Welding device for water conservancy construction pipeline machining

By designing a welding device for water conservancy construction, using hinged seats, arc cross-sections and balls, the stable clamping of the pipeline and the precise positioning of the welding head are achieved, and the unstable welding quality and operation difficulty in water conservancy construction are solved. The major problem improves the accuracy and efficiency of welding.

CN222037439UActive Publication Date: 2024-11-22HAMI ZHONGSHUI FLUID EQUIP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420378797.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-29
Publication Date
2024-11-22
Estimated Expiration
2034-02-28

AI Technical Summary

Technical Problem

In water conservancy construction, when welding pipes on site, the welding quality is unstable and operation is difficult due to frequent adjustment of posture and relying on technical experience.

Method used

A welding device for processing pipelines in water conservancy construction was designed, including lower support and upper support. Through structures such as articulated seats, arc-shaped sections, brackets, balls, screws and L-shaped carrier plates, stable clamping and stabilization of pipelines are achieved and Precise positioning of welding heads reduces welding difficulty and experience-dependent needs.

Benefits of technology

It improves the accuracy and efficiency of welding, consistency of welding joint distribution, and reduces misalignment during welding and labor intensity of technicians.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222037439U_ABST
    Figure CN222037439U_ABST
Patent Text Reader

Abstract

The utility model relates to a welding device for water conservancy construction pipeline machining. The welding device comprises a lower support and an upper support. A hinge seat is arranged at one end of the lower support; the upper support is connected with the hinge seat; a pipeline is clamped between the upper support and the lower support; a welding head through hole is formed in the upper support; an adjusting block is arranged in the welding head through hole; and the welding head is arranged on the adjusting block. A pipeline is supported through the lower support, and the pipeline is clamped and limited through the upper support; then, the welding head is driven to move through the adjusting block of the welding through hole, the optimal welding point between the two pipelines is found, and the welding head is fixed to the optimal welding point; and then the welding head is pressed, so that the welding head is in contact with the welding spot for welding.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a welding device, in particular to a welding device for processing water conservancy construction pipelines, belonging to the technical field of pipeline processing equipment. Background Art

[0002] In water conservancy construction, drainage pipes, cable pipes, etc. are usually included, and the pipes in water conservancy construction are all welded on site, which is different from the use of special tooling equipment in the factory to weld the pipes. Therefore, in the process of on-site welding, professional welding technicians usually hold the welding head and perform electric welding on the pipe joints. The defects of this method are: first, since the circumference of the pipe needs to be welded and the coverage area is wide, the technician needs to frequently adjust the posture to adapt to the changes in the welding points, which makes the operation difficult; secondly, the control of the welding points is entirely based on the personal experience of the technician, resulting in uneven welding quality. Therefore, further improvement is needed. Utility Model Content

[0003] The purpose of the utility model is to solve the above-mentioned shortcomings and provide a welding device for processing water conservancy construction pipelines, which has a reasonable welding method, reduces labor intensity, improves welding point accuracy, and improves welding construction efficiency.

[0004] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0005] A welding device for processing water conservancy construction pipelines comprises a lower support and an upper support; a hinged seat is arranged at one end of the lower support; the upper support is connected to the hinged seat; the pipeline is clamped between the upper support and the lower support; a welding head through hole is arranged on the upper support; support platforms are arranged on the left and right sides of the lower support; an adjustment block is arranged in the welding head through hole; and the welding head is arranged on the adjustment block.

[0006] Furthermore, the upper support and the lower support have an arc-shaped cross-section; a hinged head is provided at one end of the upper support; the hinged head is rotatably connected in the hinged seat; a first fixed block is provided at the other end of the lower support relative to the hinged seat; a second fixed block is provided at the other end of the upper support relative to the hinged head; threaded holes are provided in the first fixed block and the second fixed block.

[0007] Furthermore, the welding head through hole is a long through hole; the inner surface of the lower support is provided with a left rib and a right rib; balls are provided on the left rib and the right rib; the pipeline is supported on the left rib and the right rib; the left rib and the right rib are distributed circumferentially along the inner wall of the lower support.

