Hoisting device for cement concrete prefabricated part production
By designing a cement concrete prefabricated component hoisting device with a power source assembly and an adjustable joist hoisting lug assembly, the problem of frequent replacement of hoisting devices in the prior art is solved, and efficient hoisting is achieved to adapt to components of different sizes.
Patent Information
- Application Number
- CN202421196830.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-29
- Publication Date
- 2025-02-11
- Estimated Expiration
- 2034-05-29
AI Technical Summary
The existing cement concrete prefabricated component hoisting device needs to be frequently replaced according to different sizes, resulting in wasted time and energy.
A lifting device including a side plate, a first lifting assembly and a second lifting assembly is designed to drive the lifting assembly movement through a power source assembly and adapt to components of different sizes by adjusting the position of the joist lifting assembly.
The device can be used for cement concrete prefabricated components of different widths and lengths without the need to replace the lifting device, which improves lifting efficiency and enhances stability.
Smart Images

Figure CN222454264U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of hoisting, in particular to a hoisting device for the production of cement concrete prefabricated components. Background Art
[0002] Cement components are the abbreviation of reinforced concrete prefabricated structural components. Reinforced concrete prefabricated structural components are generally used in municipal highway construction, water supply and drainage construction, or civilian construction.
[0003] Since there are many types of cement concrete precast components with different sizes and dimensions, different hoists are often required to hoist different precast components. The hoisting equipment needs to be replaced, which is time-consuming and labor-intensive. Utility Model Content
[0004] In view of this, the utility model aims to provide a hoisting device for cement concrete prefabricated component production to solve the problem that the hoisting device is time-consuming and labor-intensive to replace.
[0005] In order to achieve the above object, the technical solution of the utility model is implemented as follows:
[0006] A hoisting device for cement concrete prefabricated component production, comprising a side plate, a first hoisting assembly, and a second hoisting assembly;
[0007] Two side plates are arranged on both sides of the first hanging assembly and the second hanging assembly, and both ends of the first hanging assembly and the second hanging assembly are slidably arranged on the side plates;
[0008] The side plate is provided with a power source component, and the power source component can drive the first hoisting component and the second hoisting component to move.
[0009] Furthermore, the first hoisting assembly and the second hoisting assembly each include a hoisting plate, a joist lug assembly, and a hanging assembly;
[0010] The joist lug assemblies are evenly arranged above the lifting plate, a first lifting hole is provided below the lifting plate, and a hanging assembly is provided on the first lifting hole; the hanging assembly includes a lifting buckle and a lifting chain; a lifting chain is provided on the lifting buckle, and a lifting ring corresponding to the cement concrete precast component is provided at the end of the lifting chain.
[0011] Preferably, the number of joist lug assemblies arranged on one hanging plate is two, and the two joist lug assemblies are symmetrically arranged on the hanging plate.
[0012] Furthermore, a T-shaped track is provided on the lifting plate, and the joist lug assembly is slidably arranged on the T-shaped track of the lifting plate. A plurality of first locking holes are provided on the T-shaped track, and the joist lug assembly can be fixed on the T-shaped track by locking bolts.
[0013] Furthermore, a scale is provided on the T-track, and the present application can determine the installation position of the joist lug assembly through the scale, and adjust the joist lug assembly on the T-track according to the parameters of the cement concrete precast component.
[0014] Furthermore, the joist lifting ear assembly includes a slider and a lifting ear; the slider is slidably set on the T-shaped track, and the slider is provided with a second locking hole corresponding to the first locking hole; the locking bolt can set the slider on the T-shaped track; the lifting ear is provided with a second lifting hole.
[0015] Furthermore, a reinforcement plate is provided on the hanging plate.
[0016] Furthermore, the position of the second hanging hole corresponds to the position of the first locking hole.
[0017] Further, the power source assembly includes a first power source and a second power source;
[0018] The mounting ends of the two first power sources are respectively arranged on the two side plates, and the output ends of the two first power sources are connected to the first hoisting assembly;
[0019] The mounting ends of the two second power sources are respectively arranged on the two side plates, and the output ends of the two second power sources are connected to the second hoisting assembly.
[0020] Slide rails are provided at both ends of the first hoisting assembly and the second hoisting assembly, and slide grooves corresponding to the divisions are provided on the side panels.
[0021] The first power source and the second power source are symmetrically arranged on the two side plates.
[0022] Compared with the prior art, the hoisting device for cement concrete prefabricated component production described in the utility model has the following advantages:
[0023] 1. The present application can be applied to cement concrete precast components of different widths and lengths. There is no need to replace the lifting device. The device can be adjusted to be applicable to cement concrete precast components of different sizes, which greatly improves the lifting efficiency and has good stability.
