A method and system for controlling temperature and nitrate in a coke oven combustion chamber
By setting the standard temperature and control range in the coke oven, combined with the combustion chamber temperature and coking time, the gas heating pipeline valve is automatically controlled, which solves the problems of low accuracy of thermal management of existing coke ovens and nitrogen oxide pollution, and realizes intelligent Chemical control and source control reduce energy consumption and pollution emissions.
Patent Information
- Application Number
- CN201710292604.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2017-04-28
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2037-04-28
Smart Images

Figure CN107022359B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of thermal control of coke ovens in coking enterprises, and in particular to a method and system for controlling temperature and nitrate in a combustion chamber of a coke oven. Background Art
[0002] At present, among all the existing coke ovens in the world, the thermal management of most coke ovens is still in the status quo of extensive manual measurement, manual adjustment and experience management, which seriously restricts the development of coke oven technology. It is specifically manifested in the following three points: ① The standard temperature is determined entirely by the work experience of the staff. In order to ensure that there is no coke in the carbonization chamber of the whole furnace, the standard temperature is often set too high, resulting in increased energy consumption; ② The measurement of the vertical fire channel temperature adopts the traditional manual temperature measurement method. The temperature measurement interval is generally once every 4 hours. The infrared temperature measurement is used to measure the middle of the inclined channel of the downflow fire channel and the brick gas channel hole, because this place is exactly the middle position of the supply gas and the combustion air, which can basically be identified as the highest temperature point. Since manual measurement is affected by factors such as the temperature measurement point, temperature measurement time, temperature measurement location, the proficiency of the temperature measurement personnel and the external climatic conditions, the temperature measurement accuracy is low, the error is large and the timeliness is not good; ③ After the temperature measurement is completed, the operator adjusts the heating gas flow according to the temperature and adjusts the size of the smoke channel suction accordingly.
[0003] Since heating control still uses the method of manually adding and reducing gas and air flow, and the operation interval is mostly once every 4 hours, it is impossible to achieve accurate and timely adjustment. At the same time, nitrogen oxides, as pollutants, have a huge impact on human health and the ecological environment. There are three types of formation mechanisms of nitrogen oxides generated during coke oven combustion: temperature thermal NO; hydrocarbon fuel fast NO; N-containing fuel NO. The details are as follows:
[0004] ① Fuel type: nitrogen oxides generated by oxidation of organic nitrogen compounds in the fuel during combustion, mainly caused by furnace leakage;
[0005] ② Rapid type: hydrocarbon fuel decomposes during combustion, and its decomposition products react with nitrogen to generate nitrogen oxides, which is mainly caused by insufficient air in individual fire channels;
[0006] ③ Thermal type: nitrogen oxides generated by oxidation of nitrogen burning in the air at high temperatures; mainly caused by excessively high standard temperatures.
[0007] At present, the vast majority of coke oven flue gas nitrogen oxides treatment mainly adopts end-of-pipe treatment technology. Although end-of-pipe treatment can control nitrogen oxide emissions, it also brings high energy consumption to enterprises and increases the production and operation costs of enterprises. Therefore, combining the thermal management of coke ovens and the mechanism of nitrogen oxides generation during the heating process of coke ovens, developing a method and system for controlling temperature and nitrate in the combustion chamber of coke ovens, improving the thermal management level of coke ovens, realizing intelligent control, and reducing nitrogen oxide emissions from coke oven combustion exhaust gas, realizing source control of nitrate, is an issue that needs to be solved urgently. Summary of the invention
[0008] In view of this, the purpose of the present invention is to provide a method and system for controlling temperature and nitrate in a coke oven combustion chamber in order to improve the thermal management level of the coke oven, realize intelligent control, and at the same time reduce the emission of nitrogen oxides in the exhaust gas from the coke oven combustion, thereby realizing source control of nitrate.
[0009] The technical solution adopted by the present invention is: a method for controlling temperature and nitrate in a coke oven combustion chamber, comprising the following steps:
[0010] Step 1: Set the coke oven standard temperature, coke oven combustion chamber temperature control range and temperature control time zone;
[0011] The second step: measuring the temperature and coking time of the coke oven combustion chamber, and introducing the combustion chamber temperature signal and coking time into the combustion chamber temperature and nitrate control program control unit;
[0012] The third step: compare the coking time and the combustion chamber temperature with the set temperature control time area and temperature control range, determine whether the set control conditions are met, and output the corresponding control signal to the combustion chamber gas heating pipeline valve control unit, thereby achieving control of the combustion chamber temperature.
