Batter post bolt positioning method based on BIM technology
Through BIM technology and precise inclined column bolt positioning device, the problem of inaccurate inclined column bolts in traditional construction methods is solved, the construction quality and safety are improved, and a more efficient construction process is achieved.
Patent Information
- Application Number
- CN202411299038.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-18
- Publication Date
- 2025-01-03
- Estimated Expiration
- 2044-09-18
AI Technical Summary
Traditional construction methods cannot accurately locate the position of inclined column bolts, resulting in construction safety and quality problems, especially when the concrete column top is too high.
Using the inclined column bolt positioning method based on BIM technology, by constructing a BIM database and a bolt surveying and mapping database, designing a project control network, using a total station to locate, and designing an inclined column bolt positioning device, including fixing frames, positioning components, and fixing clip components and leveling ruler, precisely position and install oblique column bolts.
The positioning accuracy of inclined column bolts is improved, the construction period is shortened, the construction quality and installation are improved, and the safety hazards of construction are reduced.
Smart Images

Figure CN119244025A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to building construction, in particular to a method for positioning inclined column bolts based on BIM technology. Background Art
[0002] Columns are load-bearing components that bear axial pressure in building structures and are one of the most important weight-bearing components in building structures. Diagonal columns transfer the weight of a building to the foundation through diagonal support. Compared with traditional vertical columns, diagonal columns can more effectively disperse weight, reduce column pressure, and improve structural stability. Therefore, diagonal columns are often seen in large venues.
[0003] When the inclined column is too high, the construction is usually carried out by adding concrete inclined columns to steel structure inclined columns. At this time, it is necessary to reserve embedded inclined column bolts on the concrete inclined columns. The reserved and embedded positioning of the inclined column bolts is a difficult problem in the construction process. The traditional construction method is to weld a positioning frame and tie the positioning frame and steel bars. This method usually cannot accurately locate the position of the inclined column bolts, and when the top of the concrete column is too high, the risk factor is greatly increased, which poses a great hidden danger to the safety and quality of the construction. Summary of the invention
[0004] The present invention aims to solve the above technical problems, thereby providing a method for positioning inclined column bolts based on BIM technology to improve construction quality.
[0005] The present invention solves the technical problem and adopts the following technical solution: A method for positioning inclined column bolts based on BIM technology comprises the following steps: S1. Build BIM database and bolt surveying database The BIM database includes the overall building model, the inclined column node model information and the inclined column bolt model information. The inclined column bolt surveying and mapping database includes the inclined column bolt embedded position and inclined column bolt embedded depth. S2. Design the project control network and collect the location information of the embedded bolts of the inclined columns according to the information in the BIM database and the project reference point information. The location information of the embedded bolts of the inclined columns includes coordinates and embedding depth. S3. Use a total station to lay out the pre-embedded positioning coordinates of the inclined column bolts; S4, making a slanted column bolt positioning device, and installing the slanted column bolt positioning device on the top of the concrete slanted column; S5, passing the inclined column bolt through the inclined column bolt positioning device and connecting the inclined column bolt to the concrete inclined column; S6. Remove the inclined column bolt positioning device and carry out positioning and layout of the next inclined column embedded bolt.
[0006] Compared with the prior art, the present invention using the above technical solution has the following beneficial effects: Improve the positioning accuracy of the inclined column bolts, shorten the construction period, improve the installation performance, and improve the construction quality.
[0007] Further, the optimization scheme of the present invention is: In the step S1, the embedded position of the inclined column bolt is positioned and analyzed to form the coordinate data of the embedded position of the inclined column bolt and the position of the control point of the design optimization project.
[0008] In the step S1, the building construction information and measure materials in the BIM database are visualized and displayed, and the building construction information and measures in the BIM database are modified according to the display results.
[0009] The inclined column bolt positioning device includes a first fixing frame and a second fixing frame arranged in parallel. The first fixing frame and the second fixing frame are parallelogram structures. A positioning assembly is provided between the upper connecting rods of the first fixing frame and the second fixing frame, a fixing clamp assembly is provided between the left connecting rods of the first fixing frame and the second fixing frame, and a level ruler is provided between the right connecting rods of the first fixing frame and the second fixing frame.
