Central air conditioner fresh air system energy-saving device
By adopting a gradient treatment mechanism in the central air conditioning fresh air system, using independently powered spiral high-resistance heating pipes and metal air intake tanks, the air flow temperature is accurately controlled, and the problems of excessive uselessness of heating elements and inaccurate temperature adjustment in the prior art are solved, reducing power consumption and improving the balance of somatosensory temperature.
Patent Information
- Application Number
- CN202411406277.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-10
- Publication Date
- 2025-02-25
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
When heating the existing central air conditioner fresh air system, multiple heating elements are in power-on state but cannot be controlled independently, resulting in a significant increase in useless work in some components, high power consumption, inaccurate temperature adjustment, and large differences in somatosensory temperature.
The gradient processing mechanism is adopted, including multiple spiral high-resistance heating pipes and connected metal air intake tanks. Each heating pipe can be independently powered. Through the real-time detection of the hierarchical heating method and temperature sensor, the airflow temperature is accurately controlled to avoid multiple heating elements working simultaneously.
It effectively reduces the power consumption of air conditioners, improves the accuracy of temperature adjustment and the balance of somatosensory temperature, and reduces the repeated adjustment of temperature by users.
Smart Images

Figure CN119508975A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of fresh air systems, and in particular to an energy-saving device for a central air-conditioning fresh air system. Background Art
[0002] The central air conditioning fresh air system is a system that introduces fresh air into the room and processes and distributes it through the air conditioning system. Its main function is to provide fresh air and input it into the room through temperature and humidity control to maintain a comfortable indoor environment.
[0003] The functions of central air conditioners are the same as those of ordinary air conditioners, which mainly adjust the indoor temperature. However, the power consumption of heating during the use of air conditioning is much greater than that of cooling. This is because the power consumption of components such as electric auxiliary heating, compressors, and reversing valves is increased during the heating process. At the same time, the air conditioner also needs to blow the heat absorbed by the outdoor heat exchanger back into the room during heating. In this way, the indoor heat obtained during heating is more than the heat dissipated during cooling. Therefore, heating consumes more electricity than cooling.
[0004] However, the existing central air conditioning fresh air system has the following shortcomings:
[0005] When traditional air conditioners are used for heating, they mainly install adapter heaters in independent air ducts. The continuously compressed high-temperature airflow passes through the interior of the heater, and the pre-discharged airflow is heated by physical heating. However, there are still some shortcomings, such as:
[0006] 1) In order to prevent airflow from escaping in some areas, the existing central air conditioner electric auxiliary heating components usually have heaters that match the airway size. During use, multiple heating elements in the device are powered on. Since the airflow release amount is much smaller than the cross-section in the airway and multiple heating elements cannot be controlled independently, some heating elements do useless work, greatly increasing the power consumption of the air conditioner.
[0007] 2) The electric auxiliary heating components of traditional central air conditioners can only control the power of the heating elements according to the set temperature of the air conditioner. However, this method is highly blind and the air flow temperature after secondary heating cannot be accurately controlled, resulting in large differences in perceived temperature. Users need to repeatedly adjust the temperature.
[0008] Therefore, we propose an energy-saving device for the central air-conditioning fresh air system to solve the above-mentioned problems. Summary of the invention
[0009] The object of the present invention is to provide an energy-saving device for a central air-conditioning fresh air system. Through the gradient processing mechanism, the ability of each spiral high-resistance heating tube therein to be independently powered can be utilized to bake the connected metal air inlet tanks in turn, so as to achieve the purpose of heating the high-speed gas therein. Before each airflow is transmitted to the lower-level metal air inlet tank, the airflow temperature can be detected by the upper-level temperature sensor. The system components can analyze and judge based on the actual data. If it is consistent with the setting, the high-temperature airflow is discharged normally. Otherwise, the subsequent spiral high-resistance heating tubes are energized until the airflow temperature is heated to within the set range, thereby avoiding multiple heating elements being in a full load state to solve the problems raised by the above-mentioned background technology.
