Coal mine gas extraction control method and system based on transparent geology

By integrating multi-source geological data to build a real-time model, the intelligent gas extraction system based on transparent geology enables precise borehole design and real-time monitoring. This solves the problems of insufficient accuracy and delayed assessment in traditional gas extraction, improves gas extraction efficiency and safety, and optimizes the coal mine production process.

CN120798422APending Publication Date: 2025-10-17ECCOM NETWORK SYST CO LTD

Patent Information

Application Number
CN202511158382.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-08-18
Publication Date
2025-10-17

AI Technical Summary

Technical Problem

Traditional gas extraction methods suffer from problems such as insufficient precision in borehole design, delayed evaluation of extraction effects, lack of systematic data management, and difficulty in adapting to complex geological changes, resulting in high risk of gas accidents and low efficiency.

Method used

By employing a transparent geology-based approach, a real-time model is constructed by integrating multi-source geological data. Combined with intelligent borehole design, real-time monitoring, and evaluation, the model achieves dynamic optimization of precise borehole layout and gas extraction effectiveness. Through system integration, efficient data management and collaborative work are realized.

Benefits of technology

It significantly improved the accuracy of borehole design and construction efficiency, enabled real-time dynamic evaluation of gas extraction effects, reduced the risk of gas accidents, optimized coal mine production processes, and improved safety and production efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120798422A_ABST
    Figure CN120798422A_ABST
Patent Text Reader

Abstract

The invention provides a coal mine gas extraction management and control method and system based on transparent geology, and the method comprises the following steps: integrating multi-source geological data, and constructing a transparent geological model which can reflect the actual geological condition in real time; based on geological information provided by the transparent geological model, calculating and optimizing key parameters of a drill hole in combination with coal and rock seeing parameters of a constructed drill hole to obtain preset drill hole design parameters; construction parameters and drilling parameters of drilling machine equipment are collected in real time; the drilling parameters are compared with the preset drilling design parameters; meanwhile, the drilling construction quality is analyzed and evaluated according to the construction parameters and the drilling parameters; and an extraction effect evaluation model and an extraction effect prediction model are constructed, gas parameters are collected in real time, and the gas extraction effect is evaluated. By means of the transparent geologic model, intelligent control over the whole coal mine gas extraction process is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present application relates to the technical field of coal mine safety production and gas control, in particular to a coal mine gas extraction management and control method and system based on transparent geology, and especially to a coal mine gas extraction intelligent management and control system and method based on transparent geology. BACKGROUND

[0002] In coal mining operations, gas has always been a key factor threatening safety production. Gas explosion, gas outburst and other accidents occur frequently, causing incalculable loss to personnel life and property. The key to eradicating gas disasters lies in efficient extraction, that is, fast, clean and efficient extraction, which is the fundamental way to solve the problems of gas overrun, explosion and outburst. However, the current traditional gas extraction means has many significant drawbacks: 1) Poor precision of drilling design: The traditional drilling design highly depends on manual experience and cannot accurately match the complex and variable geological conditions. In the face of complex geological structure areas, coal seam thickness variation zones and uneven gas occurrence areas, the manually designed drilling holes are often difficult to accurately locate the gas enrichment area, resulting in serious lack of rationality of drilling hole layout, low gas extraction efficiency, and gas concentration cannot be effectively controlled, greatly increasing the potential risk of gas accidents.

[0003] 2) Significant lag in extraction effect evaluation: At present, the extraction effect is mainly evaluated by manual periodic detection, which cannot realize real-time monitoring. During the detection interval, once the extraction process appears abnormal, such as drilling hole blockage and gas outflow sudden change, it is difficult to detect and handle in time, so that the gas control work is always in a passive state, which cannot effectively guarantee the safety environment of coal mining.

[0004] 3) Lack of systematic data management: Drilling hole data is stored in scattered places, with various formats and no uniformity, and there is no standardized and systematic management system. Historical data is difficult to integrate and analyze, and valuable information cannot be extracted to provide strong support for optimization of gas extraction scheme, adjustment of drilling hole parameters and subsequent mining decision-making.

[0005] 4) Difficult to adapt to complex geological changes: With the continuous expansion of coal mining depth and breadth, the geological conditions become more and more complex. Frequent changes in geological structure, irregular changes in coal seam thickness and inclination, and dynamic evolution of gas occurrence state all bring great challenges to the traditional gas extraction management method, which is difficult to meet the high standard requirements of modern coal mine safety production.

[0006] In view of the above problems, it is an urgent need to develop a coal mine gas extraction system with high-precision transparent geological modeling, accurate intelligent drilling design, real-time intelligent monitoring, intelligent drilling, intelligent control, efficient data processing capability and cross-system integration and collaboration to ensure coal mine safety production, improve gas extraction efficiency and resource utilization.

[0007] The patent document with publication number CN113107461B discloses a coal mine gas extraction intelligent monitoring and control system and a use method thereof. The monitoring and control system includes a ground server, a ring network system, an underground ring network switch, a PLC controller, a data integrator, and a drilling monitor. The ground server is used to issue instructions, receive and store data. The ring network system is used to transmit instructions and data. The ground server is connected to the underground ring network switch through the ring network system. The PLC controller is connected to the underground ring network switch. The data integrator is connected to the PLC controller. The drilling monitor is connected to the PLC controller and the data integrator respectively. However, this patent document still has the defect of poor drilling design accuracy. SUMMARY

[0008] In view of the defects in the prior art, the purpose of the present application is to provide a coal mine gas extraction management and control method and system based on transparent geology.

[0009] According to the coal mine gas extraction management and control method based on transparent geology provided by the present application, the following steps are included: Transparent geological model construction step: integrating multi-source geological data, and constructing a transparent geological model that can reflect real-time geological conditions according to the integrated multi-source geological data; Drilling design and optimization step: based on the geological information provided by the transparent geological model, combining the coal-bearing rock parameters of the constructed drilling, calculating and optimizing the key parameters of the drilling, and obtaining the preset drilling design parameters; Drilling construction monitoring and evaluation step: real-time acquisition of drilling equipment construction parameters and drilling parameters; comparison of drilling parameters with the preset drilling design parameters, if the comparison result is inconsistent, adjustment of drilling equipment drilling parameters until consistent with the preset drilling design parameters; at the same time, analysis and evaluation of drilling construction quality according to the construction parameters and the drilling parameters, if the evaluation result is unqualified, analysis of factors affecting drilling construction quality, and adjustment of drilling equipment construction parameters and drilling parameters according to the analysis result; The gas extraction effect monitoring and evaluation step comprises the following steps: constructing an extraction effect evaluation model and an extraction effect prediction model, collecting gas parameters in real time, evaluating the gas extraction effect through the extraction effect evaluation model and the extraction effect prediction model according to the collected gas parameters, optimizing the extraction scheme according to the evaluation result, and adjusting the construction mode of the drilling construction according to the optimized extraction scheme.

[0010] Preferably, the coal mine gas extraction management method further comprises the following steps: The drilling database full life cycle management step comprises the following steps: building a construction full process database covering drilling design, drilling construction and gas extraction; The cross-system integration and collaboration step comprises the following steps: sharing the construction full process database with other work systems of the coal mine, and performing real-time interaction and collaborative work of data.

[0011] Preferably, in the transparent geological model construction step: The multi-source geological data are multi-source heterogeneous data comprising roadway exposure data, geological drilling detection results and mine geophysical prospecting results; In the data collection and preprocessing stage, the original data are filtered and processed by using a data cleaning algorithm, a data quality evaluation algorithm, a data clustering analysis algorithm and a data outlier detection algorithm, and the error data and redundant information are removed; The filtered data are evaluated in multiple dimensions by using a data quality scoring model, and the dimensions of the evaluation include data integrity, data accuracy and data consistency, and the data that pass the evaluation are used as the basic data of the modeling link.

[0012] Preferably, in the transparent geological model construction step: The transparent geological model is constructed by using a three-dimensional geological modeling algorithm and a data fusion algorithm; The three-dimensional geological modeling algorithm adopts a hybrid modeling strategy, combines an octree algorithm based on a voxel and a triangular mesh algorithm based on a surface, and describes the morphology of a geological body; The data fusion algorithm fuses data of different sources by using a weighted average method and a neural network method, and constructs the transparent geological model.

[0013] Preferably, in the transparent geological model construction step: A channel for monitoring the change of geological data in real time is built, and the transparent geological model is updated when new geological data are generated; A data integration algorithm in an incremental updating algorithm is used to perform format conversion and standardization processing on the new data, and the new data are fused into the corresponding position of the model according to the spatial position and attribute information; The difference detection and updating algorithm is used to compare the new data with the model data, and the attribute values are updated according to the rules; When the new data triggers the change of the model structure, the model structure adjustment algorithm in the dynamic reconstruction algorithm is used to modify the topological structure, re-divide the geological body boundary and grid, and optimize the model precision. The attribute propagation and optimization algorithm based on the geological rule and the physical model is used to recalculate and propagate the geological attribute, and the error and uncertainty are reduced through iterative calculation, so that the model is always consistent with the actual geological conditions.

