Method and device for managing photovoltaic generating capacity of expressway service area

By obtaining and calculating photovoltaic power generation and vehicle information in the highway service area and deciding on the storage or provision of electricity, the problem of unreasonable photovoltaic power generation management is solved, and the reasonable management and efficiency improvement of power supply is achieved.

CN119253606AActive Publication Date: 2025-01-03TRANSPORT PLANNING & RES INST MINIST OF TRANSPORT +2
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411403591.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-09
Publication Date
2025-01-03
Estimated Expiration
2044-10-09

AI Technical Summary

Technical Problem

In the prior art, there is a lack of effective methods for managing photovoltaic power generation in highway service areas, resulting in unreasonable layout of photovoltaic modules and ineffective management of power generation, which cannot meet the power demand of trams.

Method used

By obtaining the power generation capacity of the photovoltaic module within each unit time period and vehicle information entering the service area, calculate the power demand within each unit time period, decide whether to store or provide the power, and manage it based on the stored power attenuation coefficient and battery capacity , optimize the use of photovoltaic power generation.

Benefits of technology

The reasonable management of photovoltaic power generation in the highway service area has been achieved, the power supply capacity has been ensured, and the power supply efficiency and reliability of the service area has been improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119253606A_ABST
    Figure CN119253606A_ABST
Patent Text Reader

Abstract

The invention provides a management method and device for photovoltaic generating capacity of an expressway service area. The method comprises the following steps: acquiring electric quantity Qg generated by a photovoltaic module corresponding to a target expressway service area in each unit time period in a first preset time period; acquiring information of vehicles entering the target expressway service area in each unit time period in the first preset time period, and acquiring electric quantity Qc required by the target expressway service area in each unit time period based on the acquired vehicle information; for the s-th unit time period, if Qgs corresponding to the unit time period is greater than Qcs, storing the residual electric quantity, and if Qgs is less than Qcs, providing electric quantity Qd to obtain the available electric quantity corresponding to the s-th unit time period; and obtaining the maximum power consumption in the available power consumption in the first preset time period as the reference power consumption, and obtaining the capacity of the storage battery based on the reference power consumption. The photovoltaic generating capacity can be reasonably managed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of electric power technology, and in particular to a method and device for managing photovoltaic power generation in a highway service area. Background Art

[0002] With the vigorous advocacy of clean energy, trams have been widely popularized. With the continuous improvement of battery life, more and more trams are running on highways. This puts higher requirements on the power supply capacity of highway service areas. As an important renewable energy source, solar energy has become the focus of clean energy application. Photovoltaic modules, as the core part of solar power generation systems, have been widely used. However, the current layout of photovoltaic modules is basically based on experience, which will make the layout of photovoltaic modules unreasonable. In addition, the management of photovoltaic power generation has not been effectively managed. Summary of the invention

[0003] In view of the above technical problems, the technical solution adopted by the present invention is:

[0004] According to a first aspect of the present invention, a method for managing photovoltaic power generation in a highway service area is provided, the method comprising the following steps:

[0005] S200, obtaining the amount of electricity Qg generated by the photovoltaic components corresponding to the target high-speed service area in each unit time period within a first preset time period.

[0006] S210, obtaining vehicle information entering the target highway service area in each unit time period within the first preset time period, and obtaining the power Qc required by the target highway service area in each unit time period based on the obtained vehicle information; the vehicle information includes vehicle flow and the number of electric vehicles.

[0007] S220, for the s-th unit time period, if the Qg corresponding to the unit time period s >Qc s , then the remaining power Qr=(Qg s -Qc s ) for storage, if Qg s <Qc s , then the power provided is Qd=(Qc s -Qg s ), and the available power corresponding to the s-th unit time period is obtained; where the stored power is equal to Qr×α s , α sis the storage attenuation coefficient corresponding to the sth unit time period, s ranges from 1 to N, N is the number of unit time periods; the available power in the current unit time period is equal to the available power corresponding to the previous unit time period plus the power stored in the current unit time period or minus the power provided in the current unit time period.

[0008] S230, obtaining the maximum amount of power available in the first preset time period as a reference amount of power, and obtaining the capacity of the battery based on the reference amount of power.