[0010] To achieve the above-mentioned object, the present invention provides the following technical solutions: an energy-saving device for a central air-conditioning fresh air system, comprising a filter chamber, a first transition chamber, a refrigeration chamber, a heating chamber, a second transition chamber and a release chamber;
[0011] A gradient processing mechanism is provided inside the heating chamber;
[0012] The gradient processing mechanism includes a first inner frame, a group of first wiring bases are equidistantly installed on the bottom of the inner wall of the first inner frame, the number of the first wiring bases in a group is five, and the top of each of the first wiring bases is fixedly connected to a first load-bearing frame, a group of power supply brackets are fixedly installed on the bottom of the inner wall of the first inner frame, and the number of a group of power supply brackets is equal to a group of first load-bearing frames, a spiral high-resistance heating tube is fixedly installed on the top of each of the power supply brackets, and the wiring ends of each of the spiral high-resistance heating tubes are respectively connected to the output end of a corresponding first load-bearing frame, a metal air inlet tank is fixedly inserted into the inner surface wall of each of the spiral high-resistance heating tubes, and the outer surfaces of the four metal air inlet tanks are provided with first joints, and a shunt pipe is fixedly connected between each of the first joints and the top of a metal air inlet tank, a group of ceramic seats and independent power supplies are respectively fixedly installed on the top of the heating chamber, the number of a group of ceramic seats and independent power supplies is equal to a group of metal air inlet tanks, and the top of each of the ceramic seats is fixedly installed. A first metal copper plate is fixedly connected to the bottom of each independent power supply, a second metal copper plate is fixedly connected to the top of each independent power supply, a group of wires are fixedly connected to the inside of each ceramic seat, the output end of each group of wires is respectively connected to the wiring terminal of a corresponding first wiring base, a group of conductive rods are fixedly connected between the equal sides of each first metal copper plate and the second metal copper plate, a group of hollow sleeves are fixedly installed at the bottom of the heating chamber, and the number of a group of hollow sleeves is equal to a group of metal air inlet tanks, a plugging head is movably provided inside each hollow sleeve, a second wiring base is fixedly installed inside each plugging head, a temperature sensor is fixedly connected to the top of each second wiring base, a first plug socket is fixedly connected to the bottom of each second wiring base, a group of receivers are fixedly installed at the bottom of the heating chamber, a group of first information lines are fixedly installed inside each of the first plug sockets, and the output ends of each group of the first information lines are respectively connected to the wiring terminals of a corresponding receiver.
[0013] Preferably, a primary gas gathering box and a secondary gas gathering box are fixedly installed on the top and bottom of the heating chamber respectively, a second joint is provided on the outer wall of one of the metal gas inlet tanks, a first connecting pipe is fixedly connected to the top of one of the metal gas inlet tanks, an air inlet end of the first connecting pipe is connected to the bottom of the primary gas gathering box, a second connecting pipe is fixedly connected to the inside of the second joint, and an exhaust end of the second connecting pipe is connected to the top of the secondary gas gathering box.
[0014] Preferably, an external cover is fixedly mounted on the bottom of each of the metal air inlet tanks, and an outer wall of each of the plugging heads is provided with a group of sealing rings, and the size of each of the plugging heads is adapted to the inner wall of the external cover.
[0015] Preferably, a group of L-shaped frames are fixedly installed on the bottom of the heating chamber, the number of the L-shaped frames in a group is equal to that of a group of external covers, a positioning flange is fixedly installed on the bottom of each of the L-shaped frames, an electric push rod is fixedly inserted inside each of the positioning flanges, an associated frame is fixedly sleeved on the axial end of each of the electric push rods, and the top of each of the associated frames is respectively connected to the bottom of the sealing head.
[0016] Preferably, an electrical control box is fixedly installed on one side of the outer wall of the heating chamber, a second socket is fixedly connected to one side of the outer wall of the heating chamber, a group of second information lines are fixedly connected inside the second socket, the output ends of the group of second information lines are all connected to the wiring terminals of the electrical control box, and a first sealing plate is fixedly installed on both sides of the rear of the heating chamber.
[0017] Preferably, a second inner frame is fixedly installed inside the refrigeration warehouse, a surface cooler is provided inside the second inner frame, and second sealing plates are fixedly installed on both rear surfaces of the refrigeration warehouse.
[0018] Preferably, two first air-guiding square tubes are fixedly connected to the top of the first transition bin, the exhaust end of each of the first air-guiding square tubes passes through the top of the refrigeration bin and the primary air collecting box respectively, and are respectively connected to the interior of the refrigeration bin and the primary air collecting box, the interior of the two first air-guiding square tubes are provided with stop valves, and a driving motor is fixedly installed on one side of the outer wall of the two first air-guiding square tubes, and the shaft end of each of the driving motors is respectively inserted into the interior of a corresponding stop valve.
