Prefabricated non-dismantling formwork for dam bracket

By designing the prefabricated formwork for the dam ox leg of the limiting component and the support component, the problem of loose formwork connection caused by the impact force of liquid concrete when falling is solved, and the prevention of plate displacement and improvement of the density and durability of the dam structure is achieved. effect.

CN119434193APending Publication Date: 2025-02-14CHINA WATER CONSERVANCY & HYDROPOWER NO 9 ENG BUREAU CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411585343.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-08
Publication Date
2025-02-14

AI Technical Summary

Technical Problem

During the construction of prefabricated formwork for dam ox leg, the impact force of liquid concrete when falling causes too much lateral pressure on the back of the formwork, causing loose connections of the formwork, which in turn causes defects such as uneven, honeycomb or hollows on the concrete surface, reducing the dam structure density and durability increase damage risk.

Method used

A prefabricated disassembly-free formwork for dam ox leg including limiting components and support components was designed. The limiting assembly consists of a first embedded steel bar, a support frame, a stabilizing rod, a plate body and a second embedded steel bar, and the support assembly includes a tensioning member, a support member and a strike member. Through the cooperation of these components, the pressure of liquid concrete on the slab body is prevented from loosening the connection between the slab body and the second embedded steel bar.

Benefits of technology

It effectively avoids loose connections caused by the pressure of liquid concrete on the slab, prevents the displacement of the slab, and avoids defects such as unevenness, honeycombs or hollows on the concrete surface, thereby improving the density and durability of the dam structure and reducing the risk of damage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119434193A_ABST
    Figure CN119434193A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of dam construction, in particular to a dam corbel prefabricated non-dismantling formwork which comprises a limiting assembly and a formwork body. Comprising a first embedded steel bar, a supporting frame arranged on the first embedded steel bar, a stabilizing rod arranged on the inner wall of the end of the supporting frame, a plate body arranged on one side of the supporting frame and a second embedded steel bar arranged at the bottom of the plate body. The supporting assembly comprises a tensioning piece, a supporting piece arranged on the tensioning piece and a knocking piece arranged between the tensioning piece and the plate body; wherein the supporting assembly is arranged on the limiting assembly. The structure has the beneficial effects that the connection looseness of the plate body and the second embedded steel bars caused by the pressure of liquid concrete on the plate body is avoided, the defects of unevenness, honeycombs or holes and the like of the concrete surface caused by the displacement of the plate body are prevented, and then the compactness and durability of a dam structure are prevented from being reduced; and the risk of dam damage is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of dam construction, in particular to a prefabricated non-disassembly template for a dam corbel. Background Art

[0002] The role of the prefabricated formwork for the dam corbel is to achieve a fast, safe and efficient construction process by pre-manufacturing and optimizing the formwork structure. This formwork design eliminates the formwork removal step in traditional construction, greatly reducing safety hazards in construction, while improving construction efficiency and the appearance quality of the structure, ensuring the stability and bearing capacity of the dam corbel part.

[0003] However, after the formwork is installed, the speed of pouring concrete cannot be precisely controlled, resulting in the impact force generated when the concrete falls at a faster speed, which will produce significant lateral pressure on the back of the formwork. This pressure exceeds the bearing capacity of the fixed formwork and will cause the formwork connection to loosen, causing the formwork to shift, which in turn leads to defects such as unevenness, honeycombs or voids on the concrete surface, reducing the density and durability of the dam structure and increasing the risk of dam damage. Summary of the invention

[0004] In view of the problems existing in the prior art, the present invention is proposed.

[0005] In order to solve the above technical problems, the present invention provides the following technical solutions: a prefabricated non-disassembly formwork for dam corbels, comprising:

[0006] A limiting component includes a first embedded steel bar, a support frame arranged on the first embedded steel bar, a stabilizing rod arranged on the inner wall of the end of the support frame, a plate body arranged on one side of the support frame and a second embedded steel bar arranged at the bottom of the plate body; and a supporting component includes a tensioning member, a supporting member arranged on the tensioning member and a knocking member arranged between the tensioning member and the plate body; wherein the supporting component is arranged on the limiting component; wherein the tensioning member includes a mud receiving plate, and the space on one side of the plate body close to the supporting component is poured with concrete, the concrete generates pressure on the plate body, and the concrete falls on the mud receiving plate to deflect the mud receiving plate, thereby pulling the knocking member to cause the plate body to generate a force opposite to the concrete.

