High-pile photovoltaic module installation tool rack

By adopting a dual pedal structure and elevated frame in the photovoltaic module installation tool holder, combined with anti-slip and seat belt suspension design, the problem of unstable installation in high pile environment is solved, and the rapid, safe and efficient photovoltaic module installation is achieved, which improves the Installation efficiency and safety.

CN222044965UActive Publication Date: 2024-11-22YANGTZE THREE GORGES TECHNOLOGY & ECONOMY DEVELOPMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420597646.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-26
Publication Date
2024-11-22
Estimated Expiration
2034-03-26

AI Technical Summary

Technical Problem

The existing photovoltaic module installation tools are unstable in high pile environments, have low installation accuracy, and pose safety risks, making it difficult to adapt to the installation needs of high pile components.

Method used

A high-pile photovoltaic assembly installation tool holder was designed, adopting a double pedal structure and elevated frame, combining anti-slip design and seat belt suspension structure to realize the free operation of operators on the shelf, and improve the installation through the clamped-stayed rod and rib fixing structure. stability and safety.

Benefits of technology

It realizes rapid, safe and efficient installation, ensures installation pass rate, reduces the need to erect auxiliary frames, improves the operating safety factor, and improves installation efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222044965U_ABST
    Figure CN222044965U_ABST
Patent Text Reader

Abstract

The utility model provides a high-pile photovoltaic assembly installation tool rack which comprises a pipe pile used for installing a photovoltaic assembly, and a lower portion hoop assembly and an upper portion hoop assembly are fixedly installed at different heights of the pipe pile. Cantilever cross beams perpendicular to the pipe pile are reversely and fixedly mounted on the lower hoop assembly and the upper hoop assembly; a diagonal draw bar is arranged between the cantilever beam located on the lower hoop assembly and the upper hoop assembly, and a diagonal draw bar is arranged between the cantilever beam located on the upper hoop assembly and the lower hoop assembly. And a long pedal is supported between the cantilever cross beams at the same height in a crossing manner. The tool rack is compact and firm in overall structure, convenient and fast to install and safe to use, a photovoltaic module installation worker can freely go up and down the rack body through the double-pedal structure and the climbing rack, the upper portion and the lower portion can be installed at the same time, the installation qualification rate can be guaranteed, and erecting of other auxiliary rack bodies is omitted.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of photovoltaic panel installation, in particular to a high-pile photovoltaic component installation tool rack. Background Art

[0002] Distributed photovoltaics have developed steadily and rapidly in recent years. In 2023, China's newly installed distributed photovoltaic capacity reached 97.88 million kilowatts, reaching a historical high, with a year-on-year growth of 91%. Distributed photovoltaics accounted for 45% of photovoltaic installed capacity. According to the upward trend, it is expected that the newly installed capacity of distributed photovoltaics will exceed 100 million kWh in 2024.

[0003] As photovoltaic composite projects continue to advance, the "photovoltaic +" model will inevitably increase the height of photovoltaic modules from the ground. The pipe piles used in general land-based photovoltaics are PHC-type pipe piles. The higher the pipe piles are, the higher the height of photovoltaic modules installed in deserts, mountains, and mining areas will be. The original scaffolding and hook-type erection methods are easy to topple over, unstable, and have low installation accuracy. There are many safety hazards and other problems that make them no longer suitable for high-pile module installation. Therefore, how to adapt to the installation of high-pile photovoltaic modules and do it quickly and well has become a problem that needs to be solved in the current photovoltaic module installation operation. Utility Model Content

[0004] The purpose of the utility model is to provide a high-pile photovoltaic component installation tool rack in view of the above-mentioned problems. The overall structure of this tool rack is compact and firm, the installation is convenient and quick, and it has safety performance in use. By adopting a double pedal structure and a climbing frame, photovoltaic component installation workers can freely go up and down the frame, and the upper and lower parts can be installed at the same time, which can not only ensure the installation qualification rate, but also save the need to set up other auxiliary frames; the pedal structure adopts an anti-slip design, and the safety belt hanging structure solves the problem that the safety belt cannot be hung during high-altitude operations, thereby improving the safety factor of the operation.