[0010] The positioning assembly includes a first positioning rod and a second positioning rod arranged in parallel. Both ends of the first positioning rod and the second positioning rod are slidably connected to the upper connecting rod through sliders. The first positioning rod and the second positioning rod are provided with long grooves, and two transverse sliders are placed in the long grooves and slidably connected to the long grooves.
[0011] The fixing clamp assembly includes a shell, a first clamp, a second clamp and a spring. The shell is provided with a through hole penetrating the main body. The first clamp and the second clamp are inverted L-shaped. One end of the first clamp and the second clamp are respectively inserted into the two ends of the shell through hole and connected by a spring. The other ends of the first clamp and the second clamp are respectively clamped with the left connecting rods of the first fixing frame and the second fixing frame.
[0012] The level ruler comprises a horizontal rod and a level tube. The horizontal rod is connected with two right connecting rods through a ruler support, and the level tube is arranged in the middle of the horizontal rod.
[0013] A lower angle adjuster and an upper angle adjuster are respectively provided between the lower connecting rod and the left connecting rod, and between the upper connecting rod and the left connecting rod. The lower angle adjuster and the upper angle adjuster both include angle plates and pin shafts. The angle plates are attached to both sides of the left connecting rod and are fixedly connected to the lower connecting rod or the upper connecting rod. The angle plates are provided with an arc-shaped sliding groove. The left connecting rod is fixedly connected with the pin shaft and is slidably connected to the sliding groove.
[0014] A groove is arranged in the middle of the upper connecting rod.
[0015] The right connecting rod is a telescopic structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1It is a front view of the oblique column bolt positioning device according to an embodiment of the present invention; Figure 2 for Figure 1 A top view of Figure 3 for Figure 2 Left view of .
[0017] In the figure: a first fixing frame 1; a lower connecting rod 101; a left connecting rod 102; an upper connecting rod 103; a right connecting rod 104; a second fixing frame 2; a positioning assembly 3; a first positioning rod 301; a second positioning rod 302; a slider 303; a transverse slider 304; a fixing clamp assembly 4; a housing 401; a first clamp plate 402; a second clamp plate 403; a spring 404; a level 5; a horizontal rod 501; a ruler support 502; a level tube 503; a lower angle adjuster 6; an angle plate 601; a pin 602; and an upper angle adjuster 7. DETAILED DESCRIPTION
[0018] The present invention is further described in detail below with reference to the accompanying drawings and embodiments.
[0019] This embodiment provides a method for positioning inclined column bolts based on BIM technology, which is performed in the following steps: S1. Build BIM database and bolt surveying database The BIM database includes the overall building model, the inclined column node model information and the inclined column bolt model information. The inclined column bolt mapping database includes the data of the embedded position of the inclined column bolt and the embedded depth of the inclined column bolt. The embedded position of the inclined column bolt is located and analyzed to form the coordinate data of the embedded position of the inclined column bolt and the control point position of the design optimization project. The building construction information and measure materials in the BIM database are visualized, and the building construction information and measures in the BIM database are modified according to the display results to avoid the situation of lack of visibility during construction layout. The embedded position coordinate data and control point information of the inclined column bolt are designed, and the embedded coordinates of the inclined column bolt corresponding to the optimal control point are selected for layout.