[0014] Preferably, in the drilling design and optimization step: The key parameters of the drilling hole include the drilling hole azimuth, the drilling hole inclination, and the drilling hole length. For the geological abnormal area, the drilling equipment is adjusted and the drilling path is planned according to the real-time data of the transparent geological model, so that the drilling hole can penetrate the gas enrichment area. Through seamless integration and bidirectional dynamic mutual feedback of CAD software, drilling design drawings and three-dimensional models are generated. In the drilling design process, the mutual influence between different drilling holes is considered, and an optimization algorithm is used for drilling layout planning to control the drilling hole spacing and angle.

[0015] Preferably, in the drilling construction monitoring and evaluation step: The construction parameters and drilling hole parameters are collected by sensors; the construction parameters include drilling speed, drilling torque, and drilling pressure; the drilling hole parameters include drilling hole azimuth and drilling hole inclination. When evaluating the drilling construction quality, the indicators covered include drilling hole spacing, control range, and coal displacement. The real-time collected drilling hole azimuth and drilling hole inclination data correspond to the actual drilling trajectory, and the preset drilling design parameters correspond to the design trajectory. When the actual drilling trajectory deviates from the design trajectory, the drilling direction and angle of the drilling equipment are adjusted according to the size and direction of the deviation, so that the drilling hole returns to the design trajectory. The unqualified drilling construction quality includes drilling trajectory deviation exceeding the preset value and drilling parameters not within the normal threshold.

[0016] Preferably, in the gas extraction effect monitoring and evaluation step: Based on the coal seam gas basic parameter data, gas reserve data, and extraction cumulative amount data, the gas flow theory, numerical simulation algorithm, and data analysis method are used to construct an extraction effect evaluation model and an extraction effect prediction model. The gas parameters include gas flow, gas concentration, gas negative pressure, and CO content in gas.

[0017] Preferably, in the drilling hole database full life cycle management step: The data query engine module and the data visualization module are constructed, information retrieval can be performed by using the data query engine module, and two-dimensional charts and three-dimensional models can be generated by using the data visualization module; The historical data is analyzed by using a data mining algorithm, and potential laws and problems in drilling design, drilling construction and drilling extraction processes are analyzed and obtained; The data is encrypted by using a multi-layer encryption algorithm, a data backup and recovery mechanism is established, and the data is backed up to various storage media and stored in different geographical locations on a regular basis.

[0018] The application also provides a coal mine gas extraction control system based on transparent geology, comprising the following modules: A transparent geology model construction module: integrating multi-source geological data, and constructing a transparent geology model capable of reflecting real-time geological conditions according to the integrated multi-source geological data; A drilling design and optimization module: based on the geological information provided by the transparent geology model, combining the coal-bearing rock parameters of the drilled holes, calculating and optimizing the key parameters of the drilling holes, and obtaining the preset drilling design parameters; A drilling construction monitoring and evaluation module: real-time acquisition of drilling equipment construction parameters and drilling parameters; comparison of the drilling parameters with the preset drilling design parameters, if the comparison result is inconsistent, adjustment of the drilling parameters of the drilling equipment until the preset drilling design parameters are consistent; at the same time, analysis and evaluation of the drilling construction quality according to the construction parameters and the drilling parameters, if the evaluation result is unqualified, analysis of the factors affecting the drilling construction quality, and adjustment of the construction parameters and drilling parameters of the drilling equipment according to the analysis result; A gas extraction effect monitoring and evaluation module: construction of an extraction effect evaluation model and an extraction effect prediction model, real-time acquisition of gas parameters, evaluation of the gas extraction effect by the extraction effect evaluation model and the extraction effect prediction model according to the acquired gas parameters, optimization of the extraction scheme according to the evaluation result, and adjustment of the construction mode of the drilling construction according to the optimized extraction scheme.

[0019] Compared with the prior art, the application has the following beneficial effects: 1、The application significantly improves the accuracy and construction efficiency of intelligent drilling design, and the intelligent design method effectively overcomes the limitations of manual experience, makes the drilling layout more scientific and reasonable, reduces the number of invalid drilling holes, and reduces the construction cost, at the same time, the accurate drilling design improves the gas extraction efficiency, which can more quickly and effectively reduce the gas concentration, and provides a solid guarantee for coal mine safety production.

[0020] 2. The present invention realizes real-time dynamic evaluation of the effect of intelligent gas extraction. With the help of underground hardware systems and ground intelligent analysis platforms, it can promptly discover problems in the extraction process and quickly take corresponding measures to solve them, greatly improving the compliance rate of gas extraction, significantly reducing the risk of gas accidents, and creating a safe and stable working environment for coal mining.

[0021] 3. The present invention realizes the establishment of a full-life cycle drilling database, realizes efficient data management and in-depth analysis, convenient and fast data query function and intuitive data visualization display, provides staff with clear data cognition, and through in-depth mining of historical data, can provide a scientific and accurate basis for gas extraction decision-making, improve the accuracy and scientificity of decision-making, and promote the development of gas control work towards refinement and intelligence.

[0022] 4. Through system integration and collaboration, the present invention realizes the interconnection and collaborative operation among various intelligent systems in coal mines, optimizes the overall production process of coal mines, improves the intelligence level and production efficiency of coal mines, reduces production costs, promotes the sustainable development of the coal mining industry, and enables coal mine production to run on a safe, efficient and green track. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Other features, objects and advantages of the present invention will become more apparent upon reading the detailed description of non-limiting embodiments with reference to the following drawings: Figure 1 This is a schematic diagram of the architecture of the intelligent management and control system for coal mine gas control; Figure 2 This is a flow chart of the intelligent management and control system for coal mine gas control; Figure 3 This is a schematic diagram of the functional interface of the intelligent management and control system for coal mine gas control; Figure 4 Schematic diagram for building a high-precision transparent geological model Figure 1 ; Figure 5 Schematic diagram for building a high-precision transparent geological model Figure 2 ; Figure 6 Schematic diagrams for intelligent design and real-time optimization of drilling profiles; Figure 7 Schematic diagram for strip placement and real-time optimization. DETAILED DESCRIPTION

[0024] The application will be described in detail below with specific embodiments. The following examples will help those skilled in the art to further understand the application, but do not limit the application in any form. It should be noted that those skilled in the art can make several changes and improvements without departing from the concept of the application. These are within the scope of protection of the application.

[0025] Example 1 The embodiment provides a coal mine gas extraction management and control method based on transparent geology, comprising the following steps: The transparent geology model construction step: integrating multi-source geological data, and constructing a transparent geology model capable of reflecting real-time geological conditions according to the integrated multi-source geological data; In the transparent geology model construction step: The multi-source geological data are multi-source heterogeneous data including roadway exposure data, geological drilling detection results, and mine geophysical prospecting results; In the data acquisition and preprocessing stage, the original data are screened and processed by using a data cleaning algorithm, a data quality evaluation algorithm, a data clustering analysis algorithm, and a data outlier detection algorithm, and the error data and redundant information are removed; The filtered data are evaluated in multiple dimensions by using a data quality scoring model, and the dimensions of the evaluation include data integrity, data accuracy, and data consistency, and the data that pass the evaluation are used as the basic data of the modeling link; The transparent geology model is constructed by using a three-dimensional geological modeling algorithm and a data fusion algorithm; The three-dimensional geological modeling algorithm adopts a hybrid modeling strategy, combines an octree algorithm based on a voxel and a triangular mesh algorithm based on a surface, and describes the morphology of a geological body; The data fusion algorithm uses a weighted average method and a neural network method to fuse data of different sources and construct the transparent geology model; A channel for monitoring real-time geological data changes is built, and when new geological data are generated, the transparent geology model is updated; The data integration algorithm in the incremental update algorithm is used to perform format conversion and standardization processing on the new data, and the new data are integrated into the corresponding position of the model according to the spatial position and attribute information; The difference detection and update algorithm is used to compare the new data and the model data, and the attribute values are updated according to the rules; When the new data cause the model structure to change, the model structure adjustment algorithm in the dynamic reconstruction algorithm is used to modify the topological structure, redivide the geological body boundary and grid, and optimize the model precision; The attribute propagation and optimization algorithm based on geological rules and physical models is used to recalculate and propagate the geological attributes, and the error and uncertainty are reduced through iterative calculation, so that the model always keeps consistent with the actual geological conditions.

[0026] Drilling design and optimization step: based on the geological information provided by the transparent geological model, combined with the coal-bearing rock parameters of the constructed drill holes, the key parameters of the drill holes are calculated and optimized to obtain the preset drilling design parameters; In the drilling design and optimization step: The key parameters of the drill holes include the drilling azimuth angle, the drilling inclination angle, and the drilling length; For geological abnormal areas, according to the real-time data of the transparent geological model, adjust the drilling equipment and plan the drilling path to enable the drill hole to penetrate the gas enrichment area; Through seamless integration and bidirectional dynamic mutual feedback of CAD software, drilling design drawings and three-dimensional models are generated; During the drilling design process, the mutual influence between different drill holes is considered, and an optimization algorithm is used for drilling layout planning to control the drilling spacing and angle.

