Green building pile foundation pouring guide device
By introducing vibrating motors and support components into the pile foundation pouring guide device, the concrete blockage and hopper skew between the hopper and the diversion pipe are solved, and an efficient and accurate pile foundation pouring process is achieved.
Patent Information
- Application Number
- CN202421277457.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-06
- Publication Date
- 2025-03-18
- Estimated Expiration
- 2034-06-06
AI Technical Summary
In the existing pile foundation pouring guide device, there is no vibrating structure on the hopper, which causes the concrete to be easily blocked between the hopper and the flow guide tube, and the lack of a support structure, which causes the hopper to be easily skewed.
A green building pile foundation casting guide device was designed, using a vibrating motor to generate vibration to prevent concrete from being blocked, and the hopper was supported by a support component composed of sheath, structural blocks and support pipes to prevent it from skewing.
Vibration of the concrete between the hopper and the deflector is avoided by vibrating the concrete, and the supporting components effectively prevent the hopper from skewing, improving the pouring efficiency and accuracy.
Smart Images

Figure CN222632249U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of pile foundation casting, in particular to a green building pile foundation casting guide device. Background Art
[0002] Green buildings improve the environmental quality around buildings through innovative structural design, and can save resources and make rational use of them. The construction of green buildings is the same as ordinary buildings, and foundation piles need to be poured. When pouring foundation piles, the guide pipe needs to be inserted into the pile hole and the concrete needs to be introduced into the pile hole through the hopper.
[0003] The existing pile foundation casting guide device consists of two parts: a guide pipe and a hopper. There is no vibration structure on the hopper, so concrete is easily blocked between the hopper and the guide pipe. There is no support structure, so the hopper is easily skewed. Therefore, a green building pile foundation casting guide device is proposed. Vibration generated by a vibration motor prevents concrete from being blocked between the hopper and the guide pipe. A support assembly consisting of a sheath, a structural block and a support pipe is provided to support the hopper so that it will not be skewed. Utility Model Content
[0004] In view of the problems in the prior art, the utility model provides a green building pile foundation casting guide device, which uses the vibration generated by a vibration motor to prevent concrete from being skewed between the hopper and the guide pipe, and is provided with a support assembly composed of a sheath, a structural block and a support pipe, which can support the hopper and prevent it from being skewed.
[0005] The technical solution adopted by the utility model to solve the technical problem is a green building pile foundation casting guide device, comprising a bearing plate, a limiting sleeve welded on the top of the bearing plate, a material guide pipe penetrating the inside of the limiting sleeve, a hopper is arranged on the top of the material guide pipe, and vibration motors are installed on both sides of the hopper through a mounting frame;
[0006] Support components are provided at both ends of the top of the supporting plate. The support components include structural blocks welded to both sides of the hopper and sleeves welded to both ends of the top of the supporting plate. A support tube is provided through the inside of the sleeve, and one side of the sleeve is connected to a first fixing bolt through a threaded groove.
[0007] By adopting the above technical solution, after the bearing plate is placed on the pile hole, the guide pipe is passed through the limiting sleeve and fixed, and after the concrete is poured into the hopper, it is guided into the pile hole through the guide pipe, the vibration motor vibrates between the guide pipe and the hopper, and the support pipe is fixed to support the hopper.
[0008] Specifically, the two sides of the limiting sleeve are equidistantly connected with second fixing bolts through thread grooves, and the two sides of the material guiding tube are equidistantly provided with slots corresponding to the second fixing bolts.
[0009] Specifically, an internal threaded sleeve is welded at the bottom end of the hopper, an external threaded butt pipe is welded at the top end of the material guide pipe, and the external threaded butt pipe is connected to the inside of the internal threaded sleeve.
[0010] Specifically, reserved grooves are formed through both ends of the top of the bearing plate, and second lifting ears are welded on both sides of the limiting sleeve.
[0011] Specifically, first lifting ears are welded at both ends of the hopper.
[0012] Specifically, a connecting frame is welded inside the hopper.