[0013] Preferably, the temperature control range and temperature control time zone of the coke oven combustion chamber in the first step and the third step include:
[0014] The measured temperature of the vertical fire channel - the set standard temperature is less than -10℃, and the coking time is 6-9h or the coking time is 17.5-23.5h, and the valve is not closed or adjusted down accordingly;
[0015] -10℃≤actual temperature of vertical fire channel-set standard temperature<0℃, and coking time is 6-9h or coking time is 17.5-23.5h, the corresponding valve closing or reducing time is 3.5min;
[0016] 0℃≤actual temperature of vertical fire channel-set standard temperature<15℃, and coking time is 6-9h or coking time is 17.5-23.5h, the corresponding valve closing or reducing time is 7min;
[0017] 15℃≤actual temperature of vertical fire channel-set standard temperature<20℃, and coking time is 6-9h or coking time is 17.5-23.5h, the corresponding valve closing or reducing time is 10min;
[0018] 20℃≤actual temperature of vertical fire channel - set standard temperature, and coking time is 6-9h or coking time is 17.5-23.5h, the corresponding valve closing or reducing time is 15min.
[0019] Preferably, the temperature of the coke oven combustion chamber in the second step is the temperature of the coke oven combustion chamber vertical fire channel downward airflow for 5 minutes.
[0020] A system used in a coke oven combustion chamber temperature and nitrate control method, the system comprising a combustion chamber vertical flue temperature measuring unit, a coking time calculation unit, a combustion chamber coal gas heating pipeline valve control unit and a combustion chamber temperature and nitrate control program control unit, wherein the combustion chamber temperature and nitrate control program control unit is respectively connected to the combustion chamber vertical flue temperature measuring unit, the coking time calculation unit and the combustion chamber coal gas heating pipeline valve control unit.
[0021] Preferably, the combustion chamber vertical flue temperature measuring unit is a high-temperature optical temperature measuring lens arranged on a standard vertical flue or an adjacent vertical flue, and is used to measure the actual temperature of the combustion chamber vertical flue.
[0022] Preferably, the coking time calculation unit calculates the coking time through the coke oven pushing and coal loading car signal, takes the start of coal loading by the coal loading car as the coking time starting point, and takes the start of coke pushing by the coke pushing car as the coking time ending point, to calculate the real-time coking time.
[0023] Preferably, the coking time calculation unit measures the temperature of the raw gas through a thermocouple installed at the coke oven bridge pipe, and takes the rising of the raw gas temperature from 100-300°C to 400-600°C within 1 hour as the starting point of the coking time, and the next rising of the raw gas temperature from 100-300°C to 400-600°C within 1 hour as the end point of the coking time, and calculates the real-time coking time in sequence. At the same time, in order to ensure the accuracy of the coking time calculation, the coking time calculated by judging the change of the raw gas temperature is combined with the coking sequence, and the coking time of the current hole is judged according to the coking time of the coke in the previous hole in the coking sequence.
[0024] Preferably, the combustion chamber gas heating pipe valve control unit adjusts the addition and subtraction of gas and air flow by installing a valve on the gas heating pipe, and the valve is an explosion-proof pneumatic ball valve or an explosion-proof electric ball valve or an explosion-proof pneumatic butterfly valve or an explosion-proof electric butterfly valve, and the valve is installed between the exchange plug and the addition and subtraction cock.
[0025] Preferably, the combustion chamber temperature control and pin control program control unit is used to set the coke oven standard temperature, the coke oven combustion chamber temperature control range and the set temperature control time area, and issue control instructions to the combustion chamber gas heating pipeline valve control unit according to the actual measured temperature and coking time of the vertical fire channel.