[0019] Preferably, a third inner frame is fixedly installed inside the filter bin, and a layered filter assembly is provided inside the third inner frame. The bottoms of the refrigeration bin and the secondary air collecting box are fixedly connected to a second air guide square tube, and the exhaust ends of the two second air guide square tubes pass through the bottom of the second transition bin and are connected to the inner wall of the second transition bin.
[0020] Preferably, a third sealing plate is fixedly installed on the rear surface of the filter bin, a second load-bearing frame is fixedly installed on the rear surface of the third sealing plate, a servo motor is fixedly inserted inside the second load-bearing frame, an output end of the servo motor is fixedly connected to an air separation unit, outer walls of the air separation unit are respectively fixedly connected with a discharge connector and an air intake connector, an exhaust end of the discharge connector passes through the outer wall of the third sealing plate, and is connected to the interior of the filter bin.
[0021] Preferably, the first inner frame is fixedly installed inside the heating chamber, a bevel groove is provided on the front surface of the release chamber, and a slotted baffle is fixedly installed inside the bevel groove.
[0022] Compared with the prior art, the present invention has the following beneficial effects:
[0023] 1. The present invention sets a gradient processing mechanism, wherein a plurality of spiral high-resistance heating tubes are preset in the mechanism, and the same number of metal air inlet tanks are connected. The size of each metal air inlet tank is reasonably controlled so that each metal air inlet tank has a certain gas storage capacity. The gas guiding direction of the shunt pipe can ensure that the high-speed airflow flows from top to bottom in each metal air inlet tank. Since each spiral high-resistance heating tube can be powered independently, the connected metal air inlet tanks can be baked in turn to achieve the purpose of heating the high-speed gas therein. Before each airflow is transported to the lower-level metal air inlet tank, the upper-level temperature sensor can detect the airflow temperature. The system The components can be analyzed and judged based on the actual data. If it is consistent with the setting, the high-temperature airflow is discharged normally. Otherwise, the subsequent spiral high-resistance heating tubes will continue to be energized until the airflow temperature is heated to within the set range. The mechanism adopts a graded heating method to independently control the opening of multiple heating components, build a complete airflow channel, and set up multiple transition containers of uniform size to achieve multiple heating of high-speed airflow. During the process, the number of heating components opened and the number of heating times are accurately controlled according to the actual temperature of the airflow, thereby avoiding multiple heating elements being fully loaded when the equipment is auxiliary heated, effectively reducing the power consumption of the equipment.
[0024] 2. The present invention sets a gradient processing mechanism. The multiple metal air inlet tanks set in the mechanism can be superimposed to heat the circulating airflow. Every time the airflow is heated in a metal air inlet tank, it will be detected by the temperature sensor therein. The obtained actual data can be analyzed by relevant components in the electrical control box and compared with the set values one by one. The number of airflow heating times is set, and the pre-discharge airflow temperature is accurately calibrated to the set range. Due to the reduction of the airway area, the same amount of gas will increase the air pressure in the airway, and the high-temperature gas can be squeezed and released quickly, reducing temperature loss and quickly balancing the indoor temperature. The user can quickly obtain the body temperature and avoid repeatedly adjusting the equipment temperature, which causes a heavy load on each component. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 This is a main structural stereogram of an energy-saving device for a central air-conditioning fresh air system of the present invention;
[0026] Figure 2 This is a side structural stereogram of an energy-saving device for a central air-conditioning fresh air system of the present invention;
[0027] Figure 3 This is a bottom structural stereogram of an energy-saving device for a central air-conditioning fresh air system of the present invention;
[0028] Figure 4 It is an enlarged stereoscopic diagram of the structure of a gradient processing mechanism in an energy-saving device for a central air-conditioning fresh air system of the present invention;
[0029] Figure 5 The present invention is a central air conditioning fresh air system energy saving device Figure 4 A magnified stereoscopic image of the structure at center A;
[0030] Figure 6 It is an enlarged stereoscopic view of the first inner frame connected structure in an energy-saving device for a central air-conditioning fresh air system of the present invention;
[0031] Figure 7 It is an enlarged stereoscopic diagram of a part of the structure of an energy-saving device for a central air-conditioning fresh air system of the present invention;
[0032] Figure 8 It is an enlarged stereoscopic diagram of a refrigeration bin connected structure in an energy-saving device for a central air-conditioning fresh air system of the present invention;
[0033] Fig. 9 It is an enlarged stereoscopic view of the structure connected to the filter bins in an energy-saving device for a central air-conditioning fresh air system of the present invention.