[0013] Beneficial effects of the utility model:
[0014] (1) The utility model discloses a green building pile foundation casting guide device. When concrete is poured into a hopper, it is guided into the pile hole through a guide pipe. The vibration motor is turned on to generate vibration, which is transmitted to the space between the hopper and the guide pipe. The concrete between the hopper and the guide pipe can be vibrated to prevent the concrete from piling up or clogging between the guide pipe and the hopper.
[0015] (2) The utility model discloses a green building pile foundation casting guide device, wherein the support tube in the sheath moves up and down so that the top of the support tube is against the bottom of the structural block, and the first fixing bolt is tightened to fix the support tube. The support tube can be used to support the hopper so that it will not tilt. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The utility model is further described below in conjunction with the accompanying drawings and embodiments.
[0017] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0018] Figure 2 This is a schematic diagram of the structure of the load-bearing plate of the utility model;
[0019] Figure 3 This is a cross-sectional view of the material guide pipe and hopper of the utility model;
[0020] Figure 4 This is a schematic diagram of the support assembly structure of the utility model;
[0021] In the figure: 1. load-bearing plate; 2. limiting sleeve; 3. material guide pipe; 301. external threaded butt pipe; 302. slot; 4. hopper; 401. internal threaded sleeve; 402. connecting frame; 5. support assembly; 501. sheath; 502. structural block; 503. support pipe; 504. first fixing bolt; 6. vibration motor; 7. first lifting ear; 8. second fixing bolt; 9. reserved slot; 10. second lifting ear. DETAILED DESCRIPTION
[0022] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific implementation methods.
[0023] The vibration generated by the vibration motor prevents the concrete from being tilted between the hopper and the guide pipe, and a support assembly consisting of a sheath, a structural block and a support pipe is provided to support the hopper so that it will not tilt. Figure 1-4 As shown, a green building pile foundation casting guide device described in the utility model comprises a bearing plate 1, a limiting sleeve 2 is welded on the top of the bearing plate 1, a material guide pipe 3 is provided inside the limiting sleeve 2, a hopper 4 is provided on the top of the material guide pipe 3, and vibration motors 6 are installed on both sides of the hopper 4 through a mounting frame;
[0024] Support components 5 are provided at both ends of the top of the supporting plate 1, and the support component 5 includes a structural block 502 welded to both sides of the hopper 4 and a sleeve 501 welded to both ends of the top of the supporting plate 1, a support tube 503 is sleeved through the inside of the sleeve 501, and one side of the sleeve 501 is connected to a first fixing bolt 504 through a threaded groove.
[0025] When in use, after the bearing plate 1 is placed on the pile hole, the guide pipe 3 is passed through the limiting sleeve 2 and fixed. After the concrete is poured into the hopper 4, it is guided into the pile hole through the guide pipe 3. The vibration motor 6 vibrates between the guide pipe 3 and the hopper 4. After the support pipe 503 is fixed, it supports the hopper 4.
[0026] For example, Figure 2 , Figure 3 As shown, the utility model also includes that the two sides of the limiting sleeve 2 are equidistantly connected with second fixing bolts 8 through thread grooves, and the two sides of the guide pipe 3 are equidistantly provided with slots 302 corresponding to the second fixing bolts 8.
[0027] When in use, the second fixing bolt 8 is tightened so that one end thereof is inserted into the corresponding slot 302 , so that the material guiding tube 3 can be fixed after being moved up and down.
[0028] For example, Figure 3 As shown, the utility model also includes that an internal threaded sleeve 401 is welded at the bottom of the hopper 4, and an external threaded butt pipe 301 is provided at the top of the guide pipe 3, and the external threaded butt pipe 301 is connected to the inside of the internal threaded sleeve 401.
[0029] When in use, the hopper 4 is fixed to the top of the material guide pipe 3 through the internal threaded sleeve 401 and the external threaded butt pipe 301, which is convenient for installation and disassembly.