[0020] S2. Design the project control network and collect the location information of the embedded bolts of the inclined columns according to the information in the BIM database and the project reference point information. The location information of the embedded bolts of the inclined columns includes the coordinates and the embedding depth. S3. Use a total station to lay out the pre-embedded positioning coordinates of the inclined column bolts; S4, making a slanted column bolt positioning device, which is mainly composed of a first fixing frame 1, a second fixing frame 2, a positioning assembly 3, a fixing clamp assembly 4 and a level ruler 5 ( Figure 1-Figure 3As shown). Both the first fixing frame 1 and the second fixing frame 2 are parallelogram structures, and the first fixing frame 1 and the second fixing frame 2 are arranged in parallel. The first fixing frame 1 is mainly composed of a lower connecting rod 101, a left connecting rod 102, an upper connecting rod 103 and a right connecting rod 104. The four connecting rods are hingedly connected, and the two right connecting rods 104 are telescopic structures to adapt to various sizes of oblique column bolts; A positioning assembly 3 is provided between the upper connecting rods 103 of the first fixing frame 1 and the second fixing frame 2. The positioning assembly 3 is mainly composed of a first positioning rod 301, a second positioning rod 302, a slider 303 and a transverse slider 304. The first positioning rod 301 and the second positioning rod 302 are arranged in parallel, and the two ends of the first positioning rod 301 and the second positioning rod 302 are respectively slidably connected to the two upper connecting rods 103 through the sliders 303. The first positioning rod 301 and the second positioning rod 302 are both provided with long grooves, and two transverse sliders 304 are placed in the long grooves and slidably connected to the long grooves. The transverse slider 304 is provided with a round hole; A fixing clamp assembly 4 is provided between the left connecting rod 102 of the first fixing frame 1 and the second fixing frame 2. The fixing clamp assembly 4 is mainly composed of a shell 401, a first clamp plate 402, a second clamp plate 403 and a spring 404. The shell 401 has a rectangular cross section and is provided with a through hole with a rectangular cross section that passes through the shell. The first clamp plate 402 and the second clamp plate 403 are inverted L-shaped. One end of the first clamp plate 402 and the second clamp plate 403 are respectively inserted into the two ends of the shell 401 and connected by the spring 404. The other ends of the first clamp plate 402 and the second clamp plate 403 are respectively clamped with the left connecting rod 102 of the first fixing frame 1 and the second fixing frame 2; A level ruler 5 is provided between the right connecting rod 104 of the first fixing frame 1 and the second fixing frame 2. The level ruler 5 is mainly composed of a horizontal rod 501, a ruler support 502 and a level tube 503. The horizontal rod 501 is connected to the two right connecting rods 104 through the ruler support 502. The level tube 503 is placed in the middle of the horizontal rod 501 to adjust the level between the two first fixing frames 1 and the second fixing frames 2. The level tube 503 is installed in the middle of the two lower connecting rods 101, and a groove is provided in the middle of the upper connecting rods 103 of the two lower connecting rods and the level tube 503 is installed.
[0021] A lower angle adjuster 6 and an upper angle adjuster 7 are respectively arranged between the lower connecting rod 101 and the left connecting rod 102, and between the upper connecting rod 103 and the left connecting rod 102. The lower angle adjuster 6 and the upper angle adjuster 7 are both composed of an angle plate 601 and a pin 602. The angle plates 602 of the lower angle adjuster 6 are attached to both sides of the left connecting rod 102 and are fixedly connected to the lower connecting rod 101. The angle plates 602 of the lower angle adjuster 6 are fan-shaped and have an arc-shaped slide groove. The left connecting rod 102 is equipped with a pin 602 and is slidably connected to the slide groove. The angle plate 602 of the upper angle adjuster 7 is semicircular; Install the inclined column bolt positioning device on the top of the concrete inclined column, install the first fixing frame 1 and the second fixing frame 2 on both sides of the inclined column bolt, adjust the level, use the lower angle adjuster 6 and the upper angle adjuster 7 to adjust the left connecting rod 102 and the right connecting rod 104 to be parallel to the inclined column bolt, install the bottom level ruler 5 to adjust the level, and install the fixing clamp assembly 4. Install the positioning assembly 3 on the two upper connecting rods 103, and adjust the position of the positioning device by measuring the observation position of the instrument.
[0022] S5. Finally, the oblique column bolts are passed through the circular holes of the transverse slider 304 and welded to the oblique column reinforcement.
[0023] S6. After pouring is completed, remove the inclined column bolt positioning device and carry out positioning and layout of the next inclined column embedded bolt.
[0024] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited by the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, and these changes and improvements all fall within the scope of the present invention to be protected.
