETAILED DESCRIPTION
[0026] All features disclosed in this specification, or steps in all methods or processes disclosed, except mutually exclusive features and / or steps, can be combined in any manner.
[0027] Any feature disclosed in this specification (including any additional claims and abstract), unless otherwise stated, may be replaced by other equivalent or alternative features having similar purposes. That is, unless otherwise stated, each feature is only an example of a series of equivalent or similar features.
[0028] In the description of the present invention, it is necessary to understand that the directions or positional relationships indicated by the terms "up", "down", "left", "right", etc. are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention.
[0029] In addition, the terms "first", "second", etc. are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first", "second", etc. may explicitly or implicitly include one or more of the features.
[0030] Example 1
[0031] like Figure 1 As shown, the present invention provides a technical solution:
[0032] A shale gas collection and storage device for a well site, which at least includes but is not limited to a collection end 1, a piston 2, a gas storage tank 3 and a sealing plug 4; the collection end 1 is provided with an on-off valve 5 for on-off control of the outlet pressure, the gas storage tank 3 is provided with an air inlet pipe 6 connected to the collection end 1, and the collection end 1 is provided with a connecting cavity 11 for the air inlet pipe 6 to enter and exit; at least one end of the sealing plug 4 is connected to the air inlet pipe 6 and / or the gas storage tank 3 through an elastic component to seal it; the sealing plug 4 can open the port where the air inlet pipe 6 is located under the action of an external force; a flexible sealing member 12 is provided on the connecting cavity 11 and at least one end of the air inlet pipe 6, and the piston 2 is arranged in the gas storage tank 3.
[0033] Based on the above structure, the connecting cavity 11 and the air inlet pipe 6 are connected and fixed by the flexible seal 12. When it is necessary to fix them, the air inlet pipe 6 is inserted into the connecting cavity 11. Due to the presence of the flexible seal 12, during the insertion process, the outer end of the air inlet pipe 6 and the inner end of the connector squeeze the flexible seal 12 to increase its friction, so that the connecting cavity 11 and the air inlet pipe 6 are fixed to a certain extent. At the same time, the deformed flexible seal 12 seals the gap between the outer end of the air inlet pipe 6 and the inner end of the connector, so that the collecting end 1 and the gas storage tank 3 are connected as one. At the same time, the pressure at the air outlet end of the collecting end 1 is adjusted by the pressure regulating component to apply pressure to the sealing plug 4, and finally the channel on the gas storage tank 3 is opened to store the gas on the gas storage tank 3.
[0034] As an example, the outer wall of the air intake pipe 6 is smoothly arranged, the interior of the air intake pipe 6 is hollow, one end of the elastic component is fixedly connected to the inner wall of the air intake pipe 6, and the other end is connected to the sealing plug 4.
[0035] Based on the above structure, by setting the outer wall of the air intake pipe 6 to be smooth, the air tightness of the air intake pipe 6 and the connecting cavity 11 when being fixed can be increased, and the strength of the connection can also be increased. If it is set to a rough surface, the flexible sealing member 12 that is squeezed and deformed cannot completely seal the gap, that is, it cannot achieve sealing and fixing;
[0036] At the same time, the interior of the air inlet pipe 6 is set to be hollow, which not only reserves movement space for the sealing plug 4, but also serves as a gas flow channel. When the sealing plug 4 is opened by external force, the gas enters the gas storage tank 3 from the interior of the air inlet pipe 6 for storage.
[0037] As an example, the collection end 1 may include a first connecting pipe 13, a second connecting pipe 14 and a gas pressure reducing valve 15; the gas pressure reducing valve 15 is arranged between the first connecting pipe 13 and the second connecting pipe 14, and the gas pressure reducing valve 15 has two pressure gauges, which are respectively arranged on the two ports of the gas pressure reducing valve 15; the connecting chamber 11 and the on-off valve 5 are arranged on the second connecting pipe 14.
[0038] Based on the above structure, the first port of the gas pressure reducing valve 15 is connected to the shale gas discharge port of the well site through the first connecting pipe 13. The pressure gauge at the air inlet pipe 6 is used to detect the shale gas input pressure of the well site, and the air outlet port is used to detect the air outlet pressure. The gas pressure reducing valve 15 can adjust the gas pressure and output it after reducing the pressure.