[0027] Drilling construction monitoring and evaluation step: real-time acquisition of drilling equipment construction parameters and drilling parameters; compare the drilling parameters with the preset drilling design parameters, if the comparison result is inconsistent, adjust the drilling parameters of the drilling equipment until they are consistent with the preset drilling design parameters; at the same time, analyze and evaluate the drilling construction quality according to the construction parameters and drilling parameters, if the evaluation result is unqualified, analyze the factors affecting the drilling construction quality, and adjust the construction parameters and drilling parameters of the drilling equipment according to the analysis result; In the drilling construction monitoring and evaluation step: Acquire construction parameters and drilling parameters through sensors; construction parameters include drilling speed, drilling torque, and drilling pressure; drilling parameters include drilling azimuth and drilling inclination angle; When evaluating the drilling construction quality, the indicators covered include drilling spacing, control range, and coal displacement; Compare the real-time acquired drilling azimuth and drilling inclination angle data with the preset drilling design parameters; the real-time acquired drilling azimuth and drilling inclination angle data correspond to the actual drilling trajectory, and the preset drilling design parameters correspond to the design trajectory; when the actual drilling trajectory deviates from the design trajectory, adjust the drilling direction and angle of the drilling equipment according to the size and direction of the deviation to make the drilling return to the design trajectory; The unqualified conditions of drilling construction quality include drilling trajectory deviation exceeding the preset value and drilling parameters not within the normal threshold.

[0028] Gas extraction effect monitoring and evaluation step: build an extraction effect evaluation model and an extraction effect prediction model, real-time acquisition of gas parameters, according to the acquired gas parameters, evaluate the gas extraction effect through the extraction effect evaluation model and the extraction effect prediction model, optimize the extraction scheme according to the evaluation result, and adjust the construction method of drilling construction according to the optimized extraction scheme; In the gas extraction effect monitoring and evaluation step: Based on the coal seam gas basic parameter data, gas reserve data and extraction cumulative amount data, the gas flow theory, numerical simulation algorithm and data analysis method are used to construct the extraction effect evaluation model and extraction effect prediction model; The gas parameters include gas flow, gas concentration, gas negative pressure and CO content in gas.

[0029] The drilling database full life cycle management step: build a full process database covering drilling design, drilling construction and gas extraction construction; In the drilling database full life cycle management step: The data query engine module and the data visualization module are constructed, the information retrieval can be carried out by using the data query engine module, and the two-dimensional chart and the three-dimensional model can be generated by using the data visualization module; The historical data is analyzed by using the data mining algorithm, and the potential rules and problems in the drilling design, drilling construction and drilling extraction process are analyzed; The data is encrypted by using a multi-layer encryption algorithm, a data backup and recovery mechanism is established, the data is backed up to multiple storage media regularly, and is stored in different geographical positions.

[0030] The cross-system integration and cooperation step: the full process database is shared with other work systems of the coal mine, and the real-time interaction and cooperation of data are carried out.

[0031] The application also provides a coal mine gas extraction management and control system based on transparent geology, which can be realized by executing the process steps of the coal mine gas extraction management and control method based on transparent geology, that is, the coal mine gas extraction management and control method based on transparent geology can be understood as the preferred embodiment of the coal mine gas extraction management and control system based on transparent geology by those skilled in the art.

[0032] Example 2 The embodiment provides a coal mine gas extraction management and control system based on transparent geology, which comprises the following modules: The transparent geology model construction module: integrating multi-source geological data, constructing a transparent geology model capable of reflecting real-time geological conditions according to the integrated multi-source geological data; In the transparent geology model construction module: The multi-source geological data are multi-source heterogeneous data including roadway exposure data, geological drilling detection results and mine geophysical prospecting results; In the data acquisition and preprocessing stage, the original data is filtered and processed by using data cleaning algorithm, data quality evaluation algorithm, data clustering analysis algorithm and data outlier detection algorithm to eliminate error data and redundant information. The filtered data is evaluated in multiple dimensions by a data quality scoring model, including data integrity, data accuracy and data consistency. The data that passes the evaluation is used as the basis data for the modeling stage. A transparent geological model is constructed by using three-dimensional geological modeling algorithm and data fusion algorithm, including data preprocessing and quality control steps, implementation steps of mixed strategy of three-dimensional geological modeling algorithm, multi-dimensional implementation steps of data fusion algorithm, and model dynamic updating and precision optimization steps.

[0033] The data preprocessing and quality control steps include the following steps: Multi-source heterogeneous data acquisition step: integrate roadway exposure data (coal seam thickness, lithology description, etc.), geological drilling detection results (drilling columnar chart, logging data, etc.), and mine geophysical prospecting results (seismic exploration data, electromagnetic detection data, etc.) to form a multi-source heterogeneous data set. Data formats include vector data (CAD drawings, GIS layers, etc.), raster data (geophysical image, etc.), and text data (geological report, etc.).

[0034] Data cleaning and preprocessing step: use data cleaning algorithm (based on rule-based outlier detection, missing value interpolation, etc.) to eliminate error data (drilling depth values that deviate significantly from physical laws, etc.), and use data clustering analysis algorithm (K-means) to identify and filter redundant data. Use data quality evaluation algorithm to score from three dimensions of integrity (drilling data coverage), accuracy (geophysical data consistency with drilling data), and consistency (geological layer matching degree of different data sources). The data that passes the scoring enters the modeling stage.

[0035] Implementation steps of mixed strategy of three-dimensional geological modeling algorithm, including the following steps: Application step of octree algorithm based on voxel, including: space division step: divide the geological space into octree structure, the root node represents the entire modeling area, recursively divide into 8 child nodes until the preset precision (minimum voxel edge length 1m) is reached; attribute assignment step: for each voxel, assign attributes such as lithology and gas content based on adjacent drilling data or geophysical inversion results, and use trilinear interpolation method to ensure attribute continuity; suitable for describing large-scale, continuously distributed geological bodies (coal seams, rock layers), supporting efficient spatial query and topological analysis.

[0036] The application steps of the surface-based triangulated network (TIN) algorithm include: interface extraction: extracting discrete point clouds of geological interfaces (such as coal seam roofs and floors, fault interfaces, etc.) from preprocessed data, and generating an irregular triangulated network using the Delaunay triangulation algorithm; and precision optimization: increasing the density of triangulated network nodes in geologically complex areas (such as fault zones and fold cores) and improving interface accuracy through local retriangulation. This accurately depicts the undulating shape of geological interfaces and is suitable for describing discontinuous geological features (such as faults and pinchout zones).

[0037] The integration steps of the hybrid modeling strategy include: volume-surface fusion step: spatially aligning the octree voxel model with the TIN surface model, and using the surface model to constrain the boundary conditions of the voxel model (the coal seam roof and floor limit the voxel modeling range, etc.); dynamic weight adjustment step: automatically adjusting the contribution of the two models according to the data density, such as using the voxel model as the main model in areas with dense drilling, and enhancing the accuracy of the surface model in areas with rich geophysical data.

[0038] The multi-dimensional implementation steps of the data fusion algorithm include the following steps: The multi-source data fusion steps of the weighted average method include: weight calculation step: setting fusion weights based on the reliability of the data source (drilling data weight 0.6, seismic data weight 0.3, well logging data weight 0.1) and spatial distance (inverse distance weighting IDW); attribute fusion formula is: Vfinal= Vinitial + Vadd ,in, Vfinal is Attribute value after fusion, For the i The weight of the data, It is the original attribute value. It is suitable for the integration of gradually changing attributes such as lithology and coal seam thickness to ensure a smooth transition of the model.

[0039] The nonlinear fusion steps of the neural network method include: Model construction: Using a three-layer BP neural network (input layer, hidden layer, output layer, etc.), the input is multi-source data features (such as borehole lithology codes and geophysical velocity values), and the output is geological attribute predictions; Training data preparation: Using measured borehole data as labels and geophysical data as input, the network parameters are optimized using a backpropagation algorithm (learning rate 0.01, iterations 1000). This captures nonlinear relationships between data (such as the complex correlation between gas content, coal seam depth, and tectonic stress), improving modeling accuracy under complex geological conditions.

[0040] The steps of dynamic model update and accuracy optimization include the following: The incremental updating mechanism step specifically includes: a new data access step: when new drilling data or geophysical results are added, the data integration algorithm is used to standardize the new data into a unified format (CSV, GeoJSON), and the corresponding model area is quickly located through spatial indexing; a local updating step: a difference detection algorithm is used to compare the new data with the existing model values, and if the attribute deviation exceeds the threshold (coal seam thickness change > 5%), the local body element and the triangular net are updated.

[0041] The structural dynamic reconstruction step specifically includes: a topology adjustment step: when new data reveals changes in geological structure (such as the discovery of new faults, etc.), the model structure adjustment algorithm is used to modify the octree topology structure, redivide the geological body boundary, and synchronously update the triangular net connection relationship of the TIN surface; a grid optimization step: through an adaptive grid densification algorithm, the body element grid is automatically refined in the complex structure area (the body element side length is refined from 1m to 0.5m), and the model resolution is improved.

[0042] The attribute propagation and error correction step specifically includes: a physical model constraint step: based on geological rules (sedimentary continuity, tectonic stress conduction, etc.) and seepage physical models, the attribute propagation algorithm is used to diffuse the attribute values of local updating to the surrounding area, avoiding attribute mutations in the model; an iterative optimization step: through the error back propagation algorithm, the attribute values of the octree body element and the triangular net node are adjusted until the global error converges (mean square error MSE < 0.05).

