Photovoltaic power station planning method and system based on mudflat scene

By determining the target area in the tidal flat area, combining tidal and ecological factors, and calculating the planned area of ​​the photovoltaic power station, the problem of damage to the ecological environment by the construction of photovoltaic power stations in the tidal flat area is solved, and the balance between ecological protection and power station development is achieved.

CN119558463AActive Publication Date: 2025-03-04JINKO POWER TECH CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411608924.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-12
Publication Date
2025-03-04
Estimated Expiration
2044-11-12

AI Technical Summary

Technical Problem

Construction of photovoltaic power stations in mudflat areas may cause damage to the ecological environment. How to find a balance between protecting the ecological environment and building photovoltaic power stations?

Method used

By obtaining the landform images and tidal factors of the tidal flat area, determine the first area; then obtain the vegetation area, wildlife habitat area and migration area, and determine the target area in relation to the first area; calculate the planned area of ​​the photovoltaic power station, determine whether it is larger than the preset area, and if so, push the planned area to the user.

Benefits of technology

Ensure the stability of the natural ecology and achieve the healthy development of photovoltaic power plants, balancing the needs of ecological protection and power plant construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119558463A_ABST
    Figure CN119558463A_ABST
Patent Text Reader

Abstract

The invention provides a photovoltaic power station planning method and system based on a mud flat scene, and the method comprises the steps: obtaining a landform image of a to-be-planned region, and determining a first region according to the landform image and a tide factor; obtaining a vegetation area, a wild animal habitat area and a migration area of the to-be-planned area, and determining a target area in the first area according to the relationship between the vegetation area, the wild animal habitat area and the migration area and the first area; calculating a photovoltaic power station planning area of the target area, and judging whether the photovoltaic power station planning area is greater than a preset area; and if yes, pushing the photovoltaic power station planning area to the user, so that the stability of natural ecology and the healthy development of the photovoltaic power station can be ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of photovoltaic power station planning, and in particular relates to a photovoltaic power station planning method and system based on a tidal flat scenario. Background Art

[0002] Tidal flats are a special landform in coastal areas, mainly distributed near the coastline. It refers to the flat or slightly flat area where the sea and land meet, usually the intersection of water and land.

[0003] The tidal flats have unique geographical conditions. On the one hand, they have a relatively wide and flat terrain, and the sunshine resources are often relatively abundant, which is suitable for the construction of photovoltaic power stations to utilize solar energy resources. However, there are also many challenges in the tidal flats. Among them, the construction of photovoltaic power stations may cause damage to the local ecological balance. Therefore, it is necessary to balance the protection of the ecological environment with the construction of photovoltaic power stations. Summary of the invention

[0004] Based on this, an embodiment of the present invention provides a photovoltaic power station planning method and system based on a tidal flat scenario, which aims to assist in the planning of photovoltaic power stations to strike a balance between protecting the ecological environment and building photovoltaic power stations.

[0005] A first aspect of an embodiment of the present invention provides a photovoltaic power station planning method based on a tidal flat scenario, the method comprising:

[0006] Acquire a topographic image of the area to be planned, and determine a first area according to the topographic image and tidal factors;

[0007] Acquire a vegetation area, a wildlife habitat area, and a migration area of ​​the area to be planned, and determine a target area in the first area according to the relationship between the vegetation area, the wildlife habitat area, the migration area, and the first area;

[0008] Calculating the planned area of ​​the photovoltaic power station in the target area, and determining whether the planned area of ​​the photovoltaic power station is larger than a preset area;

[0009] If yes, the planned area of ​​the PV power station will be pushed to the user.

[0010] Furthermore, the step of obtaining a topographic image of the area to be planned and determining the first area according to the topographic image and tidal factors includes:

[0011] Acquire a historical geomorphic image of the area to be planned, mark the tidal flat area and the tidal area in the historical geomorphic image, and obtain a marking result;

[0012] Acquire a topographic image of the area to be planned according to a preset period, and divide the tidal flat area and the tidal area in the topographic image according to the marking result;

[0013] The first area is determined according to changes in the divided tidal flat area and tidal area.