Claims
1. A method for positioning inclined column bolts based on BIM technology, comprising the following steps: S1. Build BIM database and bolt surveying database The BIM database includes the overall building model, the inclined column node model information and the inclined column bolt model information. The inclined column bolt surveying and mapping database includes the inclined column bolt embedded position and inclined column bolt embedded depth. S2. Design the project control network and collect the location information of the embedded bolts of the inclined columns according to the information in the BIM database and the project reference point information. The location information of the embedded bolts of the inclined columns includes coordinates and embedding depth. S3. Use a total station to lay out the pre-embedded positioning coordinates of the inclined column bolts; S4, making a slanted column bolt positioning device, and installing the slanted column bolt positioning device on the top of the concrete slanted column; S5, passing the inclined column bolt through the inclined column bolt positioning device and connecting the inclined column bolt to the concrete inclined column; S6. Remove the inclined column bolt positioning device and carry out positioning and layout of the next inclined column embedded bolt.
2. The method for positioning inclined column bolts based on BIM technology according to claim 1 is characterized in that: In the step S1, the embedded position of the inclined column bolt is positioned and analyzed to form the coordinate data of the embedded position of the inclined column bolt and the position of the control point of the design optimization project.
3. The method for positioning inclined column bolts based on BIM technology according to claim 1 is characterized in that: In the step S1, the building construction information and measure materials in the BIM database are visualized and displayed, and the building construction information and measures in the BIM database are modified according to the display results.
4. The method for positioning inclined column bolts based on BIM technology according to claim 1 is characterized in that: The inclined column bolt positioning device includes a first fixing frame and a second fixing frame arranged in parallel. The first fixing frame and the second fixing frame are parallelogram structures. A positioning assembly is provided between the upper connecting rods of the first fixing frame and the second fixing frame, a fixing clamp assembly is provided between the left connecting rods of the first fixing frame and the second fixing frame, and a level ruler is provided between the right connecting rods of the first fixing frame and the second fixing frame.
5. The method for positioning inclined column bolts based on BIM technology according to claim 4 is characterized in that: The positioning assembly includes a first positioning rod and a second positioning rod arranged in parallel. Both ends of the first positioning rod and the second positioning rod are slidably connected to the upper connecting rod through sliders. The first positioning rod and the second positioning rod are provided with long grooves, and two transverse sliders are placed in the long grooves and slidably connected to the long grooves.
6. The method for positioning inclined column bolts based on BIM technology according to claim 4 is characterized in that: The fixing clamp assembly includes a shell, a first clamp, a second clamp and a spring. The shell is provided with a through hole penetrating the main body. The first clamp and the second clamp are inverted L-shaped. One end of the first clamp and the second clamp are respectively inserted into the two ends of the shell through hole and connected by a spring. The other ends of the first clamp and the second clamp are respectively clamped with the left connecting rods of the first fixing frame and the second fixing frame.
7. The method for positioning inclined column bolts based on BIM technology according to claim 4 is characterized in that: The level ruler comprises a horizontal rod and a level tube. The horizontal rod is connected with two right connecting rods through a ruler support, and the level tube is arranged in the middle of the horizontal rod.
8. The method for positioning inclined column bolts based on BIM technology according to claim 4 is characterized in that: A lower angle adjuster and an upper angle adjuster are respectively provided between the lower connecting rod and the left connecting rod, and between the upper connecting rod and the left connecting rod. The lower angle adjuster and the upper angle adjuster both include angle plates and pin shafts. The angle plates are attached to both sides of the left connecting rod and are fixedly connected to the lower connecting rod or the upper connecting rod. The angle plates are provided with an arc-shaped sliding groove. The left connecting rod is fixedly connected with the pin shaft and is slidably connected to the sliding groove.
9. The method for positioning inclined column bolts based on BIM technology according to claim 4 is characterized in that: A groove is arranged in the middle of the upper connecting rod.
10. The method for positioning inclined column bolts based on BIM technology according to claim 4 is characterized in that: The right connecting rod is a telescopic structure.
Citation Information
Patent Citations
Positioning device and construction method for reserved sleeve steel dowels of transfer layer of prefabricated building and
CN110424636A
Foundation bolt mounting bracket and use method
CN118148383A
Equipment foundation bolt pre-burying method based on BIM and GIS technologies
CN118551444A
Positioning device for steel embedded part of batter post
CN210032663U
An adjustable pad stone fixture
CN215104605U