Glass kiln tail gas energy-saving heat exchanger device and process system thereof

By designing a glass kiln exhaust energy-saving heat exchanger device, using secondary air to preheat and assist combustion, absorb exhaust waste heat, the problem of unsatisfactory waste heat recovery of kiln exhaust heat is solved, and energy consumption is reduced and energy utilization is improved, which has reduced the Production costs and carbon emissions.

CN222048621UActive Publication Date: 2024-11-22TANGSHAN XIZE THERMAL ENERGY TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323332386.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-07
Publication Date
2024-11-22
Estimated Expiration
2033-12-07

AI Technical Summary

Technical Problem

The waste heat recovery of the exhaust gas of the glass kiln furnace is not ideal, resulting in high energy consumption and low energy utilization. The existing waste heat boilers are mainly used for cooling, and the waste heat cannot be effectively utilized.

Method used

Design a glass kiln exhaust gas energy-saving heat exchanger device, including a frame, an air pre-assembler body and two heat exchangers, which is connected to the denitrogenation, desulfurization and dust removal devices through the kiln exhaust pipe, and preheating and combustion-assisted by secondary air , absorb exhaust gas waste heat to increase combustion speed and melting speed.

Benefits of technology

Effectively recover the waste heat of the kiln exhaust gas, reduce fuel consumption, reduce NOx emissions, reduce production costs, improve energy utilization, reduce purification input and operating costs, comprehensively reduce carbon emissions, and improve ecological, environmental and economic benefits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222048621U_ABST
    Figure CN222048621U_ABST
Patent Text Reader

Abstract

The utility model relates to a glass kiln, in particular to a glass kiln tail gas energy-saving heat exchanger device and a process system thereof. Comprising a rack and a heat exchanger, a hollow air pre-heater body is arranged on the upper portion of the rack, two cavities are formed in the air pre-heater body, a flue gas inlet header pipe and a flue gas outlet header pipe are arranged at the two ends of the air pre-heater body respectively, and a flue gas outlet branch pipe and a flue gas inlet branch pipe are installed at the tops of the two cavities respectively; a second heat exchanger and a first heat exchanger are installed in the two cavities respectively, a secondary air inlet connecting pipe is installed at the inlet end of the first heat exchanger, a secondary air outlet connecting pipe is installed at one end of the secondary air inlet connecting pipe of the second heat exchanger, and a communicating cover is installed between the outlet end of the first heat exchanger and the inlet end of the second heat exchanger. The waste heat of the tail gas of the kiln is recycled and directly used for preheating combustion-supporting secondary air, the combustion speed and the burnout degree of fuel are greatly improved through the secondary air with the higher temperature, the unit output is improved, meanwhile, the fuel is saved, and the production cost of products is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a glass kiln, in particular to a glass kiln tail gas energy-saving heat exchanger device and a process system thereof. Background Art

[0002] The exhaust gas of the glass kiln reaches a temperature of over 400℃ after being discharged from the heat storage chamber. The exhaust loss accounts for more than 30% of the energy consumption of the glass kiln. The energy consumption is large, the resource utilization rate is low, only about 40%, and the waste heat recovery is not ideal. For the glass kilns currently in service, the exhaust gas waste heat boiler is only a means of cooling. Most of the small amount of steam generated is directly discharged or partially used for employee bathing and heating. Since the daily glass kilns are generally small in scale and the flue gas temperature is low, waste heat power generation cannot be carried out, and the energy utilization rate is low. Utility Model Content

[0003] The utility model aims to solve the above technical problems, thereby providing a glass kiln tail gas energy-saving heat exchanger device and a process system thereof, which can recover the waste heat of the kiln tail gas, save fuel and reduce product production costs.

[0004] The utility model solves the technical problem and adopts the following technical solution:

[0005] A glass furnace tail gas energy-saving heat exchanger device comprises a frame and a heat exchanger, wherein the upper part of the frame is provided with a hollow

[0006] The air preheater body has two chambers, a flue gas inlet main pipe and a flue gas outlet main pipe are respectively provided at both ends of the preheater body, a flue gas outlet branch pipe and a flue gas inlet branch pipe are respectively installed on the top of the two chambers; the second heat exchanger and the first heat exchanger are respectively installed in the two chambers, a secondary air inlet pipe is installed at the inlet end of the first heat exchanger, a secondary air outlet pipe is installed at one end of the secondary air inlet pipe of the second heat exchanger, and a connecting cover is installed between the outlet end of the first heat exchanger and the inlet end of the second heat exchanger.

