Frame positioning type static load balancing weight hoisting equipment

By designing a frame-positioning static counterweight lifting device, the horizontal and vertical extension sections are used to align the static counterweight in both directions, solving the problem of difficult positioning for crane operators, improving lifting efficiency and reducing danger.

CN222312467UActive Publication Date: 2025-01-07FUZHOU LIANQIANG HOISTING & TRANSPORTATION CO LTD

Patent Information

Application Number
CN202421184330.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-28
Publication Date
2025-01-07
Estimated Expiration
2034-05-28

AI Technical Summary

Technical Problem

In existing technologies, it is difficult for crane operators to position the lifting equipment, resulting in long docking times and low efficiency.

Method used

Design a frame-positioning static load counterweight hoisting device, including a device body, a hoisting assembly, a first guide assembly, and a second guide assembly. By setting the second guide assembly in front of and behind the device body, the static load counterweight is aligned bidirectionally using the lateral and longitudinal extension sections, and the hoisting assembly is accurately aligned in conjunction with the first guide assembly.

Benefits of technology

It improves the docking efficiency of hoisting equipment, reduces the danger to operators in the static load counterweight lifting and lowering area, and simplifies the hoisting difficulty.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222312467U_ABST
    Figure CN222312467U_ABST
Patent Text Reader

Abstract

The utility model provides frame positioning type static load balancing weight hoisting equipment which comprises an equipment body, a hoisting assembly, a first guide assembly and a second guide assembly, the second guide assembly is arranged and located in at least one direction of the front portion and the rear portion of the equipment body, the top of a static load balancing weight is aligned through a transverse extending section, and therefore the hoisting efficiency of the static load balancing weight is improved. The side face of the static load balancing weight is aligned through the longitudinal extending section, before hanging of the hanging assembly and when an equipment body is hung by hoisting equipment, bidirectional alignment is conducted on the equipment body swinging on a rope, and the effect that the hanging assembly is guided to be accurately aligned with a hooking area of the static load balancing weight is achieved in cooperation with the first guiding assembly; and the danger that personnel are located in a lifting area of the static load balancing weight is avoided, and the hoisting difficulty of hoisting equipment operators on the static load balancing weight is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of static load counterweight hoisting equipment, in particular to a frame positioning type static load counterweight hoisting equipment. Background Art

[0002] Static load test refers to a test method in which vertical pressure, vertical upward pull or horizontal thrust is applied step by step to the top of the pile, and the settlement, upward pull or horizontal displacement of the top of the pile is observed over time to determine the corresponding single pile vertical compressive bearing capacity, single pile vertical pull-out bearing capacity or single pile horizontal bearing capacity.

[0003] At present, the counterweight blocks of static load tests are hoisted by simple lifting equipment through wire tying or hook lifting. As described in Technical Solution 201310305451.1, only simple cranes are used for lifting operations, and the actual lifting operations are performed by on-site operators on their own. If special lifting equipment is used to adapt to the static load counterweight blocks with hanging components, so that the static load counterweight blocks are placed without the need for personnel, it will be difficult for the crane operator to position the lifting equipment, resulting in a long time for the lifting equipment to be docked, resulting in low docking efficiency. Utility Model Content

[0004] In view of the above problems, the purpose of the utility model is to provide a frame-positioning static load counterweight lifting device to solve the problem in the prior art that it is difficult for crane operators to position the lifting device, resulting in a long docking time and low docking efficiency for the lifting device.

[0005] The utility model provides a frame-positioning static load counterweight hoisting device, comprising a device body, a hanging assembly, a first guide assembly and a second guide assembly;

[0006] The equipment body is connected to the lifting equipment;

[0007] The hanging assembly is arranged on both sides of the equipment body, and is used to hang the static load counterweight block during lifting, or to unhook the static load counterweight block when the material reaches the placement position;

[0008] The first guide assembly is arranged on both sides of the equipment body and extends downwardly of the equipment body, and is used for positioning the static load counterweight in the height direction;

[0009] The second guide assembly is arranged in at least one direction in front of and behind the equipment body. The second guide assembly includes a transverse extension section and a longitudinal extension section. One end of the transverse extension section is connected to the equipment body, and the longitudinal extension section is connected to the transverse extension section, which is used for positioning in front of or behind the static load counterweight block.