[0009] According to a second aspect of the present invention, a device for managing photovoltaic power generation in a highway service area is provided, the device comprising:

[0010] The first acquisition module is used to acquire the amount of electricity Qg generated by the photovoltaic components corresponding to the target high-speed service area in each unit time period within a first preset time period.

[0011] The second acquisition module is used to obtain vehicle information entering the target highway service area in each unit time period within the first preset time period, and obtain the power Qc required by the target highway service area in each unit time period based on the obtained vehicle information; the vehicle information includes vehicle flow and the number of electric vehicles.

[0012] The processing module is used for the s-th unit time period, if the Qg corresponding to the unit time period s >Qc s , then the remaining power Qr=(Qg s -Qc s ) for storage, if Qg s <Qc s , then the power provided is Qd=(Qc s -Qg s ), and the available power corresponding to the s-th unit time period is obtained; where the stored power is equal to Qr×α s , α s is the storage attenuation coefficient corresponding to the sth unit time period, s ranges from 1 to N, N is the number of unit time periods; the available power in the current unit time period is equal to the available power corresponding to the previous unit time period plus the power stored in the current unit time period or minus the power provided in the current unit time period.

[0013] The third acquisition module is used to acquire the maximum amount of power available within the first preset time period as a reference amount of power, and acquire the capacity of the battery based on the reference amount of power.

[0014] The present invention has at least the following beneficial effects:

[0015] The method for managing photovoltaic power generation in a highway service area provided in an embodiment of the present invention determines the capacity of the batteries to be arranged based on the power generation of the photovoltaic components in the highway service area within a set time period and the power demand of the service area within the set time period, thereby being able to reasonably manage the photovoltaic power generation in the highway service area.

[0016] It should be understood that the contents described in this section are not intended to identify the key or important features of the embodiments of the present invention, nor are they intended to limit the scope of the present invention. Other features of the present invention will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0018] Figure 1 A flowchart of a method for managing photovoltaic power generation in a highway service area provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0020] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art of the present invention. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items.

[0021] It should be noted that some exemplary embodiments are described as processes or methods depicted as flow charts. Although the flow charts describe the steps as sequential processes, many of the steps can be implemented in parallel, concurrently or simultaneously. In addition, the order of the steps can be rearranged. The process can be terminated when its operation is completed, but it can also have additional steps not included in the accompanying drawings. The process can correspond to a method, function, procedure, subroutine, subprogram, etc.

[0022] The embodiment of the present invention provides a method for managing photovoltaic power generation in a highway service area. Figure 1 As shown, the method may include the following steps:

[0023] S200, obtaining the amount of electricity Qg generated by the photovoltaic components corresponding to the target high-speed service area in each unit time period within a first preset time period.

[0024] S210, obtaining vehicle information entering the target highway service area in each unit time period within the first preset time period, and obtaining the power Qc required by the target highway service area in each unit time period based on the obtained vehicle information; the vehicle information includes vehicle flow and the number of electric vehicles.

[0025] S220, for the s-th unit time period, if the Qg corresponding to the unit time period s >Qc s , then the remaining power Qr=(Qg s -Qc s ) for storage, if Qg s <Qc s , then the power provided is Qd=(Qc s -Qg s ), and the available power corresponding to the s-th unit time period is obtained; where the stored power is equal to Qr×α s , α s is the storage attenuation coefficient corresponding to the sth unit time period, s ranges from 1 to N, N is the number of unit time periods; the available power in the current unit time period is equal to the available power corresponding to the previous unit time period plus the power stored in the current unit time period or minus the power provided in the current unit time period.

[0026] In the embodiment of the present invention, each time the battery is discharged, the storage attenuation coefficient is set to the initial value α0. If the s-1th unit time period is a discharge state of providing power, the attenuation storage coefficient of the sth unit time period is α0, that is, α s =α0. If the s-1th unit time period is the storage state of the stored electricity, the storage attenuation coefficient corresponding to the sth unit time period is equal to (α s-1 -k×α s-1 ), α s-1 is the storage attenuation coefficient of the s-1th unit time period, k is a preset coefficient, 0<k<1, k can be obtained based on the battery attenuation coefficient calculation formula. The battery attenuation coefficient SOH satisfies: SOH=1-(C init -C batt ) / 0.2×C init , C init is the initial capacity of the battery, C batt is the current capacity of the battery.