[0034] In the figure: 1, filter chamber; 2, first transition chamber; 3, refrigeration chamber; 4, heating chamber; 5, second transition chamber; 6, release chamber; 7, gradient processing mechanism; 701, first inner frame; 702, first wiring base; 703, power supply bracket; 704, first load-bearing frame; 705, spiral high-resistance heating tube; 706, metal air inlet tank; 707, first joint; 708, second joint; 709, shunt pipe; 710, primary gas collection box; 711, first connecting pipe; 712, secondary gas collection box; 713, second connecting pipe; 714, ceramic seat; 715, first metal copper plate; 716, wire; 717, independent power supply; 718, second metal copper plate; 719, conductive rod; 720, hollow sleeve; 721, external cover; 722, L-shaped frame; 7 23. Positioning flange; 724. Electric push rod; 725. Associated frame; 726. Sealing head; 727. Sealing ring; 728. Second wiring base; 729. Temperature sensor; 730. First plug socket; 731. Receiver; 732. First information line; 733. Electrical control box; 734. Second plug socket; 735. Second information line; 736. First sealing plate; 8. Second inner frame; 9. Surface cooler; 10. Second sealing plate; 11. First air guide square tube; 12. Stop valve; 13. Drive motor; 14. Third inner frame; 15. Layered filter assembly; 16. Third sealing plate; 17. Air outlet unit; 18. Discharge connector; 19. Air intake connector; 20. Second load-bearing frame; 21. Servo motor; 22. Second air guide square tube; 23. Slotted baffle. DETAILED DESCRIPTION
[0035] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the implementation regulations described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0036] Please refer to the attached Figure 1 -Attached Fig. 9 As shown, the present invention provides a technical solution: an energy-saving device for a central air-conditioning fresh air system, comprising a filter chamber 1, a first transition chamber 2, a refrigeration chamber 3, a heating chamber 4, a second transition chamber 5 and a release chamber 6, and a gradient processing mechanism 7 is provided inside the heating chamber 4.
[0037] according to Figure 4 , Figure 5 , Figure 6 and Figure 7As shown, the gradient processing mechanism 7 includes a first inner frame 701, a group of first wiring bases 702 are equidistantly installed at the bottom of the inner wall of the first inner frame 701, the number of the first wiring bases 702 in a group is five, the top of each first wiring base 702 is fixedly connected to a first load-bearing frame 704, a group of power supply brackets 703 are fixedly installed at the bottom of the inner wall of the first inner frame 701, and the number of the power supply brackets 703 in a group is equal to that of the first load-bearing frame 704, and a spiral high-resistance heating tube 705 is fixedly installed on the top of each power supply bracket 703, and each spiral high-resistance heating tube 705 has a The wiring terminals are respectively connected to the output ends of the corresponding first load-bearing frames 704, the inner surface wall of each spiral high-resistance heating tube 705 is fixedly inserted with a metal air inlet tank 706, the outer surface walls of the four metal air inlet tanks 706 are respectively provided with a first joint 707, and a shunt pipe 709 is fixedly connected between each first joint 707 and the top of a metal air inlet tank 706, and a group of ceramic seats 714 and independent power supplies 717 are respectively fixedly installed on the top of the heating chamber 4, and the number of a group of ceramic seats 714 and independent power supplies 717 is equal to that of a group of metal air inlet tanks 706, and the top of each ceramic seat 714 The first copper plate 715 is fixedly connected to each of the independent power supplies 717, the second copper plate 718 is fixedly connected to the top of each of the ceramic bases 714, a group of wires 716 is fixedly connected to the inside of each of the ceramic bases 714, the output end of each group of wires 716 is respectively connected to the terminal of a corresponding first wiring base 702, a group of conductive rods 719 is fixedly connected between the equal sides of each of the first copper plate 715 and the second copper plate 718, a group of hollow sleeves 720 is fixedly installed at the bottom of the heating chamber 4, and the number of the group of hollow sleeves 720 is equal to the number of the group of metal inlet tanks 706. A plugging head 726 is movably provided inside each hollow sleeve 720, a second wiring base 728 is fixedly installed inside each plugging head 726, a temperature sensor 729 is fixedly connected to the top of each second wiring base 728, a first plug socket 730 is fixedly connected to the bottom of each second wiring base 728, a group of receivers 731 is fixedly installed at the bottom of the heating chamber 4, a group of first information lines 732 are fixedly installed inside each first plug socket 730, and the output ends of each group of first information lines 732 are respectively connected to the wiring terminals of a corresponding receiver 731.