[0007] A process system of a glass kiln exhaust gas energy-saving heat exchanger device, comprising a glass kiln exhaust gas energy-saving heat exchanger device, a kiln exhaust gas pipeline and a connecting pipeline, wherein the smoke inlet main pipe of the air preheater body is connected with the kiln through the kiln exhaust gas pipeline, the smoke outlet branch pipe of the chamber where the second heat exchanger is located is connected with a denitrification device, a desulfurization device, a dust removal device and the smoke inlet branch pipe in sequence through a connecting pipeline, and the smoke outlet main pipe is connected with an induced draft fan and a chimney in sequence through a connecting pipeline; the secondary air inlet pipe is connected with the secondary air inlet pipe, and the secondary air outlet pipe is connected with the kiln or a raw material heating system through a secondary air outlet pipe.

[0008] Compared with the prior art, the utility model adopting the above technical solution has the following beneficial effects:

[0009] 1) Recover the waste heat from the kiln exhaust gas and use it directly to preheat the combustion-supporting secondary air. The high-temperature secondary air will greatly increase the combustion speed and burnout of the fuel, which will correspondingly increase the melting speed of the glass raw materials. While increasing unit output, it will save fuel and reduce product production costs;

[0010] 2) Reduce the excess air coefficient, reduce the emission of kiln tail gas, reduce the original emission concentration of NOx, reduce the amount of combustion air, reduce the tail gas flow, and reduce the investment and operating cost of tail gas purification;

[0011] 3) Reduce the comprehensive carbon emissions of glass kilns, so as to maximize the ecological benefits, environmental benefits, social benefits and economic benefits.

[0012] Further, the optimization scheme of the utility model is:

[0013] The second heat exchanger and the first heat exchanger are both arranged horizontally, and both ends of the two heat exchangers pass through the side plates on both sides of the air preheater body.

[0014] A first ash hopper and a second ash hopper corresponding to the first heat exchanger and the second heat exchanger are respectively provided at the bottom of the preheater body.

[0015] The outlets at the bottom of the first ash hopper and the second ash hopper are both equipped with gate valves.

[0016] The smoke inlet main pipe, the smoke outlet main pipe, the secondary air inlet connecting pipe and the secondary air outlet connecting pipe are all equipped with connecting flanges.

[0017] The first heat exchanger and the second heat exchanger are of shell-and-tube type or heat pipe type.

[0018] A first bypass pipeline is arranged between the smoke inlet main pipe and the smoke outlet branch pipe, and a second bypass pipeline is arranged between the smoke inlet branch pipe and the smoke outlet main pipe. Both the first bypass pipeline and the second bypass pipeline are equipped with regulating valves. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a front view of an embodiment of the utility model;

[0020] Figure 2 for Figure 1 Left view of

[0021] Figure 3 Schematic diagram of the process system of an embodiment of the utility model.

[0022] In the figure: frame 1; air preheater body 2; left chamber 2-1; right chamber 2-2; flue gas outlet branch pipe 2-3; flue gas inlet branch pipe 2-4; flue gas inlet main pipe 3; flue gas outlet main pipe 4; first heat exchanger 5; first bypass pipeline 5-1; second heat exchanger 6; second bypass pipeline 6-1; secondary air inlet connecting pipe 7; secondary air outlet connecting pipe 8; connecting cover 9; first ash hopper 10; second ash hopper 11; denitrification device 12; desulfurization device 13; bag filter 14; induced draft fan 15; chimney 16; kiln exhaust pipe 17; connecting pipe 18; secondary air inlet pipe 19; secondary air outlet pipe 20. DETAILED DESCRIPTION

[0023] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments.

[0024] See also Figure 1 , Figure 2 The present embodiment provides a glass furnace tail gas energy-saving heat exchanger device, which is mainly composed of a frame 1, an air preheater body 2, a first heat exchanger 5 and a second heat exchanger 6. The frame 1 is a welded component, which is provided with four legs. The air preheater body 2 is installed on the upper part of the frame 1. The air preheater body 2 is a hollow structure, and its cross-section is rectangular or square. The air preheater body 2 is arranged longitudinally, and a partition is provided in the air preheater body 2. The partition divides the air preheater body 2 into a left chamber 2-1 and a right chamber 2-2. The left and right ends of the air preheater body 2 are respectively installed with a flue gas inlet main pipe 3 and a flue gas outlet main pipe 4. The flue gas inlet main pipe 3 is connected to the left chamber 2-1, and the flue gas outlet main pipe 4 is connected to the right chamber 2-2. The top plate of the left chamber 2-1 is installed with a flue gas outlet branch pipe 2-3, and the top plate of the right chamber 2-2 is installed with a flue gas inlet branch pipe 2-4.

