Aluminum film beam penetrating positioner system
Through the aluminum membrane formwork components and positioning parts of the aluminum membrane through beam positioner system, the problem of inaccurate positioning of the beam casing is solved, precise positioning and cost reduction are achieved, and the safety of the building structure is improved.
Patent Information
- Application Number
- CN202420793124.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-17
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2034-04-17
AI Technical Summary
During the construction of beam penetration, the inaccurate positioning of the beam penetration casing leads to difficulty in penetration of later pipe penetration, which is high in cost and affects structural safety.
The aluminum membrane beam positioner system is adopted to accurately position the steel sleeve through assembled and molded aluminum membrane formwork assembly and removable positioning parts to ensure that the position of each installation is fixed and can be reused.
Accurate positioning of steel casings, reduces beam penetration costs, improves structural safety, and facilitates the reuse of aluminum membrane formwork components at the same location on different floors.
Smart Images

Figure CN222120938U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of building beam penetration, and in particular to an aluminum film beam penetration positioner system. Background Art
[0002] With the continuous release of policies on fine decoration of real estate in various regions across the country, fine decoration has become an inevitable trend in the national real estate market. Fine-decorated houses are appearing in many new residential buildings in various places. For a construction project that is delivered with fine decoration, if the pre-reservation and pre-embedding stages are done well in the early stage, the whole project will be half successful. The difficulty of fine-decorated houses lies in the large number of pre-embedded points, especially the beam sleeves. Inaccurate pre-embedded positioning will lead to the inability to properly penetrate the pipes in the later stage, and holes can only be opened twice. Opening holes is not only costly, but also affects the structural safety. Summary of the Invention
[0003] In order to overcome the existing deficiencies, an embodiment of the present application provides an aluminum film beam-penetrating positioner system, which can solve the problem of inaccurate pre-embedded positioning of the beam-penetrating sleeve mentioned above.
[0004] The technical solution adopted by the embodiment of the present application to solve its technical problems is: an aluminum membrane beam positioner system, including an assembled aluminum membrane template component, and detachable positioning parts are screwed on the side walls at both ends of the aluminum membrane template component, and the two positioning parts are arranged correspondingly and supported by the same steel casing, and the two ends of the steel casing are respectively contacted with the side walls at both ends of the aluminum membrane template component.
[0005] In a specific embodiment, the aluminum film formwork assembly includes a bottom plate, two first side plates and two second side plates are installed on the top of the bottom plate, and the two first side plates and the two second side plates form a beam forming area.
[0006] In a specific embodiment, first connecting plates are fixedly connected to both end side walls of the bottom plate, frame-type connecting plates are fixedly connected to one end side wall of the two first side plates, and the bottoms of the two frame-type connecting plates are respectively screwed to the two first connecting plates.
[0007] In a specific embodiment, second connecting plates are fixedly mounted on both end side walls of the two second side plates, and the two second connecting plates on one side are screwed to the side walls of the two frame-shaped connecting plates.
[0008] In a specific embodiment, the two positioning members are respectively screwed to the two first side panels, and the positioning members include four support members that are all screwed to the first side panels, and the four support members are respectively located at the two horizontal end points and the two vertical end points of the circular cross-section of the steel casing.
[0009] In a specific embodiment, the support member includes a locator attached to the side wall of the first side panel, a self-tapping bolt sliding through the locator, the locator is arranged in contact with the outer wall of the steel casing, the self-tapping bolt is screwed to the side wall of the first side panel, and the locator is fixed to the first side panel.
[0010] In a specific embodiment, a receiving groove is provided on the side wall of one end of the positioner, a through hole is provided at the bottom of the receiving groove, one end of the self-tapping bolt passes through the through hole, and the head thereof is placed in the receiving groove.
[0011] In a specific embodiment, a threaded hole is provided on the side wall of the first side plate, and the self-tapping bolt is threadedly connected to the threaded hole.
[0012] The advantages of the embodiments of the present application are: by setting an aluminum film formwork component that can be assembled and formed, positioning parts are installed on the side walls of the aluminum film formwork component, and the positioning parts are used to support the steel casing, so that the positioning parts can be fixed in position each time they are installed, so as to achieve precise positioning of the steel casing, and then the aluminum film formwork component can be repeatedly dismantled and reused for installation at the same position on the lower layer. The positioning parts are set as four support parts, and the two support parts at the bottom and both sides are installed first to facilitate placing the steel casing on the three support parts, and finally the top support part is installed to achieve the purpose of positioning the steel casing, thereby facilitating precise positioning of the steel casing. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 A schematic diagram of the main structure of the aluminum film beam positioner system provided in an embodiment of the present application;
[0014] Figure 2 A schematic diagram of the partial structure of the aluminum film through-beam positioner system provided in an embodiment of the present application;
[0015] Figure 3 A schematic diagram of the support structure in the aluminum film beam-penetrating positioner system provided in an embodiment of the present application;
[0016] Figure 4 This is a schematic diagram of the disassembled structure of the aluminum film formwork assembly in the aluminum film beam positioner system provided in the embodiment of the present application.