[0010] Different from the prior art, the above technical solution has the following advantages: by setting a second guide assembly, which is located in at least one direction in front and rear of the equipment body, the top of the static load counterweight block is aligned through the transverse extension section, and the side of the static load counterweight block is aligned through the longitudinal extension section. Before the hanging assembly is hung, when the lifting equipment hangs the equipment body, the equipment body swinging on the rope is aligned in both directions, and cooperates with the first guide assembly to achieve the effect of guiding the hanging assembly to accurately align with the hooking area of ​​the static load counterweight block, thereby avoiding the danger of people being in the lifting and landing area of ​​the static load counterweight block and reducing the difficulty of lifting the static load counterweight block by the lifting equipment operator.

[0011] As a preferred embodiment of the present application, the hanging assembly includes a hanging hook and a hanging hook linkage. The hanging hook is connected to both sides of the equipment body through a rotating shaft, and includes a hook body and a counterweight. The hook body is located below the rotating shaft, and the counterweight is located above the rotating shaft. The counterweight is connected to the hanging hook linkage. The hanging hook linkage is used to drive the hanging hook to hang the static load counterweight using the hook body during lifting, or to unhook the hook body from the static load counterweight when the material falls to the ground. By setting the hanging hook and the hanging hook linkage, the hanging hook is rotated along the rotating shaft to achieve hooking and unhooking with the static load counterweight, and the hanging hook linkage is set to drive the hanging hook, so as to facilitate the driving process of the hanging hook.

[0012] As a preferred embodiment of the present application, the hook linkage member is a motor, and the telescopic end of the motor is connected to the counterweight part.

[0013] As a preferred embodiment of the present application, it further includes guide wheels, which are arranged on the first guide assembly on both sides of the device body, and the arc surfaces of the guide wheels on both sides of the device body are arranged opposite to each other. By arranging the guide wheels, it is convenient for the first guide assembly to guide in the height direction, and further accurately fix the hooking position.

[0014] As a preferred embodiment of the present application, there are two guide wheels on each side of the equipment body.

[0015] As a preferred embodiment of the present application, a height guide is further included, one end of which is connected to the second guide assembly, and the other end of which is extended to the bottom of the device body. By setting the height guide, after the second guide assembly is docked, the preset height guide can be relied on to make the second guide assembly contact the static load counterweight in the height direction, and then the relative position of the hanging assembly on the device body and the static load counterweight in the height direction can be accurately limited by the height guide, thereby improving the hooking efficiency of the hanging assembly.

[0016] As a preferred embodiment of the present application, the transverse extension section and the longitudinal extension section of the second guide assembly are connected by a lifting rod. By setting up a lifting rod to connect the transverse extension section and the longitudinal extension section, it is convenient to free up placement space for the side of the static load counterweight block during the placement process of the static load counterweight block, thereby avoiding the continuous placement of the longitudinal extension section causing the side space to be occupied during the placement process of the static load counterweight block.

[0017] As a preferred embodiment of the present application, the equipment body further comprises a hanging rack, the hanging rack is arranged on the upper part of the equipment body, and the equipment body is connected to the hanging device through the hanging rack. By arranging the hanging rack, it is convenient to contact the hanging rack after the annular segment rises, so that the lifting device drives the hanging rack and the equipment body connected to the hanging rack to be lifted together through the annular segment.

[0018] As a preferred embodiment of the present application, the length of the longitudinal extension section of the second guide assembly is greater than that of the first guide assembly. By setting the length of the longitudinal extension section of the second guide assembly to be greater than that of the first guide assembly, it is convenient to align the static load counterweight block through the longitudinal extension section before aligning the first guide assembly. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the specific implementation methods of the utility model or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0020] Figure 1 This is a front structural schematic diagram of a frame-positioning static load counterweight hoisting device in an embodiment of the utility model;

[0021] Figure 2 It is a side structural schematic diagram of a frame-positioning static load counterweight hoisting device with a lifting rod in an embodiment of the utility model;

[0022] Figure 3 This is a schematic diagram of the front hoisting state of the frame positioning static load counterweight hoisting device in the embodiment of the utility model;

[0023] Figure 4 It is a side structural schematic diagram of the frame positioning type static load counterweight hoisting device in the embodiment of the utility model;

[0024] Figure 5 It is a schematic diagram of the structure of the static load counterweight block in the embodiment of the utility model.