[0014] Furthermore, the step of determining the first area according to the changes of the divided tidal flat area and tidal area includes:

[0015] Obtaining a first pixel value of a first pixel point representing a tidal flat area and a second pixel value of a second pixel point representing a tidal area;

[0016] Overlap all the topographic images of the area to be planned in chronological order;

[0017] According to the second pixel value, a union process is performed on the tidal areas in the overlapped landform images, wherein during the union process, the pixel values ​​of the pixel points in the areas where the tidal areas between the landform images intersect are superimposed;

[0018] According to the first pixel value, intersection processing is performed on the tidal flat area in the overlapped landform image, wherein, during the intersection processing, the pixel value of the pixel point in the area where the tidal flat area between the landform images intersects is always the first pixel value;

[0019] When the tidal region is the smallest, obtaining the pixel superposition value of the pixel points to be processed by the union, and determining whether the pixel superposition value is less than a threshold value;

[0020] If it is determined that the pixel superposition value is less than the threshold, the pixel point whose pixel superposition value is less than the threshold is marked;

[0021] An area formed by the marked pixel points and the pixel points belonging to the first pixel value is determined as the first area.

[0022] Furthermore, in the process of union processing, the pixel values ​​of the pixel points in the area where the tidal areas between the landform images intersect will be superimposed, and the number of all landform images collected when the tidal area is the smallest will be obtained, and the pixel value size of a single superposition will be determined based on the number and the pixel value range of the second pixel point.

[0023] Furthermore, the step of obtaining a vegetation area, a wildlife habitat area, and a migration area of ​​the area to be planned, and determining a target area in the first area according to a relationship between the vegetation area, the wildlife habitat area, and the migration area and the first area includes:

[0024] Obtain the current vegetation area, wildlife habitat area and migration area of ​​the area to be planned, and predict the target vegetation area, target wildlife habitat area and target migration area based on the corresponding historical changes of the current vegetation area, wildlife habitat area and migration area of ​​the area to be planned;

[0025] Determining whether the target vegetation area, the target wildlife habitat area, and the target migration area interfere with the first area;

[0026] If it is determined that the target vegetation area, the target wildlife habitat area, and the target migration area interfere with the first area, the first area is adjusted to obtain the target area.

[0027] Furthermore, the step of adjusting the first area to obtain the target area includes:

[0028] According to the ecological importance, the target vegetation area, the target wildlife habitat area and the target migration area are evaluated respectively to obtain corresponding scores, wherein the sum of the scores of the target vegetation area, the target wildlife habitat area and the target migration area is the full score;

[0029] According to the grade standard, the corresponding subdivided areas in the target vegetation area, the target wildlife habitat area and the target migration area are scored to obtain the score of each subdivided area;

[0030] The first area is adjusted according to the scores of each subdivided area to obtain the target area.

[0031] Furthermore, the step of adjusting the first area according to the scores of each subdivided area to obtain the target area includes:

[0032] Determining the largest photovoltaic power station planning area in the first area according to the illumination direction;

[0033] Determining whether the target vegetation area, the target wildlife habitat area, and the target migration area interfere with the largest photovoltaic power station planning area in the first area;

[0034] If yes, determine the area of ​​interference between the target vegetation area, the target wildlife habitat area, and the target migration area and the largest photovoltaic power station planning area in the first area, and calculate the proportion of each interfering area in the corresponding subdivided area;

[0035] Determine the score of each interfering area according to the proportion of the area of ​​each interfering area in the corresponding subdivided area and the score of the corresponding subdivided area;

[0036] According to the score of each interfered area and the ecological minimum score value, the corresponding interfered area is divided out from the first area to obtain the target area.

[0037] A second aspect of an embodiment of the present invention provides a photovoltaic power station planning system based on a tidal flat scenario, which is used to implement the photovoltaic power station planning method based on a tidal flat scenario provided in the first aspect, and the system includes:

[0038] A first determination module is used to obtain a landform image of the area to be planned, and determine a first area according to the landform image and tidal factors;

[0039] A second determination module is used to obtain a vegetation area, a wildlife habitat area, and a migration area of ​​the area to be planned, and determine a target area in the first area according to a relationship between the vegetation area, the wildlife habitat area, and the migration area and the first area;

[0040] A judgment module, used to calculate the planned area of ​​the photovoltaic power station in the target area, and judge whether the planned area of ​​the photovoltaic power station is larger than a preset area;

[0041] The push module is used to push the planned area of ​​the photovoltaic power station to the user when it is determined that the planned area of ​​the photovoltaic power station is larger than the preset area.

