Alternate jacking structure of building
By setting vertical and horizontal connection components and connection mechanisms in the alternate lifting structure of the building, the problem of deformation of lattice steel support under vertical load is solved, the stability and safety of the structure are achieved, and safety hazards are reduced.
Patent Information
- Application Number
- CN202421292161.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-06
- Publication Date
- 2025-03-04
- Estimated Expiration
- 2034-06-06
AI Technical Summary
During the alternating lifting of a building, the lattice steel support will deform under the action of vertical and horizontal loads, resulting in coordinated deformation of vertical and horizontal connections, and even lead to damage to the connection, affecting structural safety, and posing huge safety hazards.
An alternating lifting structure of a building is designed, and the stability and safety of the connection are ensured by setting a number of vertical and horizontal linking components between the steel support A component and the steel support B component, and a connecting mechanism for reducing synergistic deformation is provided at the connection, including a modified polytetrafluoroethylene slider and a reminder mechanism.
It effectively reduces the coordinated deformation between the steel support A component and the steel support B component, reduces the overall risk of damage during the alternating hoisting process, ensures structural safety during the building hoisting process, and promptly detects and deals with loose steel cylinder hoists, avoiding potential dangers.
Smart Images

Figure CN222557841U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building jacking equipment, in particular to an alternating jacking structure of a building. Background Art
[0002] At present, in the alternating jacking process of previous buildings (such as bridges, etc.), the connection structure of the lattice steel support is: the main steel support and the longitudinal and transverse connections are welded through flanges. This method has a large overall rigidity and is suitable for the overall jacking support system. However, in the alternating jacking process, the lattice steel support will be divided into two groups, A and B. When the A group of steel supports are subjected to vertical loads and the B group is unloaded, the A group of steel supports will produce vertical deformation under the jacking load, so that the longitudinal and transverse connections between A and B will be deformed synergistically. This situation is more obvious in the support system with a higher height. When the B group of steel supports will be passively stressed, it may even cause the connection between A and B to be destroyed, so that the overall lattice steel support fails, affecting the structural safety during the jacking process, and there are huge safety hazards. In addition, the steel cylinder clamps used in the main steel support are usually installed with bolts or fasteners, but the steel cylinder clamps are loose during use but are not discovered and repaired in time. The loose steel cylinder clamps will reduce the stability of the building support body and increase the risk of collapse or collapse, thereby posing a threat to construction personnel and the surrounding environment. Utility Model Content
[0003] The purpose of the utility model is to propose an alternating jacking structure for a building in view of the problem that in the previous alternating jacking process of a building, when the lattice steel supports will be divided into two groups, A and B, and the A group of steel supports will be subjected to vertical loads and the B group will be unloaded, in this case the B group of steel supports will be passively stressed, and even the connection between A and B will be destroyed, thereby causing the overall lattice steel supports to fail, affecting the structural safety during the jacking process, and posing a huge safety hazard.
[0004] The technical solution of the utility model: an alternating jacking structure of a building, comprising a steel support A component and a steel support B component, and also comprising: longitudinal and transverse connecting components connected by multiple groups of transverse supports, arranged between the steel support A component and the steel support B component; the steel support A component and the steel support B component reduce the coordinated deformation between the longitudinal and transverse connecting components through vertical loads, and the connection between the steel support A component, the steel support B component and the longitudinal and transverse connecting components is provided with a connecting mechanism that reduces the coordinated deformation; a prompting mechanism is arranged on the steel support A component and the steel support B component for timely reminding the connecting mechanism of safety hazards.
[0005] Optionally, the connecting mechanism includes a steel cylinder hoop at the connection between the steel support A component, the steel support B component and the longitudinal and transverse connection components, a dust cover is provided on the outside of the steel cylinder hoop, a modified polytetrafluoroethylene slide plate is provided between the steel cylinder hoop and the steel support A component and the steel support B component, an adhesive is coated between the steel cylinder hoop and the modified polytetrafluoroethylene slide plate, a thick slide plate is also provided between the modified polytetrafluoroethylene slide plate and the outer walls of the steel support A component and the steel support B component, silicone grease is coated between the modified polytetrafluoroethylene slide plate and the thick slide plate, and a lock is provided on the outside of the steel cylinder hoop for installing the longitudinal and transverse connection components.
