A vertical combined transport method for marine containers from loading port CY, transit port CY to unloading port CY

By adopting combined transport units in maritime container transport and utilizing link lock marshalling and disassembly technology, the problem of low single container transport efficiency in the existing technology is solved, efficient loading and unloading and energy saving are achieved, and port resource utilization is significantly improved. and environmental protection.

CN107487647BActive Publication Date: 2024-10-25吴惠民 +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201710668435.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2017-08-07
Publication Date
2024-10-25
Estimated Expiration
2037-08-07

AI Technical Summary

Technical Problem

The existing maritime container transportation method uses a single natural container as the transportation unit, which is inefficient and cannot fully utilize port resources, resulting in high loading and unloading efficiency and energy consumption.

Method used

Using an expanded container combined transport unit, multiple natural containers are grouped into combined boxes through link locks to achieve vertical combined transportation from the loading port to the unloading port, including route determination, marshalling, loading, maritime transportation and disassembly Wait for steps.

Benefits of technology

It improves container loading and unloading efficiency, shortens port berthing time, increases port throughput, saves energy consumption, reduces production costs, and improves the environment.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

A vertical combined transport method for marine containers from loading port CY, transshipment port CY to unloading port CY is to connect two natural containers vertically with a link lock to form a transport and loading and unloading operation unit to form a combined box, which replaces the existing single box transport unit and is suitable for standard dry cargo containers for sea transportation. The whole transportation of the combined box goes through: pre-assembly by the shipping company, marshaling at the terminal yard, vehicle transportation, loading by quay crane, unloading at the unloading port by sea, disassembly, and loading the transshipment box on the transshipment ship to the destination port, etc., involving shipping companies, loading and unloading including transshipment ports, and the transport and loading and unloading equipment equipped therewith. The combined boxes are marshaled on the principle of the same unloading port, the same transshipment port, and the same container length, and the maximum weight range is 30.5 tons to 60 tons. Taking a 10,000-TEU ship as an example, when the average assembly rate is 95%, the loading and unloading efficiency is increased by 90%, and the terminal utilization rate is increased by 77.3%, which reduces the cost and energy consumption of equipment of various enterprises in the ship transportation and port loading and unloading industry chain, and is beneficial to the protection of port and marine environment.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] manual Technical Field

[0002] The present invention relates to the field of container waterway transportation, and in particular to a vertical combined transportation method for marine containers from a loading port CY, a transshipment port CY to a unloading port CY. Background Art

[0003] Maritime container transportation has gone through a period of sixty years since its inception. Today, container shipping has spread to all seas in the world. The goods transported involve all aspects of human food, clothing, housing, transportation and production, so it is widely valued and welcomed by countries around the world. Maritime container transportation is a very mature and highly standardized industry, and my country is fully in line with the international standards. Existing technology shows that existing maritime container transportation uses a single natural container as a transportation unit. Summary of the invention

[0004] This method uses an enlarged container combined transport unit to replace a single natural container transport unit to form a combined box, completes the grouping and loading of containers at the loading port CY and the transshipment port CY, marine transportation, unloading and disassembly at the unloading port CY, and includes the following steps:

[0005] Step (1). The shipping company determines the route for implementing this method;

[0006] Step (2). The shipping company provides a link lock for the combined container marshaling;

[0007] Step (3). The shipping company pre-allocates export containers for the voyage and provides a pre-allocation group plan;

[0008] Step (4). The terminal yard prepares a yard plan for the voyage export combination boxes and containers to be assembled;

[0009] Step (5). After the container enters the port, it enters different yards according to the instructions of the entry plan;

[0010] Step (6). Grouping of voyage export combination boxes;

[0011] Step (7). Yard operation of combined boxes and containers to be assembled during loading;

[0012] Step (8). Horizontal transportation of containers and containers to be assembled at the loading port terminal;

[0013] Step (9). Loading of combined containers;

[0014] Step (10). Transportation of the combined box at sea;

[0015] Step (11). The combined box is unloaded and disassembled at the shipside at the unloading port terminal;

[0016] Step (12). Horizontal transportation of combined boxes or disassembled containers at the unloading port terminal;

[0017] Step (13). The combined containers are disassembled and stacked at the unloading port yard, and the combined containers are stacked, loaded on board, transported by sea, and arrive at the unloading port.