[0007] As a preferred solution of the present invention, the mud receiving plate is arc-shaped and both ends of the mud receiving plate are bent away from the ground, and a receiving groove is provided on one side of the mud receiving plate away from the ground.

[0008] As a preferred solution described in the present invention, wherein: an anti-slip groove is provided at the top of the mud receiving plate, first load-bearing rods are rotatably connected to both sides of the mud receiving plate, the bottom end of the first load-bearing rod is fixedly connected to the first embedded steel bar and inserted into the poured concrete, and the weight of the part from the bottom end of the mud receiving plate to the first load-bearing rod is lighter than the weight of the part from the top end of the mud receiving plate to the first load-bearing rod.

[0009] As a preferred solution described in the present invention, the supporting member includes two second bearing rods fixedly connected to the supporting frame and the stabilizing rod, the bottom ends of the second bearing rods are inserted into the poured concrete, and the same barrier rod is arranged on the side where the two second bearing rods are close to each other.

[0010] As a preferred solution of the present invention, the two second bearing rods are rotatably connected to one side close to each other with a counterweight, and the center of gravity of the counterweight is located at one end of the second bearing rod away from the plate body.

[0011] As a preferred solution described in the present invention, the same second connecting block is provided on the side where the two counterweight blocks are close to each other, and an interference groove is provided at the bottom of the second connecting block. Under normal circumstances, the vertical projection area of ​​the second connecting block is larger than the vertical projection area of ​​the mud receiving plate from the first bearing rod to the top end.

[0012] As a preferred solution of the present invention, a connecting rod is arranged at one end of the counterweight block close to the plate body, and an arc-shaped abutment rod is arranged at one end of the connecting rod away from the connecting rod.

[0013] As a preferred solution described in the present invention, the same first connecting block is provided on the side where the two arc-shaped abutment rods are close to each other, the end of the arc-shaped abutment rod is arc-shaped, and the end of the connecting rod close to the arc-shaped abutment rod is inclined toward the direction away from the plate body.

[0014] As a preferred solution of the present invention, the sum of the weights of the counterweight block and the second connecting block is greater than the sum of the weights of the connecting rod, the arc-shaped abutting rod and the first connecting block.

[0015] As a preferred solution described in the present invention, the knocking member includes a second connecting ring fixedly connected to the plate body, a stretching chain is arranged on the second connecting ring, a first connecting ring is arranged at one end of the stretching chain away from the plate body, the first connecting ring is fixedly connected to the mud receiving plate, a mounting plate is slidably sleeved on the stretching chain, a gap is provided at the sliding sleeve of the mounting plate and the stretching chain, a Z-shaped impact rod is arranged on the mounting plate, and the height of the Z-shaped impact rod away from one end of the mounting plate is higher than the top height of the connecting rod.

[0016] Beneficial effects of the present invention: By arranging tensioning members and supporting members, the advantage of such arrangement is that the pressure of liquid concrete on the plate body may be prevented from causing loosening of the connection between the plate body and the second embedded steel bar, and displacement of the plate body may be prevented from causing defects such as unevenness, honeycombs or voids on the concrete surface, thereby preventing reduction in the density and durability of the dam structure and increasing the risk of dam damage. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. Among them:

[0018] Figure 1 Schematic diagram of the three-dimensional structure of the prefabricated non-removable formwork for the dam corbel.

[0019] Figure 2 It is a schematic diagram of the three-dimensional enlarged structure of the limit component.

[0020] Figure 3 It is a schematic diagram of the three-dimensional enlarged structure of the supporting component.