[0042] A third aspect of an embodiment of the present invention provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the photovoltaic power station planning method based on a tidal flat scenario provided in the first aspect.

[0043] A fourth aspect of an embodiment of the present invention provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, the photovoltaic power station planning method based on the tidal flat scenario provided in the first aspect is implemented.

[0044] A photovoltaic power station planning method and system based on a tidal flat scenario are provided in an embodiment of the present invention. The method obtains a topographic image of the area to be planned, and determines a first area according to the topographic image and tidal factors; obtains the vegetation area, wildlife habitat area and migration area of ​​the area to be planned, and determines a target area in the first area according to the relationship between the vegetation area, wildlife habitat area and migration area and the first area; calculates the planned area of ​​the photovoltaic power station in the target area, and determines whether the planned area of ​​the photovoltaic power station is larger than a preset area; if so, pushes the planned area of ​​the photovoltaic power station to the user, which can ensure the stability of the natural ecology and the healthy development of the photovoltaic power station. BRIEF DESCRIPTION OF THE DRAWINGS

[0045] Figure 1A flowchart of a photovoltaic power station planning method based on a tidal flat scenario provided in the first embodiment of the present invention;

[0046] Figure 2 A structural block diagram of a photovoltaic power station planning system based on a tidal flat scenario provided in the second embodiment of the present invention;

[0047] Figure 3 This is a structural block diagram of an electronic device provided in Embodiment 3 of the present invention. DETAILED DESCRIPTION

[0048] In order to facilitate the understanding of the present invention, the present invention will be described more fully below with reference to the relevant drawings. Several embodiments of the present invention are given in the drawings. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the present invention more thorough and comprehensive.

[0049] It should be noted that when an element is referred to as being "fixed to" another element, it may be directly on the other element or there may be a central element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. The terms "vertical", "horizontal", "left", "right" and similar expressions used herein are for illustrative purposes only.

[0050] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art of the present invention. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items.

[0051] Embodiment 1

[0052] According to an embodiment of the present invention, a photovoltaic power station planning method based on a tidal flat scenario is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described may be executed in an order different from that shown here.

[0053] In this embodiment 1, a photovoltaic power station planning method based on a tidal flat scenario is provided, which can be used in electronic devices, such as computers. Figure 1 , Figure 1 A flowchart of a photovoltaic power station planning method based on a tidal flat scenario provided in the first embodiment of the present invention is shown, which specifically includes steps S01 to S04.

[0054] Step S01, obtaining a topographic image of a region to be planned, and determining a first region according to the topographic image and tidal factors.

[0055] Specifically, the topographic images of the area to be planned can be obtained through satellite remote sensing, UAV mapping or a combination of them. It is understandable that since the tidal flats are close to the water, they will be affected by the tides and the actual area of ​​the tidal flats will change. It should be noted that the brackets of photovoltaic panels are immersed in water with high salinity for a long time, which is prone to rust and damage. Therefore, it is necessary to reasonably plan the construction area of ​​​​the photovoltaic power station to reduce the time the brackets are in the water to a certain extent.

[0056] In this embodiment, a historical geomorphic image of the area to be planned is obtained, and the tidal flat area and the tidal flat area in the historical geomorphic image are marked to obtain a marking result, wherein the marking can be performed manually, or the marking can be performed manually first, and the pixel range values ​​of the pixel points corresponding to the tidal flat area and the tidal flat area are respectively determined, and then the tidal flat area and the tidal flat area are automatically marked according to the corresponding pixel range values;

[0057] Acquire a geomorphic image of the area to be planned according to a preset period, and divide the tidal flat area and the tidal area in the geomorphic image according to the marking result, wherein the preset period can be determined by expert evaluation, and can be in hours or days. For example, one geomorphic image of the area to be planned is collected every day;