[0026] The beneficial effects of the present invention are as follows: the temperature and nitrate control method and system of the coke oven combustion chamber of the present invention integrates the coking time of the coke oven carbonization chamber and the vertical fire channel temperature of the combustion chamber, and automatically and intelligently controls the valves and valve execution control time of the combustion chamber gas heating pipeline according to the temperature range segment and the coking time segment, thereby reducing or eliminating the high temperature range of the vertical fire channel, improving the temperature uniformity coefficient of the coke oven, saving gas, and reducing the generation of nitrogen oxides from the coke oven heating source, thereby realizing source nitrate control and meeting energy conservation and environmental protection requirements. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a schematic diagram of the method of the present invention;
[0028] Figure 2 Schematic diagram of the system of the present invention. DETAILED DESCRIPTION
[0029] The principles and features of the present invention are described below in conjunction with the accompanying drawings. The examples given are only used to explain the present invention and are not used to limit the scope of the present invention.
[0030] Example 1
[0031] like Figure 1 As shown, a method for controlling temperature and nitrate in a coke oven combustion chamber comprises the following steps:
[0032] Step 1: Set the coke oven standard temperature to 1330°C in the combustion chamber temperature control program control unit;
[0033] Set the coke oven combustion chamber temperature control range and temperature control time zone:
[0034] The measured temperature of the vertical fire channel - the set standard temperature is less than -10℃, and the coking time is 6-9h, and the corresponding valve control is not closed or adjusted down;
[0035] -10℃≤actual temperature of vertical fire channel-set standard temperature<0℃, and coking time is 6-9h, corresponding valve closing or reducing time is 3.5min;
[0036] 0℃≤actual temperature of vertical fire channel - set standard temperature<15℃, and coking time is 6-9h, corresponding valve closing or reducing time is 7min;
[0037] 15℃≤actual temperature of vertical fire channel-set standard temperature<20℃, and coking time is 6-9h or coking time is 17.5-23.5h, the corresponding valve closing or reducing time is 10min;
[0038] 20℃≤actual temperature of vertical fire channel - set standard temperature, and coking time is 6-9h, corresponding to valve closing or reducing time is 15min.
[0039] Step 2: Use a high-temperature optical temperature measuring lens on a standard vertical flue to measure the temperature and coking time of the vertical flue of the coke oven combustion chamber when the airflow is down for 5 minutes, and introduce the combustion chamber temperature signal and coking time into the combustion chamber temperature and nitrate control program control unit;
[0040] The third step: compare the coking time and the combustion chamber temperature with the set temperature control time area and temperature control range, determine whether the set control conditions are met, and output a corresponding signal to control the combustion chamber gas heating pipeline valve control unit, so as to achieve reasonable control of the combustion chamber temperature.
[0041] like Figure 2 As shown, a coke oven combustion chamber temperature and nitrate control system includes a combustion chamber vertical flue temperature measuring unit, a coking time calculation unit, a combustion chamber coal gas heating pipeline valve control unit and a combustion chamber temperature and nitrate control program control unit, wherein the combustion chamber temperature and nitrate control program control unit is respectively connected to the combustion chamber vertical flue temperature measuring unit, the coking time calculation unit and the combustion chamber coal gas heating pipeline valve control unit.
[0042] Furthermore, the combustion chamber vertical flue temperature measurement unit is a high-temperature optical temperature measuring lens arranged on a standard vertical flue or an adjacent vertical flue, and is used to measure the actual temperature of the combustion chamber vertical flue.
[0043] Furthermore, the coking time calculation unit calculates the coking time based on the coke oven pushing and coal loading car signal, takes the start of coal loading by the coal loading car as the coking time starting point, and takes the start of coke pushing by the coke pushing car as the coking time ending point, to calculate the real-time coking time.
[0044] Furthermore, the combustion chamber gas heating pipe valve control unit adjusts the addition and subtraction of gas and air flow by installing a valve on the gas heating pipe. The valve is an explosion-proof pneumatic ball valve or an explosion-proof electric ball valve or an explosion-proof pneumatic butterfly valve or an explosion-proof electric butterfly valve, and the valve is installed between the exchange plug and the addition and subtraction cock.
[0045] Furthermore, the combustion chamber temperature control and pin control program control unit is used to set the coke oven standard temperature, the coke oven combustion chamber temperature control range and the set temperature control time area, and issue control instructions to the combustion chamber gas heating pipeline valve control unit according to the actual measured temperature and coking time of the vertical fire channel.