[0025] The second heat exchanger 6 is installed in the left chamber 2-1 of the air preheater body 2, and the first heat exchanger 5 is installed in the right chamber 2-2. The first heat exchanger 5 and the second heat exchanger 6 are arranged horizontally. Both ends of the first heat exchanger 5 and the second heat exchanger 6 pass through the side plates on both sides of the air preheater body 2. The first heat exchanger 5 and the second heat exchanger 6 are of tube-in-tube type or heat pipe type. The inlet end of the front side of the first heat exchanger 5 is installed with a secondary air inlet pipe 7, and the outlet end of the front side of the second heat exchanger 6 is installed with a secondary air outlet pipe 8. The secondary air inlet pipe 7 and the secondary air outlet pipe 8 are arranged on the same side. The outlet end of the rear side of the first heat exchanger 5 and the inlet end of the rear side of the second heat exchanger 6 are both installed with a connecting cover 9. The flue gas inlet main pipe 3, the flue gas outlet main pipe 4, the secondary air inlet pipe 7 and the secondary air outlet pipe 8 are all installed with connecting flanges. The secondary air enters the first heat exchanger 5 through the secondary air inlet pipe 7, enters the inlet end of the second heat exchanger 6 through the connecting cover 9 at the outlet end of the first heat exchanger 5, and flows out through the secondary air outlet pipe 8 at the outlet end of the second heat exchanger 6.

[0026] A first ash hopper 10 and a second ash hopper 11 are installed at the bottom of the preheater body 2. The first ash hopper 10 and the second ash hopper 11 correspond to the first heat exchanger 5 and the second heat exchanger 6 respectively. The outlets at the bottom of the first ash hopper 10 and the second ash hopper 11 are both installed with gate valves. The first ash hopper 10 and the second ash hopper 11 are used to temporarily store ash and discharge ash regularly.

[0027] Figure 3 As shown, the process system of the above-mentioned glass kiln tail gas energy-saving heat exchanger device is mainly composed of a heat exchanger device, a denitration device 12, a desulfurization device 13, a bag dust collector 14, an induced draft fan 15 and a chimney 16. The flue gas inlet main pipe 3 of the air preheater body 2 is connected to the heat storage chamber of the kiln through the kiln tail gas pipeline 17, the flue gas outlet branch pipe 2-3 of the left chamber 2-1 is connected to the denitration device 12, the desulfurization device 13, the dust removal device 14 and the flue gas inlet branch pipe 2-4 in sequence through the connecting pipe 18, and the flue gas outlet main pipe 4 is connected to the induced draft fan 15 and the chimney 16 in sequence through the connecting pipe 18. The secondary air inlet pipe 7 is connected to the secondary air inlet pipe 19, and the secondary air outlet pipe 8 is connected to the kiln or the raw material heating system through the secondary air outlet pipe 20.

[0028] In order to ensure the normal operation of the denitrification device 12, the desulfurization device 13 and the bag filter 14, a second bypass pipeline 6-1 is installed between the flue gas inlet main pipe 3 and the flue gas outlet branch pipe 2-3, and a first bypass pipeline 5-1 is installed between the flue gas inlet branch pipe 2-4 and the flue gas outlet main pipe 4. Both the first bypass pipeline 5-1 and the second bypass pipeline 6-1 are installed with regulating valves.

[0029] The utility model adopts a skid-mounted integrated module type, which is convenient for loading and unloading, transportation and rapid installation.

[0030] The working process of this utility model is:

[0031] The exhaust gas from the glass kiln at a temperature above 400°C enters the left chamber 2-1 of the preheater body 2, exchanges heat with the second heat exchanger 6 and is cooled to about 320°C, then enters the denitrification device 12 and is cooled to about 280°C, enters the desulfurization device 13 and is cooled to about 260°C, enters the bag filter 14, and after the temperature drops to about 220°C, enters the right chamber 2-2, exchanges heat with the first heat exchanger 5 and is cooled to about 140°C, enters the induced draft fan 15 and the chimney 16, and is discharged into the atmosphere.