[0025] The reference numerals in the above drawings are described as follows:

[0026] 10. Equipment body;

[0027] 11. Hanging rack;

[0028] 20. Suspension assembly;

[0029] 21. Lifting hook; 22. Lifting hook linkage; 23. Hook body; 24. Counterweight; 30. First guide assembly;

[0030] 31. Guide wheel;

[0031] 40. Second guide assembly;

[0032] 41. lateral extension section; 42. longitudinal extension section; 43. height guide;

[0033] 44. Lifting rod;

[0034] 50. Static load counterweight;

[0035] 51. groove; 52. hooking area. DETAILED DESCRIPTION

[0036] In order to explain in detail the possible application scenarios, technical principles, specific schemes that can be implemented, and the purposes and effects that can be achieved, the following is a detailed description of the specific embodiments listed in conjunction with the accompanying drawings. The embodiments described herein are only used to more clearly illustrate the technical solutions of the present application, and are therefore only used as examples, and cannot be used to limit the scope of protection of the present application.

[0037] Reference to "embodiment" herein means that the specific features, structures or characteristics described in conjunction with the embodiment may be included in at least one embodiment of the present application. The term "embodiment" appearing in various places in the specification does not necessarily refer to the same embodiment, nor does it particularly limit its independence or association with other embodiments. In principle, in the present application, as long as there is no technical contradiction or conflict, the various technical features mentioned in the embodiments can be combined in any way to form a corresponding implementable technical solution.

[0038] Unless otherwise defined, the technical terms used in this document have the same meanings as those generally understood by those skilled in the art to which this application belongs; the use of relevant terms in this document is only for describing specific embodiments and is not intended to limit this application.

[0039] In the description of this application, the term "and / or" is an expression used to describe the logical relationship between objects, indicating that three relationships may exist, for example, A and / or B, which means: A exists, B exists, and A and B exist at the same time. In addition, the character " / " in this article generally indicates that the objects before and after are in an "or" logical relationship.

[0040] In the present application, terms such as “first” and “second” are merely used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any actual relationship of quantity, priority or sequence between these entities or operations.

[0041] Without further limitations, in this application, the words "include", "comprises", "has" or other similar expressions used in the sentences are intended to cover non-exclusive inclusion. These expressions do not exclude the presence of additional elements in the process, method or product including the elements, so that the process, method or product including a series of elements may include not only those limited elements, but also other elements not explicitly listed, or also include elements inherent to such process, method or product.

[0042] Similar to the understanding in the Examination Guidelines, in this application, expressions such as "greater than", "less than", "exceed" and the like are understood to exclude the number itself; expressions such as "above", "below", "within" and the like are understood to include the number itself. In addition, in the description of the embodiments of this application, "multiple" means more than two (including two), and similar expressions related to "multiple" are also understood in this way, such as "multiple groups", "multiple times", etc., unless otherwise clearly and specifically limited.

[0043] In the description of the embodiments of the present application, space-related expressions used, such as "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "vertical", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential", etc., indicate the orientation or position relationship based on the orientation or position relationship shown in the specific embodiments or drawings, and are only for the convenience of describing the specific embodiments of the present application or facilitating the reader's understanding, and do not indicate or imply that the referred device or component must have a specific position, a specific orientation, or be constructed or operated in a specific orientation, and therefore cannot be understood as a limitation on the embodiments of the present application.

[0044] Unless otherwise expressly specified or limited, in the description of the embodiments of the present application, the terms such as "install", "connect", "connect", "fix", "set", etc. used should be understood in a broad sense. For example, the "connection" can be a fixed connection, a detachable connection, or an integrated setting; it can be a mechanical connection, an electrical connection, or a communication connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium; it can be the internal connection of two elements or the interaction relationship between two elements. For technicians in the technical field to which the present application belongs, the specific meanings of the above terms in the embodiments of the present application can be understood according to the specific circumstances.