[0008] Furthermore, a guide groove is provided on the side wall of the welding head through hole; both sides of the adjustment block are slidably connected in the guide groove; a screw is also included; one end of the screw is rotatably connected to the side of the adjustment block; a screw hole is provided on one side of the welding head through hole; and the screw is screwed into the screw hole.

[0009] Furthermore, a plug-in through hole is provided in the adjusting block; a vertical guide groove is symmetrically provided on the inner wall of the plug-in through hole; an L-shaped carrier plate is provided in the vertical guide groove; a spring is connected between the L-shaped carrier plate and the vertical guide groove.

[0010] Furthermore, the L-shaped carrier is provided with screw holes; the welding head is fixed on the L-shaped carrier by screws; the welding pole of the welding head passes through the plug-in through hole and is located on the inner side of the upper support.

[0011] The utility model has the following beneficial effects: the pipe is supported by the lower support, and the pipe is clamped and limited by the upper support; then, the welding head is driven to move through the adjustment block of the welding through hole to find the best welding point between the two pipes, and the welding head is fixed there; then the welding head is pressed to make it contact the welding point for welding; as the welding proceeds, the two pipes are rotated at the same time so that the other welding points at the intersection contact the welding head for the next step of welding. In this way, the distribution of the welding points is consistent, the distribution is more reasonable, and it is not easy to be misplaced. Accurate welding can be achieved without relying on the experience of technicians; at the same time, when welding at different positions, it is only necessary to rotate the pipe, and the technician does not need to adopt various postures for welding, which greatly reduces the difficulty and intensity of the welding process. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a front structural schematic diagram of the utility model.

[0013] Figure 2 Schematic diagram of the top structure of the upper support.

[0014] Figure 3 Schematic diagram of the top structure of the lower support.

[0015] Figure 4 It is a schematic diagram of the installation structure of the adjustment block and the welding head.

[0016] In the figure: 1 is a lower support, 2 is an upper support, 3 is an articulated seat, 4 is a welding head through hole, 4.1 is a plug-in through hole, 5 is an adjustment block, 5.2 is a vertical guide groove, 6 is a hinge head, 7 is a first fixed block, 8 is a second fixed block, 9 is a left rib, 10 is a right rib, 11 is a screw, and 12 is an L-shaped carrier plate. DETAILED DESCRIPTION

[0017] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0018] The terms used herein, including technical and scientific terms, have the same meaning as those generally understood by those skilled in the art, unless the terms are defined differently. It should be understood that the terms defined in commonly used dictionaries have the same meaning as those in the prior art.

[0019] See also Figure 1-Figure 3

[0020] A welding device for processing water conservancy construction pipelines, comprising a lower support 1 and an upper support 2; a hinge seat 3 is provided at one end of the lower support 1; the upper support 2 is connected to the hinge seat 3; the pipeline is clamped between the upper support 2 and the lower support 1; a welding head through hole 4 is provided on the upper support 2; an adjustment block 5 is provided in the welding head through hole 4; the welding head is arranged on the adjustment block 5.

[0021] Furthermore, the upper support 2 and the lower support 1 have an arc-shaped cross-section; a hinged joint 6 is provided at one end of the upper support 2; the hinged joint 6 is rotatably connected in the hinged seat 3; a first fixing block 7 is provided at the other end of the lower support 1 relative to the hinged seat 3; a second fixing block 8 is provided at the other end of the upper support 2 relative to the hinged joint 6; threaded holes are provided in the first fixing block 7 and the second fixing block 8.

[0022] Specifically, two adjacent pipes are spliced ​​and placed between the upper support 2 and the lower support 1. The connection between the two pipes is directly below the welding head through hole 4. The position of the welding head is adjusted by the adjustment block 5 to align the connection between the pipes.

[0023] Furthermore, the welding head through hole 4 is a long through hole; the inner surface of the lower support 1 is provided with a left rib 9 and a right rib 10; balls are provided on the left rib 9 and the right rib 10; the pipeline is supported on the left rib 9 and the right rib 10; the left rib 9 and the right rib 10 are distributed circumferentially along the inner wall of the lower support 1.