[0027] S230, obtaining the maximum amount of power available in the first preset time period as a reference amount of power, and obtaining the capacity of the battery based on the reference amount of power.

[0028] In the embodiment of the present invention, the required number of storage batteries can be determined according to the total capacity of the energy storage battery group and the capacity of the selected single storage battery.

[0029] The method for managing photovoltaic power generation in a highway service area provided in an embodiment of the present invention determines the capacity of the batteries to be arranged based on the power generation of the photovoltaic components in the highway service area within a set time period and the power demand of the service area within the set time period, thereby being able to reasonably manage the photovoltaic power generation in the highway service area.

[0030] Further, in an embodiment of the present invention, the target high-speed service area may be a high-speed service area specified by a user. The duration of the first preset time period may be set based on actual needs, for example, it may be 1 year. The duration of the unit time period may be a duration specified by the user, for example, one day or one month, etc., preferably one day.

[0031] Further, in an embodiment of the present invention, the installation location of the photovoltaic module corresponding to the target high-speed service area can be obtained based on the following steps:

[0032] S300: Obtain the power Qt required by the target highway service area within a second preset time period.

[0033] S310, obtaining a grid unit corresponding to a target expressway service area based on Qt.

[0034] S320, obtaining a photovoltaic module installable area corresponding to a target highway service area as a target installation area, and dividing the target installation area by using the grid units to obtain a plurality of grid areas.

[0035] S330, obtaining the sunshine amount of any grid area in the preset time period and the distance between any grid area and the target highway service area.

[0036] S340, based on the normalized vegetation index and environmental variables of the green plants in the area corresponding to any grid area, obtain the blocked area and the changing speed of the blocked area of ​​any grid area within a preset time period; the blocked area is the projection area of ​​the green plants in the area corresponding to the grid area in the corresponding grid area.

[0037] S350, based on the sunshine amount of the grid area corresponding to the target installation area, the distance between the grid area and the target high-speed service area, the shaded area of ​​the grid area within a preset time period and the speed of change of the shaded area, obtain the target grid as the grid for installing the photovoltaic components.

[0038] In this embodiment, since the amount of sunlight in the installation area, the distance from the service area, and the impact of green plants on the installation area are comprehensively considered, the optimal photovoltaic module installation area can be selected as much as possible to achieve the optimal layout of the photovoltaic modules.

[0039] In the embodiment of the present invention, the second preset time period may be longer than the first preset time period, and may specifically be a time period specified by the user, such as 1 year or more, such as 10 years.

[0040] Furthermore, in an embodiment of the present invention, Qt is obtained based on a trained power prediction model. The power prediction model may be an existing AI model, such as a deep neural network model.

[0041] Furthermore, in an embodiment of the present invention, the trained power consumption prediction model is obtained by the following steps:

[0042] S201, obtaining a sample data set, wherein the sample data set includes a plurality of sample data, each of which includes U and D, wherein U is the ID of the corresponding high-speed service area, and D is the power consumption time series data corresponding to the corresponding high-speed service area in a set historical time period, D = {D1, D2, ..., D i , ..., D n}, D i is the electricity consumption data corresponding to the i-th unit time period, i ranges from 1 to n, n is the number of unit time periods corresponding to the set historical segment, D i =(DC i ,DE i , Q i ), DC i is the traffic volume entering the corresponding highway service area in the i-th unit time period, DE i is the number of electric vehicles entering the corresponding highway service area in the i-th unit time period, Q i is the power consumption of the corresponding high-speed service area in the i-th unit time period.

[0043] In the embodiment of the present invention, the duration of the historical time period may be a time period specified by the user, for example, several years. The power consumption data in the sample data may be obtained based on the historical data of the corresponding service area.

[0044] S202, input the training sample data of the current batch into the current electricity prediction model for training to obtain corresponding prediction results, wherein the prediction results include electricity consumption data corresponding to the next unit time period of the unit time period corresponding to the current batch.