[0043] The three-dimensional geological modeling algorithm adopts a hybrid modeling strategy, combining the octree algorithm based on body elements and the triangular net algorithm based on surfaces to depict the shape of geological bodies; The data fusion algorithm uses the weighted average method and the neural network method to fuse data from different sources and construct a transparent geological model; A channel for real-time monitoring of changes in geological data is built, and when new geological data is generated, the transparent geological model is updated; The data integration algorithm in the incremental updating algorithm is used to format convert and standardize the new data, and according to the spatial position and attribute information, the new data is integrated into the corresponding position of the model; The difference detection and updating algorithm is used to compare the new data with the model data, and the attribute values are updated according to the rules; When the new data causes changes in the model structure, the model structure adjustment algorithm in the dynamic reconstruction algorithm is used to modify the topology structure, redivide the geological body boundary and grid, and optimize the model precision; The attribute propagation and optimization algorithm based on geological rules and physical models is used to recalculate and propagate the geological attributes, and through iterative calculation, the error and uncertainty are reduced, so that the model always remains consistent with the actual geological conditions.

[0044] Drilling design and optimization module: based on the geological information provided by the transparent geological model, combined with the coal-bearing rock parameters of the constructed drillings, the key parameters of the drillings are calculated and optimized, and the preset drilling design parameters are obtained, including: data input and preprocessing steps, key parameter intelligent calculation steps, multi-objective optimization algorithm implementation steps, geological anomaly area dynamic adjustment steps, CAD bidirectional dynamic mutual feedback implementation steps, drilling layout collaborative optimization steps, design verification and iterative optimization steps.

[0045] Data input and preprocessing steps, specifically including the following steps: Transparent geological model data analysis step: extract three-dimensional geological body attributes (coal seam thickness, dip angle, gas content distribution), structural features (fault, fold position) and spatial topological relationship from the transparent geological model, and convert the model data into a format (such as DXF, IGES) that CAD can recognize through the API interface. Key data includes: coal seam roof and floor three-dimensional surface coordinates, gas content contour distribution, spatial range of geological anomaly areas (thin coal zone, tectonic fracture, etc.).

[0046] Constructed drilling data integration step: collect the coal-bearing rock parameters of historical drillings, including: drilling trajectory coordinates (X, Y, Z) and measured azimuth, inclination, coal-bearing point depth, coal seam thickness, lithology stratification data, extraction effect data (gas extraction volume, concentration decay curve). Use data standardization algorithms to convert heterogeneous data (Excel tables, database records, etc.) into a structured data model (JSON format), and establish the association between drilling data and geological model through spatial indexing (R-tree).

[0047] Key parameter intelligent calculation step, specifically including the following steps: Initial parameter automatic generation step: based on the gas enrichment area distribution of the transparent geological model, use the shortest path algorithm (Dijkstra algorithm) to calculate the optimal path of the drilling through the gas enrichment area, and preliminarily determine: drilling starting point (usually located within the roadway contour line), target point (center of the area with gas content ≥8m³ / t), initial azimuth, inclination (satisfy the drilling rig construction capability constraint, such as inclination range -90°~+90°).

[0048] Parameter constraint condition modeling step: establish a multi-dimensional constraint equation: geological constraints: the minimum safety distance between drilling trajectory and fault ≥5m, to avoid penetrating strong water permeable layer; construction constraints: drilling curvature radius ≥100m (adjusted according to drilling rig model), single hole length ≤800m; extraction constraints: drilling control range covers 120% of the working face mining area, hole spacing ≤15m (adjusted according to coal seam permeability coefficient).

[0049] Multi-objective optimization algorithm implementation step, specifically including the following steps: Optimization objective function construction step: adopt multi-objective genetic algorithm (MOGA), optimization objectives include: maximum extraction efficiency: objective function F1 = ∑(gas-rich area volume x borehole control weight); minimum construction cost: F2 = total length of borehole x (lithology hardness coefficient + equipment loss coefficient); maximum safety: F3 = ∑(1-geological risk factor), wherein the risk factor is calculated according to parameters such as fault distance and coal seam inclination.

[0050] Algorithm iteration optimization process step: population initialization: generate 100 sets of random borehole parameter combinations as an initial population; fitness calculation: score each set of parameters according to the objective function, and retain the top 30% of excellent individuals; crossover and mutation: adopt simulated binary crossover (SBX) and polynomial mutation operators to generate a new generation of population; termination condition: terminate when the optimal solution change rate is less than 5% for 10 consecutive generations or the iteration number reaches 200, and output the Pareto optimal solution set.

[0051] Geological anomaly area dynamic adjustment step, specifically comprising the following steps: Anomaly area identification step: automatically identify the following abnormal areas through attribute threshold detection of the transparent geological model: coal seam thickness mutation zone (thickness change rate > 30%); gas content abnormal area (content > 12 m³ / t or 50% lower than the regional average); tectonic stress concentration area (determined according to finite element simulation results).

[0052] Path re-planning strategy step: adopt hierarchical adjustment mechanism for abnormal areas: micro-adjustment (abnormal range < 5m): keep the borehole starting point unchanged, and adjust the trajectory smoothly through Bezier curve to avoid thin coal zones; large adjustment (abnormal range ≥ 5m): reselect the borehole starting point, predict the abnormal area boundary using three-dimensional space interpolation algorithm (such as Kriging interpolation), and plan a bypass path; directional crossing (gas-rich area): adopt “stepped drilling” design, and penetrate complex areas through multiple segmented boreholes, with each borehole length ≤ 200m.

[0053] CAD bidirectional dynamic mutual feedback implementation step, specifically comprising the following steps: Integrated interface development step: develop a bidirectional interaction module based on AutoCAD C# API, which realizes: model import: import the three-dimensional surface of the transparent geological model into CAD as the design background; parameter mapping: automatically convert the optimized borehole parameters (azimuth angle, inclination angle) into CAD three-dimensional line segments; conflict detection: real-time check the spatial conflict (minimum distance < 2m) of the borehole trajectory with the roadway and existing boreholes.

[0054] Dynamic mutual feeding process steps: design end modification: when the engineer manually adjusts the drilling trajectory in CAD, the system automatically calculates the influence of parameter changes on the extraction effect (control range reduction) and prompts optimization suggestions; model end update: if the transparent geological model is updated due to new data (newly drilled lithology), the drilling design parameters in CAD will automatically trigger secondary optimization, prompting the engineer through a pop-up window whether to accept the update.

[0055] Drilling layout collaborative optimization steps, specifically comprising the following steps: Group hole interference analysis step: using finite element seepage simulation, a group hole extraction interference model is established: input parameters: drilling spacing, extraction negative pressure, coal seam permeability; simulation index: gas pressure distribution after 180 days of extraction, extraction standard time difference; interference threshold: when the overlap rate of adjacent drilling extraction influence radius is > 70%, layout adjustment is triggered.

[0056] Layout optimization algorithm step: using simulated annealing algorithm to adjust group hole layout: disturbance operation: randomly select 10% of the drill holes and adjust the azimuth angle within ± 15°; acceptance criterion: if the extraction uniformity of the new layout improves by ≥5%, the adjustment is accepted, otherwise it is accepted with a probability of e^(-ΔE / T) (ΔE is the difference value of the objective function, T is the temperature parameter); termination condition: when the extraction uniformity is not improved for 50 consecutive disturbances, the optimization is terminated.

[0057] Design verification and iterative optimization steps, specifically comprising the following steps: Three-dimensional visualization verification step: through the superposition rendering of CAD and transparent geological model, a three-dimensional perspective view of drilling design is generated to verify: the intersection relationship between drilling trajectory and geological interface; whether the extraction influence range covers the target area; the spatial accessibility of the drilling rig construction (such as whether the roadway height meets the drilling rig elevation requirement).

[0058] Historical data comparison verification step: establish a design-construction-extraction closed-loop verification mechanism: match the new design parameters with historical successful cases (such as drill holes with extraction standard rate > 90%) for similarity matching, calculate the parameter matching degree; if the matching degree < 70%, automatically start secondary optimization, and force the key parameters (such as azimuth angle, hole spacing) to move towards successful cases; the optimized parameters are verified for reliability through Monte Carlo simulation, simulating 100 geological fluctuation scenarios to ensure that the extraction standard probability is ≥95%.

[0059] This embodiment realizes the engineering application of multi-objective optimization algorithm, for the first time combining MOGA algorithm with coal mine drilling design, through constructing a "extraction-cost-safety" three-dimensional objective function, solving the design imbalance problem caused by traditional single objective optimization (such as only considering extraction amount), and improving the comprehensive benefit by more than 20% compared with traditional methods.

[0060] The embodiment adopts a geological anomaly dynamic response mechanism, is based on real-time updating capability of a transparent geological model, and realizes a "perception-decision-adjustment" closed loop of drilling design. When a geological anomaly changes, the system automatically triggers path re-planning, and the response time is less than or equal to 10 minutes, and the efficiency is improved by 80% compared with manual adjustment.

[0061] The embodiment adopts CAD bidirectional mutual feeding technology, develops a parametric design interface, realizes bidirectional interaction of "model-driven design-design feedback model", breaks the information island of traditional CAD and the geological model, synchronizes design modification and geological constraints in real time, and reduces the design rework rate by 40%.