[0038] according to Figure 5 and Figure 6As shown, a primary gas gathering box 710 and a secondary gas gathering box 712 are fixedly installed on the top and bottom of the heating chamber 4 respectively, a second joint 708 is provided on the outer wall of a metal gas inlet tank 706, a first connecting pipe 711 is fixedly connected to the top of the metal gas inlet tank 706, the gas inlet end of the first connecting pipe 711 is connected to the bottom of the primary gas gathering box 710, the inside of the second joint 708 is fixedly connected to the second connecting pipe 713, the exhaust end of the second connecting pipe 713 is connected to the top of the secondary gas gathering box 712, by presetting the above components, the diversion pipe 709, the first connecting pipe 711 and the second connecting pipe 713 can connect each metal gas inlet tank 706 with each other, and ensure that the airflow entering each metal gas inlet tank 706 flows from top to bottom, so that the airflow temperature measured by each temperature sensor 729 is physically heated, thereby further improving the temperature control accuracy.
[0039] according to Figure 6 and Figure 7 As shown, an external cover 721 is fixedly installed on the bottom of each metal air inlet tank 706, and a group of sealing rings 727 are provided on the outer wall of each sealing head 726. The size of each sealing head 726 is adapted to the inner wall of the external cover 721. By presetting the above components, when the equipment is working, each sealing head 726 is movably inserted into the interior of the external cover 721. During the process, the sealing ring 727 fills the gap between the external cover 721 and the sealing head 726 to ensure that the airflow does not overflow.
[0040] according to Figure 7 As shown, a group of L-shaped frames 722 are fixedly installed at the bottom of the heating chamber 4, and the number of a group of L-shaped frames 722 is equal to a group of external covers 721. A positioning flange 723 is fixedly installed at the bottom of each L-shaped frame 722. An electric push rod 724 is fixedly inserted inside each positioning flange 723. The shaft end of each electric push rod 724 is fixedly sleeved with an associated frame 725. The top of each associated frame 725 is respectively connected to the bottom of the plugging head 726. By presetting the above components, the electric push rod 724 can drive the connected components to move up and down to realize the opening and closing of the bottom channel of each metal air inlet tank 706. When the equipment is turned off, the compressed air retained in each metal air inlet tank 706 can be released in time to achieve the purpose of pressure relief and prevent the metal air inlet tank 706 from expanding and deforming under high pressure.
[0041] according to Figure 4 and Figure 5As shown, an electrical control box 733 is fixedly installed on one side of the outer wall of the heating chamber 4, a second socket 734 is fixedly connected to one side of the outer wall of the heating chamber 4, a group of second information lines 735 are fixedly connected inside the second socket 734, and the output ends of the group of second information lines 735 are connected to the wiring terminals of the electrical control box 733, and a first sealing plate 736 is fixedly installed on both sides of the rear of the heating chamber 4. By presetting the above components, a plurality of electronic components with different functions are provided in the electrical control box 733, which are used to obtain the data measured by each temperature sensor 729 in real time, and complete analysis and judgment, so as to control the opening of an appropriate amount of spiral high-resistance heating tubes 705.
[0042] according to Figure 8 As shown, a second inner frame 8 is fixedly installed inside the refrigeration bin 3, a surface cooler 9 is arranged inside the second inner frame 8, and second sealing plates 10 are fixedly installed on both the front and rear sides of the refrigeration bin 3. By presetting the above components, the second sealing plates 10 are used to seal the space inside the refrigeration bin 3, so as to ensure that the treated cold air is directly transported to the inside of the second transition bin 5 by the connected pipeline, and discharged from the release bin 6 at a high speed, so as to avoid the reduction of wind speed due to gradual consumption, which affects the indoor cooling rate.