[0045] S203, based on the prediction results of the current batch and the corresponding actual results, obtain the current loss function value of the current electricity prediction model, and determine whether the current loss function value meets the preset model training end condition. If yes, execute step S205, otherwise, execute step S204.

[0046] S204, updating the parameters of the current electricity prediction model based on the current loss function value, and using the next batch of sample data as the training sample data of the current batch, and executing S202.

[0047] S205: Using the current power prediction model as the trained power prediction model.

[0048] In an embodiment of the present invention, the loss function value can be calculated based on an existing loss function. The preset model training end condition can be set based on actual needs. For example, the loss is less than or equal to a set loss threshold and remains unchanged within a set time period.

[0049] Furthermore, Qt can be obtained through the following steps:

[0050] S10, based on the vehicle flow rate and the number of electric vehicles in the target highway service area in a set historical time period, determine the vehicle flow rate and the number of electric vehicles in the target highway service area in a unit time period as initial electricity consumption data.

[0051] S11, set counter variable j=1.

[0052] S12, if j≤k, execute S13, otherwise, execute S16; k is the number of unit time periods corresponding to the preset time period, k=roundup(t1 / t2), t1 is the duration corresponding to the preset time period, t2 is the duration corresponding to the unit time period, and roundup() means rounding up.

[0053] S13, using the current prediction result based on the trained electricity prediction model as the current electricity consumption data corresponding to the target highway service area, and adding the current prediction result to the current prediction result set; the current prediction result includes the corresponding predicted traffic flow, predicted number of electric vehicles and predicted electricity consumption; the initial value of the current prediction result set is empty.

[0054] S14, inputting the current electricity consumption data corresponding to the target highway service area into the trained electricity consumption prediction model to obtain the corresponding current prediction result.

[0055] S15, set j=j+1, and execute S12;

[0056] S16, obtaining Qt based on the predicted power consumption corresponding to the current prediction result set.

[0057] Furthermore, in an embodiment of the present invention, the grid unit corresponding to the target highway service area is obtained by consulting a preset lookup table, wherein each row of data in the preset lookup table includes the highway service area, the power consumption of the service area within a preset time period, and the corresponding grid unit.

[0058] The preset query table can be obtained based on the following steps:

[0059] S201, obtaining the power required by any reference highway service area within a preset time period.

[0060] In the embodiment of the present invention, the reference high-speed service area may be a high-speed service area specified by a user.

[0061] S202, obtaining a photovoltaic module installable area corresponding to any reference highway service area as a corresponding target installation area.

[0062] In an embodiment of the present invention, the photovoltaic module installation area corresponding to the highway service area can be determined based on actual needs, for example, it can be the two sides of the highway between the reference highway service area and the highway service area adjacent to the reference highway service area. If there is a green belt on the highway, it can also include the top of the green belt, etc. S203, using preset initial grid units to divide the target installation area corresponding to any reference highway service area to obtain a corresponding plurality of grid areas; the preset initial grid unit is a grid area suitable for installing a photovoltaic module, that is, the size of the preset initial grid unit is set to a size that can install a photovoltaic module. The grid unit can be rectangular or square.

[0063] S204: Obtain the sunshine amount of any grid area corresponding to any reference highway service area within the preset time period.

[0064] S205, based on the amount of electricity required by any reference highway service area within a preset time period and the amount of sunshine corresponding to each grid area, obtain a target grid area from multiple grid areas as a grid unit corresponding to the reference highway service area; wherein the target grid area is a square area formed by at least one initial grid unit, and the amount of electricity that can be generated by the target grid area is greater than or equal to the amount of electricity required by the corresponding reference highway service area within the preset time period.

[0065] S206: Based on the power required by any reference highway service area within a preset time period and the corresponding grid unit, the preset query table is formed.

[0066] Furthermore, the amount of electricity Qg generated by the photovoltaic module in each unit time period within the first preset time period is obtained based on the sunshine amount in the corresponding unit time period, and the specific acquisition method may be the prior art. The sunshine amount in each unit time period is obtained based on a trained sunshine amount prediction model. The sunshine amount prediction model may be an AI model, such as a deep neural network model.