[0018] Specific steps:

[0019] Step (1). The shipping company determines the route for implementing this method and agrees on the maximum weight of the combined container:

[0020] Determine the route to implement this method: The shipping company will consult with the terminal companies at the loading port (including the transit port) and the unloading port to determine the implementation of this method on the route, and exchange and analyze the technical specifications and loading and unloading capacity of the quay cranes and terminal yard equipment at each port, and determine the maximum weight of the combined container and the basic principles of marshaling;

[0021] Maximum weight of combined container: At the loading port’s terminal yard, two natural containers are connected by link locks to form a 1+1 combined transport unit (i.e., combined container). The maximum weight range is 30.5 tons to 60 tons. Typical maximum weights are 30.5 tons, 45 tons, 60 tons, or other weights suitable for the route. The maximum weight of the combined container is determined based on the technical specifications and the common maximum safe lifting load of the shore container cranes (abbreviated as: quay cranes) equipped at the loading and unloading ports (including transshipment ports), and the technical specifications and operating loads of the respective terminal yard equipment and horizontal transport equipment, as well as the operating process technology.

[0022] Marshalling principles: The containers have the same unloading port (including transshipment port), type and length, and the total weight of the containers after loading complies with the provisions of Chapter VI of the "International Convention for the Safety of Life at Sea", that is, the total weight of 20-foot and 40-foot dry cargo containers after loading does not exceed 30.48 tons, and then proceed to the subsequent steps.

[0023] Step (2). The shipping company provides a link lock for the combined container grouping:

[0024] The shipping company promptly provides qualified chain locks for the assembly of combined containers to the loading port terminals of the containers on the route. The chain locks are intermediate twist locks for securing containers on board ships that are improved from the existing technology. The structure mainly consists of a lock core and a lock shell. The two ends of the lock core are conical lock tongues. When the lock core is rotated 90 degrees relative to the lock shell, the conical lock tongues at the two ends of the lock core can generate tensile strength. The lifting load (i.e., pulling force) of each twist lock is 15 to 25 tons. During the transportation and loading and unloading of the combined container, the chain locks are always in a locked state, and then the operation of step (6) is performed.

[0025] Step (3). The shipping company pre-allocates export containers for the voyage and provides a pre-allocation group plan:

[0026] Pre-allocation groups and pre-allocation group plans: After summarizing the weight data of export containers for this voyage, the number of containers of each tonnage is accumulated, and the tonnage is distinguished and coded according to the "four-ton classification" method, following the regulations on the maximum total weight of the combined container and the requirements on the number of weight grades of the combined container. For example, the maximum weight of the combined container is determined to be 45 tons, and the combined container is divided into five heavy container grades and one empty container grade. Containers of different tonnages between different weight tonnages or within the same weight tonnage are selected for pre-allocation groups. After the pre-allocation groups of all containers are completed, the pre-allocation group plan for the export combined container of the voyage is formed; the rationality of the pre-allocation group plan is verified by calculating the stability, structural strength and fore-stern draft difference of the ship after pre-loading.

[0027] Overview of the four-ton classification method: the same type of dry cargo containers with a loaded weight ranging from 3 tons to 30 tons are divided into one tonnage according to four tonnage containers, which are divided into seven tonnage classes: A, B, ..., G. A, B, ... are tonnage numbers, A0 is an empty container, and the containers in each tonnage class are coded, such as D ton class is coded D1, D2, D3, D4, each representing a container of 15 tons to 18 tons. The decimal of the actual weight is rounded off and included in the tonnage code, such as 14.5 tons to 15.4 tons are all counted as code D1 (i.e. 15 tons), and so on. The grade number of the combination box refers to the number of grades of different weights formed after the combination box is grouped.