[0043] according to Figure 8 As shown, two first air guiding square tubes 11 are fixedly connected to the top of the first transition warehouse 2, and the exhaust end of each first air guiding square tube 11 passes through the top of the refrigeration warehouse 3 and the primary air gathering box 710 respectively, and is respectively connected to the interior of the refrigeration warehouse 3 and the primary air gathering box 710, and the interior of the two first air guiding square tubes 11 is provided with a stop valve 12, and a driving motor 13 is fixedly installed on one side of the outer wall of the two first air guiding square tubes 11, and the axial end of each driving motor 13 is respectively inserted into the interior of a corresponding stop valve 12. By presetting the above components, the stop valve 12 can freely control the opening and closing of the internal channel of each first air guiding square tube 11, so as to distinguish between cold and hot air flows, and accurately release the airflow into the corresponding warehouse body, so as to avoid the step-by-step consumption of cold and hot air flows, increase the airflow release intensity, and accelerate the indoor interference rate.
[0044] according to Figure 8 and Fig. 9 As shown, a third inner frame 14 is fixedly installed inside the filter bin 1, and a layered filter assembly 15 is provided inside the third inner frame 14. The bottoms of the refrigeration bin 3 and the secondary air collecting box 712 are fixedly connected with a second air guide square tube 22. The exhaust ends of the two second air guide square tubes 22 pass through the bottom of the second transition bin 5 and are connected to the inner wall of the second transition bin 5. By presetting the above-mentioned components, the hot and cold air flows after physical treatment can be directly transported to the corresponding bin body by the second air guide square tube 22 and quickly discharged into the room.
[0045] according to Figure 8 and Fig. 9As shown, a third sealing plate 16 is fixedly installed on the rear surface of the filter bin 1, a second load-bearing frame 20 is fixedly installed on the rear surface of the third sealing plate 16, a servo motor 21 is fixedly inserted inside the second load-bearing frame 20, an output end of the servo motor 21 is fixedly connected to an air separation unit 17, outer walls of the air separation unit 17 are respectively fixedly connected with a discharge connector 18 and an air intake connector 19, an exhaust end of the discharge connector 18 passes through the outer wall of the third sealing plate 16, and is connected to the interior of the filter bin 1, by presetting the above-mentioned components and utilizing the mechanical characteristics of the air separation unit 17 itself, the cold and hot airflows released by the compressor unit can be further enhanced, and the circulation rate of the airflow in each component can be accelerated.
[0046] according to Figure 1 and Figure 4 As shown, the first inner frame 701 is fixedly installed inside the heating chamber 4, a bevel groove is opened on the front surface of the release chamber 6, and a grooved baffle 23 is fixedly installed inside the bevel groove.
[0047] The effect achieved by the entire mechanism is: first install the equipment in the designated work area, the compressor unit tail pipe is fully connected to the top of the air inlet connector 19, and its external line is connected to the main power supply of the equipment to provide energy for multiple electrical components.
[0048] During the equipment heating stage, the equipment heating temperature is manually set, and the set data is temporarily stored in the electrical control box 733. The servo motor 21 is turned on to drive the impeller in the centrifugal unit 17 to rotate at high speed. The high-temperature compressed airflow continuously delivered by the external unit will be further accelerated in the centrifugal unit 17 and diffused from the discharge joint 18 to the filter bin 1. The airflow entering the body first crosses the interior of the layered filter assembly 15 to complete the filtration of impurities and dust, and then converges to the first transition bin 2. A designated drive motor 13 is turned on to drive the opening of a corresponding stop valve 12, and open one of the internal channels of the first air guide square tubes 11. Before the high-speed airflow enters the heating bin 4, the electrical control box 733 controls one of the independent power supplies 7 17 and the temperature sensor 729 are turned on, and its energy is transmitted by the conductive rod 719, the wire 716 and the first load-bearing frame 704, so that the corresponding spiral high-resistance heating tube 705 passes quickly, and the temperature released on the surface will continue to penetrate into the connected metal air inlet tank 706. The high-speed airflow after further processing is transmitted by the first air-conducting square tube 11 and the first connecting pipeline 711, poured into the top of a metal air inlet tank 706, and pushed to the bottom. When the airflow enters the heating range of the spiral high-resistance heating tube 705, an airflow heating can be completed. The processed airflow will quickly contact the corresponding temperature sensor 729, and the obtained temperature data will be fed back to the electrical control box 733 by the receiver 731 in real time. If the temperature meets the requirements, the airflow The airflow will pass through the subsequent metal air inlet tank 706 in sequence under the transportation