[0067] Furthermore, the trained sunshine amount prediction model is obtained through the following steps:

[0068] S1, obtain a training sample data set, each sample data includes the sunshine amount time series data SA of the corresponding sampling point of the corresponding sample data in the set historical time period, SA = {SA1, SA2, ..., SA r , ..., SA m}, SA r is the sunshine data corresponding to the rth unit time period, r ranges from 1 to m, m is the number of unit time periods corresponding to the set historical period, SA r =(L r , SA1 r , SA2 r ), L r is the position of the sampling point corresponding to the sample data, SA1 r is the weather characteristic information corresponding to the sampling point in the rth unit time period, SA2 r is the sunshine amount corresponding to the sampling point in the rth unit time period.

[0069] In the embodiment of the present invention, the sampling point may be an open area without any obstruction. The position of the sampling point may be the longitude and latitude coordinates of the sampling point, which may be obtained through the corresponding remote sensing image.

[0070] In the embodiment of the present invention, the weather characteristic information may include sunrise time, sunset time, ultraviolet intensity, temperature, humidity, visibility, etc. The sunshine amount at the sampling point may be obtained by testing an installed sunshine meter, sunshine radiation sensor, etc.

[0071] S2, input the training sample data of the current batch into the current sunshine prediction model for training to obtain corresponding prediction results, which include weather characteristic information and sunshine amount corresponding to the next unit time period of the unit time period corresponding to the current batch.

[0072] S3, based on the prediction results of the current batch and the corresponding actual results, obtain the current loss function value of the current sunshine prediction model, and determine whether the current loss function value meets the preset model training end condition. If yes, execute step S5, otherwise, execute step S4.

[0073] S4, updating the parameters of the current sunshine prediction model based on the current loss function value, and using the next batch of sample data as the training sample data of the current batch, and executing S2.

[0074] S5: Using the current sunshine amount prediction model as the trained sunshine amount prediction model.

[0075] Furthermore, the sunshine amount of the photovoltaic component in each unit time period within the first preset time period can be obtained by inputting the installation location of the photovoltaic component and the weather characteristic information corresponding to the previous unit time period into a trained sunshine amount prediction model.

[0076] Those skilled in the art know that the first unit time period in the first preset time period is the current time period. The sunshine amount corresponding to the next unit time period t is obtained based on the weather characteristic information corresponding to the previous unit time period t-1.

[0077] Further, in an embodiment of the present invention, the photovoltaic module installation area corresponding to the target highway service area may be located on both sides of the highway between the target highway service area and the highway service area adjacent to the target highway service area. If there is a green belt on the highway, it may also include the area above the green belt.

[0078] Further, in the embodiment of the present invention, the distance between each grid area and the target highway service area may be the distance between the center of the grid area and the center of the corresponding highway service area.

[0079] Those skilled in the art know that the position of each location point in each grid area can be obtained based on a corresponding map.

[0080] Further, in an embodiment of the present invention, the area corresponding to any grid area may be the green plant planting area closest to the grid area. The blocked area of ​​any grid area within a preset time period may be predicted based on the current normalized vegetation index and environmental variables of the green plants in the area corresponding to the grid area.

[0081] In the embodiment of the present invention, the environmental variables may be temperature, precipitation, etc.

[0082] Specifically, based on the current normalized vegetation index and environmental variables, the growth range of green plants in the corresponding area after a preset time period can be predicted, and then a regression model between the blocked area and the normalized vegetation index and environmental variables can be obtained.

[0083] Those skilled in the art know that, since the blocked area of ​​each grid region in each unit time period can be known, the changing speed of the blocked area of ​​each grid region in a preset time period can be obtained.

[0084] Furthermore, the target grid area is obtained by the following steps:

[0085] S161, based on the sunshine amount, distance, shaded area and shaded area change rate corresponding to any grid area, determine the scores corresponding to the sunshine amount, distance, shaded area and shaded area change rate corresponding to the grid area.

[0086] In the embodiment of the present invention, the score determination method of the sunshine amount, distance, shaded area and shaded area change speed can be set based on actual needs. Generally, the scores of sunshine amount, distance, shaded area and shaded area change speed are positively correlated with the size of sunshine amount, distance, shaded area and shaded area change speed. For example, the greater the sunshine amount, the greater the corresponding score, and vice versa.