[0028] Step (4). The terminal yard prepares a yard plan for pre-assembled containers and containers to be assembled:

[0029] The yard plan for pre-allocated modular containers or containers to be assembled includes: the container entry plan, the stacking plan for pre-allocated modular containers or containers to be assembled, and the assembly plan for modular containers;

[0030] Arrival plan: Set the maximum weight of the combined container and the number of grouping levels as described in step (3). When grouping within a tonnage level, one group of two pre-allocated containers (including pre-allocated combined containers or containers to be grouped, the same below) can be stacked on the first and second floors of the row, and the other group of two pre-allocated containers can be stacked on the third and fourth floors; when grouping between different tonnage levels, two of the pre-allocated containers can be stacked on the first and second floors of the two rows, and the other two groups of pre-allocated containers can be stacked on the third and fourth floors of the two rows; therefore, it can be planned that the containers stacked on the first and second floors of each row will enter the export yard, and the containers stacked on the third and fourth floors of the export yard will enter the auxiliary yard, forming a diversion entry plan for containers;

[0031] Stacking plan: According to the characteristics, requirements and capacity principles of ships, containers and ports in the existing technology, combined with the stacking principle of the positions in the aforementioned preparation of the entry plan, and the number of positions required for the pre-allocated combined containers or containers to be assembled at each level, the stacking plan of the pre-allocated combined containers or containers to be assembled at the export yard is prepared; the stacking plan of the export yard is convenient for reasonable and rapid loading and efficient loading operations at the yard; the stacking plan of the auxiliary yard is conducive to the assembly operation, and is convenient for the entry and transfer operations; the containers returned to the yard after customs inspection are transferred to the same ship, the same unloading port, and the same level of positions at the export yard; the transit combined containers are stacked on the same ship, the same unloading port, and the same level of positions at the export yard of the second-leg ship;

[0032] Marshalling plan: pre-assembled combined containers or containers to be assembled enter the yard and are stacked in the same group according to the order of container entry into the port, which plays the role of actual assembly. When marshaling in the yard according to the mode of first marshaling and then stacking, the marshaling can be carried out after confirming the customs clearance. The combined containers assembled in the export yard are stacked in place, and the combined containers assembled in the auxiliary yard are transported to the third and fourth floors of the export yard with the same ship, the same unloading port, and the same ranking according to the instructions of the stacking plan; when synchronous marshaling, the containers to be assembled that are stacked in the export yard after customs clearance are orderly arranged according to the stacking plan, and then the boxes in the auxiliary yard are transferred to the third and fourth floors of the export yard with the same ship, the same unloading port, and the same ranking for stacking.

[0033] Step (5). After the container enters the port, it enters different yards according to the instructions of the entry plan:

[0034] Containers transported by trucks outside the port enter the gate jointly established by the customs and the port. After the port entry inspection using existing technology, the drivers drive into the customs inspection yard, export yard and auxiliary yard respectively according to the instructions of the entry plan displayed at the gate; the containers that enter the customs inspection yard are those that need to be inspected according to the random control instructions of the customs and wait for customs inspection; the remaining containers released by the gate are divided into two parts according to the instructions of the stacking plan, one part enters the export yard and is stacked according to the stacking plan, and the other part enters the auxiliary yard for temporary stacking.

[0035] Step (6). Grouping of voyage export combination boxes: The terminal yard groups the voyage export container pre-allocation grouping plan provided by the shipping company. According to the different technical specifications of the loading and unloading and transportation equipment in the terminal yard, the process mode of first grouping and then stacking or synchronous grouping is selected for grouping;

[0036] Yard marshaling: The marshaling-before-stacking mode is an operation performed under the condition that the cranes and transport vehicles in the export yard and the auxiliary yard can lift and transport the combined boxes. The containers stacked in the export and auxiliary yards that have been confirmed to be released by the customs can be marshaled. The process is: first, a link lock is placed in the lock hole of the top corner piece of the pre-assembled bottom box. After the yard crane lifts the pre-assembled upper box and moves it horizontally above the bottom box, the lock hole of the bottom corner piece of the upper box is aligned with the link lock on the bottom box, and then the upper box is lowered to sit on the link lock. After locking the link lock, the locking safety device is opened, or when using semi-automatic link lock marshaling, the link lock can automatically lock and open the locking safety device when the upper box is seated; the combined boxes marshaled in the export yard are stacked on the spot according to the stacking plan, and the combined boxes marshaled in the auxiliary yard are transferred to the yard box position of the yard for stacking after waiting for the stacking instruction of the export yard, and then the operation of step (7) is performed;