[0046] Example 2
[0047] like Figure 1 As shown, a method for controlling temperature and nitrate in a coke oven combustion chamber comprises the following steps:
[0048] Step 1: Set the coke oven standard temperature to 1330°C in the combustion chamber temperature control program control unit;
[0049] Set the coke oven combustion chamber temperature control range and temperature control time zone:
[0050] The measured temperature of the vertical fire channel - the set standard temperature is less than -10℃, and the coking time is 17.5-23.5h, and the valve should not be closed or adjusted down accordingly;
[0051] -10℃≤actual temperature of vertical fire channel-set standard temperature<0℃, and coking time is 17.5-23.5h, corresponding valve closing or reducing time is 3.5min;
[0052] 0℃≤actual temperature of vertical fire channel-set standard temperature<15℃, and coking time is 17.5-23.5h, corresponding valve closing or reducing time is 7min;
[0053] 15℃≤actual temperature of vertical fire channel-set standard temperature<20℃, and coking time is 17.5-23.5h, corresponding valve closing or reducing time is 10min;
[0054] 20℃≤actual temperature of vertical fire channel - set standard temperature, and coking time is 17.5-23.5h, corresponding to valve closing or reducing time is 15min.
[0055] Step 2: Use a high-temperature optical temperature measuring lens on the adjacent vertical fire channel to measure the temperature and coking time of the downward airflow in the vertical fire channel of the coke oven combustion chamber at 5 minutes, and introduce the combustion chamber temperature signal and coking time into the combustion chamber temperature and nitrate control program control unit;
[0056] The third step: compare the coking time and the combustion chamber temperature with the set temperature control time area and temperature control range, determine whether the set control conditions are met, and output a corresponding signal to control the combustion chamber gas heating pipeline valve control unit, so as to achieve reasonable control of the combustion chamber temperature.
[0057] like Figure 2 As shown, a coke oven combustion chamber temperature and nitrate control system includes a combustion chamber vertical flue temperature measuring unit, a coking time calculation unit, a combustion chamber coal gas heating pipeline valve control unit and a combustion chamber temperature and nitrate control program control unit, wherein the combustion chamber temperature and nitrate control program control unit is respectively connected to the combustion chamber vertical flue temperature measuring unit, the coking time calculation unit and the combustion chamber coal gas heating pipeline valve control unit.
[0058] Furthermore, the combustion chamber vertical flue temperature measurement unit is a high-temperature optical temperature measuring lens arranged on a standard vertical flue or an adjacent vertical flue, and is used to measure the actual temperature of the combustion chamber vertical flue.
[0059] Furthermore, the coking time calculation unit measures the temperature of the raw gas by installing a high-temperature and corrosion-resistant thermocouple at the coke oven bridge pipe, and takes the rising of the raw gas temperature from 100-300°C to 400-600°C within 1 hour as the starting point of the coking time, and the next rising of the raw gas temperature from 100-300°C to 400-600°C within 1 hour as the end point of the coking time, and calculates the real-time coking time in sequence. At the same time, in order to ensure the accuracy of the coking time calculation, the coking time calculated by judging the change of the raw gas temperature is combined with the coking sequence, and the coking time of the current hole is judged according to the coking time of the coke in the previous hole in the coking sequence.
[0060] Furthermore, the combustion chamber gas heating pipe valve control unit adjusts the addition and subtraction of gas and air flow by installing a valve on the gas heating pipe. The valve is an explosion-proof pneumatic ball valve or an explosion-proof electric ball valve or an explosion-proof pneumatic butterfly valve or an explosion-proof electric butterfly valve, and the valve is installed between the exchange plug and the addition and subtraction cock.
[0061] Furthermore, the combustion chamber temperature control and pin control program control unit is used to set the coke oven standard temperature, the coke oven combustion chamber temperature control range and the set temperature control time area, and issue control instructions to the combustion chamber gas heating pipeline valve control unit according to the actual measured temperature and coking time of the vertical fire channel.