[0087] S162, multiplying the scores corresponding to the sunshine amount, distance, shaded area and shaded area change speed corresponding to any grid area by the corresponding weights respectively and adding the respective multiplication results as the installation weight of the grid area.

[0088] In an embodiment of the present invention, the weights of the sunlight amount, distance, shaded area, and shaded area change speed can be set based on actual needs. In an exemplary embodiment, the weights of the sunlight amount, distance, shaded area, and shaded area change speed can be the same, for example, all 0.25. In another exemplary embodiment, the weights of the sunlight amount, distance, shaded area, and shaded area change speed can be different, for example, the weights of the sunlight amount, distance, shaded area, and shaded area change speed can be set in a descending order.

[0089] S163, taking the grid area corresponding to the largest of all installation weights as the target grid area. Based on the same inventive concept, an embodiment of the present invention provides a management device for photovoltaic power generation in a highway service area, the device comprising:

[0090] The first acquisition module is used to acquire the amount of electricity Qg generated by the photovoltaic components corresponding to the target high-speed service area in each unit time period within a first preset time period.

[0091] The second acquisition module is used to obtain vehicle information entering the target highway service area in each unit time period within the first preset time period, and obtain the power Qc required by the target highway service area in each unit time period based on the obtained vehicle information; the vehicle information includes vehicle flow and the number of electric vehicles.

[0092] The processing module is used for the s-th unit time period, if the Qg corresponding to the unit time period s >Qc s , then the remaining power Qr=(Qg s -Qc s ) for storage, if Qg s <Qc s , then the power provided is Qd=(Qc s -Qg s ), and the available power corresponding to the s-th unit time period is obtained; where the stored power is equal to Qr×α s , α s is the storage attenuation coefficient corresponding to the sth unit time period, s ranges from 1 to N, N is the number of unit time periods; the available power in the current unit time period is equal to the available power corresponding to the previous unit time period plus the power stored in the current unit time period or minus the power provided in the current unit time period.

[0093] The third acquisition module is used to acquire the maximum amount of power available within the first preset time period as a reference amount of power, and acquire the capacity of the battery based on the reference amount of power.

[0094] The device can be used to perform Figure 1 Therefore, for the functions that can be realized by each functional module of the device, please refer to Figure 1 The description of the embodiment shown is not repeated here. An embodiment of the present invention further provides an electronic device, comprising: at least one processor; and a memory connected to the at least one processor in communication; wherein the memory stores instructions executable by the at least one processor, and the instructions are configured to execute the method described in the embodiment of the present invention.

[0095] The embodiment of the present invention further provides a non-transitory computer-readable storage medium storing computer-executable instructions, wherein the computer instructions are used to execute the method described in the embodiment of the present invention.

[0096] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps described in the present invention can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solution disclosed in the present invention can be achieved, and this document does not limit this.

[0097] The above specific implementations do not constitute a limitation on the protection scope of the present invention. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for managing photovoltaic power generation in a highway service area, characterized in that: The method comprises the following steps: S200, obtaining the amount of electricity Qg generated by the photovoltaic assembly corresponding to the target high-speed service area in each unit time period within a first preset time period; S210, obtaining vehicle information entering the target highway service area in each unit time period within the first preset time period, and obtaining the power Qc required by the target highway service area in each unit time period based on the obtained vehicle information; The vehicle information includes vehicle flow and the number of electric vehicles; S220, for the s-th unit time period, if the Qg corresponding to the unit time period s >Qc s , then the remaining power Qr=(Qg s -Qc s ) for storage, if Qg s <Qc s , then the power provided is Qd=(Qc s -Qg s ), and the available power corresponding to the s-th unit time period is obtained; where the stored power is equal to Qr×α s , α s is the storage attenuation coefficient corresponding to the sth unit time period, s ranges from 1 to N, N is the number of unit time periods; the available power in the current unit time period is equal to the available power corresponding to the previous unit time period plus the power stored in the current unit time period or minus the power provided in the current unit time period; S230, obtaining the maximum amount of power available in the first preset time period as a reference amount of power, and obtaining the capacity of the battery based on the reference amount of power.