[0005] In order to realize the above-mentioned technical features, the purpose of the utility model is achieved as follows: a high-pile photovoltaic module installation tool rack, comprising a pipe pile for installing a photovoltaic module, a lower clamp assembly and an upper clamp assembly are fixedly installed at different heights of the pipe pile; a cantilever beam perpendicular to the pipe pile is fixedly installed on the lower clamp assembly and the upper clamp assembly in reverse order; a diagonal tie rod is arranged between the cantilever beam on the lower clamp assembly and the upper clamp assembly, and a diagonal tie rod is arranged between the cantilever beam on the upper clamp assembly and the lower clamp assembly; a long pedal is cross-supported between the cantilever beams at the same height.

[0006] The lower clamp assembly and the upper clamp assembly are fixedly connected via ribs.

[0007] A safety belt hanging structure is fixed to the top edge of the cantilever beam, and the safety belt hanging structure includes a mother rope supporting upright pole fixed to the top of the cantilever beam, a safety mother rope is fixed between the tops of the mother rope supporting upright poles, and the safety mother rope is used to hang the safety belt; a mother rope supporting diagonal pole is fixed between the mother rope supporting upright poles and the cantilever beam.

[0008] A climbing frame is fixedly mounted on the lower clamp assembly and the upper clamp assembly, and a climbing board is arranged on the outer wall of the climbing frame.

[0009] A footboard is welded and fixed on the outer wall of the cantilever cross beam and the rib.

[0010] The two ends of the diagonal tie rod are respectively connected to the corresponding lower clamp assembly, upper clamp assembly and cantilever beam through tightening bolts.

[0011] Handrails are welded and fixed on the outer walls of the cantilever cross beam and the ribs.

[0012] The two ends of the long pedal are fixedly connected to the cantilever crossbeam through side pressing blocks.

[0013] The main material of the long pedal is a porous iron plate, which is fixed to a rubber pad on the top by bonding.

[0014] The utility model has the following beneficial effects:

[0015] 1. The overall structure of the utility model is compact and firm, and the installation is convenient and quick, and it has both safety performance. The double pedal structure and the climbing frame enable the photovoltaic module installation workers to freely go up and down the frame, and the upper and lower parts can be installed at the same time, which can not only ensure the installation qualification rate, but also save the need to set up other auxiliary frames; the pedal structure adopts an anti-slip design, and the safety belt hanging structure solves the problem that the safety belt cannot be hung during high-altitude operations, thereby improving the safety factor of the operation.

[0016] 2. The double pedal structure can meet the needs of both low- and high-level personnel to install photovoltaic modules at the same time, thus improving installation efficiency. The hoop can adjust the installation height of the climbing frame according to the distance from the ground, ensuring that the workers can go up and down most conveniently.

[0017] 3. The safety belt suspension structure described above can be used to reliably suspend and fix the safety belt, thereby ensuring the safety of subsequent operations.

[0018] 4. The above-mentioned climbing frame makes it easier for subsequent workers to climb and then go up to the long pedals on different levels to install photovoltaic modules on different sides.

[0019] 5. The installation and fixing structure of the above-mentioned clamping bolts ensures the reliability of the fixed installation of the inclined tie rod, thereby ensuring the supporting structural strength and stability of the cantilever beam.

[0020] 6. By adopting the above-mentioned long pedal, the pedal adopts a lightweight porous structure while meeting the bearing capacity requirements, reducing the overall mass, facilitating the assembly of the frame, and the rubber surface increases the friction at the operator's foot, making it less likely to slip, thereby reducing the upper safety hazards. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] The utility model is further described below in conjunction with the accompanying drawings and embodiments.

[0022] Figure 1 This is a left view of the high-pile photovoltaic module installation tool rack of the utility model.

[0023] Figure 2 This is the front view of the high-pile photovoltaic module installation tool rack of the utility model.

[0024] In the figure: 1. cantilever beam; 2. long pedal; 3. side pressure block; 4. diagonal tie rod; 5. footboard; 6. ribs; 7. tightening bolts; 8. pipe piles; 9. upper clamp assembly; 10. safety mother rope; 11. mother rope supporting vertical pole; 12. mother rope supporting diagonal pole; 13. lower clamp assembly; 14. handrail; 15. climbing frame; 16. climbing board. DETAILED DESCRIPTION

[0025] The implementation modes of the present utility model are further described below in conjunction with the accompanying drawings.