[0017] In the figure: 10-aluminum membrane formwork assembly; 110-base plate; 120-first side plate; 130-second side plate; 140-first connecting plate; 150-frame connecting plate; 160-second connecting plate; 20-positioning member; 30-steel casing; 40-support member; 410-positioner; 420-self-tapping bolt; 50-accommodating groove; 510-through hole; 60-threaded hole. DETAILED DESCRIPTION
[0018] The technical solution in the embodiment of the present application is to solve the problem of inaccurate pre-embedded positioning of the beam-penetrating sleeve. The overall idea is as follows:
[0019] Example 1:
[0020] See also Figure 1-4 , an aluminum film beam penetration positioner 410 system, including an assembled aluminum film formwork component 10, and detachable positioning parts 20 are screwed on the side walls at both ends of the aluminum film formwork component 10, and the two positioning parts 20 are correspondingly arranged, and the same steel casing 30 is supported between them, and the two ends of the steel casing 30 are respectively contacted with the side walls at both ends of the aluminum film formwork component 10. Specifically, in the process of building beam penetration, casing beam penetration is required at the same position on each floor, and then the pre-designed positioning parts 20 are installed on the side walls of the aluminum film formwork component 10. The positioning parts 20 can realize precise positioning of the steel casing 30, and the aluminum film formwork component 10 can be disassembled and reused, so that it is convenient to use the aluminum film formwork component 10 on other floors to perform the casing beam penetration process at the same position.
[0021] See Figure 4 The aluminum film formwork assembly 10 includes a base plate 110, and two first side panels 120 and two second side panels 130 are installed on the top of the base plate 110. The two first side panels 120 and the two second side panels 130 form a beam forming area. It should be noted that the base plate 110, the first side panel 120 and the second side panel 130 can be spliced as needed to form the required length. At the same time, the beam forming area is used for pouring concrete. Specifically, the steel casing 30 is placed in the tied steel bar tying beam, and then the tied steel bar tying beam is placed in this beam forming area, so that the steel casing 30 is placed on the positioning piece 20.
[0022] See Figure 4 , the side walls at both ends of the bottom plate 110 are fixedly connected to the first connecting plates 140, and the side walls at one end of the two first side plates 120 are fixedly connected to the frame-type connecting plates 150, and the bottoms of the two frame-type connecting plates 150 are screwed to the two first connecting plates 140 respectively, and the side walls at both ends of the two second side plates 130 are respectively fixedly installed with second connecting plates 160, and the two second connecting plates 160 on one side are respectively screwed to the side walls of the two frame-type connecting plates 150. In the specific setting, mounting holes are opened on the first connecting plate 140, the frame-type connecting plate 150 and the second connecting plate 160, and the mounting holes can correspond to each other, and then the first connecting plate 140, the frame-type connecting plate 150 and the second connecting plate 160 can be connected and fixed through the existing screw and nut connection structure.
[0023] See Figure 2The two positioning members 20 are respectively screwed to the two first side panels 120. The positioning members 20 include four support members 40 that are all screwed to the first side panels 120. The four support members 40 are respectively located at the two horizontal end points and the two vertical end points of the circular cross-section of the steel casing 30. It should be noted that the setting of the positions of the four support members 40 requires the preparation of the support members 40, a marker, a tape measure, a handheld drill, a wrench, and a ladder. According to the size marking on the drawing, the position of the support member 40 is marked on the aluminum film template assembly 10 of the steel casing 30, and a 4mm hole is drilled at the marked position to form a threaded hole 60 that is compatible with the self-tapping bolt 420.
[0024] See Figure 3 The support member 40 includes a locator 410 attached to the side wall of the first side plate 120, and a self-tapping bolt 420 is slidably passed through the locator 410. The locator 410 is in contact with the outer wall of the steel casing 30, and the self-tapping bolt 420 is screwed to the side wall of the first side plate 120, and the locator 410 is fixed to the first side plate 120. A threaded hole 60 is opened on the side wall of the first side plate 120, and the self-tapping bolt 420 is threadedly connected to the threaded hole 60. Specifically, the self-tapping bolt 420 passes through the locator 410, and the self-tapping bolt 420 is screwed to the locator 410. The bolt 420 is connected to the threaded hole 60 on the first side panel 120, so that the locator 410 can be fixed on the side wall of the first side panel 120 to complete the installation purpose of the locator 410. Specifically, the two locators 410 at the bottom and both sides are installed first to facilitate the placement of the steel casing 30 on the three locators 410, and finally the top locator 410 is installed to achieve the purpose of fixing the steel casing 30 with four locators 410, thereby avoiding the steel casing 30 from floating slightly during the concrete pouring process.