[0058] Determine the first area according to the changes of the divided tidal flat area and the tidal area, specifically, obtain a first pixel value of a first pixel point representing the tidal flat area and a second pixel value of a second pixel point representing the tidal area, wherein the first pixel value and the second pixel value may be pixel range values;

[0059] Overlap all the topographic images of the area to be planned in chronological order;

[0060] According to the second pixel value, a union process is performed on the tidal areas in the overlapped landform images, wherein, in the process of the union process, the pixel values ​​of the pixel points in the area where the tidal areas between the landform images intersect will be superimposed. It should be noted that there is a limit to the superposition of pixel values. Therefore, the number of all landform images collected when the tidal area is the smallest is obtained, and the pixel value size of a single superposition is determined according to the number and the pixel value range of the second pixel point, that is, the pixel value range of the second pixel point is divided by the number;

[0061] According to the first pixel value, intersection processing is performed on the tidal flat area in the overlapped landform image, wherein, during the intersection processing, the pixel value of the pixel point in the area where the tidal flat area between the landform images intersects is always the first pixel value;

[0062] When the tidal region is the smallest, the pixel superposition value of the pixel points to be processed by the union is obtained, and it is determined whether the pixel superposition value is less than a threshold value;

[0063] If it is determined that the pixel superposition value is less than the threshold, the pixel points whose pixel superposition value is less than the threshold are marked;

[0064] An area formed by the marked pixel points and the pixel points belonging to the first pixel value is determined as the first area.

[0065] Step S02, obtaining vegetation areas, wildlife habitat areas and migration areas of the area to be planned, and determining a target area in the first area according to the relationship between the vegetation areas, the wildlife habitat areas and the migration areas and the first area.

[0066] Specifically, the current vegetation area, wildlife habitat area and migration area of ​​the planned area are obtained, and the target vegetation area, target wildlife habitat area and target migration area are predicted according to the corresponding historical changes of the current vegetation area, wildlife habitat area and migration area of ​​the planned area. It should be noted that the prediction of the target vegetation area, target wildlife habitat area and target migration area can be predicted by expert evaluation based on historical changes, or by big data models;

[0067] Determine whether the target vegetation area, the target wildlife habitat area, and the target migration area interfere with the first area, that is, determine whether the target vegetation area, the target wildlife habitat area, and the target migration area have an intersecting area with the first area;

[0068] If it is determined that the target vegetation area, the target wildlife habitat area, and the target migration area interfere with the first area, the first area is adjusted to obtain the target area. Specifically, according to the ecological importance, the target vegetation area, the target wildlife habitat area, and the target migration area are evaluated respectively to obtain corresponding scores, which can be determined after expert evaluation. In addition, the ecological importance can be considered based on biodiversity indicators, ecosystem service function value, ecosystem stability and resilience, ecosystem rarity and vulnerability, etc. Among them, the total score of the target vegetation area, the target wildlife habitat area, and the target migration area is the full score;

[0069] According to the grade standard, the corresponding subdivided areas in the target vegetation area, the target wildlife habitat area and the target migration area are scored to obtain the score of each subdivided area. For example, the subdivided areas of the target vegetation area can be distinguished according to the plant protection grade, the subdivided areas of the target wildlife habitat area can be distinguished according to the animal protection grade, and the corresponding subdivided areas in the target migration area can be distinguished according to the priority of the migration route;

[0070] According to the scores of each subdivided area, the first area is adjusted to obtain the target area. Specifically, according to the direction of light, the largest photovoltaic power station planning area in the first area is determined. It can be understood that in the northern hemisphere, photovoltaic panels are installed facing due south, wherein the optimal installation angle of photovoltaic panels is calculated according to the local latitude to maximize the amount of solar radiation received throughout the year. For example, when the local latitude is about 30°, the installation angle can be set between 28° and 32°. In addition, the shape of the planning area of ​​the photovoltaic power station is regular and neatly arranged. Generally, the photovoltaic power station forms a rectangular pattern as a whole. Therefore, according to the rectangular pattern, the largest photovoltaic power station planning area in the first area is determined;

[0071] Determine whether the target vegetation area, the target wildlife habitat area, and the target migration area interfere with the largest photovoltaic power station planning area in the first area, that is, determine whether the target vegetation area, the target wildlife habitat area, and the target migration area intersect with the largest photovoltaic power station planning area in the first area;