of the shunt pipe 709, and then be collected in the interior of the second transition chamber 5 by the transportation of the second connecting pipe 713 and the second air guide square tube 22, and finally be discharged from the front end of the release chamber 6. Otherwise, if the airflow temperature does not meet the requirements, the electrical control box 733 can synchronously turn on a subsequent independent power supply 717 and a temperature sensor 729 before the airflow enters the next metal air inlet tank 706, so that the connected spiral high-resistance heating tube 705 is energized, and the shunt pipe 709 can pour the airflow after the first heating from top to bottom into the interior of the subsequent metal air inlet tank 706, and complete the secondary heating of the airflow, and then the temperature sensor 729 at this position detects the airflow temperature, and the obtained data is fed back in real time In the electrical control box 733, a secondary analysis is performed. If the temperature meets the requirements through the above method, the airflow is released normally after treatment. If the conditions are still not met, the subsequent spiral high-resistance heating tubes 705 are opened one by one, and the number of airflow heating times is increased gradually until the airflow meets the set range. After the equipment is turned off, each electric push rod 724 is opened synchronously to retract its inner axis into the cavity, driving the associated frame 725 and its connected components to move downward until each sealing head 726 is completely separated from the interior of the external cover 721. The relevant components in the electrical control box 733 are used to time the trapped gas release time. After the time is reached, each sealing head 726 is reset immediately to prevent excessive external dust from entering each metal air inlet tank 706 to prevent airway blockage.
[0049] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. An energy-saving device for a central air-conditioning fresh air system, characterized in that: It comprises a filtering chamber (1), a first transition chamber (2), a refrigeration chamber (3), a heating chamber (4), a second transition chamber (5) and a release chamber (6); A gradient processing mechanism (7) is provided inside the heating chamber (4); The gradient processing mechanism (7) comprises a first inner frame (701), a group of first wiring bases (702) are equidistantly installed at the bottom of the inner wall of the first inner frame (701), the number of the first wiring bases (702) in a group is five, the top of each of the first wiring bases (702) is fixedly connected to a first load-bearing frame (704), a group of power supply brackets (703) is fixedly installed at the bottom of the inner wall of the first inner frame (701), and the number of the power supply brackets (703) in a group is equal to that of the first load-bearing frame (704), a spiral high-resistance heating tube (705) is fixedly installed at the top of each of the power supply brackets (703), and the connection of each of the spiral high-resistance heating tubes (705) is fixedly connected to the first load-bearing frame (704). The wire ends are respectively connected to the output ends of the corresponding first load-bearing frames (704); the inner surface wall of each spiral high-resistance heating tube (705) is fixedly inserted with a metal air inlet tank (706); the outer surface walls of the four metal air inlet tanks (706) are each provided with a first joint (707); a shunt pipe (709) is fixedly connected between each of the first joints (707) and the top of a metal air inlet tank (706); a group of ceramic seats (714) and an independent power supply (717) are respectively fixedly installed on the top of the heating chamber (4); the number of a group of ceramic seats (714) and an independent power supply (717) is equal to that of a group of metal air inlet tanks (706); the top of each ceramic seat (714) is connected to a plurality of independent power supplies (717); The top of each independent power source (717) is fixedly connected to a first metal copper plate (715), the top of each independent power source (717) is fixedly connected to a second metal copper plate (718), the interior of each ceramic seat (714) is fixedly connected to a group of wires (716), the output end of each group of wires (716) is respectively connected to the wiring terminal of a corresponding first wiring base (702), a group of conductive rods (719) is fixedly connected between the equal sides of each first metal copper plate (715) and the second metal copper plate (718), a group of hollow sleeves (720) is fixedly installed at the bottom of the heating chamber (4), and the number of the group of hollow sleeves (720) is equal to that of the group of metal air inlet tanks (706), and each Each of the hollow sleeves (720) is movably provided with a plugging head (726), a second wiring base (728) is fixedly installed inside each of the plugging heads (726), a temperature sensor (729) is fixedly connected to the top of each of the second wiring bases (728), a first plug socket (730) is fixedly connected to the bottom of each of the second wiring bases (728), a group of receivers (731) is fixedly installed at the bottom of the heating chamber (4), a group of first information lines (732) is fixedly installed inside each of the first plug sockets (730), and the output ends of each group of the first information lines (732) are respectively connected to the wiring terminals of a corresponding receiver (731).