[0039] As an example, a push block 16, a ejector pin 17 and a guide groove 18 are provided in the connecting chamber 11; the guide groove 18 is provided along the length direction of the connecting chamber 11, the push block 16 is slidably provided in the guide groove 18, and the ejector pin 17 is provided on the push block 16. Under the action of the push block 16, the ejector pin 17 can contact the end of the sealing plug 4 at a predetermined position and push it.
[0040] Based on the above structure, the guide groove 18 provides a moving path for the push block 16. At the same time, when the gas is discharged from the second connecting pipe 14, the push block 16 will increase the contact area with others, so that the push block 16 can be subjected to a larger driving force, and finally the ejector pin 17 contacts the sealing plug 4 and pushes to open the channel. The remaining gas can enter the gas channel through the push block 16 for circulation.
[0041] As an example, a first sealing groove 19 is provided on the second connecting pipe 14 , and the flexible sealing member 12 is provided in the first sealing groove. One end of the flexible sealing member 12 contacts the outer wall of the intake pipe 6 .
[0042] Based on the above structure, the first sealing groove 19 can provide a limit for the flexible sealing, prevent the flexible sealing member 12 from being separated therefrom, ensure the stability of the connection, and prevent the sealing ring from falling off.
[0043] As an example, the sealing plug 4 may include a contact rod 41 and a sealing cover 42; the contact rod 41 is arranged at the center position of the sealing cover 42, an air inlet hole 61 is arranged on the air inlet pipe 6, the size of the contact rod 41 is adapted to the size of the air inlet hole 61, and the elastic component may be a spring 62, one end of the spring 62 is connected to the inner wall of the air inlet pipe 6, and the other end is connected to the end face of the contact rod 41 away from the air inlet hole 61, or one end of the spring 62 is connected to the inner wall of the air inlet pipe 6, and the other end is connected to the sealing cover 42.
[0044] Based on the above structure, the contact rod 41 remains in a stressed state under the pulling force of the spring 62 , so that the contact rod 41 always blocks the air inlet 61 to prevent gas from entering.
[0045] As an example, the overall cross-sectional area of the sealing cover 42 is not less than the overall cross-sectional area of the intake pipe 6, and a second sealing groove 43 and a flexible seal 12 are provided on the contact portion between the sealing cover 42 and the gas tank 3, and the flexible seal 12 is provided in the second sealing layer.
[0046] Based on the above structure, when the sealing plug 4 is under the action of elastic force, the contact rod 41 closes the air inlet 61. At the same time, in order to further ensure the sealing performance of the gas storage tank 3, a sealing layer is arranged on the sealing cover 42 to further enhance the overall air tightness. Under the action of elastic force, the sealing cover 42 is forced to compress the flexible sealing member 12 in the second sealing groove 43 to form a seal.
[0047] As an example, the interior of the gas tank 3 is a hollow structure, and a third sealing groove 31 and a flexible sealing member 12 are provided on the contact surface between the piston 2 and the inner wall of the gas tank 3 , so that the piston 2 can move along the length direction of the gas tank 3 .
[0048] Based on the above structure, the piston 2 can move along the length direction of the gas storage tank 3 under the condition of being subjected to force, so that the emptying operation and the collecting operation can be realized.
[0049] As an example, the first sealing groove 19, the second sealing groove 43 and the third sealing groove 31 are all annular grooves, and the flexible sealing member 12 can be a rubber O-ring. The annular groove can seal the end surface where it is located.
[0050] Example 2
[0051] Based on the device of the above-mentioned embodiment 1, this embodiment provides a method for collecting and storing shale gas in a well site; the method comprises the following steps:
[0052] Step 1: Prepare the operation, adjust the output pressure of the gas pressure reducing valve 15 to the minimum, and close the on-off valve 5;
[0053] Step 2: docking operation. After completing step 1, connect the first connecting pipe 13 to the shale gas discharge port of the well site, so that the collection end 1 is firmly docked with the shale gas discharge port of the well site;
[0054] Step 3: emptying operation to discharge the gas in the gas storage tank 3;
[0055] Step 4: Connecting operation: connect the air inlet pipe 6 of the air storage tank 3 with the collection end 1.
