Composite components and construction methods for co-construction of deep soft foundation channel and riverside embankment
A technology of combining components and construction methods, applied in infrastructure engineering, roads, roads, etc., can solve problems such as inability to save land, induce soil slope slippage, and increase construction costs, so as to reduce slippage risks, solve deformation coordination, and save money. land use effect
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Publication Date
- 2016-06-22
- Estimated Expiration
- Not applicable · inactive patent
Smart Images
Figure 1
Abstract
Description
technical field
[0001] The invention relates to the technical field of civil construction engineering, in particular to a combined component used for co-construction of a deep soft foundation channel and an embankment next to a river and a construction method thereof. Background technique
[0002] The coastal area has a lot of people and little land, the economy is developed, the river network and road network in the area are dense, and the land resources for engineering construction are very precious. In recent years, in order to save land and promote intensive use of land resources, road construction often changes rivers or irrigation canals to the foot of the embankment slope and follows the road. However, in coastal areas with very weak foundations, the construction of embankments along rivers is quite difficult, including a series of key technical problems. The interaction between foundation treatment of embankment along the river and the deformation of river reforming...
Examples
Embodiment Construction
[0026] Combine below figure 1 The present invention will be further described with specific embodiments.
[0027] Composite components used for co-construction of deep soft foundation channels and riverside embankments, such as figure 1 As shown, it includes the embankment 2 formed after the deep and weak embankment foundation 1 is processed and filled. The embankment 2 is built with a river bank retaining wall 3 at the foot of the side slope 14 along the river, and the outside of the river bank retaining wall 3 is an excavated river bed. , the river bank retaining wall 3 and the river bed form a river channel 4, the embankment foundation 1 adopts a consolidation drainage method, and a plastic drainage board 13 is vertically arranged in the foundation 1 for consolidation drainage. Anti-slip piles 5 are embedded in the side slope area of the embankment 2 and under the soil shoulder 11 of the embankment. An inclinometer pipe 6 is buried in the side slope area of the embank...