[0025] See Figure 3 A receiving groove 50 is provided on the side wall at one end of the locator 410, and a through hole 510 is provided at the bottom of the receiving groove 50. One end of the self-tapping bolt 420 passes through the through hole 510, and its head is placed in the receiving groove 50. When setting, the self-tapping bolt 420 passes through the through hole 510, and its head is placed in the receiving groove 50, and is set in contact with the inner wall of the receiving groove 50, which can prevent concrete from entering the receiving groove 50, thereby avoiding affecting the removal of the locator 410.
[0026] When using this application:
[0027] First, assemble the aluminum film formwork assembly 10, and then install the locator 410 on the first side panel 120. Specifically, pass the self-tapping bolt 420 through the through hole 510, and then connect it to the threaded hole 60 on the first side panel 120 to fix the locator 410 on the first side panel 120. It should be noted that the installation of the two locators 410 at the bottom and both sides is completed first, and then the steel casing 30 is passed through the existing tied steel bar binding beam to place the steel casing 30 in the steel bar binding beam, and then the steel bar binding beam is placed in the aluminum film formwork assembly 10, and at the same time, the two ends of the steel casing 30 are placed on the three locators 410 on both sides respectively, and finally the top locator 410 is installed to achieve the purpose of accurately positioning the steel casing 30. After that, the concrete pouring process can be carried out. After pouring and forming, the aluminum film formwork assembly 10 can be disassembled to complete the installation of the steel casing 30 on other floors.
[0028] It should be noted that the specific model specifications of the aluminum membrane template assembly 10 and the steel casing 30 need to be selected and determined according to the actual specifications of the device. The specific selection calculation method adopts the existing technology in this field, so it will not be described in detail.
[0029] Finally, it should be noted that the above embodiments are merely examples for the purpose of illustrating the present invention and are not intended to limit the embodiments. Those skilled in the art will readily appreciate that other variations or modifications based on the above description are possible. It is not necessary and impossible to provide an exhaustive list of all embodiments. However, obvious variations or modifications arising therefrom remain within the scope of protection of the present invention.
Claims
1. An aluminum film beam positioning system, characterized in that: It comprises an assembled aluminum film formwork component (10), wherein both end side walls of the aluminum film formwork component (10) are screwed with detachable positioning members (20), two positioning members (20) are arranged correspondingly, and a same steel sleeve (30) is supported between them, and both ends of the steel sleeve (30) are respectively arranged in contact with the end side walls of the aluminum film formwork component (10).
2. The aluminum film beam positioning system according to claim 1, characterized in that: The aluminum film formwork assembly (10) comprises a base plate (110), two first side plates (120) and two second side plates (130) are installed on the top of the base plate (110), and the two first side plates (120) and the two second side plates (130) enclose a beam forming area.
3. The aluminum film beam positioning system according to claim 2, characterized in that: The side walls at both ends of the bottom plate (110) are fixedly connected to first connecting plates (140), the side walls at one end of the two first side plates (120) are fixedly connected to frame-type connecting plates (150), and the bottoms of the two frame-type connecting plates (150) are respectively screwed to the two first connecting plates (140).
4. The aluminum film beam positioning system according to claim 3, characterized in that: Second connecting plates (160) are respectively fixedly mounted on the side walls at both ends of the two second side plates (130), and the two second connecting plates (160) on one side are respectively screwed to the side walls of the two frame-shaped connecting plates (150).
5. The aluminum film beam positioning system according to claim 2, characterized in that: The two positioning members (20) are respectively screwed onto the two first side plates (120), and the positioning member (20) includes four support members (40) which are all screwed onto the first side plates (120), and the four support members (40) are respectively located at the two horizontal end points and the two vertical end points of the circular cross section of the steel casing (30).
6. The aluminum film beam positioning system according to claim 5, characterized in that: The support member (40) includes a positioner (410) attached to the side wall of the first side plate (120), and a self-tapping bolt (420) is slidably passed through the positioner (410). The positioner (410) is arranged in contact with the outer wall of the steel casing (30), and the self-tapping bolt (420) is screwed to the side wall of the first side plate (120) to fix the positioner (410) on the first side plate (120).
7. The aluminum film beam positioning system according to claim 6, characterized in that: A receiving groove (50) is provided on the side wall at one end of the positioner (410), a through hole (510) is provided at the bottom of the receiving groove (50), one end of the self-tapping bolt (420) passes through the through hole (510), and the head thereof is placed in the receiving groove (50).