[0026] See also Figure 1-2 A high-pile photovoltaic module installation tool rack comprises a pipe pile 8 for installing photovoltaic modules, and the pipe pile 8 is fixedly installed with a lower clamp assembly 13 and an upper clamp assembly 9 at different heights; the lower clamp assembly 13 and the upper clamp assembly 9 are fixedly installed with a cantilever beam 1 perpendicular to the pipe pile 8 in reverse; a diagonal tie rod 4 is arranged between the cantilever beam 1 on the lower clamp assembly 13 and the upper clamp assembly 9, and a diagonal tie rod 4 is arranged between the cantilever beam 1 on the upper clamp assembly 9 and the lower clamp assembly 13; a long pedal 2 is supported across the cantilever beams 1 at the same height. By adopting the utility model, the overall structure of the tool rack is compact and firm, the installation is convenient and fast, and the use safety performance is combined. By adopting a double pedal structure and a climbing frame, the photovoltaic module installation workers can freely go up and down the frame, and the upper and lower parts can be installed at the same time, which can not only ensure the qualified rate of installation, but also save the need to set up other auxiliary frames; the pedal structure adopts an anti-slip design, and the safety belt hanging structure solves the problem that the safety belt cannot be hung in high-altitude operations, thereby improving the safety factor of the operation. During specific use, by fixing the tool rack on the pipe pile 8, the operator can easily climb onto the long pedals 2 located at different layers during the subsequent installation of photovoltaic components, thereby achieving the installation of photovoltaic components on different sides.

[0027] Furthermore, the lower clamp assembly 13 and the upper clamp assembly 9 are fixedly connected by ribs 6. By adopting the above-mentioned ribs 6, a reliable fixed connection between the lower clamp assembly 13 and the upper clamp assembly 9 can be achieved, thereby ensuring the structural strength and stability of both. In addition, the ribs control the upper and lower distances, eliminating the need to adjust the distance between the upper and lower clamps. By adopting an upper and lower double pedal structure, it can meet the needs of people at low and high places to install photovoltaic components at the same time, thereby improving installation efficiency. The clamp can adjust the installation height of the climbing frame according to the distance from the ground to ensure that the operators can go up and down most conveniently.

[0028] Furthermore, a safety belt hanging structure is fixed to the top edge of the cantilever beam 1, and the safety belt hanging structure includes a mother rope support vertical pole 11 fixed to the top of the cantilever beam 1, and a safety mother rope 10 is fixed between the tops of the mother rope support vertical poles 11, and the safety mother rope 10 is used to hang the safety belt; a mother rope support diagonal pole 12 is fixed between the mother rope support vertical pole 11 and the cantilever beam 1. The above-mentioned safety belt hanging structure can be used to reliably hang and fix the safety belt, thereby ensuring the safety of subsequent operations. In the specific construction process, the installation workers hang the safety rope on the corresponding safety mother rope 10, thereby protecting the installation process.

[0029] Furthermore, a climbing frame 15 is fixedly mounted on the lower clamp assembly 13 and the upper clamp assembly 9, and a climbing board 16 is arranged on the outer wall of the climbing frame 15. The climbing frame 15 facilitates subsequent operators to climb and work, and then climb onto the long pedals 2 at different levels, so as to achieve the installation of photovoltaic modules on different sides.

[0030] Furthermore, a footboard 5 is welded and fixed on the outer wall of the cantilever beam 1 and the rib 6. The footboard 5 is used to facilitate the climbing operation of the operator.

[0031] Furthermore, the two ends of the diagonal tie rod 4 are respectively connected to the corresponding lower clamp assembly 13, upper clamp assembly 9 and cantilever beam 1 through clamping bolts 7. The installation and fixing structure of the clamping bolts 7 ensures the reliability of the fixed installation of the diagonal tie rod 4, thereby ensuring the supporting structure strength and stability of the cantilever beam 1.

[0032] Furthermore, handrails 14 are welded and fixed on the outer walls of the cantilever beam 1 and the ribs 6. The handrails 14 can be used to protect operators during the operation and facilitate climbing operations.