[0032] On the secondary air side, the secondary air first enters the secondary air inlet pipe 7 and the first heat exchanger 5 in sequence from the secondary air inlet pipe 19, exchanges heat in the right chamber 2-2, and the secondary air is raised from room temperature to about 100°C, and enters the second heat exchanger 6 through the connecting cover 9, and is heated to about 200°C. It enters the secondary air outlet pipe 20 from the secondary air outlet pipe 8 and is connected to the kiln or the raw material heating system. The waste heat of the tail gas is absorbed by the two heat exchangers, and then the secondary air heated to a higher temperature through heat exchange enters the kiln to participate in the combustion, or the higher temperature hot air is sent to the raw material conveying system to preheat the raw materials. The preheating of the raw materials and the combustion-supporting air will increase the combustion speed and burnout of the fuel, which will increase the melting speed of the glass raw materials, increase the product output, and reduce the product cost.

[0033] The utility model can also be provided with instrument valves, safety protection devices and control systems to provide measurement data for temperature regulation of the device and upload the data to the control system, thereby realizing manual or automatic regulation and safety protection.

[0034] The above description is only a preferred feasible embodiment of the present utility model, and does not limit the scope of rights of the present utility model. All equivalent structural changes made using the contents of the specification and drawings of the present utility model are included in the scope of rights of the present utility model.

Claims

1. A glass furnace tail gas energy-saving heat exchanger device, comprising a frame, a heat exchanger, Features: The upper part of the frame is provided with a hollow air preheater body, in which two chambers are provided, and both ends of the preheater body are provided with a flue gas inlet main pipe and a flue gas outlet main pipe, and the tops of the two chambers are respectively provided with a flue gas outlet branch pipe and a flue gas inlet branch pipe; The second heat exchanger and the first heat exchanger are respectively installed in the two chambers, the inlet end of the first heat exchanger is installed with a secondary air inlet pipe, one end of the secondary air inlet pipe of the second heat exchanger is installed with a secondary air outlet pipe, and a connecting cover is installed between the outlet end of the first heat exchanger and the inlet end of the second heat exchanger.

2. The glass furnace tail gas energy-saving heat exchanger device according to claim 1, Features: The second heat exchanger and the first heat exchanger are both arranged horizontally, and both ends of the two heat exchangers pass through the side plates on both sides of the air preheater body.

3. The glass furnace tail gas energy-saving heat exchanger device according to claim 1, Features: A first ash hopper and a second ash hopper corresponding to the first heat exchanger and the second heat exchanger are respectively provided at the bottom of the preheater body.

4. The glass furnace tail gas energy-saving heat exchanger device according to claim 3, Features: The outlets at the bottom of the first ash hopper and the second ash hopper are both equipped with gate valves.

5. The glass furnace tail gas energy-saving heat exchanger device according to claim 1, Features: The smoke inlet main pipe, the smoke outlet main pipe, the secondary air inlet connecting pipe and the secondary air outlet connecting pipe are all equipped with connecting flanges.

6. The glass furnace tail gas energy-saving heat exchanger device according to claim 1, Features: The first heat exchanger and the second heat exchanger are of shell-and-tube type or heat pipe type.

7. A process system for a glass furnace tail gas energy-saving heat exchanger device, Features: It comprises the glass kiln exhaust gas energy-saving heat exchanger device as claimed in claim 1, the kiln exhaust gas pipeline and the connecting pipeline, the smoke inlet main pipe of the air preheater body is connected with the kiln through the kiln exhaust gas pipeline, the smoke outlet branch pipe of the chamber where the second heat exchanger is located is connected with the denitrification device, the desulfurization device, the dust removal device and the smoke inlet branch pipe in sequence through the connecting pipeline, the smoke outlet main pipe is connected with the induced draft fan and the chimney in sequence through the connecting pipeline; the secondary air inlet pipe is connected with the secondary air inlet pipe, and the secondary air outlet pipe is connected with the kiln or the raw material heating system through the secondary air outlet pipe.

8. The process system of the glass furnace tail gas energy-saving heat exchanger device according to claim 7, Features: A first bypass pipeline is arranged between the smoke inlet main pipe and the smoke outlet branch pipe, and a second bypass pipeline is arranged between the smoke inlet branch pipe and the smoke outlet main pipe. Both the first bypass pipeline and the second bypass pipeline are equipped with regulating valves.