[0062] The embodiment adopts group hole interference quantitative analysis, establishes a group hole layout optimization method based on seepage simulation, dynamically adjusts the drilling spacing by quantifying the interference degree, improves the extraction uniformity by 15%, and solves the problem of local extraction substandard caused by traditional equidistant layout.

[0063] In the drilling design and optimization module: The key parameters of the drilling hole include the drilling azimuth angle, the drilling inclination angle and the drilling length. For the geological anomaly area, the drilling equipment is adjusted and the drilling path is planned according to the real-time data of the transparent geological model, so that the drilling hole can penetrate the gas enrichment area. Through seamless integration and bidirectional dynamic mutual feeding of CAD software, drilling design drawings and three-dimensional models are generated. In the drilling design process, the mutual influence between different drilling holes is considered, an optimization algorithm is used for drilling layout planning, and the drilling spacing and angle are controlled.

[0064] The drilling construction monitoring and evaluation module: real-time acquisition of drilling equipment construction parameters and drilling parameters; comparison of drilling parameters and preset drilling design parameters, if the comparison result is inconsistent, adjust the drilling parameters of the drilling equipment until the preset drilling design parameters are consistent; at the same time, analyze and evaluate the drilling construction quality according to the construction parameters and the drilling parameters, if the evaluation result is unqualified, analyze the factors affecting the drilling construction quality, and adjust the construction parameters and drilling parameters of the drilling equipment according to the analysis result, which can adopt the following adjustment mode: Adjustment mode 1 is real-time parameter comparison and trajectory calibration. Directly adjust the drilling trajectory parameters (azimuth angle, inclination angle, depth) to make the actual drilling trajectory consistent with the preset design trajectory. For example, when the real-time collected drilling azimuth angle deviates from the preset value by more than 1°, the system automatically adjusts the drilling rig rotation angle, and drives the drill bit back to the design trajectory through the hydraulic system. The adjustment granularity is the real-time deviation during the drilling construction process, which belongs to "millimeter-level" dynamic calibration; the data source is the comparison between the drilling parameters (inertial navigation data) collected in real time only relying on the drilling rig sensors and the design parameters; the response speed is seconds-level feedback, which is suitable for coping with small amplitude changes in geology (micro changes in coal seam inclination).

[0065] Adjustment mode 2 is construction quality evaluation and parameter optimization. Adjust the construction process parameters (drilling speed, torque, pressure) and drilling quality parameters (hole spacing, control range, coal flushing volume). For example, if the drilling spacing exceeds the design value of 2m (evaluation index unqualified), it is analyzed that the drilling speed is too fast, so the drilling speed is adjusted from 0.8m / min to 0.5m / min, and the subsequent drilling position is re-planned. The adjustment dimension is the comprehensive evaluation result based on the construction quality, which involves multi-parameter collaborative adjustment (adjusting the drilling speed and drilling angle at the same time); the data source is the integration of construction parameters (such as torque fluctuation curve) and drilling parameters (such as trajectory deviation statistics), which triggers the adjustment through the quality scoring model (drilling qualification rate, coal flushing volume compliance rate); the response period is minutes to hours, which is suitable for solving the problem of phased construction quality (common deflection of drilling in a certain area).

[0066] Adjustment mode 3 is extraction effect evaluation and construction strategy optimization. Adjust the extraction construction strategy (drilling layout, extraction negative pressure, construction process), which indirectly affects the drilling parameters and construction parameters. For example, if the extraction effect evaluation model shows that the gas extraction rate in a certain area is only 60% (not up to standard), the optimized extraction scheme is to densify the drilling (hole spacing is reduced from 15m to 10m), and the drilling construction process is adjusted (progressive drilling is adopted). The adjustment level is a strategic adjustment belonging to the whole process of extraction, rather than single parameter calibration; the data source is the integration of gas parameters (flow, concentration, negative pressure), geological model (distribution of gas enrichment area, etc.) and historical extraction data, which predicts the effect through the prediction model (LSTM neural network); the response period is hours to days, which is suitable for coping with large-scale changes in geology (such as sudden change of coal seam thickness) or overall optimization of extraction system.

[0067] This embodiment adopts multi-scale data fusion, and integrates the real-time drilling data of adjustment mode 1, the construction quality data of adjustment mode 2 and the extraction effect data of adjustment mode 3 into a three-dimensional spatial coordinate system through the transparent geological model, to realize the correlation analysis of "trajectory-quality-effect".

[0068] This embodiment adopts adaptive weight adjustment, automatically allocates adjustment weights according to geological complexity, and mainly adopts mode 1 (weight 60%) in simple structure area, and strengthens the strategy optimization of mode 3 (weight 50%) in gas enrichment area.

[0069] This embodiment adopts digital twin verification, simulates the superposition effect (real-time correction + quality optimization + strategy adjustment) of the three adjustment modes through the digital twin platform before the adjustment instruction is executed, and ensures the reliability of the adjustment result.

[0070] In the drilling construction monitoring and evaluation module: Construction parameters and drilling parameters are collected through sensors; the construction parameters include drilling speed, drilling torque and drilling pressure; the drilling parameters include drilling azimuth and drilling inclination; When evaluating the drilling construction quality, the indicators covered include drilling spacing, control range and coal displacement; The real-time collected drilling azimuth and drilling inclination data correspond to the actual drilling trajectory, and the preset drilling design parameters correspond to the design trajectory; when the actual drilling trajectory deviates from the design trajectory, the drilling direction and angle of the drilling equipment are adjusted according to the size and direction of the deviation, so that the drilling returns to the design trajectory; The unqualified drilling construction quality includes drilling trajectory deviation exceeding the preset value and drilling parameters not within the normal threshold.

[0071] The gas extraction effect monitoring and evaluation module: build an extraction effect evaluation model and an extraction effect prediction model, collect gas parameters in real time, evaluate the gas extraction effect through the extraction effect evaluation model and the extraction effect prediction model according to the collected gas parameters, optimize the extraction scheme according to the evaluation result, and adjust the construction method of drilling construction according to the optimized extraction scheme; In the gas extraction effect monitoring and evaluation module: Based on coal seam gas basic parameter data, gas reserve data and extraction cumulative data, the extraction effect evaluation model and the extraction effect prediction model are constructed by using gas flow theory, numerical simulation algorithm and data analysis method; The gas parameters include gas flow, gas concentration, gas negative pressure and CO content in gas.

[0072] The drilling database full life cycle management module: build a construction full process database covering drilling design, drilling construction and gas extraction; In the drilling database full life cycle management module: The data query engine module and the data visualization module are constructed, the information retrieval can be performed by using the data query engine module, and the two-dimensional chart and the three-dimensional model can be generated by using the data visualization module. The historical data is analyzed by using a data mining algorithm, and potential laws and problems in drilling design, drilling construction and drilling extraction process are analyzed; A multi-layer encryption algorithm is used for data encryption processing, a data backup and recovery mechanism is established, data is backed up to multiple storage media regularly, and stored in different geographical locations.

[0073] Cross-system integration and collaboration module: share the construction whole process database with other work systems of the coal mine, and realize real-time interaction and collaborative work of data.

[0074] The application also provides a coal mine gas extraction control system based on transparent geology, which can be realized by executing the process module of the coal mine gas extraction control method based on transparent geology, that is, the coal mine gas extraction control method based on transparent geology can be understood by those skilled in the art as the preferred embodiment of the coal mine gas extraction control system based on transparent geology.

[0075] Example 3 Those skilled in the art can understand this embodiment as a more specific description of embodiment 1 and embodiment 2.

[0076] The present embodiment provides a coal mine gas extraction intelligent control system and method based on transparent geology, which focuses on the field of coal mine safety production and gas control technology, and is especially committed to realizing intelligent control of the whole process of coal mine gas extraction by means of transparent geology model.

[0077] The coal mine gas extraction intelligent control system based on transparent geology comprises the following modules: 1) High-precision transparent geology model intelligent construction module: This module is a key technical support for intelligent mining of coal mines, which integrates multiple source geological data systematically, uses advanced algorithms and advanced technologies, and constructs a high-precision three-dimensional model that can reflect the real-time geological situation.

[0078] In the data acquisition and preprocessing stage, the module widely integrates roadway exposure data, advanced geological drilling detection results, mine geophysical prospecting results and other multi-source heterogeneous data. By means of data cleaning and quality evaluation technology, clustering analysis, outlier detection and other algorithms are used to strictly select and process the original data, and to eliminate error data and redundant information; through the data quality scoring model, the data is evaluated from the dimensions of integrity, accuracy and consistency, to ensure that the data entering the modeling link is true and reliable.

[0079] In the model construction process, advanced three-dimensional geological modeling algorithms and advanced data fusion technologies work together.

[0080] The three-dimensional geological modeling algorithm adopts a hybrid modeling strategy, combining the octree algorithm based on voxels and the triangular mesh algorithm based on surfaces to accurately depict the morphology of geological bodies.

[0081] The data fusion technology uses weighted average method, neural network method, etc., to deeply fuse data from different sources, fully utilize the advantages of each data, and construct a high-precision transparent geological model.