Claims
1. A method for controlling temperature and nitrate in a coke oven combustion chamber, characterized in that: The steps include: Step 1: Set the coke oven standard temperature, coke oven combustion chamber temperature control range and temperature control time zone; The second step: measuring the temperature and coking time of the coke oven combustion chamber, and introducing the combustion chamber temperature signal and coking time into the combustion chamber temperature and nitrate control program control unit; Step 3: Compare the coking time and the combustion chamber temperature with the set temperature control time zone and temperature control range, determine whether the set control conditions are met, and output the corresponding control signal to the combustion chamber gas heating pipeline valve control unit, thereby realizing the control of the combustion chamber temperature; Wherein, the temperature control range and temperature control time area of the coke oven combustion chamber described in the first step and the third step include: The measured temperature of the vertical fire channel - the set standard temperature is less than -10℃, and the coking time is 6-9h or the coking time is 17.5-23.5h, and the valve is not closed or adjusted down accordingly; -10℃≤actual temperature of vertical fire channel-set standard temperature<0℃, and coking time is 6-9h or coking time is 17.5-23.5h, the corresponding valve closing or reducing time is 3.5min; 0℃≤actual temperature of vertical fire channel-set standard temperature<15℃, and coking time is 6-9h or coking time is 17.5-23.5h, the corresponding valve closing or reducing time is 7min; 15℃≤actual temperature of vertical fire channel-set standard temperature<20℃, and coking time is 6-9h or coking time is 17.5-23.5h, the corresponding valve closing or reducing time is 10min; 20℃≤actual temperature of vertical fire channel - set standard temperature, and coking time is 6-9h or coking time is 17.5-23.5h, the corresponding valve closing or reducing time is 15min.
2. A method for controlling temperature and nitrate in a coke oven combustion chamber according to claim 1, characterized in that: The temperature of the coke oven combustion chamber in the second step is the temperature of the coke oven combustion chamber when the vertical fire channel has downward airflow for 5 minutes.
3. The coke oven combustion chamber temperature and nitrate control system used in the coke oven combustion chamber temperature and nitrate control method according to claim 1 or 2, characterized in that: The system comprises a combustion chamber vertical flue temperature measuring unit, a coking time calculating unit, a combustion chamber coal gas heating pipeline valve control unit and a combustion chamber temperature control and nitrate control program control unit, wherein the combustion chamber temperature control and nitrate control program control unit are respectively connected to the combustion chamber vertical flue temperature measuring unit, the coking time calculating unit and the combustion chamber coal gas heating pipeline valve control unit.
4. A coke oven combustion chamber temperature and nitrate control system according to claim 3, characterized in that: The combustion chamber vertical flue temperature measuring unit is a high-temperature optical temperature measuring lens arranged on the upper part of a standard vertical flue or an adjacent vertical flue, and is used to measure the actual temperature of the combustion chamber vertical flue.
5. A coke oven combustion chamber temperature and nitrate control system according to claim 3, characterized in that: The coking time calculation unit calculates the coking time through the coke oven pushing and coal loading car signal, takes the start of coal loading by the coal loading car as the coking time starting point, and takes the start of coking by the coke pushing car as the coking time ending point, and calculates the real-time coking time.
6. A coke oven combustion chamber temperature and nitrate control system according to claim 3, characterized in that: The coking time calculation unit measures the temperature of the raw gas by installing a thermocouple at the coke oven bridge pipe, and takes the rising of the raw gas temperature from 100-300°C to 400-600°C within 1 hour as the starting point of the coking time, and the next rising of the raw gas temperature from 100-300°C to 400-600°C within 1 hour as the end point of the coking time, and calculates the real-time coking time in sequence. At the same time, in order to ensure the accuracy of the coking time calculation, the coking time calculated by judging the change of the raw gas temperature is combined with the coking sequence, and the coking time of the current hole is judged according to the coking time of the coke in the previous hole in the coking sequence.
7. A coke oven combustion chamber temperature and nitrate control system according to claim 3, characterized in that: The combustion chamber gas heating pipeline valve control unit adjusts the addition and subtraction of gas and air flow by installing a valve on the gas heating pipeline. The valve is an explosion-proof pneumatic ball valve or an explosion-proof electric ball valve or an explosion-proof pneumatic butterfly valve or an explosion-proof electric butterfly valve, and the valve is installed between the exchange cock and the addition and subtraction cock.
8. A coke oven combustion chamber temperature and nitrate control system according to claim 3, characterized in that: The combustion chamber temperature control and pin control program control unit is used to set the coke oven standard temperature, the coke oven combustion chamber temperature control range and the set temperature control time area, and issue control instructions to the combustion chamber gas heating pipeline valve control unit according to the actual measured temperature and coking time of the vertical fire channel.