[0056] Step 5: Collection operation, open the on-off valve 5, and transport the gas of predetermined pressure to the gas storage tank 3.
[0057] In step three, the specific steps are as follows: the operator pushes the contact rod 41 along the direction of the gas tank 3 to separate the contact rod 41 from the gas inlet hole 61, and the sealing cover 42 from the inner wall of the gas tank 3, and finally opens the gas inlet hole 61 and the entire gas flow channel. At this time, the piston 2 is pushed toward the direction close to the gas inlet pipe 6 to make the piston 2 contact with the sealing cover 42 to discharge the gas remaining in the collection chamber as much as possible.
[0058] In step four, the specific steps are as follows: insert the air intake pipe 6 into the connecting cavity 11, so that the flexible sealing member 12 in the first sealing groove 19 contacts the outer wall of the air intake pipe 6, thereby forming a seal and providing a connecting support force.
[0059] In step five, the specific steps are as follows: when collecting, adjust the output pressure of the gas pressure reducing valve 15 so that the output pressure does not exceed the maximum friction between the air inlet pipe 6 and the connecting chamber 11; when opening the on-off valve 5, the gas will force the push block 16 to move in a predetermined direction, and finally make the ejector pin 17 contact with the contact rod 41, and open the gas flow channel, so that the gas to be tested enters the cavity of the gas storage tank 3 for collection; after the piston 2 retreats to the tail end of the gas storage tank 3, close the on-off valve 5, adjust the output pressure of the gas pressure reducing valve 15 to the minimum, pull the air inlet pipe 6 out of the connecting chamber 11 of the second connecting pipe 14, and the sealing plug 4 will automatically seal the end part under the action of the spring 62 to prevent other gases from mixing into the gas storage tank 3.
[0060] This solution reduces the pressure of high-pressure shale gas at the discharge port by setting a gas pressure reducing valve 15, thereby avoiding high pressure damage to the gas storage tank 3 and other dangerous factors. By setting a piston 2 in the gas storage tank 3, the gas in the gas storage tank 3 can be easily emptied. The movable plugs at the gas inlet and outlet of the gas storage tank 3 can open the gas storage tank 3 when filling or extracting shale gas samples, and keep the gas storage tank 3 well sealed during storage. In addition, the positional relationship between the sealing plug 4, the rubber O-ring, and the gas inlet and outlet of the gas storage tank 3 can ensure that the gas storage tank 3 is sealed before being disconnected from the connecting pipe, thereby avoiding gas leakage in the gas storage tank 3 during the disconnection process.
[0061] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A shale gas collection and storage device at a well site, characterized in that: It includes a collecting end, a piston, an air storage tank and a sealing plug; the collecting end is provided with an on-off valve for on-off control of the outlet pressure, the air storage tank is provided with an air inlet pipe connected to the collecting end, and the collecting end is provided with a connecting cavity for the air inlet pipe to enter and exit; at least one end of the sealing plug is connected to the air inlet pipe and / or the air storage tank through an elastic component to seal it; the sealing plug can open the port where the air inlet pipe is located under the action of external force; a flexible sealing member is provided on at least one end of the connecting cavity and the air inlet pipe, and the piston is arranged in the air storage tank.
2. A shale gas collection and storage device for a well site as claimed in claim 1, characterized in that: The outer wall of the air intake pipe is smoothly arranged, the interior of the air intake pipe is hollow, one end of the elastic component is fixedly connected to the inner wall of the air intake pipe, and the other end is connected to the sealing plug.
3. A shale gas collection and storage device for a well site as claimed in claim 1 or 2, characterized in that: The collecting end includes a first connecting pipe, a second connecting pipe and a gas pressure reducing valve; the gas pressure reducing valve is arranged between the first connecting pipe and the second connecting pipe, and the gas pressure reducing valve has two pressure gauges, which are respectively arranged on the two ports of the gas pressure reducing valve; the connecting chamber and the on-off valve are arranged on the second connecting pipe.