[0021] Figure 4 It is a schematic diagram of the three-dimensional enlarged structure of the tensioning member.

[0022] Figure 5 A partial three-dimensional enlarged structural diagram of the support component

[0023] Figure 6 It is a three-dimensional enlarged structural diagram of the striking piece.

[0024] Figure numbers: 100, limit assembly; 101, first embedded steel bar; 102, support frame; 103, stabilizer bar; 104, plate body; 105, second embedded steel bar; 200, support assembly; 201, tension member; 201a, mud receiving plate; 201b, accommodating groove; 201c, first load-bearing rod; 202, support member; 202a, second load-bearing rod; 202b, stop rod; 202c, interference groove; 202d, counterweight block; 202e, connecting rod; 202f, arc-shaped interference rod; 202g, first connecting block; 202h, second connecting block; 203, knocking member; 203a, mounting plate; 203b, stretching chain; 203c, first connecting ring; 203d, Z-shaped impact rod; 203e, second connecting ring. DETAILED DESCRIPTION

[0025] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.

[0026] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.

[0027] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.

[0028] Example 1

[0029] Reference Figure 1 to Figure 6 , which is the first embodiment of the present invention, provides a prefabricated non-disassembly formwork for a dam corbel. By setting a limiting component 100 and a supporting component 200, it is prevented that the pressure of liquid concrete on the plate body 104 causes the loosening of the connection between the plate body 104 and the second embedded steel bar 105, and prevents the plate body 104 from being displaced to cause defects such as unevenness, honeycombs or voids on the concrete surface, thereby preventing the density and durability of the dam structure from being reduced and the risk of increasing dam damage is avoided.

[0030] Specifically, the limiting assembly 100 includes a first embedded steel bar 101, a support frame 102 arranged on the first embedded steel bar 101, a stabilizing rod 103 arranged on the inner wall of the end of the support frame 102, a plate body 104 arranged on one side of the support frame 102 and a second embedded steel bar 105 arranged at the bottom of the plate body 104; and a supporting assembly 200 includes a tensioning member 201, a supporting member 202 arranged on the tensioning member 201 and a knocking member 203 arranged between the tensioning member 201 and the plate body 104; wherein the supporting assembly 200 is arranged on the limiting assembly 100; wherein the tensioning member 201 includes a mud receiving plate 201a, and the space on one side of the plate body 104 close to the supporting assembly 200 is poured with concrete, and the concrete exerts pressure on the plate body 104, and the concrete falls on the mud receiving plate 201a to deflect the mud receiving plate 201a, thereby pulling the knocking member 203 to make the plate body 104 generate a force opposite to the concrete.

[0031] The first embedded steel bar 101 and the second embedded steel bar 105 are inserted and fixedly sleeved into the poured concrete to limit the position, and the stabilizing rod 103 can strengthen the structural strength of the support frame 102 and increase the stability.

[0032] In summary, by setting the limiting component 100 and the supporting component 200, when the workers pre-embed the first embedded steel bar 101 and the second embedded steel bar 105 into the poured concrete layer, and then install the plate body 104 on the second embedded steel bar 105 at a pre-designed inclination angle, the stabilizing rod 103 is fixedly connected to the support frame 102, and the support frame 102 is respectively fixedly connected to the plate body 104 and the first embedded steel bar 101, the tensioning member 201 is fixedly connected to the first embedded steel bar 101 and installed in the poured concrete, the supporting member 202 is fixedly connected to the supporting frame 102 and the stabilizing rod 103 and the bottom end of the supporting member 202 is installed in the poured concrete, and a row is installed reciprocatingly, and the plate bodies 104 are tightly attached to each other without any gaps.