[0024] Specifically, two adjacent pipes are supported by the left rib 9 and the right rib 10 on both sides respectively. At the same time, since there are balls on the surfaces of the left rib 9 and the right rib 10, the process of rotating the pipe is easier.

[0025] Furthermore, a guide groove is provided on the side wall of the welding head through hole 4; both sides of the adjustment block 4 are slidably connected in the guide groove; a screw 11 is also included; one end of the screw 11 is rotatably connected to the side of the adjustment block 5; a screw hole is provided on one side of the welding head through hole 4; and the screw 11 is screwed into the screw hole.

[0026] Specifically, by rotating the screw rod 11 , since the screw rod 11 is screwed into the screw hole, when the screw rod is rotated, the screw rod will move horizontally, thereby driving the adjustment block 4 to move in the welding head through hole 4 .

[0027] Furthermore, the adjusting block 4 is provided with a plug-in through hole 4.1; the inner wall of the plug-in through hole 4.1 is symmetrically provided with a vertical guide groove 4.2; an L-shaped carrier plate 12 is provided in the vertical guide groove 4.2; a spring is connected between the L-shaped carrier plate 12 and the vertical guide groove 4.2.

[0028] The welding head is fixed on the L-shaped carrier plate 12. Due to the action of the spring, when not pressed, it bounces upward and is separated from the pipeline; when pressed, the welding head descends and the welding electrode can come into contact with the connection of the pipeline.

[0029] Furthermore, the L-shaped carrier is provided with screw holes; the welding head is fixed on the L-shaped carrier by screws; the welding pole of the welding head passes through the plug-in through hole and is located on the inner side of the upper support.

[0030] Finally, it should be noted that the above embodiments are only for illustrating the technical solution of the utility model rather than limiting it. Although the utility model is described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the technical solution of the utility model can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution of the utility model, which should be included in the scope of the claims of the utility model.

Claims

1. A welding device for processing water conservancy construction pipelines, Features: It comprises a lower support and an upper support; a hinged seat is arranged at one end of the lower support; the upper support is connected to the hinged seat; the pipeline is clamped between the upper support and the lower support; a welding head through hole is arranged on the upper support; an adjustment block is arranged in the welding head through hole; the welding head is arranged on the adjustment block.

2. The welding device for processing water conservancy construction pipelines according to claim 1, Features: The upper support and the lower support are of arc-shaped cross-section; a hinged joint is arranged at one end of the upper support; the hinged joint is rotatably connected in the hinged seat; a first fixing block is arranged at the other end of the lower support relative to the hinged seat; a second fixing block is arranged at the other end of the upper support relative to the hinged joint; threaded holes are provided in the first fixing block and the second fixing block.

3. The welding device for processing water conservancy construction pipelines according to claim 2, Features: The welding head through hole is a long through hole; the inner surface of the lower support is provided with a left rib and a right rib; balls are provided on the left rib and the right rib; the pipeline is supported on the left rib and the right rib; the left rib and the right rib are distributed circumferentially along the inner wall of the lower support.

4. The welding device for processing water conservancy construction pipelines according to claim 3, Features: A guide groove is provided on the side wall of the welding head through hole; the two sides of the adjustment block are slidably connected in the guide groove; a screw rod is also included; one end of the screw rod is rotatably connected to the side of the adjustment block; a screw hole is provided on one side of the welding head through hole; and the screw rod is screwed into the screw hole.

5. The welding device for processing water conservancy construction pipelines according to claim 4, Features: The adjusting block is provided with a plug-in through hole; the inner wall of the plug-in through hole is symmetrically provided with vertical guide grooves; an L-shaped carrier plate is arranged in the vertical guide groove; a spring is connected between the L-shaped carrier plate and the vertical guide groove.

6. The welding device for processing water conservancy construction pipelines according to claim 5, Features: The L-shaped carrier is provided with screw holes; the welding head is fixed on the L-shaped carrier by screws; the welding pole of the welding head passes through the plug-in through hole and is located on the inner side of the upper support.