[0006] Optionally, the prompt mechanism includes a top ring fixedly connected to the top of the steel tube clamp, the interior of the top ring is provided with a plurality of first telescopic grooves and second telescopic grooves which are linearly arranged and connected, the interior of the first telescopic groove is connected with a sliding block, glue is dotted between the sliding block and the first telescopic groove, and the interior of the first telescopic groove is provided with a second spring for pushing the sliding block against the outer wall of the steel support A component or the steel support B component.
[0007] Optionally, the prompt mechanism also includes an insert block fixedly connected to the sliding block and movably passing through the second telescopic slot, the second telescopic slot is movably connected with a sliding release block inside, the top of the sliding release block is fixedly connected with a first spring for resisting against the inner wall of the second telescopic slot to pop the sliding release block out of the second telescopic slot, the end of the sliding release block close to the insert block is provided with a slot for it to be inserted into, and the top of the sliding release block is located in the first spring and a connecting pull rope is provided.
[0008] Optionally, one end of the connecting pull rope is fixedly connected to the inner wall of the second telescopic groove, and the other end of the connecting pull rope is fixedly connected to the sliding block.
[0009] Optionally, the insert block is movably connected to the second spring, one end of the second spring is fixedly connected to the sliding stop block, and the other end of the second spring is fixedly connected to the inner wall of the first telescopic slot.
[0010] Optionally, the steel support A component and the steel support B component are provided with a section for installing the connecting mechanism and limiting its position.
[0011] Compared with the prior art, the utility model has the following beneficial technical effects:
[0012] The utility model utilizes the coordination of structures such as a steel support A component, a steel support B component, a longitudinal and transverse connection component and a connecting mechanism, and arranges a steel support A component and a steel support B component at the bottom of a building that is alternately jacked. The longitudinal and transverse connection component realizes relative sliding of the steel support A component and the steel support B component by arranging a modified polytetrafluoroethylene slide plate, thereby reducing the coordinated deformation between the steel support A component and the steel support B component, and reducing the overall damage risk of the longitudinal and transverse connection components due to increased coordinated deformation as the jacking height increases during the alternate jacking process, thereby effectively ensuring the structural safety of the building during the jacking process.
[0013] Furthermore, by designing the prompt mechanism, top ring, first telescopic slot, second telescopic slot and other structures, the loose steel cylinder clamp can be discovered and promptly handled, which can not only ensure the stability and safety of the building structure, but also reduce the risk of accidents caused by loose clamps. At the same time, timely discovery and repair of loose steel cylinder clamps can also prevent further damage or destruction and avoid causing more serious structural problems. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 A schematic elevation diagram of an alternating jacking structure of a building of the utility model is given;
[0015] Figure 2 for Figure 1 A top view of
[0016] Figure 3 for Figure 1 A partial structural diagram of
[0017] Figure 4 for Figure 1 A top view of the middle structure;
[0018] Figure 5 for Figure 4 Structural diagram of the middle steel tube hoop;
[0019] Figure 6 for Figure 5 A schematic diagram of a partial cross-sectional structure;
[0020] Figure 7 for Figure 6 Schematic diagram of the split structure in the middle part.
[0021] Figure numerals: 1. Steel support A assembly; 2. Steel support B assembly; 3. Longitudinal and transverse connection assembly; 4. Dust cover; 5. Modified polytetrafluoroethylene slide plate; 6. Thick slide plate; 7. Steel tube clamp; 8. Top ring; 81. First telescopic groove; 82. Second telescopic groove; 83. Sliding block; 84. Sliding release block; 85. First spring; 86. Insert block; 87. Connecting rope; 88. Slot; 89. Second spring. DETAILED DESCRIPTION
[0022] The technical solution of the present utility model will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present utility model, rather than all of the embodiments.