[0033] When workers pour liquid and viscous concrete in the space on one side of the plate body 104 close to the supporting assembly 200, the concrete falls on the side of the plate body 104 close to the supporting assembly 200. Part of the concrete exerts downward pressure on the side under the action of gravity, causing the plate body 104 to tend to deflect downward, increasing the loosening probability of the connection between the plate body 104 and the second embedded steel bar 105, while the remaining part of the concrete is poured on the tensioning member 201, so that the tensioning force exerted by the tensioning member 201 on the plate body 104 by pulling the striking member 203 and the pressure exerted by the concrete on the plate body 104 are partially offset, reducing the loosening probability of the connection between the plate body 104 and the second embedded steel bar 105. rate, and the tensioning member 201 will press against the supporting member 202 to deflect the supporting member 202, so that the end of the supporting member 202 applies a thrust to the plate body 104, and this thrust further offsets the pressure exerted by the concrete on the plate body 104, further reduces the probability of loosening at the connection between the plate body 104 and the second embedded steel bar 105, avoids the pressure of the liquid concrete on the plate body 104 causing the connection between the plate body 104 and the second embedded steel bar 105 to loosen, prevents the plate body 104 from being displaced and causing defects such as unevenness, honeycombs or voids on the concrete surface, thereby preventing the density and durability of the dam structure from being reduced, and avoiding the risk of increasing dam damage.

[0034] Example 2

[0035] Reference Figure 1 to Figure 6 , which is the second embodiment of the present invention. This embodiment is based on the previous embodiment, but differs in that a tensioning member 201 and a supporting member 202 are provided. The advantage of such a provision is to prevent the pressure of liquid concrete on the plate body 104 from causing loosening of the connection between the plate body 104 and the second embedded steel bar 105, and to prevent the plate body 104 from being displaced and causing defects such as unevenness, honeycombs or voids on the concrete surface, thereby preventing the density and durability of the dam structure from being reduced and the risk of increasing dam damage.

[0036] Specifically, the mud receiving plate 201a is arc-shaped and both ends of the mud receiving plate 201a are bent in a direction away from the ground, and a receiving groove 201b is provided on one side of the mud receiving plate 201a away from the ground.

[0037] An anti-slip groove is provided at the top of the mud receiving plate 201a, and the first bearing rod 201c is rotatably connected to both sides of the mud receiving plate 201a. The bottom end of the first bearing rod 201c is fixedly connected to the first embedded steel bar 101 and inserted into the poured concrete. The weight of the part from the bottom end of the mud receiving plate 201a to the first bearing rod 201c is lighter than the weight of the part from the top end of the mud receiving plate 201a to the first bearing rod 201c.

[0038] The supporting member 202 includes two second bearing rods 202a fixedly connected to the supporting frame 102 and the stabilizing rod 103. The bottom ends of the second bearing rods 202a are inserted into the poured concrete. The same blocking rod 202b is provided on the side where the two second bearing rods 202a are close to each other.

[0039] The two second bearing rods 202a are rotatably connected to one side thereof close to each other with a counterweight 202d. The center of gravity of the counterweight 202d is located at one end of the second bearing rod 202a away from the plate 104.

[0040] The same second connecting block 202h is arranged on the side where the two counterweight blocks 202d are close to each other, and a resistance groove 202c is opened at the bottom of the second connecting block 202h. Under normal conditions, the vertical projection area of ​​the second connecting block 202h is larger than the vertical projection area of ​​the mud plate 201a from the first bearing rod 201c to the top.

[0041] A connecting rod 202e is disposed at one end of the counterweight block 202d close to the plate body 104, and an arc-shaped abutting rod 202f is disposed at one end of the connecting rod 202e away from the connecting rod 202e.

[0042] The same first connection block 202g is disposed on the side where the two arc-shaped abutting rods 202f are close to each other. The end of the arc-shaped abutting rod 202f is arc-shaped. The end of the connecting rod 202e close to the arc-shaped abutting rod 202f is inclined in a direction away from the plate body 104.

[0043] The sum of the weights of the counterweight block 202d and the second connecting block 202h is greater than the sum of the weights of the connecting rod 202e, the arc-shaped abutting rod 202f and the first connecting block 202g.