[0033] Furthermore, both ends of the long pedal 2 are respectively fixedly connected to the cantilever beam 1 through side pressing blocks 3. The long pedal 2 can be reliably fixed by the side pressing blocks 3.

[0034] Furthermore, the main material of the long pedal 2 is a porous iron plate, which is fixed to the rubber pad by bonding. By adopting the above-mentioned long pedal 2, the pedal adopts a lightweight porous structure while meeting the bearing capacity requirements, reducing the overall mass, facilitating the assembly of the frame, and the rubber surface increases the friction of the operator's foot, making it difficult to slip, and reducing the upper safety hazards.

[0035] Working process and principle of this utility model:

[0036] By adopting the installation tool rack of the utility model, during the installation process of the photovoltaic module, first, the lower clamp assembly 13 and the upper clamp assembly 9 are installed at different heights of the pipe pile 8, and then, the corresponding cantilever beam 1 is installed on the lower clamp assembly 13 and the upper clamp assembly 9 simultaneously, and the inclined rod 4 is fixedly installed between the cantilever beam 1 and the lower clamp assembly 13 and the upper clamp assembly 9, and then the long pedal 2 is fixed at the top end of the cantilever beam 1; after all the tool racks are installed and fixed, the operator goes up to the corresponding long pedal 2 through the corresponding climbing frame 15, and then the operator performs the installation operation of the photovoltaic panel on the long pedal 2.

Claims

1. A high-pile photovoltaic module installation tool rack, characterized in that: The invention comprises a pipe pile (8) for installing a photovoltaic module, wherein a lower clamp assembly (13) and an upper clamp assembly (9) are fixedly installed at different heights on the pipe pile (8); a cantilever beam (1) perpendicular to the pipe pile (8) is fixedly installed on the lower clamp assembly (13) and the upper clamp assembly (9) in reverse order; an inclined tie rod (4) is arranged between the cantilever beam (1) on the lower clamp assembly (13) and the upper clamp assembly (9), and an inclined tie rod (4) is arranged between the cantilever beam (1) on the upper clamp assembly (9) and the lower clamp assembly (13); and a long pedal (2) is supported across the cantilever beams (1) at the same height.

2. According to claim 1, a high-pile photovoltaic assembly installation tool rack is characterized by: The lower clamp assembly (13) and the upper clamp assembly (9) are fixedly connected via ribs (6).

3. The high-pile photovoltaic assembly installation tool rack according to claim 1, characterized in that: A safety belt suspension structure is fixed to the top edge of the cantilever beam (1), the safety belt suspension structure comprising a mother rope support vertical pole (11) fixed to the top of the cantilever beam (1), a safety mother rope (10) fixed between the tops of the mother rope support vertical poles (11), the safety mother rope (10) being used to suspend the safety belt; and a mother rope support diagonal pole (12) fixed between the mother rope support vertical pole (11) and the cantilever beam (1).

4. The high-pile photovoltaic assembly installation tool rack according to claim 1, characterized in that: A climbing frame (15) is fixedly mounted on the lower clamp assembly (13) and the upper clamp assembly (9), and a climbing board (16) is arranged on the outer wall of the climbing frame (15).

5. The high-pile photovoltaic assembly installation tool rack according to claim 2, characterized in that: A footboard (5) is welded and fixed to the outer walls of the cantilever cross beam (1) and the ribs (6).

6. The high-pile photovoltaic assembly installation tool rack according to claim 1, characterized in that: Both ends of the inclined tie rod (4) are connected to the corresponding lower clamp assembly (13), upper clamp assembly (9) and cantilever cross beam (1) via clamping bolts (7) respectively.

7. The high-pile photovoltaic assembly installation tool rack according to claim 2, characterized in that: A handrail (14) is welded and fixed to the outer wall of the cantilever cross beam (1) and the ribs (6).

8. The high-pile photovoltaic assembly installation tool rack according to claim 1, characterized in that: Both ends of the long pedal (2) are fixedly connected to the cantilever crossbeam (1) via side pressure blocks (3) respectively.

9. A high-pile photovoltaic assembly installation tool rack according to claim 8, characterized in that: The main material of the long pedal (2) is a porous iron plate, and the upper side is fixed to the rubber pad by bonding.