[0023] The components of the embodiments of the present invention generally described and shown in the drawings herein can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present invention provided in the drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention.
[0024] Based on the embodiments of the present utility model, all other embodiments obtained by ordinary technicians in the field without making any creative work shall fall within the scope of protection of the present utility model.
[0025] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0026] It should be noted that the terms "include", "comprises" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.
[0027] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0028] Example
[0029] like Figure 1-7 As shown, the utility model proposes an alternating jacking structure of a building, including a steel support A component 1 and a steel support B component 2. During the jacking process, as the steel support A component 1 and the steel support B component 2 are raised, a longitudinal and transverse connecting component 3 that can slide relatively is added at every height, which can not only ensure the stability of the overall support, but also reduce the coordinated deformation of the steel support A component 1 and the steel support B component 2 and the longitudinal and transverse connecting component 3 during the alternating jacking process. Thus, a reliable and stable alternating jacking support system is formed. A section is provided on the steel support A component 1 and the steel support B component 2 for the connection mechanism to be installed and limited. The limit position is to prevent the connection mechanism from being installed too high or too low on the steel support A component 1 and the steel support B component 2. It also includes: longitudinal and transverse connection components 3 connected by multiple groups of transverse supports, which are arranged between the steel support A component 1 and the steel support B component 2; the steel support A component 1 and the steel support B component 2 reduce the coordinated deformation between the longitudinal and transverse connection components 3 through vertical loads, and the connection between the steel support A component 1, the steel support B component 2 and the longitudinal and transverse connection components 3 is provided with a connection mechanism to reduce the coordinated deformation; a reminder mechanism is arranged on the steel support A component 1 and the steel support B component 2 for timely reminding the connection mechanism of safety hazards.
[0030] Further, the connection mechanism includes a steel cylinder clamp 7 at the connection of the steel support A component 1, the steel support B component 2 and the longitudinal and transverse connection component 3. The steel cylinder clamp 7 refers to a device or structure used to reinforce and stabilize the steel cylinder (also called a steel barrel). A dust cover 4 is provided on the outside of the steel cylinder clamp 7. A modified polytetrafluoroethylene slide plate 5 is provided between the steel cylinder clamp 7 and the steel support A component 1 and the steel support B component 2. An adhesive is applied between the steel cylinder clamp 7 and the modified polytetrafluoroethylene slide plate 5. The adhesive is a substance that can bond two or more objects together. They play a key role in various applications, from glue in daily life to composite material manufacturing in industry. A thick slide plate 6 is also provided between the modified polytetrafluoroethylene slide plate 5 and the outer wall of the steel support A component 1 and the steel support B component 2. Silicone grease is applied between the modified polytetrafluoroethylene slide plate 5 and the thick slide plate 6. Silicone grease is a grease mixed with silicon oxide and organic resin, which is usually used to lubricate and prevent friction between metal parts. The outside of the steel tube clamp 7 is provided with a lock buckle for installing the longitudinal and transverse connection components 3.
[0031] Among them, the prompt mechanism includes a top ring 8 fixedly connected to the top of the steel tube clamp 7, and a plurality of first telescopic grooves 81 and second telescopic grooves 82 are arranged linearly and connected inside the top ring 8. The inside of the first telescopic groove 81 is connected with a sliding block 83, and glue is dotted between the sliding block 83 and the first telescopic groove 81. The inside of the first telescopic groove 81 is provided with a second spring 89 for pushing the sliding block 83 against the outer wall of the steel support A component 1 or the steel support B component 2. The function of the second spring 89 is to make the sliding block 83 automatically snap into the gap when a gap is generated between the steel tube clamp 7 and the steel support A component 1 and the steel support B component 2, thereby starting the element in the second telescopic groove 82.