[0044] Among them, the mud receiving plate 201a is arc-shaped and both ends of the mud receiving plate 201a are bent away from the ground, so that the end of the mud receiving plate 201a close to the counterweight block 202d can push and resist the counterweight block 202d when the mud receiving plate 201a is deflected, so that the end of the mud receiving plate 201a away from the counterweight block 202d can receive the concrete poured from above.

[0045] A receiving groove 201b is provided on one side of the mud receiving plate 201a away from the ground, and the receiving groove 201b is conducive to catching concrete poured from above into the receiving groove 201b to prevent it from falling from the mud receiving plate 201a.

[0046] The top of the mud receiving plate 201a is provided with an anti-skid groove, which is beneficial for the end of the mud receiving plate 201a close to the counterweight block 202d to push and resist the counterweight block 202d when the mud receiving plate 201a deflects to increase the friction force and avoid slipping.

[0047] Both sides of the mud receiving plate 201a are rotatably connected with the first bearing rod 201c, which can bear the weight of the mud receiving plate 201a to prevent the gravity of the mud receiving plate 201a from being applied to the support frame 102 and the plate body 104, thereby increasing the burden on the support frame 102 and the plate body 104.

[0048] The weight of the part from the bottom end of the mud receiving plate 201a to the first bearing rod 201c is lighter than the weight of the part from the top end of the mud receiving plate 201a to the first bearing rod 201c, which makes it easier for the end of the mud receiving plate 201a away from the counterweight block 202d to tilt upward, thereby catching the poured concrete.

[0049] The supporting member 202 includes two second bearing rods 202a fixedly connected to the supporting frame 102 and the stabilizing rod 103, so as to bear the gravity of the counterweight block 202d, the second connecting block 202h, the connecting rod 202e, the arc-shaped resistance rod 202f and the first connecting block 202g, thereby preventing an additional burden on the plate body 104 and the supporting frame 102.

[0050] An interference groove 202c is provided at the bottom of the second connecting block 202h to facilitate the interference of the end of the mud receiving plate 201a. Under normal circumstances, the vertical projection area of ​​the second connecting block 202h is larger than the vertical projection area of ​​the mud receiving plate 201a from the first bearing rod 201c to the top end, so as to prevent workers from pouring concrete at the end of the mud receiving plate 201a close to the counterweight block 202d when pouring concrete, and prevent the end of the mud receiving plate 201a away from the counterweight block 202d from being unable to deflect downward.

[0051] A first connecting block 202g is disposed on one side of the two arc-shaped abutting rods 202f that are close to each other. The first connecting block 202g can enhance the structural strength of the arc-shaped abutting rods 202f.

[0052] The end of the arc-shaped abutting rod 202 f is arc-shaped, which improves the tolerance of the arc-shaped abutting rod 202 f abutting and pressing the plate body 104 .

[0053] One end of the connecting rod 202e close to the arc-shaped abutting rod 202f is inclined away from the plate body 104 to prevent concrete from falling on the connecting rod 202e when poured, sliding through the connecting rod 202e to the side of the plate body 104 away from the connecting rod 202e and falling on people.

[0054] The sum of the weights of the counterweight block 202d and the second connecting block 202h is greater than the sum of the weights of the connecting rod 202e, the arc-shaped abutment rod 202f and the first connecting block 202g, which is beneficial for the counterweight block 202d and the second connecting block 202h to push the end of the mud plate 201a close to the counterweight block 202d to abut against the stop rod 202b to limit the position under normal conditions.

[0055] In summary, by setting the tensioning member 201 and the supporting member 202, after the workers pour the concrete, part of the concrete falls into the receiving groove 201b, so that the weight of the end of the mud receiving plate 201a away from the counterweight block 202d is greater than the sum of the weight of the end of the mud receiving plate 201a close to the counterweight block 202d, the counterweight block 202d and the second connecting block 202h, thereby causing the mud receiving plate 201a to deflect, and the end of the mud receiving plate 201a away from the counterweight block 202d sinks, and the end of the mud receiving plate 201a close to the counterweight block 202d is tilted and inserted into the resistance groove 202c to push the counterweight block 202d and the second connecting block 202h to tilt up.