[0024] 2. The present application can adjust the distance between the first hoisting assembly and the second hoisting assembly and can adjust the width, and the present application is adjusted through the first power source and the second power source. The first hoisting assembly and the second hoisting assembly can be symmetrically arranged on the side panel and can be suitable for precast cement concrete components of different widths.
[0025] 3. The present application can adjust the length by adjusting the position of the joist lug assembly. The position of the hanging assembly corresponds to the position of the joist lug assembly, and cement concrete precast components of different lengths can be used. In addition, the present application is provided with multiple hanging assemblies, which can make the lifting more stable.
[0026] 4. The present application can determine the installation position of the joist lug assembly through the scale, and adjust the joist lug assembly on the T-track according to the parameters of the cement concrete prefabricated component. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] The accompanying drawings constituting a part of the present invention are used to provide a further understanding of the present invention. The illustrative embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention. In the accompanying drawings:
[0028] Figure 1 This is a schematic diagram of a hoisting device for cement concrete prefabricated component production according to an embodiment of the utility model;
[0029] Figure 2 This is a schematic diagram of another side of a lifting device for producing cement concrete prefabricated components described in an embodiment of the utility model.
[0030] Description of reference numerals:
[0031] 1. Side panel; 2. Lifting plate; 3. Lifting buckle; 4. Lifting chain; 5. First lifting hole; 6. Lifting ring; 7. T-track; 8. Sliding block; 9. Lifting ear; 10. Second lifting hole; 11. Reinforcement plate; 12. First power source; 13. Second power source; 14. Slide; 15. Locking bolt. DETAILED DESCRIPTION
[0032] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other.
[0033] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments.
[0034] like Figure 1 to Figure 2 As shown, a hoisting device for cement concrete precast component production includes a side plate 1, a first hoisting assembly, and a second hoisting assembly; the two side plates 1 are arranged on both sides of the first hoisting assembly and the second hoisting assembly, and both ends of the first hoisting assembly and the second hoisting assembly are slidably arranged on the side plate 1; a power source assembly is provided on the side plate 1, and the power source assembly can drive the first hoisting assembly and the second hoisting assembly to move.
[0035] The first hoisting assembly and the second hoisting assembly both include a hoisting plate 2, a joist lug 9 assembly, and a hanging assembly; the joist lug 9 assembly is evenly arranged above the hoisting plate 2, a first hoisting hole 5 is provided below the hoisting plate 2, and a hanging assembly is provided on the first hoisting hole 5; the hanging assembly includes a hoisting buckle and a hoisting chain 4; a hoisting buckle is provided with a hoisting chain 4, and an end of the hoisting chain 4 is provided with a hoisting ring 6 corresponding to the cement concrete precast component.
[0036] In a specific implementation, the number of joist lug 9 assemblies provided on one hanging plate 2 is two, and the two joist lug 9 assemblies are symmetrically provided on the hanging plate 2 .
[0037] A T-shaped track 7 is provided on the lifting plate 2 , and the joist lug 9 assembly is slidably arranged on the T-shaped track 7 of the lifting plate 2 . A plurality of first locking holes are provided on the T-shaped track 7 , and the joist lug 9 assembly can be fixedly arranged on the T-shaped track 7 by locking bolts 15 .
[0038] The T-track 7 is provided with a scale, and the present application can determine the installation position of the joist lug 9 assembly through the scale, and adjust the joist lug 9 assembly on the T-track 7 according to the parameters of the cement concrete precast component.
[0039] The joist lug 9 assembly includes a slider 8 and a lug 9; the slider 8 is slidably arranged on the T-shaped track 7, and a second locking hole corresponding to the first locking hole is arranged on the slider 8; the locking bolt 15 can set the slider 8 on the T-shaped track 7; the lug 9 is provided with a second lifting hole 10. A reinforcing plate 11 is provided on the lifting plate 2. The position of the second lifting hole 10 corresponds to the position of the first locking hole.
[0040] The power source assembly includes a first power source 12 and a second power source 13; the mounting ends of the two first power sources 12 are respectively arranged on the two side panels 1, and the output ends of the two first power sources 12 are connected to the first hanging assembly; the mounting ends of the two second power sources 13 are respectively arranged on the two side panels 1, and the output ends of the two second power sources 13 are connected to the second hanging assembly. Slide rails are arranged at both ends of the first hanging assembly and the second hanging assembly, and a slide groove 14 corresponding to the classification is arranged on the side panel 1. The first power source 12 and the second power source 13 are symmetrically arranged on the two side panels 1.
[0041] The lifting buckle is a prior art, and the lifting buckle can be installed on the first lifting hole 5. The lifting buckle adopts the prior art, such as model G209 (Jiangsu Haigang Complete Equipment Installation Co., Ltd.).
[0042] The first power source 12 and the second power source 13 are push cylinders, and the push cylinders adopt the existing technology.