[0032] Furthermore, the prompt mechanism also includes an insert block 86 fixedly connected to the sliding block 83 and movably passing through the second telescopic slot 82, the insert block 86 is movably connected to the second spring 89, one end of the second spring 89 is fixedly connected to the sliding block 83, and the other end of the second spring 89 is fixedly connected to the inner wall of the first telescopic slot 81, and the second telescopic slot 82 is movably connected with a sliding block 84 inside, and the top of the sliding block 84 is fixedly connected with a first spring 85 for resisting the inner wall of the second telescopic slot 82 and then ejecting the sliding block 84 from the second telescopic slot 82, and the function of the first spring 85 is to automatically eject the sliding block 84 that is not stuck from the second telescopic slot 82, and then make the sliding block 84 available for the staff to check in time. The sliding block 84 is provided with a slot 88 for it to be inserted into at one end close to the insert block 86, and the top of the sliding block 84 is provided with a connecting rope 87 located in the first spring 85, and the color of the connecting rope 87 can be relatively conspicuous, so that the staff can quickly check it. One end of the connecting rope 87 is fixedly connected to the inner wall of the second telescopic groove 82 , and the other end of the connecting rope 87 is fixedly connected to the sliding block 84 .
[0033] In this embodiment, a reliable and stable steel support A component 1 and a steel support B component 2 are installed at the bottom of the building to be jacked up, and then a section of the steel support A component 1 and the steel support B component 2 is left for the installation of the connection mechanism and a limit position. Then, two semicircular modified polytetrafluoroethylene slide plates with suitable widths are customized, and they are fixed to the inner walls of the two semicircular steel cylinder clamps 7 by applying adhesive between the polytetrafluoroethylene plates. Then, silicone grease is applied between the two semicircular steel cylinder clamps 7 of the modified polytetrafluoroethylene slide plate 5 in the connection mechanism section of the steel support A component 1 and the steel support B component 2 to reduce friction. The longitudinal and transverse connection components 3 are installed on the outside of the steel cylinder clamp 7 by welding or locking, so that the longitudinal and transverse connection components 3 can be made reliable and stable. Then, the lower foundations of the steel support A component 1 and the steel support B component 2 have reliable support to ensure that the height of the longitudinal and transverse connection components 3 does not change during the alternating jacking process. Finally, during the jacking process, as the steel support A component 1 and the steel support B component 2 are raised, a relatively slidable longitudinal and transverse connecting component 3 is added at every certain height, which can not only ensure the stability of the overall support, but also reduce the coordinated deformation of the steel support A component 1 and the steel support B component 2 and the longitudinal and transverse connecting component 3 during the alternating jacking process, thereby forming a reliable and stable alternating jacking support system;
[0034] When the steel tube clamp 7 is installed on the steel support A component 1 and the steel support B component 2, the bolts on the steel tube clamp 7 are tightened by a tool so that the inner wall of the steel tube clamp 7 is tightly attached to the outer wall of the steel support A component 1 or the steel support B component 2, and at the same time, the end of the sliding block 83 protruding outside the steel tube clamp 7 first abuts against the outer wall of the steel support A component 1 or the steel support B component 2, and the glue dotted between the sliding block 83 and the first telescopic groove 81 is broken by tightening the tool. At this time, the sliding block 83 is ready to go in the first telescopic groove 81. When the steel tube clamp 7 is loosened on the steel support A component 1 or the steel support B component 2, a gap will be generated between the inner wall of the steel tube clamp 7 and the outer wall of the steel support A component 1 or the steel support B component 2. At this time, the sliding block 83 moves toward the direction of the steel support A component 1 or the steel support B component 2 through the elastic thrust of the second spring 89, until the sliding block 83 drives the plug block 86 to disengage from the slot 88 at one end of the sliding release block 84, and then the sliding release block 84 is subjected to the elastic thrust of the first spring 85, so that the sliding release block 84 is suspended on the outer wall of the steel support A component 1 or the steel support B component 2 by the connecting pull rope 87. The staff can visually check the suspended sliding release block 84, and then deal with the loose steel tube clamp 7 in time to avoid danger.