[0072] If yes, determine the area of ​​the target vegetation area, the target wildlife habitat area, and the target migration area interfering with the largest PV power station planning area in the first area, and calculate the proportion of each interfering area in the corresponding subdivided area;

[0073] Determine the score of each interfering area according to the proportion of the area of ​​each interfering area in the corresponding subdivided area and the score of the corresponding subdivided area;

[0074] According to the scores of each interfered area and the minimum ecological score value, the corresponding interfered area is divided out from the first area to obtain the target area. For example, the total score of the target vegetation area, the target wildlife habitat area and the target migration area is 100 points, and the minimum ecological score value is 80 points. It can be understood that after the interfered area is finally divided out from the first area, the total score of the remaining target vegetation area, target wildlife habitat area and target migration area is not less than 80 points. It should be noted that priorities can be set for the vegetation area, wildlife habitat area and migration area, and the corresponding interfered area is divided out from the first area according to the order of priority.

[0075] Step S03, calculating the planned area of ​​the photovoltaic power station in the target area, and determining whether the planned area of ​​the photovoltaic power station is larger than a preset area, and if so, executing step S04.

[0076] Among them, a regular photovoltaic power station area is planned in the target area, and the area of ​​the photovoltaic power station area is calculated, and finally compared with the preset area.

[0077] Step S04: Push the planned area of ​​the photovoltaic power station to the user.

[0078] In summary, the photovoltaic power station planning method based on the tidal flat scene in the above-mentioned embodiment of the present invention obtains a topographic image of the area to be planned, and determines the first area according to the topographic image and tidal factors; obtains the vegetation area, wildlife habitat area and migration area of ​​the area to be planned, and determines the target area in the first area according to the relationship between the vegetation area, wildlife habitat area and migration area and the first area; calculates the planned area of ​​the photovoltaic power station in the target area, and determines whether the planned area of ​​the photovoltaic power station is greater than the preset area; if so, pushes the planned area of ​​the photovoltaic power station to the user, which can ensure the stability of the natural ecology and the healthy development of the photovoltaic power station.

[0079] Embodiment 2

[0080] See also Figure 2 , Figure 2 This is a structural block diagram of a photovoltaic power station planning system based on a tidal flat scenario provided in the second embodiment of the present invention. The photovoltaic power station planning system 200 based on the tidal flat scenario is used to implement the above-mentioned embodiments and preferred implementation modes, and the descriptions that have been made will not be repeated. As used below, the term "module" can implement a combination of software and / or hardware for a predetermined function. Although the devices described in the following embodiments are preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceivable.

[0081] Specifically, the photovoltaic power station planning system 200 based on the tidal flat scenario includes: a first determination module 21, a second determination module 22, a judgment module 23 and a push module 24, wherein:

[0082] A first determination module 21 is used to obtain a landform image of the area to be planned, and determine a first area according to the landform image and tidal factors;

[0083] A second determination module 22 is used to obtain a vegetation area, a wildlife habitat area, and a migration area of ​​the area to be planned, and determine a target area in the first area according to the relationship between the vegetation area, the wildlife habitat area, and the migration area and the first area;

[0084] A judgment module 23, used to calculate the planned area of ​​the photovoltaic power station in the target area, and judge whether the planned area of ​​the photovoltaic power station is larger than a preset area;

[0085] The push module 24 is used to push the planned area of ​​the photovoltaic power station to the user when it is determined that the planned area of ​​the photovoltaic power station is larger than a preset area.

[0086] Further, in some optional embodiments of the present invention, the first determining module 21 includes:

[0087] A marking unit, used for acquiring a historical geomorphic image of the area to be planned, marking a tidal flat area and a tidal area in the historical geomorphic image, and obtaining a marking result;

[0088] A division unit, used for acquiring a landform image of the area to be planned according to a preset period, and dividing the tidal flat area and the tidal area in the landform image according to the marking result;

[0089] The first determining unit is used to determine the first area according to changes in the divided tidal flat area and tidal area.