[0056] While the counterweight block 202d and the second connecting block 202h are tilted upward, the connecting rod 202e, the arc-shaped contact rod 202f and the first connecting block 202g sink. When the bottom of one end of the mud receiving plate 201a away from the counterweight block 202d contacts and limits the poured concrete, the end of the arc-shaped contact rod 202f contacts the side of the plate body 104 away from the connecting rod 202e and applies pressure to the plate body 104 to offset the pressure applied to the side of the plate body 104 close to the connecting rod 202e when part of the liquid concrete is poured.

[0057] At the same time, when the end of the mud receiving plate 201a close to the counterweight block 202d is tilted upward, the tensile chain 203b is stretched straight between the plate body 104 and the mud receiving plate 201a, thereby applying a pulling force to the side of the plate body 104 close to the connecting rod 202e, and partially offsetting the pressure applied to the side of the plate body 104 close to the connecting rod 202e when the liquid concrete is poured. The advantage of this arrangement is to prevent the pressure of the liquid concrete on the plate body 104 from causing the connection between the plate body 104 and the second embedded steel bar 105 to loosen, and to prevent the plate body 104 from being displaced and causing defects such as unevenness, honeycombs or voids on the concrete surface, thereby preventing the density and durability of the dam structure from being reduced, and avoiding the risk of increasing damage to the dam.

[0058] Example 3

[0059] Reference Figure 1 to Figure 6, which is the third embodiment of the present invention. This embodiment is based on the previous embodiment, and the difference is that by setting the knocking piece 203, the advantage of such a setting is that not only the Z-shaped impact rod 203d knocks the connecting rod 202e to make a sound, reminding the staff that the concrete can continue to be poured, but also the Z-shaped impact rod 203d pushes away the liquid concrete slag that falls on the connecting rod 202e, preventing the liquid concrete slag from falling along the connecting rod 202e to the side of the plate 104 away from the connecting rod 202e and falling, thereby preventing people from being hit.

[0060] Specifically, the knocking member 203 includes a second connecting ring 203e fixedly connected to the plate body 104, a stretching chain 203b is arranged on the second connecting ring 203e, a first connecting ring 203c is arranged at one end of the stretching chain 203b away from the plate body 104, the first connecting ring 203c is fixedly connected to the mud receiving plate 201a, a mounting plate 203a is slidably sleeved on the stretching chain 203b, a gap is provided at the sliding sleeve of the mounting plate 203a and the stretching chain 203b, a Z-shaped impact rod 203d is arranged on the mounting plate 203a, and the height of the Z-shaped impact rod 203d away from the end of the mounting plate 203a is higher than the top height of the connecting rod 202e.

[0061] The stretching chain 203b is close to the plate body 104 and the top of the mud receiving plate 201a. When the liquid concrete covers the striking piece 203, the pouring stops.

[0062] The height of one end of the stretched chain 203b near the first connecting ring 203c is higher than the height of one end of the stretched chain 203b near the second connecting ring 203e, which is beneficial to improve the efficiency of the Z-shaped impact rod 203d hitting the connecting rod 202e when the mounting plate 203a slides.

[0063] When the stretch chain 203b is in a stretched state, the height of the end of the Z-shaped impact rod 203d away from the stretch chain 203b is higher than the top height of the connecting rod 202e, and there is a gap between the end of the Z-shaped impact rod 203d away from the mounting plate 203a and the top of the connecting rod 202e.

[0064] There is a gap at the sliding sleeve joint between the mounting plate 203a and the stretching chain 203b, which facilitates the left and right swinging of the mounting plate 203a.