2. The method according to claim 1, characterized in that The installation location of the photovoltaic module corresponding to the target high-speed service area is obtained based on the following steps: S300, obtaining the power Qt required by the target highway service area within a second preset time period; S310, obtaining a grid unit corresponding to a target highway service area based on Qt; S320, obtaining a photovoltaic module installable area corresponding to a target highway service area as a target installation area, and dividing the target installation area by using the grid units to obtain a plurality of grid areas; S330, obtaining the sunshine amount of any grid area in the preset time period and the distance between any grid area and the target highway service area; S340, based on the normalized vegetation index and environmental variables of the green plants in the area corresponding to any grid area, obtaining the blocked area and the change speed of the blocked area of ​​any grid area within a preset time period; the blocked area is the projection area of ​​the green plants in the area corresponding to the grid area in the corresponding grid area; S350, based on the sunshine amount of the grid area corresponding to the target installation area, the distance between the grid area and the target high-speed service area, the shaded area of ​​the grid area within a preset time period and the speed of change of the shaded area, obtain the target grid as the grid for installing the photovoltaic components.

3. The method according to claim 2, characterized in that Qt is obtained based on the trained power prediction model.

4. The method according to claim 3, characterized in that The trained power prediction model is obtained through the following steps: S201, obtaining a sample data set, wherein the sample data set includes a plurality of sample data, each of which includes U and D, wherein U is the ID of the corresponding high-speed service area, and D is the power consumption time series data corresponding to the corresponding high-speed service area in a set historical time period, D = {D1, D2, ..., D i , ..., D n }, D i is the electricity consumption data corresponding to the i-th unit time period, i ranges from 1 to n, n is the number of unit time periods corresponding to the set historical segment, D i =(DC i ,DE i , Q i ), DC i is the traffic volume entering the corresponding highway service area in the i-th unit time period, DE i is the number of electric vehicles entering the corresponding highway service area in the i-th unit time period, Q i is the power consumption of the corresponding high-speed service area in the i-th unit time period; S202, inputting the training sample data of the current batch into the current power prediction model for training to obtain a corresponding prediction result, wherein the prediction result includes power consumption data corresponding to the next unit time period of the unit time period corresponding to the current batch; S203, based on the prediction results of the current batch and the corresponding actual results, the current loss function value of the current electricity prediction model is obtained, and it is determined whether the current loss function value meets the preset model training end condition. If so, step S205 is executed, otherwise, step S204 is executed; S204, updating the parameters of the current power prediction model based on the current loss function value, and using the next batch of sample data as the training sample data of the current batch, and executing S202; S205: Using the current power prediction model as the trained power prediction model.

5. The method according to claim 1, characterized in that The amount of electricity Qg generated by the photovoltaic component in each unit time period within the first preset time period is obtained based on the sunshine amount in the corresponding unit time period, and the sunshine amount in each unit time period is obtained based on the trained sunshine amount prediction model.

6. The method according to claim 5, characterized in that The trained sunshine amount prediction model is obtained through the following steps: S1, obtain a training sample data set, each sample data includes the sunshine amount time series data SA of the corresponding sampling point of the corresponding sample data in the set historical time period, SA = {SA1, SA2, ..., SA r , ..., SA m }, SA r is the sunshine data corresponding to the rth unit time period, r ranges from 1 to m, m is the number of unit time periods corresponding to the set historical period, SA r =(L r , SA1 r , SA2 r ), L r is the position of the sampling point corresponding to the sample data, SA1 r is the weather characteristic information corresponding to the sampling point in the rth unit time period, SA2 r is the sunshine amount corresponding to the sampling point in the rth unit time period; S2, inputting the training sample data of the current batch into the current sunshine prediction model for training to obtain the corresponding prediction result, wherein the prediction result includes the weather characteristic information and sunshine amount corresponding to the next unit time period of the unit time period corresponding to the current batch; S3, based on the prediction results of the current batch and the corresponding actual results, the current loss function value of the current sunshine prediction model is obtained, and it is determined whether the current loss function value meets the preset model training end condition. If so, step S5 is executed, otherwise, step S4 is executed; S4, updating the parameters of the current sunshine amount prediction model based on the current loss function value, and using the next batch of sample data as the training sample data of the current batch, and executing S2; S5: Using the current sunshine amount prediction model as the trained sunshine amount prediction model.