[0090] Further, in some optional embodiments of the present invention, the first determining unit includes:

[0091] An acquisition subunit, used to acquire a first pixel value of a first pixel point representing a tidal flat area and a second pixel value of a second pixel point representing a tidal area;

[0092] The overlapping subunit is used to overlap all the topographic images of the area to be planned in chronological order;

[0093] a union processing subunit, configured to perform a union processing on the tidal areas in the overlapped landform images according to the second pixel value, wherein, during the union processing, the pixel values ​​of the pixel points in the area where the tidal areas of the landform images intersect are superimposed, and in addition, the number of all landform images collected when the tidal area is the smallest is obtained, and the pixel value size of a single superposition is determined according to the number and the pixel value range of the second pixel point;

[0094] An intersection processing subunit, configured to perform intersection processing on the tidal flat area in the overlapped landform image according to the first pixel value, wherein during the intersection processing, the pixel value of the pixel point in the area where the tidal flat area between the landform images intersects is always the first pixel value;

[0095] A judging subunit, used for obtaining the pixel superposition value of the pixel points to be processed by the union when the tidal area is the smallest, and judging whether the pixel superposition value is less than a threshold value;

[0096] a marking subunit, for marking the pixel points whose pixel superposition value is less than the threshold value if it is determined that the pixel superposition value is less than the threshold value;

[0097] A determination subunit is used to determine an area formed by the marked pixel points and the pixel points belonging to the first pixel value as the first area.

[0098] Further, in some optional embodiments of the present invention, the second determining module 22 includes:

[0099] A prediction unit is used to obtain the current vegetation area, wildlife habitat area and migration area of ​​the area to be planned, and predict the target vegetation area, target wildlife habitat area and target migration area according to the corresponding historical changes of the current vegetation area, wildlife habitat area and migration area of ​​the area to be planned;

[0100] A first judgment unit, used to judge whether the target vegetation area, the target wildlife habitat area and the target migration area interfere with the first area;

[0101] An adjustment unit is used to adjust the first area to obtain the target area if it is determined that the target vegetation area, the target wildlife habitat area and the target migration area interfere with the first area.

[0102] Further, in some optional embodiments of the present invention, the adjustment unit includes:

[0103] An evaluation subunit, for evaluating the target vegetation area, the target wildlife habitat area, and the target migration area respectively according to their ecological importance, and obtaining corresponding scores, wherein the sum of the scores of the target vegetation area, the target wildlife habitat area, and the target migration area is the full score;

[0104] A scoring subunit is used to score the corresponding subdivided areas in the target vegetation area, the target wildlife habitat area and the target migration area according to the grade standard to obtain the score of each subdivided area;

[0105] An adjusting subunit, configured to adjust the first area according to the scores of each subdivided area to obtain the target area, and specifically, determine the largest photovoltaic power station planning area in the first area according to the illumination direction;

[0106] Determining whether the target vegetation area, the target wildlife habitat area, and the target migration area interfere with the largest photovoltaic power station planning area in the first area;

[0107] If yes, determine the area of ​​interference between the target vegetation area, the target wildlife habitat area, and the target migration area and the largest photovoltaic power station planning area in the first area, and calculate the proportion of each interfering area in the corresponding subdivided area;

[0108] Determine the score of each interfering area according to the proportion of the area of ​​each interfering area in the corresponding subdivided area and the score of the corresponding subdivided area;

[0109] According to the score of each interfered area and the ecological minimum score value, the corresponding interfered area is divided out from the first area to obtain the target area.

[0110] Embodiment 3

[0111] Another aspect of the present invention provides an electronic device, see Figure 3 , shown is an electronic device in Embodiment 3 of the present invention, including a memory 20, a processor 10, and a computer program 30 stored in the memory and executable on the processor, wherein when the processor 10 executes the computer program 30, the photovoltaic power station planning method based on the tidal flat scenario as described above is implemented.

[0112] In some embodiments, the processor 10 may be a central processing unit (CPU), a controller, a microcontroller, a microprocessor or other data processing chip, used to run program codes or process data stored in the memory 20, such as executing access restriction programs.