4. A shale gas collection and storage device for a well site as claimed in claim 3, characterized in that: A pushing block, an ejector pin and a guide groove are provided in the connecting cavity; the guide groove is provided along the length direction of the connecting cavity, the pushing block is slidably provided in the guide groove, and the ejector pin is provided on the pushing block. Under the action of the pushing block, the ejector pin can contact the end of the sealing plug at a predetermined position and push it.
5. A shale gas collection and storage device for a well site as claimed in claim 4, characterized in that: The second connecting pipe is provided with a first sealing groove, the flexible sealing member is provided in the first sealing groove, and one end of the flexible sealing member is in contact with the outer wall of the air inlet pipe.
6. A shale gas collection and storage device for a well site as claimed in claim 5, characterized in that: The sealing plug includes a contact rod and a sealing cover; the contact rod is arranged at the center position of the sealing cover, an air inlet hole is arranged on the air inlet pipe, the size of the contact rod is adapted to the size of the air inlet hole, the elastic component is a spring, one end of the spring is connected to the inner wall of the air inlet pipe, and the other end is connected to the end face of the contact rod away from the air inlet hole, or one end of the spring is connected to the inner wall of the air inlet pipe, and the other end is connected to the sealing cover.
7. A shale gas collection and storage device for a well site as claimed in claim 6, characterized in that: The overall cross-sectional area of the sealing cover is not less than the overall cross-sectional area of the air intake pipe, and a second sealing groove and a flexible sealing member are provided on the contact portion between the sealing cover and the air storage tank.
8. A method for collecting and storing shale gas at a well site; characterized in that: It includes the following steps: Step 1: Prepare for operation, adjust the output pressure of the gas pressure reducing valve to the minimum, and close the on-off valve at the same time; Step 2: docking operation. After completing step 1, connect the first connecting pipe to the shale gas discharge port of the well site, so that the collection end and the shale gas discharge port of the well site are firmly docked; Step 3: Emptying operation to discharge the gas in the gas tank; Step 4: Connect the air inlet pipe of the gas storage tank to the collection end; Step 5: Collecting operation, open the on-off valve, and deliver the gas of the predetermined pressure to the gas storage tank.
9. A method for collecting and storing shale gas in a well site as claimed in claim 8, characterized in that: In step three, the specific steps are that the operator pushes the contact rod along the direction of the gas tank to separate the contact rod from the air inlet hole and the sealing cover from the inner wall of the gas tank, and finally opens the air inlet hole and the entire gas flow channel. At this time, the piston is pushed toward the direction close to the air inlet pipe to make the piston contact with the sealing cover to discharge as much gas remaining in the collection chamber as possible.
10. A method for collecting and storing shale gas in a well site according to claim 8 or 9, characterized in that: In step 4, the specific steps are: inserting the air intake pipe into the connection cavity, so that the flexible sealing member in the first sealing groove contacts the outer wall of the air intake pipe, forming a seal and providing a connection support force; In step five, the specific steps are as follows: during collection, the output pressure of the gas pressure reducing valve is adjusted so that the output pressure does not exceed the maximum friction between the air inlet pipe and the connecting cavity; when the on-off valve is opened, the gas will force the push block to move in a predetermined direction, eventually causing the ejector pin to contact the contact rod, and the gas flow channel to be opened, so that the gas to be tested enters the cavity of the gas storage tank for collection; after the piston retreats to the rear end of the gas storage tank, the on-off valve is closed, the output pressure of the gas pressure reducing valve is adjusted to the minimum, the air inlet pipe is pulled out of the connecting cavity of the second connecting pipe, and the sealing plug will automatically seal the end component under the action of the spring to prevent other gases from mixing into the gas storage tank.
Citation Information
Patent Citations
Sampling and sample injection device and method for mud gas carbon isotope analysis
CN112924249A
Gas sampling and collecting device
CN210513837U
Safe environment-friendly gas sampling device for petroleum and natural gas chemical enterprises
CN211205926U
gas sampler
DE29611215U1