[0035] The preferred embodiments of the utility model of the above utility model are only used to help explain the utility model. The preferred embodiments do not describe all the details in detail, nor do they limit the utility model to only specific implementation methods. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the utility model, so that technicians in the relevant technical field can well understand and use the utility model. The utility model is limited only by the claims and their full scope and equivalents.
Claims
1. An alternating jacking structure of a building, comprising a steel support A component (1) and a steel support B component (2), characterized in that: Also includes: A plurality of groups of longitudinal and transverse connection components (3) connected by transverse supports, arranged between the steel support A component (1) and the steel support B component (2); The steel support A component (1) and the steel support B component (2) reduce the coordinated deformation between the longitudinal and transverse connecting components (3) through vertical loads, and a connection mechanism for reducing the coordinated deformation is provided at the connection between the steel support A component (1), the steel support B component (2) and the longitudinal and transverse connecting components (3); A reminder mechanism is provided on the steel support A component (1) and the steel support B component (2) for timely reminding the connection mechanism of potential safety hazards.
2. The alternating jacking structure of a building according to claim 1, characterized in that: The connection mechanism comprises a steel cylinder clamp (7) at the connection between the steel support A component (1), the steel support B component (2) and the longitudinal and transverse connection component (3); a dust cover (4) is provided on the outside of the steel cylinder clamp (7); a modified polytetrafluoroethylene slide plate (5) is provided between the steel cylinder clamp (7) and the steel support A component (1) and the steel support B component (2); an adhesive is applied between the steel cylinder clamp (7) and the modified polytetrafluoroethylene slide plate (5); a thick slide plate (6) is further provided between the modified polytetrafluoroethylene slide plate (5) and the outer wall of the steel support A component (1) and the steel support B component (2); silicone grease is applied between the modified polytetrafluoroethylene slide plate (5) and the thick slide plate (6); and a lock buckle is provided on the outside of the steel cylinder clamp (7) for installing the longitudinal and transverse connection component (3).
3. The alternating jacking structure of a building according to claim 2, characterized in that: The prompt mechanism comprises a top ring (8) fixedly connected to the top of the steel tube clamp (7), the top ring (8) is provided with a plurality of linearly arranged and connected first telescopic grooves (81) and second telescopic grooves (82), the first telescopic groove (81) is connected with a sliding block (83), glue is dotted between the sliding block (83) and the first telescopic groove (81), and the first telescopic groove (81) is provided with a second spring (89) for pushing the sliding block (83) against the outer wall of the steel support A component (1) or the steel support B component (2).
4. The alternating jacking structure of a building according to claim 3, characterized in that: The prompt mechanism also includes an insert block (86) fixedly connected to the sliding block (83) and movably passing through the second telescopic groove (82); a sliding block (84) is movably connected inside the second telescopic groove (82); a first spring (85) is fixedly connected to the top of the sliding block (84) for resisting against the inner wall of the second telescopic groove (82) and then ejecting the sliding block (84) out of the second telescopic groove (82); a slot (88) for the sliding block (84) to be inserted is provided at one end of the sliding block (84) close to the insert block (86); and a connecting pull rope (87) is provided at the top of the sliding block (84) located inside the first spring (85).
5. The alternating jacking structure of a building according to claim 4, characterized in that: One end of the connecting pull rope (87) is fixedly connected to the inner wall of the second telescopic groove (82), and the other end of the connecting pull rope (87) is fixedly connected to the sliding block (84).
6. The alternating jacking structure of a building according to claim 4, characterized in that: The insert block (86) is movably sleeved with the second spring (89), one end of the second spring (89) is fixedly connected to the sliding stop block (83), and the other end of the second spring (89) is fixedly connected to the inner wall of the first telescopic slot (81).
7. The alternating jacking structure of a building according to claim 1, characterized in that: The steel support A component (1) and the steel support B component (2) are provided with a section for the connection mechanism to be installed and to limit its position.