[0113] Among them, the memory 20 includes at least one type of readable storage medium, and the readable storage medium includes flash memory, hard disk, multimedia card, card-type memory (for example, SD or DX memory, etc.), magnetic memory, disk, optical disk, etc. The memory 20 may be an internal storage unit of an electronic device in some embodiments, such as a hard disk of the electronic device. The memory 20 may also be an external storage device of an electronic device in other embodiments, such as a plug-in hard disk equipped on the electronic device, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (FlashCard), etc. Further, the memory 20 may also include both an internal storage unit and an external storage device of the electronic device. The memory 20 may be used not only to store application software and various types of data of the electronic device, but also to temporarily store data that has been output or is to be output.

[0114] It should be pointed out that Figure 3The structure shown does not constitute a limitation on the electronic device. In other embodiments, the electronic device may include fewer or more components than those shown in the figure, or combine certain components, or arrange the components differently.

[0115] The embodiment of the present invention further provides a computer-readable storage medium having a computer program stored thereon, and when the program is executed by a processor, the above-mentioned photovoltaic power station planning method based on the tidal flat scenario is implemented.

[0116] Those skilled in the art will appreciate that the logic and / or steps represented in the flowchart or otherwise described herein, for example, may be considered as an ordered list of executable instructions for implementing logical functions, and may be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute instructions), or in conjunction with such instruction execution systems, devices or apparatuses. For purposes of this specification, a "computer-readable medium" may be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in conjunction with such instruction execution systems, devices or apparatuses.

[0117] More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or more wires (electronic device), a portable computer disk case (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), an optical fiber device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be a paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium, followed by editing, deciphering or, if necessary, processing in another suitable manner, and then stored in a computer memory.

[0118] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, a plurality of steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or a combination thereof: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.

[0119] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0120] The above embodiments only express several implementation methods of the present invention, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present invention. It should be pointed out that, for a person of ordinary skill in the art, several modifications and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the present invention patent shall be subject to the attached claims.

Claims

1. A photovoltaic power station planning method based on a tidal flat scenario, characterized in that: The method comprises: Acquire a topographic image of the area to be planned, and determine a first area according to the topographic image and tidal factors; Acquire a vegetation area, a wildlife habitat area, and a migration area of ​​the area to be planned, and determine a target area in the first area according to the relationship between the vegetation area, the wildlife habitat area, the migration area, and the first area; Calculating the planned area of ​​the photovoltaic power station in the target area, and determining whether the planned area of ​​the photovoltaic power station is larger than a preset area; If yes, the planned area of ​​the PV power station will be pushed to the user.

2. The photovoltaic power station planning method based on the tidal flat scenario according to claim 1 is characterized in that: The step of obtaining a topographic image of the area to be planned and determining the first area according to the topographic image and tidal factors comprises: Acquire a historical geomorphic image of the area to be planned, mark the tidal flat area and the tidal area in the historical geomorphic image, and obtain a marking result; Acquire a topographic image of the area to be planned according to a preset period, and divide the tidal flat area and the tidal area in the topographic image according to the marking result; The first area is determined according to changes in the divided tidal flat area and tidal area.

3. The photovoltaic power station planning method based on the tidal flat scenario according to claim 2 is characterized in that: The step of determining the first area according to the changes of the divided tidal flat area and tidal area comprises: Obtaining a first pixel value of a first pixel point representing a tidal flat area and a second pixel value of a second pixel point representing a tidal area; Overlap all the topographic images of the area to be planned in chronological order; According to the second pixel value, a union process is performed on the tidal areas in the overlapped landform images, wherein during the union process, the pixel values ​​of the pixel points in the areas where the tidal areas between the landform images intersect are superimposed; According to the first pixel value, intersection processing is performed on the tidal flat area in the overlapped landform image, wherein, during the intersection processing, the pixel value of the pixel point in the area where the tidal flat area between the landform images intersects is always the first pixel value; When the tidal region is the smallest, obtaining the pixel superposition value of the pixel points to be processed by the union, and determining whether the pixel superposition value is less than a threshold value; If it is determined that the pixel superposition value is less than the threshold, the pixel point whose pixel superposition value is less than the threshold is marked; An area formed by the marked pixel points and the pixel points belonging to the first pixel value is determined as the first area.