[0045] Please also read Figures 1 to 5 The inventor provides a frame-positioned static load counterweight 50 hoisting device, comprising a device body 10, a hanging assembly 20, a first guide assembly 30 and a second guide assembly 40;

[0046] The equipment body 10 is connected to the lifting equipment;

[0047] The hanging assembly 20 is arranged on both sides of the equipment body 10, and is used to hang the static load counterweight block 50 during lifting, or to unhook the static load counterweight block 50 when the material reaches the placement position;

[0048] The first guide assembly 30 is disposed on both sides of the equipment body 10 and extends downwardly from the equipment body 10 to position the static load counterweight 50 in the height direction;

[0049] The second guide assembly 40 is arranged in at least one direction in front of and behind the equipment body 10. The second guide assembly 40 includes a transverse extension section 41 and a longitudinal extension section 42. One end of the transverse extension section 41 is connected to the equipment body 10, and the longitudinal extension section 42 is connected to the transverse extension section 41, and is used for positioning in front of or behind the static load counterweight 50.

[0050] According to the above structure, during the actual use of the frame positioning type static load counterweight 50 hoisting equipment, the operator operates the lifting equipment, such as a crane, and pulls the equipment body 10 to the position where the static load counterweight 50 is placed by means of a hook or a rope, and then first passes through the second guide assembly 40 toward the side of the first guide assembly 30 to contact the side of the static load counterweight 50. After the second guide assembly 40 contacts the static load counterweight 50 to restrict one side, the first guide assemblies 30 on both sides of the equipment body 10 are inserted into the docking grooves pre-opened in the static load counterweight 50. After the longitudinal extension section 42 of the second guide assembly 40 is docked with the first guide assembly 30, the equipment body 10 is lowered as a whole, and the transverse extension section 41 of the paper second guide assembly 40 contacts the top surface of the static load counterweight 50, completing the entire positioning process.

[0051] After completing the positioning process, the operator drives the hanging assembly 20 to work, hooks the static load counterweight 50 in the pre-set hooking area 52, and completes the hooking step. The operator operates the lifting equipment to drive the equipment body 10 and the static load counterweight 50 hung on the equipment body 10 to move to the designated placement location. After arriving at the placement location, the hanging assembly 20 is driven to disengage from the hooking area 52 of the static load counterweight 50, and the static load counterweight 50 is left at the designated placement location. Driven by the lifting equipment, the equipment body 10 is pulled out with the hanging assembly 20, the first guide assembly 30, and the second guide assembly 40. Repeat the above operation until all the static load counterweights 50 are hoisted. By setting a second guide assembly, which is located in at least one direction in front and rear of the equipment body 10, the top of the static load counterweight block 50 is aligned through the lateral extension section 41, and the side of the static load counterweight block 50 is aligned through the longitudinal extension section 42. Before the hanging assembly 20 is hung, when the lifting equipment hangs the equipment body 10, the equipment body 10 swinging on the rope is aligned in both directions, and cooperates with the first guide assembly to achieve the effect of guiding the hanging assembly 20 to accurately align with the hooking area 52 of the static load counterweight block 50, thereby avoiding the danger of people being in the lifting and landing area of ​​the static load counterweight block 50 and reducing the difficulty of the lifting equipment operator in hanging the static load counterweight block 50.

[0052] Please also read Figures 1 to 5 As a preferred embodiment of the present application, the hanging assembly 20 includes a hanging hook 21 and a hanging hook linkage 22. The hanging hook 21 is connected to both sides of the equipment body 10 through a rotating shaft, and includes a hook body 23 and a counterweight 24. The hook body 23 is located below the rotating shaft, and the counterweight 24 is located above the rotating shaft. The counterweight 24 is connected to the hanging hook linkage 22. The hanging hook linkage 22 is used to drive the hanging hook 21 to hang the hook area 52 of the static load counterweight 50 using the hook body 23 during lifting, or to unhook the hook body 23 from the static load counterweight 50 when the material falls to the ground. By setting the hanging hook 21 and the hanging hook linkage 22, the hanging hook is rotated along the rotating shaft to realize the hooking and unhooking with the static load counterweight 50, and the hanging hook linkage 22 is set to drive the hanging hook 21, so as to facilitate the driving process of the hanging hook 21.