[0065] In summary, by setting the knocking piece 203, when the stretching chain 203b between the plate body 104 and the mud receiving plate 201a is pulled to a straight state by the upturned end of the mud receiving plate 201a, the poured liquid concrete falls on the stretching chain 203b under the action of gravity and exerts pressure on the stretching chain 203b, causing the stretching chain 203b to deform and generate elastic potential energy, driving the mounting plate 203a to slide slightly on the stretching chain 203b, and the mounting plate 203a makes the Z-shaped impact rod 203d move away from the end of the stretching chain 203b toward the connecting rod 202e, not only knocking the connecting rod 202e but also sliding along the top arc of the connecting rod 202e in the direction away from the plate body 104 and pushing away the concrete slag falling on the connecting rod 202e and moving in the direction away from the plate body 104. The Z-shaped impact rod 203d is movable, and there is a gap at the sliding sleeve joint of the mounting plate 203a and the stretching chain 203b, so that the Z-shaped impact rod 203d is not in the same straight line when it descends and collides with the connecting rod 202e. Therefore, when the Z-shaped impact rod 203d pushes away the concrete slag, the concrete slag moves to the two sides of the connecting rod 202e and falls. The concrete slag falls on the stretching chain 203b and bounces off, so that the stretching chain 203b is reset and reciprocates until the liquid concrete completely covers the striking piece 203. The advantage of such a setting is that not only the Z-shaped impact rod 203d knocks on the connecting rod 202e to make a sound, reminding the staff that the concrete can continue to be poured, but also the Z-shaped impact rod 203d pushes away the liquid concrete slag that falls on the connecting rod 202e, preventing the liquid concrete slag from falling along the connecting rod 202e to the side of the plate body 104 away from the connecting rod 202e and falling, so as to prevent people from being hit.

[0066] Importantly, it should be noted that the construction and arrangement of the present application shown in a number of different exemplary embodiments are only exemplary. Although only a few embodiments are described in detail in this disclosure, it should be readily understood by those who refer to this disclosure that many modifications are possible (e.g., the size, scale, structure, shape and proportion of various elements, and parameter values ​​(e.g., temperature, pressure, etc.), installation arrangements, use of materials, color, directional changes, etc.) without substantially departing from the novel teachings and advantages of the subject matter described in the application. For example, the element shown as integrally formed can be composed of multiple parts or elements, the position of the element can be inverted or otherwise changed, and the nature or number or position of the discrete element can be changed or changed. Therefore, all such modifications are intended to be included in the scope of the present invention. The order or sequence of any process or method steps can be changed or reordered according to alternative embodiments. In the claims, any clause of "dam corbel prefabricated non-removal formwork plus function" is intended to cover the structure described herein that performs the function, and is not only structurally equivalent but also an equivalent structure. Without departing from the scope of the invention, other substitutions, modifications, changes and omissions may be made in the design, operating conditions and arrangement of the exemplary embodiments. Therefore, the present invention is not limited to a specific embodiment, but extends to a variety of modifications that still fall within the scope of the appended claims.

[0067] Additionally, in order to provide a concise description of exemplary embodiments, all features of an actual embodiment (ie, those features that are not relevant to the best mode presently contemplated for carrying out the invention or those that are not relevant to implementing the invention) may not be described.

[0068] It will be appreciated that in the development of any actual implementation, as in any engineering or design project, numerous implementation-specific decisions may be made. Such a development effort may be complex and time-consuming, but will be a routine task of design, fabrication, and production for those of ordinary skill having the benefit of this disclosure without undue experimentation.

[0069] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.

Claims

1. A prefabricated non-disassembly formwork for dam corbels, characterized in that: include, A limiting assembly (100) comprises a first embedded steel bar (101), a support frame (102) arranged on the first embedded steel bar (101), a stabilizing rod (103) arranged on the inner wall of the end of the support frame (102), a plate body (104) arranged on one side of the support frame (102), and a second embedded steel bar (105) arranged at the bottom of the plate body (104); and, A supporting component (200) comprises a tensioning member (201), a supporting member (202) disposed on the tensioning member (201), and a striking member (203) disposed between the tensioning member (201) and the plate body (104); Wherein, the supporting component (200) is arranged on the limiting component (100); The tensioning member (201) includes a mud receiving plate (201a), and a space on one side of the plate body (104) close to the supporting assembly (200) is poured with concrete. The concrete exerts pressure on the plate body (104). The concrete falls on the mud receiving plate (201a) to deflect the mud receiving plate (201a), thereby pulling the striking member (203) to cause the plate body (104) to generate a force opposite to the concrete.