[0082] This model presents the detailed information of geological structure, coal seam distribution, and gas occurrence in a visual and three-dimensional manner, providing a solid geological basis for drilling design and gas extraction scheme development.

[0083] To ensure the timeliness and accuracy of the model, the module establishes a channel to monitor real-time geological data changes. Once new geological data is generated, the model update program is triggered immediately.

[0084] The data integration algorithm in the incremental update algorithm converts and standardizes the new data, and then accurately integrates it into the corresponding position of the model based on spatial location and attribute information.

[0085] The difference detection and update algorithm compares the new data with the model data, and updates the attribute values according to the rules, such as adjusting the dip angle, strike, and other related attributes when the coal seam thickness changes.

[0086] In the dynamic reconstruction algorithm, the model structure adjustment algorithm modifies the topological structure and re-divides the geological body boundaries and grids when new data triggers structural changes, optimizing the model precision.

[0087] The attribute propagation and optimization algorithm recalculates and propagates geological attributes based on geological rules and physical models, reducing errors and uncertainties through iterative calculations, ensuring that the model always remains highly consistent with the actual geological conditions.

[0088] 2) Intelligent drilling design and optimization module: Based on the accurate geological information provided by the transparent geological model, combined with the coal-bearing rock parameters of the constructed drillings, intelligent algorithms are used to automatically calculate and optimize the key parameters of the drillings, including azimuth angle, inclination angle, length, etc.

[0089] For geological abnormal areas, the system has intelligent adaptive adjustment function, which can accurately plan the drilling path according to the real-time data of the geological model, ensuring that the drilling can accurately penetrate the gas enrichment area, and maximizing the gas extraction effect.

[0090] Through seamless integration and bidirectional dynamic interaction with CAD software, the automatic and accurate generation of drilling design drawings and three-dimensional models is realized, providing intuitive, clear, and accurate guidance for field construction.

[0091] In the drilling design process, the mutual influence between different drillings is fully considered, the optimization algorithm is used for drilling layout planning, the drilling spacing and angle are reasonably controlled, the interference between drillings is avoided, and the overall gas extraction efficiency is improved.

[0092] 3) Drilling intelligent construction monitoring and evaluation module: High-precision sensors are equipped on the drilling equipment to collect drilling speed, torque, pressure and other construction parameters in real time. At the same time, advanced azimuth and angle sensors are introduced to monitor the azimuth and inclination of the drilling in real time, providing data support for real-time correction of the drilling machine.

[0093] Through these data, the drilling construction quality is monitored and evaluated comprehensively and in real time, covering key indicators such as drilling spacing, control range, and coal displacement.

[0094] During the monitoring process, the system compares the real-time collected drilling azimuth and inclination data with the preset drilling design parameters. Once the actual drilling trajectory deviates from the designed trajectory, the system will immediately start the real-time correction function of the drilling machine. According to the size and direction of the deviation, the drilling direction and angle of the drilling machine are automatically adjusted to make the drilling return to the designed trajectory as soon as possible, ensuring the accuracy of the drilling construction.

[0095] Once the construction quality problem is found, such as large deviation of drilling trajectory, abnormal drilling parameters, etc., the system immediately starts the intelligent analysis program to automatically find the cause, such as equipment failure, sudden change of geological conditions, improper construction technology, etc., and provides targeted improvement measures according to the analysis results.

[0096] At the same time, according to the real-time feedback data in the construction process, the design parameters of the subsequent drilling are dynamically adjusted to ensure the double improvement of construction quality and efficiency. A perfect construction quality traceability system is established to record the whole construction process of each drilling, including construction time, construction personnel, construction parameter changes, drilling trajectory correction, etc. Information is convenient for subsequent quality analysis and problem troubleshooting.

[0097] 4) Gas intelligent extraction effect monitoring and evaluation module: Based on the evaluation of coal seam gas basic parameters, gas reserves, and cumulative extraction, etc. Data, comprehensively use gas flow theory, numerical simulation technology and data analysis method, build scientific and accurate extraction effect evaluation model and prediction model.

[0098] Using the hardware system installed in the underground gas extraction drilling, real-time collection of gas flow, concentration, negative pressure, CO and other parameters, and rapid uploading of these data to the ground software system platform.

[0099] The ground system uses advanced intelligent analysis algorithms to deeply process and analyze the collected data, dynamically evaluates the gas extraction effect of the working face, and timely discovers the extraction substandard area and potential safety hazards.

[0100] When the extraction effect reaches the preset standard, the system automatically sends a prompt message to guide relevant personnel to conduct extraction effect inspection. After the effect inspection is qualified, the system automatically collects extraction basic condition information according to the requirements of the coal mine gas extraction standard judgment implementation details, and quickly generates a gas extraction standard report with detailed content and standardized format.

[0101] Through long-term monitoring and analysis of extraction effect, the extraction scheme is continuously optimized, and the overall effect of gas extraction is continuously improved.

[0102] 5) Drilling database full life cycle management module: A database covering the whole process of drilling design, construction, and extraction is built. Automatic data collection, standardized storage, and standardized management are realized to ensure the integrity, consistency, and accuracy of the data.

[0103] A powerful data query engine is provided to support users to quickly search through multiple conditions such as drilling number, construction time, coal seam location, and gas extraction indicators. Advanced data visualization technology is used to present drilling data in intuitive and easy-to-understand charts, images, and other forms, including two-dimensional charts (column chart to show the gas extraction amount of different areas of the drilling, line chart to reflect the trend of gas concentration, co, pressure, and other data of a drilling over time), three-dimensional models (clearly showing the distribution of drilling in underground space and the spatial relationship with geological structure), etc. to facilitate users to analyze data and make decisions. Through deep mining of historical data and using data mining algorithms (such as association rule mining, clustering analysis, time series analysis, etc.), potential laws and problems in drilling design, construction, and extraction process are found to provide strong support for optimizing gas extraction scheme and improving construction technology.

[0104] In the process of database management, multi-layer encryption technology is used to encrypt data to ensure the security of data in storage and transmission. At the same time, a perfect data backup and recovery mechanism is established, and data is backed up to multiple storage media (such as local tape library, off-site cloud storage, etc.) and stored in different geographical locations to prevent data loss due to natural disasters, equipment failures, etc. and ensure the stable operation of the system.

[0105] 6) System integration and collaboration module: Deep integration and seamless connection with other intelligent systems of coal mines, such as ventilation system, safety monitoring system, production scheduling system, etc. are realized to build a unified data sharing platform, realize real-time interaction and collaborative work of data.

[0106] Through the interconnection and interworking of data, the overall production process of the coal mine is optimized, and the production efficiency and safety are improved. For example, the operating parameters of the ventilation system are automatically adjusted according to the gas extraction situation to ensure that the gas concentration is always within a safe range; when the gas concentration is abnormal, the safety monitoring system is linked to immediately issue an alarm and start the corresponding emergency disposal measures; in cooperation with the production scheduling system, the coal mining operation plan is reasonably arranged according to the gas extraction progress and effect to avoid the impact of gas accidents on production.

[0107] As shown in Figure 1 , it is an architecture diagram of the intelligent management and control system for coal mine gas control based on transparent geology, which clearly shows the mutual relationship and data flow between various modules (high-precision transparent geology model intelligent construction module, drilling intelligent design and optimization module, drilling intelligent construction monitoring and evaluation module, gas intelligent extraction effect monitoring and evaluation module, drilling full life cycle data management module, system integration and collaboration module).

[0108] As shown in Figure 2 , it is a flowchart diagram of the intelligent management and control system for coal mine gas control, which details the specific steps and processes of drilling from design requirement proposal, geological data acquisition, model calculation and parameter optimization, to design drawing and three-dimensional model generation, to field construction, construction monitoring and feedback adjustment, and drilling database management, cross-system integrated data sharing and collaboration.

[0109] As shown in Figure 3 , it is a functional interface diagram of the intelligent management and control system for coal mine gas control, which shows the functions of transparent geology, drilling design, data acquisition and control, governance effect compliance evaluation, abnormal management, data information library management, and system management.

[0110] This embodiment realizes intelligent and accurate drilling design and efficient extraction. Based on high-precision transparent geology model, it deeply analyzes complex geological features such as coal seam thickening area and gas enrichment area, and uses intelligent algorithm to automatically and accurately optimize key parameters such as drilling azimuth angle, inclination angle, and length. By dynamically adjusting the drilling path and layout, it ensures that the drilling can accurately penetrate the gas enrichment area, significantly improves the effectiveness of drilling and the efficiency of gas extraction, increases the gas extraction compliance rate, reduces the risk of gas over-limit and explosion from the source, and ensures the safety of coal mine production.

[0111] The embodiment constructs a real-time dynamic monitoring and intelligent control system, builds a real-time monitoring network covering the whole process of gas extraction, collects and analyzes key parameters such as gas flow, concentration and negative pressure in real time through the linkage of underground sensors and ground intelligent analysis platform, realizes second-level response evaluation of gas extraction effect by using extraction effect evaluation and prediction model, discovers abnormal extraction areas and potential safety hazards in time, and when the extraction effect is not up to standard, the system automatically starts the intelligent control program, adjusts the drilling parameters, extraction equipment operation state or ventilation system configuration, ensures that the gas concentration is continuously and stably within the safety threshold, and forms a closed-loop management mode of "monitoring-evaluation-control".