[0053] Please also read Figures 1 to 5 As a preferred embodiment of the present application, the hook linkage 22 is a motor, and the telescopic end of the motor is connected to the counterweight part 24.

[0054] Please also read Figures 1 to 5 As a preferred embodiment of the present application, it further includes guide wheels 31, which are arranged on the first guide assembly 30 on both sides of the device body 10, and the arc surfaces of the guide wheels 31 on both sides of the device body 10 are arranged opposite to each other. By setting the guide wheels 31, it is convenient for the first guide assembly 30 to guide in the height direction, and further accurately fix the hooking position.

[0055] Please also read Figures 1 to 5 As a preferred embodiment of the present application, the number of guide wheels 31 on each side of the equipment body 10 is two.

[0056] Please also read Figures 1 to 5 As a preferred embodiment of the present application, a height guide 43 is further included, one end of which is connected to the second guide assembly 40, and the other end of which is extended downwardly to the device body 10. By setting the height guide 43, after the second guide assembly 40 is docked, the second guide assembly 40 can be connected to the static load counterweight 50 in the height direction by relying on the preset height guide 43, and the relative position of the hanging assembly 20 on the device body 10 and the static load counterweight 50 in the height direction can be accurately limited by relying on the height guide 43, thereby improving the hooking efficiency of the hanging assembly 20.

[0057] See also Figure 2 As a preferred embodiment of the present application, in order to avoid the space occupation of the side of the static load counterweight 50 during the placement process, resulting in a gap between multiple static load counterweights 50 stacked; or two static load counterweights 50 clamp the longitudinal extension section 42 during the placement process, making it difficult to remove the static load counterweight 50 from the equipment after placement; or affecting the placement of the static load counterweight 50, avoiding the static load counterweight 50 that has been placed and the static load counterweight 50 to be placed clamping the longitudinal extension section, or multiple static load counterweights 50 stacked during the placement process, and adjusting the longitudinal extension section 42 during the placement process, resulting in a restriction on the placement direction. In addition to the second guide assembly 40 of the lateral extension section and the longitudinal extension section that are directly fixedly connected, the lateral extension section 41 of the second guide assembly 40 can also be connected to the longitudinal extension section 42 through a lifting rod 44. By setting up a lifting rod 44 to connect the lateral extension section 41 and the longitudinal extension section 42, it is convenient to free up placement space for the side of the static load counterweight block 50 during the placement process of the static load counterweight block 50, thereby avoiding the continuous placement of the longitudinal extension section 42 causing the side space to be occupied during the placement process of the static load counterweight block 50.

[0058] Please also read Figures 1 to 5 As a preferred embodiment of the present application, the equipment body 10 further includes a hanging frame 11, which is arranged on the upper part of the equipment body 10, and the equipment body 10 is connected to the hanging device through the hanging frame 11. By providing the hanging frame 11, it is convenient to contact the hanging frame 11 after the annular segment rises, so that the lifting device drives the hanging frame 11 and the equipment body 10 connected to the hanging frame 11 to be lifted together through the annular segment.

[0059] Please also read Figures 1 to 5As a preferred embodiment of the present application, the length of the longitudinal extension section 42 of the second guide assembly 40 is greater than the length of the first guide assembly 30. By setting the length of the longitudinal extension section 42 of the second guide assembly 40 to be greater than the length of the first guide assembly 30, it is convenient to align the static load counterweight 50 through the longitudinal extension section 42 before the first guide assembly 30 is aligned.

[0060] Please also read Figures 1 to 5 In the above embodiment, the hooking area 52 of the static load counterweight block 50 uses steel bars with both ends pre-buried in the static load counterweight block 50, and the groove 51 is a groove 51 formed by knocking or grinding on the static load counterweight block 50. The static load counterweight block 50 is made of reinforced concrete or rock material.