[0030] For example, Figure 2As shown, the utility model also includes that reserved grooves 9 are formed through both ends of the top of the bearing plate 1 , and second lifting ears 10 are welded on both sides of the limiting sleeve 2 .
[0031] When in use, the reserved groove 9 is provided to facilitate personnel to carry the load-bearing plate 1 , and the second lifting lug 10 is provided to facilitate equipment to lift the load-bearing plate 1 .
[0032] For example, Figure 1 As shown, the utility model also includes that first lifting ears 7 are welded at both ends of the hopper 4 .
[0033] When in use, the first lifting lug 7 is provided to facilitate the equipment to lift the hopper 4 .
[0034] For example, Figure 3 As shown, the utility model also includes that a connecting frame 402 is welded inside the hopper 4.
[0035] When in use, the connecting frame 402 can increase the strength of the hopper 4, making it less likely to deform.
[0036] When the utility model is used, the personnel puts the bearing plate 1 on the pile hole, inserts the guide pipe 3 into the limiting sleeve 2 and moves it up and down, adjusts the height of the guide pipe 3, tightens the second fixing bolt 8 so that one end of the guide pipe 3 is inserted into the slot 302, pushes the guide pipe 3 after moving up and down to fix it, and fixes the hopper 4 to the top of the guide pipe 3 through the external threaded butt pipe 301 and the internal threaded sleeve 401;
[0037] The support tube 503 in the sheath 501 is moved up and down, so that the top of the support tube 503 is against the bottom of the structural block 502, and the first fixing bolt 504 is tightened to fix the support tube 503. The hopper 4 can be supported by the support tube 503 so that it will not be skewed;
[0038] When concrete is poured into the hopper 4, it is guided into the pile hole through the guide pipe 3, and the vibration motor 6 is turned on to generate vibration, which is transmitted to the space between the hopper 4 and the guide pipe 3. The concrete between the hopper 4 and the guide pipe 3 can be vibrated to prevent the concrete from piling up or clogging between the guide pipe 3 and the hopper 4.
[0039] The above shows and describes the basic principles, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions in the specification are only to illustrate the principles of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the protection required by the utility model. The scope of protection required by the utility model is defined by the attached claims and their equivalents.
Claims
1. A green building pile foundation casting guide device, characterized in that: It comprises a bearing plate (1), a limiting sleeve (2) is welded on the top of the bearing plate (1), a material guide tube (3) is provided inside the limiting sleeve (2), a material hopper (4) is provided at the top of the material guide tube (3), and vibration motors (6) are installed on both sides of the material hopper (4) through a mounting frame; Support assemblies (5) are provided at both ends of the top of the support plate (1), and the support assembly (5) comprises a structural block (502) welded to both sides of the hopper (4) and a sleeve (501) welded to both ends of the top of the support plate (1), a support tube (503) is provided through the inside of the sleeve (501), and one side of the sleeve (501) is connected to a first fixing bolt (504) via a threaded groove.
2. A green building pile foundation casting guide device according to claim 1, characterized in that: The two sides of the limiting sleeve (2) are equidistantly connected to second fixing bolts (8) via threaded grooves, and the two sides of the material guide tube (3) are equidistantly provided with clamping grooves (302) corresponding to the second fixing bolts (8).
3. A green building pile foundation casting guide device according to claim 1, characterized in that: An internally threaded sleeve (401) is welded to the bottom end of the hopper (4), and an externally threaded butt joint pipe (301) is welded to the top end of the material guide pipe (3), and the externally threaded butt joint pipe (301) is connected to the inside of the internally threaded sleeve (401).
4. A green building pile foundation casting guide device according to claim 1, characterized in that: Reserved grooves (9) are provided through the two ends of the top of the bearing plate (1), and second lifting ears (10) are welded on both sides of the limiting sleeve (2).
5. A green building pile foundation casting guide device according to claim 1, characterized in that: First lifting ears (7) are welded at both ends of the hopper (4).
6. A green building pile foundation casting guide device according to claim 1, characterized in that: A connecting frame (402) is welded inside the hopper (4).