7. The method according to claim 2, characterized in that The target grid area is obtained by the following steps: S161, based on the sunshine amount, distance, shaded area and shaded area change rate corresponding to any grid area, determining the scores corresponding to the sunshine amount, distance, shaded area and shaded area change rate corresponding to the grid area; S162, multiplying the scores corresponding to the sunshine amount, distance, shaded area and shaded area change speed corresponding to any grid area by the corresponding weights respectively and adding the respective multiplication results as the installation weight of the grid area; S163: The grid area corresponding to the largest of all installation weights is used as the target grid area.

8. A management device for photovoltaic power generation in a highway service area, characterized in that: The device comprises: A first acquisition module is used to acquire the amount of electricity Qg generated by the photovoltaic assembly corresponding to the target high-speed service area in each unit time period within a first preset time period; A second acquisition module is used to acquire vehicle information entering the target highway service area in each unit time period within the first preset time period, and acquire the power Qc required by the target highway service area in each unit time period based on the acquired vehicle information; the vehicle information includes vehicle flow and the number of electric vehicles; The processing module is used for the s-th unit time period, if the Qg corresponding to the unit time period s >Qc s , then the remaining power Qr=(Qg s -Qc s ) for storage, if Qg s <Qc s , then the power provided is Qd=(Qc s -Qg s ), and the available power corresponding to the s-th unit time period is obtained; where the stored power is equal to Qr×α s , α s is the storage attenuation coefficient corresponding to the sth unit time period, s ranges from 1 to N, N is the number of unit time periods; the available power in the current unit time period is equal to the available power corresponding to the previous unit time period plus the power stored in the current unit time period or minus the power provided in the current unit time period; The third acquisition module is used to acquire the maximum amount of power available within the first preset time period as a reference amount of power, and acquire the capacity of the battery based on the reference amount of power.

9. The device according to claim 8, characterized in that The installation location of the photovoltaic module corresponding to the target high-speed service area is obtained based on the following steps: S300, obtaining the power Qt required by the target highway service area within a second preset time period; S310, obtaining a grid unit corresponding to a target highway service area based on Qt; S320, obtaining a photovoltaic module installable area corresponding to a target highway service area as a target installation area, and dividing the target installation area by using the grid units to obtain a plurality of grid areas; S330, obtaining the sunshine amount of any grid area in the preset time period and the distance between any grid area and the target highway service area; S340, based on the normalized vegetation index and environmental variables of the green plants in the area corresponding to any grid area, obtaining the blocked area and the speed of change of the blocked area of ​​any grid area within a preset time period; the blocked area is the projection area of ​​the green plants in the area corresponding to the grid area in the corresponding grid area; S350, based on the sunshine amount of the grid area corresponding to the target installation area, the distance between the grid area and the target high-speed service area, the shaded area of ​​the grid area within a preset time period and the speed of change of the shaded area, obtain the target grid as the grid for installing the photovoltaic components.

10. The device according to claim 9, characterized in that The target grid area is obtained by the following steps: S161, based on the sunshine amount, distance, shaded area and shaded area change rate corresponding to any grid area, determining the scores corresponding to the sunshine amount, distance, shaded area and shaded area change rate corresponding to the grid area; S162, multiplying the scores corresponding to the sunshine amount, distance, shaded area and shaded area change speed corresponding to any grid area by the corresponding weights respectively and adding the respective multiplication results as the installation weight of the grid area; S163: The grid area corresponding to the largest of all installation weights is used as the target grid area.

Citation Information

Patent Citations

  • Micro-grid optimization operation method and system considering electric vehicle load demand response

    CN116505517A

  • Photovoltaic development potential mining method considering on-site consumption

    CN117217622A

  • Highway road area photovoltaic resource developable potential assessment method and related device

    CN118539426A

  • Layout optimization method and device for photovoltaic modules in expressway service area

    CN119249666A

  • Method and device for monitoring carbon emission reduction of photovoltaic power generation system in expressway service area

    CN119298846A