[0061] In the above embodiment, the hook linkage 22 of the hanging assembly 20 can adopt an electric push rod or a hydraulic push rod, and the telescopic end of the push rod is directly connected to the lifting hook 21, or the lifting hook 21 is connected by a rope, so as to realize the effect of rotating the lifting hook 21 along the rotating axis of the equipment body 10, thereby realizing the rotation effect of the lifting hook 21.

[0062] In the above embodiment, the lifting rod 44 can be an electric push rod or a hydraulic push rod, and the movable end and the fixed end of the electric push rod or the hydraulic push rod are respectively connected to the transverse extension section 41 and the longitudinal extension section 42.

[0063] Finally, it should be noted that although the above embodiments have been described in the specification and drawings of this application, this does not limit the scope of patent protection of this application. All technical solutions generated by replacing or modifying equivalent structures or equivalent processes based on the essential concept of this application using the contents recorded in the specification and drawings of this application, as well as directly or indirectly implementing the technical solutions of the above embodiments in other related technical fields, are included in the scope of patent protection of this application.

Claims

1. A frame-positioned static load counterweight hoisting device, characterized in that: It includes a device body, a hanging assembly, a first guide assembly and a second guide assembly; The equipment body is connected to the lifting equipment; The hanging assembly is arranged on both sides of the equipment body, and is used to hang the static load counterweight block during lifting, or to unhook the static load counterweight block when the material reaches the placement position; The first guide assembly is arranged on both sides of the equipment body and extends downwardly of the equipment body, and is used for positioning the static load counterweight in the height direction; The second guide assembly is arranged in at least one direction in front of and behind the equipment body. The second guide assembly includes a transverse extension section and a longitudinal extension section. One end of the transverse extension section is connected to the equipment body, and the longitudinal extension section is connected to the transverse extension section, which is used for positioning in front of or behind the static load counterweight block.

2. The frame-positioning static load counterweight hoisting device according to claim 1 is characterized in that: The hanging assembly includes a hanging hook and a hanging hook linkage. The hanging hook is connected to both sides of the equipment body through a rotating shaft, and includes a hook body and a counterweight part. The hook body is located below the rotating shaft, and the counterweight part is located above the rotating shaft. The counterweight part is connected to the hanging hook linkage. The hanging hook linkage is used to drive the hanging hook to use the hook body to hang the static load counterweight block during lifting, or to decouple the hook body from the static load counterweight block when the material falls to the ground.

3. The frame-positioned static load counterweight hoisting device according to claim 2 is characterized in that: The hook linkage member is a motor, and the telescopic end of the motor is connected to the counterweight part.

4. The frame-positioning static load counterweight hoisting device according to claim 1, characterized in that: It also includes guide wheels, which are arranged on the first guide assemblies on both sides of the equipment body, and the arc surfaces of the guide wheels on both sides of the equipment body are arranged opposite to each other.

5. The frame-positioning static load counterweight hoisting device according to claim 4 is characterized in that: There are two guide wheels on each side of the equipment body.

6. The frame-positioning static load counterweight hoisting device according to claim 1, characterized in that: It also includes a height guide, one end of which is connected to the second guide assembly, and the other end of which is extended downwardly from the equipment body.

7. The frame-positioned static load counterweight hoisting device according to claim 1, characterized in that: The transverse extension section and the longitudinal extension section of the second guide assembly are connected via a lifting rod.

8. The frame-positioned static load counterweight hoisting device according to claim 1, characterized in that: The equipment body also includes a hanging frame, which is arranged on the upper part of the equipment body, and the equipment body is connected to the hanging device through the hanging frame.

9. The frame-positioning static load counterweight hoisting device according to claim 1, characterized in that: The length of the longitudinal extension section of the second guide assembly is greater than the length of the first guide assembly.

Citation Information

Patent Citations

  • Walking type detection platform for static load of engineering foundation piles

    CN103362150B

Cited By

  • Positioning frame folding type static load balancing weight hoisting equipment