4. The photovoltaic power station planning method based on the tidal flat scenario according to claim 3 is characterized in that: In the process of union processing, in the step of superimposing the pixel values ​​of the pixel points in the area where the tidal areas between the landform images intersect, the number of all landform images collected when the tidal area is the smallest is obtained, and the pixel value size of a single superposition is determined based on the number and the pixel value range of the second pixel point.

5. The photovoltaic power station planning method based on the tidal flat scenario according to claim 4 is characterized in that: The step of obtaining a vegetation area, a wildlife habitat area, and a migration area of ​​the area to be planned, and determining a target area in the first area according to a relationship between the vegetation area, the wildlife habitat area, and the migration area and the first area comprises: Obtain the current vegetation area, wildlife habitat area and migration area of ​​the area to be planned, and predict the target vegetation area, target wildlife habitat area and target migration area based on the corresponding historical changes of the current vegetation area, wildlife habitat area and migration area of ​​the area to be planned; Determining whether the target vegetation area, the target wildlife habitat area, and the target migration area interfere with the first area; If it is determined that the target vegetation area, the target wildlife habitat area, and the target migration area interfere with the first area, the first area is adjusted to obtain the target area.

6. The photovoltaic power station planning method based on the tidal flat scenario according to claim 5 is characterized in that: The step of adjusting the first area to obtain the target area includes: According to the ecological importance, the target vegetation area, the target wildlife habitat area and the target migration area are evaluated respectively to obtain corresponding scores, wherein the sum of the scores of the target vegetation area, the target wildlife habitat area and the target migration area is the full score; According to the grade standard, the corresponding subdivided areas in the target vegetation area, the target wildlife habitat area and the target migration area are scored to obtain the score of each subdivided area; The first area is adjusted according to the scores of each subdivided area to obtain the target area.

7. The photovoltaic power station planning method based on the tidal flat scenario according to claim 6 is characterized in that: The step of adjusting the first area according to the scores of each subdivided area to obtain the target area includes: Determining the largest photovoltaic power station planning area in the first area according to the illumination direction; Determining whether the target vegetation area, the target wildlife habitat area, and the target migration area interfere with the largest photovoltaic power station planning area in the first area; If yes, determine the area of ​​interference between the target vegetation area, the target wildlife habitat area, and the target migration area and the largest photovoltaic power station planning area in the first area, and calculate the proportion of each interfering area in the corresponding subdivided area; Determine the score of each interfering area according to the proportion of the area of ​​each interfering area in the corresponding subdivided area and the score of the corresponding subdivided area; According to the score of each interfered area and the ecological minimum score value, the corresponding interfered area is divided out from the first area to obtain the target area.

8. A photovoltaic power station planning system based on tidal flat scene, characterized in that: The system is used to implement the photovoltaic power station planning method based on the tidal flat scenario as described in any one of claims 1 to 7, and comprises: A first determination module is used to obtain a landform image of the area to be planned, and determine a first area according to the landform image and tidal factors; A second determination module is used to obtain a vegetation area, a wildlife habitat area, and a migration area of ​​the area to be planned, and determine a target area in the first area according to a relationship between the vegetation area, the wildlife habitat area, and the migration area and the first area; A judgment module, used to calculate the planned area of ​​the photovoltaic power station in the target area, and judge whether the planned area of ​​the photovoltaic power station is larger than a preset area; The push module is used to push the planned area of ​​the photovoltaic power station to the user when it is determined that the planned area of ​​the photovoltaic power station is larger than the preset area.

9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the method for planning a photovoltaic power station based on a tidal flat scenario as described in any one of claims 1 to 7 is implemented.

10. An electronic device, characterized in that: The method comprises a memory, a processor and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, the method for planning a photovoltaic power station based on a tidal flat scenario as described in any one of claims 1 to 7 is implemented.

Citation Information

Patent Citations

  • Photovoltaic power station site selection method, apparatus and device and computer readable storage medium

    CN109165769A

  • Construction method for mudflat photovoltaic power station

    CN113530236A

  • Distributed photovoltaic development position optimal planning method and system based on remote sensing map

    CN117689168A

  • Method for recovering and reconstructing shrub-type exendin habitat in arid river valley area

    CN117993594A

  • Distributed photovoltaic power station position planning method and system

    CN118642502A