[0112] The embodiment creates a whole life cycle data-driven decision-making platform, establishes a standardized chart database covering the whole process of drilling design, construction and extraction, realizes automatic data collection, encrypted storage and intelligent management, reveals the potential relationship between drilling parameters, geological conditions and extraction effect through multi-dimensional data query, visual analysis and deep mining, and provides data support for gas extraction scheme optimization, construction process improvement and mining planning decision-making, so as to improve the accuracy of decision-making and promote the transformation of gas control from experience-driven to data-driven.

[0113] The embodiment promotes the intelligent and collaborative development of coal mines, realizes deep integration and seamless collaboration with intelligent systems such as coal mine ventilation, safety monitoring and production scheduling, builds a unified data sharing and business collaboration platform, automatically optimizes ventilation scheme, triggers safety warning and adjusts production plan according to the dynamic of gas extraction, eliminates information silos, improves overall production efficiency of coal mines, reduces comprehensive operating costs, and helps the sustainable development of intelligent and green coal mines.

[0114] Example 4 Those skilled in the art can understand the embodiment as a more specific description of embodiment 1, embodiment 2 and embodiment 3.

[0115] The embodiment takes the bottom extraction lane of 12919 upper machine lane of a mine as an example.

[0116] 1) Intelligent construction of high-precision transparent geological model implementation: In the process of coal mining, professional geologists are arranged to collect roadway exposure data regularly, and detailed records of coal seam thickness changes, geological structure characteristics, rock properties and other information are made. At the same time, the results of advanced geological drilling and mine geophysical exploration are sorted and analyzed to ensure the accuracy and integrity of the data. These multi-source geological data are transmitted to a special data processing center through high-speed network, and professional geological modeling software is used to build the model according to the established modeling algorithm. In the construction process, the model parameters are repeatedly fine-tuned according to the actual geological conditions to ensure that the model can truly reflect the geological conditions. A data updating mechanism is established, and when new geological data are generated, such as new geological exploration or new geological phenomena found during roadway excavation, the data are immediately transmitted to the data processing center to trigger the model updating process. The model is updated using incremental updating and dynamic reconstruction algorithms to ensure that the model can reflect the geological changes in real time.

[0117] As shown in Figure 4 , it is a high-precision transparent geological model construction schematic Figure 1 , which presents the data collection, preprocessing and preliminary modeling stage in the process of high-precision transparent geological model construction.

[0118] As shown in Figure 5 , it is a high-precision transparent geological model construction schematic Figure 2 , which shows the model updating, dynamic reconstruction and other key links in the process of high-precision transparent geological model construction.

[0119] 2) Intelligent design and optimization of drilling: The constructed transparent geological model data and the drilled hole data are imported into the drilling design and optimization module. The system starts the intelligent algorithm to automatically calculate and optimize the drilling parameters. The generated drilling design drawings and three-dimensional models are transmitted to the construction site in real time through the network, and the construction personnel receive the design files by means of electronic equipment (such as tablet computers, smart terminals, etc.) and perform drilling construction according to the design. During the construction process, if the construction personnel find that the geological conditions do not match the design, such as encountering faults, sudden thinning of coal seams, etc., they can timely feedback the information to the system through the on-site communication equipment. After receiving the feedback, the system reanalyzes the geological data, adjusts the drilling design parameters using the optimization algorithm, and transmits the adjusted design scheme to the construction site again to guide the subsequent construction of the construction personnel.

[0120] As shown in Figure 6 , it is a schematic diagram of intelligent design and real-time optimization of drilling profile, which reflects the design of drilling profile and the real-time optimization according to the geological changes during the construction process. As shown in Figure 7 , it is a schematic diagram of strip arrangement and real-time optimization.

[0121] 3) Intelligent construction monitoring and evaluation of drilling: A high-precision sensor array is deployed at the core of the drilling rig, where the inertial navigation sensors use MEMS (Micro-Electro-Mechanical System) technology, with a three-axis gyroscope, three-axis accelerometer, and magnetometer working together to capture real-time attitude information of the drilling rig in three-dimensional space. The tilt sensor uses a high-precision dual-axis digital sensor, with a measurement accuracy of 0.01°, which can accurately perceive the change in drilling inclination angle. The laser range finder measures the drilling depth with millimeter-level precision at a sampling frequency of 10 Hz. These sensors transmit the collected drilling orientation, inclination, and depth data in encrypted data packets to the drilling construction monitoring and evaluation module in real time through low-power Bluetooth or ZigBee wireless transmission protocols. Upon receiving the data, the monitoring system immediately starts the dynamic trajectory comparison program. The system compares the real-time drilling trajectory data with the designed trajectory based on the transparent geological model in milliseconds. When the orientation deviation exceeds 1° or the inclination deviation exceeds 0.5°, the intelligent correction program is automatically triggered. This program sends instructions to the drilling rig hydraulic control system through industrial Ethernet, accurately adjusts the pressure and flow of the hydraulic pump, and drives the steering mechanism to adjust the drill bit attitude. At the same time, the system generates visual correction operation instruction animations using three-dimensional modeling technology, which are displayed directly to the construction personnel through the explosion-proof display screen on the construction site, guiding them to complete the correction operation. In addition, the system introduces a long short-term memory neural network (LSTM) to build a risk prediction model. The torque, pressure, and drilling speed during drilling are used as input parameters, and the LSTM network learns and remembers historical data to mine the potential correlation between parameter trends and risk events such as sticking and hole collapse. The model predicts real-time data at 1-second intervals, and when the predicted risk probability exceeds the preset threshold, it immediately issues a warning through various means such as audible and visual alarms, mobile app push, and generates a risk warning report on the system interface, detailing the risk causes and recommended preventive measures such as adjusting mud ratio and reducing drilling speed, providing double protection for construction safety.

[0122] 4) Gas intelligent extraction effect monitoring and evaluation implementation: A special hardware monitoring system is installed in the gas extraction drilling hole in the mine, which can collect gas flow, concentration, negative pressure, CO and other parameters in real time. The collected data is quickly uploaded to the ground software system platform through the industrial Ethernet or wireless transmission network in the mine. After receiving the data, the ground system starts the intelligent analysis program, uses the extraction effect evaluation model and prediction model to deeply process and analyze the data. The system dynamically evaluates the gas extraction effect of the working face according to the analysis results, and immediately reminds the relevant personnel through system pop-up windows, short message notifications and other means when it finds that the extraction is not up to standard or there is potential safety hidden danger. When the extraction effect reaches the preset standard, the system automatically sends a prompt message to guide the staff to conduct extraction effect test. After the effect test is qualified, the system automatically collects the extraction basic condition information such as coal seam geological condition, extraction equipment parameter, extraction time, etc. according to the requirements of the coal mine gas extraction standard evaluation implementation details, uses the preset report template to quickly generate the gas extraction standard report, and stores the report in the database for users to query and download at any time.

[0123] 5) Drilling full life cycle data management implementation: A functional complete database management system is developed, a reasonable database table structure is designed, such as drilling basic information table, construction record table, gas extraction data table, etc., and the association relationship between tables is established. In the data acquisition end, the data of drilling design, construction, extraction and other stages are collected and transmitted in a standardized format through data acquisition equipment. In terms of data query, multiple query entrances are provided for users, including Web interface query, mobile terminal APP query, etc. Users can input drilling number, construction time, coal seam location, gas extraction index and other query conditions for data retrieval according to their own needs. In terms of data visualization, professional visualization tools are used to convert data into intuitive charts and models for display. For example, the gas extraction amount of drilling holes in different areas is compared through a column chart, the trend of gas concentration of a drilling hole with time is shown through a line chart, and the distribution of drilling holes in underground space and the relationship with geological structure are presented through a three-dimensional model. Historical data is backed up regularly, and data is backed up to different storage media and geographical locations according to the data backup strategy. At the same time, data analysis tools are used to deeply mine historical data, such as using association rule mining to analyze the relationship between drilling design parameters and gas extraction effect, using clustering analysis to classify drilling data under different geological conditions, and using time series analysis to predict the trend of gas extraction amount. The analysis results are fed back to the relevant departments to provide reference for gas extraction decision-making.

[0124] 6) System integration and collaborative implementation: The system is integrated with the ventilation system, safety monitoring system, production scheduling system, etc. of the coal mine. In terms of hardware, a unified data transmission network is built to ensure real-time data transmission between systems. In terms of software, data interaction interfaces are developed, data interaction specifications are formulated, and data sharing and collaborative work between systems are realized. For example, when the gas extraction effect monitoring and evaluation module finds that the gas concentration is close to the warning value, the data is transmitted to the ventilation system, and the ventilation system automatically adjusts the speed and air volume of the ventilator according to the preset rules to ensure that the gas concentration is always within the safe range. At the same time, the gas concentration anomaly information is transmitted to the safety monitoring system, which immediately issues an alarm and starts the emergency plan to notify relevant personnel to take appropriate safety measures. In addition, the system also works with the production scheduling system to reasonably arrange the coal mining operation plan according to the gas extraction progress and effect, avoiding the impact of gas accidents on production, and realizing the safe and efficient operation of coal mine production.