[0037] Orderly stacking and transfer of containers to be assembled: Containers to be assembled for synchronous assembly stacked at the export yard are sorted and ranked according to the stacking plan after customs inspection and release. Containers to be assembled stacked at the auxiliary yard that are released by the customs are transferred to the export yard according to the instructions of the stacking plan;

[0038] Description of the synchronous marshaling method: The first mode of synchronous marshaling is described in step (7) the yard operation of the containers to be marshaled during the loading process, and the second mode of synchronous marshaling is described in step (8) the horizontal transportation of the combined containers.

[0039] Step (7). Yard operation of combined boxes and containers to be assembled during loading:

[0040] Loading of modular boxes: The transport vehicle loaded with modular boxes drives into the lane under the crane of the export yard. The crane lifts the modular boxes stacked on the box position in the yard, lifts them up and moves them horizontally to the top of the transport vehicle. After the locking holes of the bottom corner pieces of the modular boxes are aligned with the positioning cones on the vehicle flatbed, the modular boxes are lowered to sit on the vehicle flatbed, and the stacking cones are positioned in the locking holes. Then, the operation of step (8) is performed.

[0041] Loading and marshaling of containers to be assembled: The first mode of synchronous marshaling is the marshaling performed when the yard crane cannot lift the combined container. The vehicle transporting the combined container stops at the lane under the yard crane. The yard crane first lifts the pre-assembled bottom container and loads it onto the transport vehicle. Then, a link lock is placed in the lock hole of the top corner piece of the bottom container. The crane then lifts the upper container and moves it above the bottom container. Then, the lock hole of the bottom corner piece of the upper container is aligned with the link lock of the bottom container. The upper container is lowered and seated on the link lock of the bottom container. After the link lock is locked, the locking safety device is opened. Alternatively, when a semi-automatic link lock is used for marshaling, the link lock can be automatically locked and the locking safety device is opened after the upper container is seated. Then, the operation of step (8) is performed.

[0042] Loading containers to be assembled: The yard crane lifts the upper box of the containers to be assembled and loads it onto the semi-trailer at the front of the double-hook container truck. The vehicle moves forward a distance of one container and then stops. The crane then lifts the lower box and places it on the semi-trailer at the rear. Then the double-hook container truck loads two containers, or two existing container trucks are used to transport two containers to be assembled, and the containers are driven to the side of the ship and parked side by side under the quay crane, and then the operation of step (8) is entered.

[0043] Step (8). Horizontal transportation of combined boxes and containers to be assembled within the terminal:

[0044] Transport vehicles load combined boxes or containers to be assembled and transport them from the export yard to the ship's side at the dock;

[0045] Vehicles for transporting combined boxes include: a special container truck for combined boxes, which is a special vehicle for use in the port consisting of a tractor and a double trailer with sufficient load capacity; or a conventional container truck for use in the port, which travels at a safe low speed when in use; and a straddle carrier and an automatic guided vehicle that can safely transport combined boxes;

[0046] Combined box transportation: The transport vehicle loads the combined box, including the combined box arranged under the yard crane in step (7), and transports it to the quayside crane at the dock at a safe speed, and then enters the operation of step (9);

[0047] Transportation and marshaling of containers to be assembled: synchronous marshaling The second mode of marshaling is performed when the yard crane and horizontal transport vehicle cannot load, unload and transport the combined container. The double-hook container truck is loaded with the containers to be assembled and drives to the quay crane at the side of the ship. A link lock is manually installed in the lock hole of the top corner piece of the bottom box on the rear trailer. At the same time, the quay crane lifts the upper box on the front trailer and stops after it is raised. The container truck moves forward to the distance of one box space and stops. The quay crane lifts the upper box so that the bottom corner piece of the upper box is aligned with the link lock on the top of the bottom box. The upper box is lowered and seated on the link lock of the bottom box. The locking safety device is opened after the link lock is locked. Alternatively, when using a semi-automatic link lock for marshaling, the link lock is automatically locked and the locking safety device is opened after the upper box is seated. Then the vehicle loads the combined container and enters step (9).