2. The central air conditioning fresh air system energy-saving device according to claim 1, characterized in that: A primary gas gathering box (710) and a secondary gas gathering box (712) are fixedly installed on the top and bottom of the heating chamber (4), respectively; a second joint (708) is provided on the outer wall of one of the metal gas inlet tanks (706); a first connecting pipe (711) is fixedly connected to the top of one of the metal gas inlet tanks (706); an air inlet end of the first connecting pipe (711) is connected to the bottom of the primary gas gathering box (710); a second connecting pipe (713) is fixedly connected to the inside of the second joint (708); an exhaust end of the second connecting pipe (713) is connected to the top of the secondary gas gathering box (712).
3. The central air conditioning fresh air system energy-saving device according to claim 1, characterized in that: An external cover (721) is fixedly mounted on the bottom of each metal air inlet tank (706), and a group of sealing rings (727) are provided on the outer wall of each plugging head (726). The size of each plugging head (726) is adapted to the inner wall of the external cover (721).
4. The central air conditioning fresh air system energy-saving device according to claim 1, characterized in that: A group of L-shaped frames (722) are fixedly installed at the bottom of the heating chamber (4), and the number of the group of L-shaped frames (722) is equal to the number of the group of external covers (721). A positioning flange (723) is fixedly installed at the bottom of each of the L-shaped frames (722), and an electric push rod (724) is fixedly inserted inside each of the positioning flanges (723). An associated frame (725) is fixedly sleeved on the shaft end of each of the electric push rods (724), and the top of each of the associated frames (725) is respectively connected to the bottom of the sealing head (726).
5. The central air conditioning fresh air system energy-saving device according to claim 1 is characterized in that: An electrical control box (733) is fixedly installed on one side of the outer wall of the heating chamber (4), and a second socket (734) is fixedly connected to one side of the outer wall of the heating chamber (4). A group of second information lines (735) are fixedly connected inside the second socket (734), and the output ends of the group of second information lines (735) are all connected to the wiring terminals of the electrical control box (733). First sealing plates (736) are fixedly installed on both sides of the rear of the heating chamber (4).
6. The central air conditioning fresh air system energy saving device according to claim 1, characterized in that: A second inner frame (8) is fixedly installed inside the refrigeration bin (3), a surface cooler (9) is provided inside the second inner frame (8), and second sealing plates (10) are fixedly installed on both rear surfaces of the refrigeration bin (3).
7. The central air conditioning fresh air system energy saving device according to claim 2 is characterized in that: The top of the first transition chamber (2) is fixedly connected to two first air guiding square tubes (11), the exhaust end of each of the first air guiding square tubes (11) respectively passes through the top of the refrigeration chamber (3) and the primary air collecting box (710), and is respectively connected to the interior of the refrigeration chamber (3) and the primary air collecting box (710), the interior of the two first air guiding square tubes (11) is provided with a stop valve (12), and one side of the outer wall of the two first air guiding square tubes (11) is fixedly installed with a driving motor (13), and the shaft end of each of the driving motors (13) is respectively inserted into the interior of a corresponding stop valve (12).
8. The central air conditioning fresh air system energy-saving device according to claim 2 is characterized in that: A third inner frame (14) is fixedly installed inside the filter bin (1), and a layered filter assembly (15) is provided inside the third inner frame (14). The bottoms of the refrigeration bin (3) and the secondary air collecting box (712) are fixedly connected with a second air guide square tube (22), and the exhaust ends of the two second air guide square tubes (22) pass through the bottom of the second transition bin (5) and are connected to the inner wall of the second transition bin (5).
9. The central air conditioning fresh air system energy saving device according to claim 1, characterized in that: A third sealing plate (16) is fixedly mounted on the rear surface of the filter bin (1), a second load-bearing frame (20) is fixedly mounted on the rear surface of the third sealing plate (16), a servo motor (21) is fixedly inserted inside the second load-bearing frame (20), an output end of the servo motor (21) is fixedly connected to an air separation unit (17), an outer wall of the air separation unit (17) is fixedly connected to a discharge joint (18) and an air intake joint (19), an exhaust end of the discharge joint (18) passes through the outer wall of the third sealing plate (16), and is connected to the interior of the filter bin (1).
10. The central air conditioning fresh air system energy-saving device according to claim 1, characterized in that: The first inner frame (701) is fixedly installed inside the heating chamber (4), a bevel groove is provided on the front surface of the release chamber (6), and a slotted baffle (23) is fixedly installed inside the bevel groove.