[0125] The present application realizes intelligent management and control of the whole process of coal mine gas extraction by means of a transparent geological model.

[0126] Those skilled in the art know that, in addition to implementing the system provided by the present application and each device, module, unit thereof in pure computer readable program code, the same function can be realized by logically programming the method steps in the form of logic gates, switches, application specific integrated circuits, programmable logic controllers and embedded microcontrollers. Therefore, the system provided by the present application and each device, module, unit thereof can be considered as a hardware component, and the devices, modules, units included therein for realizing various functions can also be considered as structures within the hardware component; the devices, modules, units for realizing various functions can also be considered as both software modules realizing the method and structures within the hardware component.

[0127] The specific embodiments of the present application are described above. It should be understood that the present application is not limited to the above specific embodiments, and those skilled in the art can make various changes or modifications within the scope of the claims, which does not affect the essential content of the present application. The embodiments of the present application and the features in the embodiments can be arbitrarily combined with each other without conflict.

Claims

1. A coal mine gas extraction control method based on transparent geology, characterized in that: The steps include: Steps for constructing a transparent geological model: Integrate multi-source geological data and construct a transparent geological model that can reflect the actual geological conditions in real time based on the integrated multi-source geological data; Drilling design and optimization step: Based on the geological information provided by the transparent geological model and combined with the coal and rock parameters of the constructed boreholes, the key parameters of the drilling are calculated and optimized to obtain the preset drilling design parameters; The drilling construction monitoring and evaluation step includes: collecting the construction parameters and drilling parameters of the drilling rig equipment in real time; comparing the drilling parameters with the preset drilling design parameters; if the comparison result is inconsistent, adjusting the drilling parameters of the drilling rig equipment until they are consistent with the preset drilling design parameters; at the same time, analyzing and evaluating the drilling construction quality based on the construction parameters and the drilling parameters; if the evaluation result is unqualified, analyzing the factors affecting the drilling construction quality, and adjusting the construction parameters and drilling parameters of the drilling rig equipment based on the analysis results; Gas extraction effect monitoring and evaluation steps: construct an extraction effect evaluation model and an extraction effect prediction model, collect gas parameters in real time, evaluate the gas extraction effect through the extraction effect evaluation model and the extraction effect prediction model based on the collected gas parameters, optimize the extraction plan based on the evaluation results, and adjust the drilling construction method based on the optimized extraction plan.

2. The coal mine gas extraction control method based on transparent geology according to claim 1 is characterized in that: The coal mine gas extraction control method also includes the following steps: Drilling database full lifecycle management steps: Build a database covering the entire construction process from drilling design, drilling construction, and gas extraction; Cross-system integration and collaboration steps: Share the construction process database with other work systems of the coal mine to conduct real-time data interaction and collaborative work.

3. The coal mine gas extraction control method based on transparent geology according to claim 1 is characterized in that: In the transparent geological model construction step: The multi-source geological data is multi-source heterogeneous data including tunnel exposure data, geological drilling detection results, and mine geophysical exploration results; During the data collection and preprocessing phase, data cleaning algorithms, data quality assessment algorithms, data clustering analysis algorithms, and data outlier detection algorithms are used to screen and process raw data and eliminate erroneous data and redundant information. The screened data is evaluated in multiple dimensions using a data quality scoring model. The evaluation dimensions include data integrity, data accuracy, and data consistency. The qualified data is used as the basic data for the modeling process.

4. The coal mine gas extraction control method based on transparent geology according to claim 1 is characterized in that: In the transparent geological model construction step: Constructing the transparent geological model using a three-dimensional geological modeling algorithm and a data fusion algorithm; The three-dimensional geological modeling algorithm adopts a hybrid modeling strategy, combining an octree algorithm based on voxels and a triangulated network algorithm based on surfaces to depict the morphology of geological bodies; The data fusion algorithm utilizes weighted average method and neural network method to fuse data from different sources and construct the transparent geological model.

5. The coal mine gas extraction control method based on transparent geology according to claim 1 is characterized in that: In the transparent geological model construction step: Establish a channel for real-time monitoring of geological data changes, and update the transparent geological model when new geological data is generated; Using the data integration algorithm in the incremental update algorithm, the new data is formatted and standardized, and integrated into the corresponding position of the model based on the spatial location and attribute information; Use difference detection and update algorithms to compare new data with model data and update attribute values ​​according to rules; When new data causes the model structure to change, the model structure adjustment algorithm in the dynamic reconstruction algorithm is used to modify the topology, re-divide the geological body boundaries and grids, and optimize the model accuracy. Using attribute propagation and optimization algorithms based on geological laws and physical models, geological attributes are recalculated and propagated, and errors and uncertainties are reduced through iterative calculations to ensure that the model is always consistent with the actual geological conditions.

6. The coal mine gas extraction control method based on transparent geology according to claim 1 is characterized in that: In the drilling design and optimization steps: The key parameters of drilling include drilling azimuth, drilling inclination, and drilling length; For areas with geological anomalies, drilling equipment is adjusted and drilling paths are planned based on real-time data from the transparent geological model, so that the borehole can penetrate the gas-rich area; Generate drilling design drawings and 3D models through seamless integration and two-way dynamic feedback of CAD software; During the drilling design process, the mutual influence between different boreholes is considered, and the optimization algorithm is used to plan the drilling layout and control the drilling spacing and angle.

7. The coal mine gas extraction control method based on transparent geology according to claim 1 is characterized in that: In the drilling construction monitoring and evaluation steps: The construction parameters and drilling parameters are collected through sensors; the construction parameters include drilling speed, drilling torque, and drilling pressure; the drilling parameters include drilling direction and drilling inclination; When evaluating the quality of drilling construction, the indicators covered include drilling spacing, control range, and coal flushing volume; The real-time collected drilling azimuth and drilling inclination data are compared with the preset drilling design parameters. The real-time collected drilling azimuth and drilling inclination data correspond to the actual drilling trajectory, and the preset drilling design parameters correspond to the designed trajectory. When the actual drilling trajectory deviates from the designed trajectory, the drilling direction and angle of the drilling rig are adjusted according to the size and direction of the deviation to return the drilling to the designed trajectory. Cases where drilling construction quality fails to meet standards include drilling trajectory deviation exceeding preset values ​​and drilling parameters not being within normal thresholds.

8. The coal mine gas extraction control method based on transparent geology according to claim 1 is characterized in that: In the gas extraction effect monitoring and evaluation steps: Based on coal seam gas basic parameter data, gas reserve data, and cumulative extraction data, and using gas flow theory, numerical simulation algorithms, and data analysis methods, a extraction effect evaluation model and an extraction effect prediction model are constructed. Gas parameters include gas flow, gas concentration, gas negative pressure, and CO content in the gas.

9. The coal mine gas extraction control method based on transparent geology according to claim 2, characterized in that: In the drilling database full life cycle management steps: Construct a data query engine module and a data visualization module, which can be used to retrieve information and generate two-dimensional charts and three-dimensional models; Use data mining algorithms to mine and analyze historical data to identify potential patterns and problems in drilling design, drilling construction, and drilling extraction processes; Use multi-layer encryption algorithms to encrypt data, establish data backup and recovery mechanisms, regularly back up data to multiple storage media, and store it in different geographical locations.

10. A coal mine gas extraction control system based on transparent geology, characterized in that: Includes the following modules: Transparent geological model construction module: Integrate multi-source geological data and build a transparent geological model that can reflect the actual geological conditions in real time based on the integrated multi-source geological data; Drilling design and optimization module: Based on the geological information provided by the transparent geological model and the coal and rock parameters of the constructed boreholes, the module calculates and optimizes the key parameters of the boreholes to obtain the preset drilling design parameters; Drilling construction monitoring and evaluation module: collects construction parameters and drilling parameters of drilling equipment in real time; compares the drilling parameters with the preset drilling design parameters; if the comparison result is inconsistent, adjusts the drilling parameters of the drilling equipment until they are consistent with the preset drilling design parameters; at the same time, analyzes and evaluates the drilling construction quality based on the construction parameters and the drilling parameters; if the evaluation result is unqualified, analyzes the factors affecting the drilling construction quality, and adjusts the construction parameters and drilling parameters of the drilling equipment based on the analysis results; Gas extraction effect monitoring and evaluation module: constructs an extraction effect evaluation model and an extraction effect prediction model, collects gas parameters in real time, evaluates the gas extraction effect based on the collected gas parameters through the extraction effect evaluation model and the extraction effect prediction model, optimizes the extraction plan based on the evaluation results, and adjusts the drilling construction method based on the optimized extraction plan.

Citation Information

Patent Citations

  • Intelligent monitoring and control system for coal mine gas extraction and its application method

    CN113107461B

Cited By

  • Dynamic evaluation and closed-loop control method for coal mine gas control extraction effect

    CN121581432A

  • Coal mine gas prevention and control extraction effect dynamic evaluation and closed-loop management and control method

    CN121581432B

  • Self-adaptive control method for coal mine underground directional long drill hole frequency amplitude alternating hydraulic caving

    CN121875685A

  • Self-adaptive control method for frequency-amplitude alternating hydraulic cavitation of long directional borehole in coal mine underground

    CN121875685B