2. The prefabricated non-disassembly formwork for dam corbels according to claim 1, characterized in that: The mud receiving plate (201a) is arc-shaped and both ends of the mud receiving plate (201a) are bent in a direction away from the ground. A receiving groove (201b) is provided on a side of the mud receiving plate (201a) away from the ground.

3. The prefabricated non-disassembly formwork for dam corbels according to claim 2, characterized in that: The top of the mud receiving plate (201a) is provided with an anti-slip groove, and both sides of the mud receiving plate (201a) are rotatably connected to first bearing rods (201c), the bottom end of the first bearing rod (201c) is fixedly connected to the first embedded steel bar (101) and inserted into the poured concrete, and the weight of the part from the bottom end of the mud receiving plate (201a) to the first bearing rod (201c) is lighter than the weight of the part from the top end of the mud receiving plate (201a) to the first bearing rod (201c).

4. The prefabricated non-disassembly formwork for dam corbels according to claim 3, characterized in that: The supporting member (202) comprises two second bearing rods (202a) fixedly connected to the supporting frame (102) and the stabilizing rod (103), the bottom ends of the second bearing rods (202a) being inserted into the poured concrete, and a same blocking rod (202b) being arranged on the side where the two second bearing rods (202a) are close to each other.

5. The prefabricated non-disassembly formwork for dam corbels according to claim 4, characterized in that: The two second bearing rods (202a) are rotatably connected to one side close to each other with a counterweight block (202d), and the center of gravity of the counterweight block (202d) is located at the end of the second bearing rod (202a) away from the plate body (104).

6. The prefabricated non-disassembly formwork for dam corbels according to claim 5, characterized in that: The same second connecting block (202h) is arranged on the side where the two counterweight blocks (202d) are close to each other, and a resistance groove (202c) is arranged at the bottom of the second connecting block (202h). Under normal conditions, the vertical projection area of ​​the second connecting block (202h) is larger than the vertical projection area of ​​the mud receiving plate (201a) from the first bearing rod (201c) to the top end.

7. The prefabricated non-disassembly formwork for dam corbels according to claim 6, characterized in that: A connecting rod (202e) is provided at one end of the counterweight block (202d) close to the plate body (104), and an arc-shaped abutment rod (202f) is provided at one end of the connecting rod (202e) away from the connecting rod (202e).

8. The prefabricated non-disassembly formwork for dam corbels according to claim 7, characterized in that: A same first connecting block (202g) is provided on the side where the two arc-shaped abutting rods (202f) are close to each other, the end of the arc-shaped abutting rod (202f) is arc-shaped, and the end of the connecting rod (202e) close to the arc-shaped abutting rod (202f) is inclined in a direction away from the plate body (104).

9. The prefabricated non-disassembly formwork for dam corbels according to claim 8, characterized in that: The sum of the weights of the counterweight block (202d) and the second connecting block (202h) is greater than the sum of the weights of the connecting rod (202e), the arc-shaped abutting rod (202f) and the first connecting block (202g).

10. The prefabricated non-disassembly formwork for dam corbels according to claim 9, characterized in that: The knocking member (203) includes a second connecting ring (203e) fixedly connected to the plate body (104); a stretching chain (203b) is arranged on the second connecting ring (203e); a first connecting ring (203c) is arranged at one end of the stretching chain (203b) away from the plate body (104); the first connecting ring (203c) is fixedly connected to the mud receiving plate (201a); a mounting plate (203a) is slidably sleeved on the stretching chain (203b); a gap is provided at the sliding sleeve joint between the mounting plate (203a) and the stretching chain (203b); a Z-shaped knocking rod (203d) is arranged on the mounting plate (203a); the height of the Z-shaped knocking rod (203d) away from the mounting plate (203a) is higher than the top height of the connecting rod (202e).