[0048] Alternatively, two container trucks of the prior art are used to transport and marshal the containers to be assembled, one of which has a weight capable of loading the combined container, and is loaded with two containers to be assembled, and driven to the side of the ship under the quay crane and stopped side by side. During the marshalling process, the quay crane lifts the upper container and moves it to the top of the bottom container while the vehicle does not move. The rest of the process is the same as described above, and then the vehicle is loaded with the combined container and enters the operation of step (9).

[0049] Step (9). Shipment of combined boxes:

[0050] The loading is carried out in accordance with the combined container stowage plan reviewed by the chief mate on board and the loading sequence plan prepared by the yard; the quay cranes suitable for combined container loading: quay cranes of different technical specifications and structural types using existing technologies, including: conventionally used ordinary quay cranes, 40-foot quay cranes equipped with retractable spreaders, 40-foot container quay cranes with double spreaders, single-lift double-trolley quay cranes, etc., with a lifting load ranging from 35 tons to 70 tons;

[0051] Loading of modular containers: The quay crane lifts the modular containers loaded on the transport vehicle or continues to lift the modular containers assembled at the side of the ship. After the quay crane is raised, it moves horizontally to the top of the container position specified by the stowage plan on the ship and then descends, so that the fastening twist locks in the lock holes of the bottom corner fittings of the modular containers are aligned with the positioning base on the deck below the container position or the lock holes of the top corner fittings of the container, so that the modular containers are seated in place on the container position (when the modular containers are loaded on the deck of the ship); or (when the modular containers are loaded in the cabin of the ship) the quay crane lifts the modular containers and aligns them with the positioning entrances of the box grid guide columns (container guide rails) on the front and rear side walls of the container position, and descends the modular containers to seat them in place on the bottom of the cabin below the container position or the top of the container, and then performs the operation of step (10).

[0052] Step (10). Transportation of combined boxes at sea:

[0053] Ships suitable for combined containers in marine transportation: small, medium, large or ultra-large marine full container ships with various container capacities, or other types of multi-purpose, open container ships using existing technology;

[0054] Before the ship sails: The chief mate on board reviews the combined container loading plan to ensure good stability of the ship, appropriate draft difference between the bow and stern, and meet the longitudinal and local strength requirements of the ship to avoid container reversal during subsequent port loading and unloading;

[0055] During the voyage: when loading combined boxes or transferring combined boxes, the existing technology or novel piloting technology is used to guide the ship to the unloading port safely; the ship can use the time saved at the terminal to slow down the voyage;

[0056] Before the ship arrives at the port: keep close contact with the shore base and the next port, and inform the arrival time of the ship and the unloading status of the combined container in a timely manner.

[0057] Step (11). Unloading of modular containers at the unloading port and disassembly at the shipside:

[0058] Unloading the modular box at the unloading port: using the existing quay crane, lifting the modular box that has arrived at the port or is in transit at the port from the ship container position, lifting it horizontally to the top of the horizontal transport vehicle of the same type as that described in step (8) waiting at the ship side dock, aligning the lock hole of the bottom corner piece of the modular box with the stacking cone on the vehicle platform, lowering it so that the modular box is seated on the platform of the vehicle, and then performing the operation of step (12);

[0059] Shipside disassembly: The combined containers that need to be disassembled at the shipside are unloaded by the quay crane to the front semi-trailer of the double trailer truck waiting at the dock. Then, the safety device of the link lock is manually closed and the link lock is opened. The quay crane continues to lift the upper container and then removes the link lock. The double trailer truck moves forward a container length and then stops. The quay crane lifts the upper container to the platform of the rear semi-trailer, lowers the upper container to the platform of the semi-trailer, and the double trailer truck loads two containers to perform step (12).