[0043] When the present application is used in practice, the width can be adjusted by adjusting the distance between the first lifting assembly and the second lifting assembly. The present application is adjusted by the first power source 12 and the second power source 13. The first lifting assembly and the second lifting assembly can be symmetrically arranged on the side plate 1. The distances pushed by the first power source 12 and the second power source 13 are the same. According to the length of the precast cement concrete component, the length can be adjusted by adjusting the position of the joist lug 9 assembly. The position of the hanging assembly corresponds to the position of the joist lug 9 assembly. The joist lug 9 assembly is arranged on the T-track 7 through a locking nut. The lifting rope of the lifting machine is respectively connected to the four first lifting holes. The position of the joist lug 9 assembly corresponds to the position of the precast cement concrete component. The lifting ring 6 at the bottom of the joist lug 9 assembly is connected to the precast cement concrete component, and can be lifted.
[0044] If it is necessary to hoist cement concrete precast components of different sizes, the output ends of the first power source 12 and the second power source 13 push the first hoisting assembly and the second hoisting assembly, thereby changing the distance between the first hoisting assembly and the second hoisting assembly, and manually adjusting the position of the joist lug 9 assembly. The installation position of the joist lug 9 assembly can be determined by the scale, and the joist lug 9 assembly can be adjusted on the T-track 7 according to the parameters of the cement concrete precast components, thereby adjusting the lateral distance. It can be suitable for cement concrete precast components of different sizes without replacing the hoisting device.
[0045] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A hoisting device for cement concrete prefabricated component production, characterized in that: It comprises a side plate (1), a first lifting assembly, and a second lifting assembly; The two side plates (1) are arranged on both sides of the first hanging assembly and the second hanging assembly, and both ends of the first hanging assembly and the second hanging assembly are slidably arranged on the side plates (1); A power source assembly is provided on the side plate (1), and the power source assembly can drive the first hoisting assembly and the second hoisting assembly to move.
2. A hoisting device for cement concrete prefabricated component production according to claim 1, characterized in that: The first hoisting assembly and the second hoisting assembly both comprise a hoisting plate (2), a joist lug (9) assembly, and a hanging assembly; The joist lug (9) components are evenly arranged above the lifting plate (2); a first lifting hole (5) is provided below the lifting plate (2); a hanging component is provided on the first lifting hole (5); the hanging component comprises a lifting buckle (3) and a lifting chain (4); the lifting buckle (3) is provided with a lifting chain (4); and a lifting ring (6) corresponding to the cement concrete prefabricated component is provided at the end of the lifting chain (4).
3. A hoisting device for cement concrete prefabricated component production according to claim 2, characterized in that: The number of joist lug (9) assemblies arranged on one lifting plate (2) is two, and the two joist lug (9) assemblies are symmetrically arranged on the lifting plate (2).
4. The hoisting device for cement concrete prefabricated component production according to claim 1, characterized in that: A T-shaped track (7) is provided on the lifting plate (2), and a joist lug (9) assembly is slidably arranged on the T-shaped track (7) of the lifting plate (2). A plurality of first locking holes are provided on the T-shaped track (7), and the joist lug (9) assembly can be fixedly arranged on the T-shaped track (7) by means of locking bolts (15).
5. The hoisting device for cement concrete prefabricated component production according to claim 3 is characterized in that: The T-shaped track (7) is provided with scales.
6. The hoisting device for cement concrete prefabricated component production according to claim 1, characterized in that: The joist lifting lug (9) assembly comprises a slider (8) and a lifting lug (9); the slider (8) is slidably arranged on a T-shaped track (7), and a second locking hole corresponding to the first locking hole is arranged on the slider (8); a locking bolt (15) can set the slider (8) on the T-shaped track (7); and the lifting lug (9) is provided with a second lifting hole (10).
7. A hoisting device for cement concrete prefabricated component production according to claim 6, characterized in that: A reinforcing plate (11) is provided on the hanging plate (2).
8. A hoisting device for cement concrete prefabricated component production according to claim 7, characterized in that: The position of the second hanging hole (10) corresponds to the position of the first locking hole.
9. A hoisting device for cement concrete prefabricated component production according to claim 8, characterized in that: The power source assembly includes a first power source (12) and a second power source (13); The mounting ends of the two first power sources (12) are respectively arranged on the two side plates (1), and the output ends of the two first power sources (12) are connected to the first hanging assembly; The mounting ends of the two second power sources (13) are respectively arranged on the two side plates (1), and the output ends of the two second power sources (13) are connected to the second hoisting assembly; Slide rails are provided at both ends of the first lifting assembly and the second lifting assembly, and slide grooves (14) corresponding to the divisions are provided on the side plate (1).
10. A hoisting device for cement concrete prefabricated component production according to claim 9, characterized in that: The first power source (12) and the second power source (13) are symmetrically arranged on the two side plates (1).