[0060] Alternatively, when two container trucks of the prior art are used to assist in disassembly, the quay crane unloads the combined box onto one of the container trucks that has the weight capacity to load the combined box. After disassembly, the quay crane lifts the upper box onto another container truck. The disassembly process is as described above, and then step (12) is performed.

[0061] Step (12). Horizontal transportation of combined boxes at the unloading port:

[0062] Horizontal transportation of modular boxes: The vehicle loaded with modular boxes is transported from the shipside to the crane at the import yard of the unloading port, and the disassembly and stacking operations of step (13) are carried out;

[0063] Horizontal transportation of transfer boxes: The transfer boxes in this port are transported by vehicles to the crane of the export yard of the second-leg ship and stacked in step (13);

[0064] Transport of disassembled containers at the shipside: The double-trailer container truck mentioned in the preceding paragraph loads the two disassembled containers and transports them to the crane at the import yard of the unloading port, or two container trucks of the prior art transport the disassembled containers at the shipside to the crane at the import yard of the unloading port to perform the stacking operation of step (13).

[0065] Step (13). Disassembly and stacking of combined containers at the unloading port yard, stacking of combined containers at the second-leg ship yard, reloading of the second-leg ship, sea transportation, and arrival at the unloading port:

[0066] Disassembly of modular boxes in the yard: The yard crane lifts the modular boxes loaded on the transport vehicle, raises and moves horizontally to the top of the box position specified in the import stacking plan, descends and seats it in the box position, manually closes the safety device of the link lock, opens the link lock, and the crane lifts the upper box again, removes the link lock, and descends to seat the upper box on the bottom box;

[0067] Stacking of disassembled containers in the yard: When the combined container is seated on the planned container position in the yard, the lower container has completed the stacking operation in the yard. After the combined container is disassembled, the crane will lift the upper container, seat it and complete the stacking on the lower container.

[0068] Stacking of disassembled containers at the shipside: The yard crane lifts two disassembled containers loaded on a double-hook container truck or two container trucks of the prior art for the second time, and successively lifts and unloads them above the container space of the planned designated import yard, and then lowers them to the upper and lower layers of the container space for stacking.

[0069] Stacking of the transit combined box: The crane at the second-hand ship yard lifts the combined box on the vehicle, lifts it up and then moves it to the designated container position at the second-hand ship yard. The yard crane lowers the combined box and places it on the container position for stacking. Then, the second-hand ship yard operation and other steps (7) to (13) that are the same as those of the present method are performed, thereby completing the transit combined box arrival at the final unloading port yard and stacking.

[0070] The economic and social benefits of the invention are:

[0071] The present invention realizes shared economic benefits through the collaborative efforts of container shipping companies, container loading ports, container transshipment ports, and container unloading ports in the marine container transportation industry chain;

[0072] It can significantly improve the container loading and unloading efficiency of ships and shorten their berthing time at the port; it can also significantly improve the container loading and unloading efficiency and berth utilization efficiency of the terminal berth, so that the berth has more time to load and unload containers of other ships, thereby increasing the potential of the port to increase container throughput; extend the service life of terminal loading and unloading and transportation equipment; and effectively save energy consumption;

[0073] The present invention enables enterprises in the maritime container transportation industry chain to jointly reduce production costs, especially energy consumption, and plays a positive role in improving the environment for ports and ships sailing through the ocean. It fully demonstrates the comprehensive influence of this method on an industrial chain and a route. With the extension and expansion of the route, the depth and breadth of the economic and social benefits obtained will be immeasurable. Specific embodiments

[0074] An example of a 10,000 TEU ship: the ship carries 18,800 TEUs in a round trip, calls at 8 ports along the way, has a total voyage of 22,800 nautical miles, and consumes 250 tons of fuel per day; the ratio of 20 / 40-foot containers is calculated as 60% / 40%. During the whole voyage, the quay cranes load and unload a total of 13,429 natural containers (units), with a total of 26,858 lifts, and an average of 1,679 natural containers per port, with 3,358 lifts. The present invention was fully implemented at the terminals of eight ports, and operations were performed according to steps (1) to (13) of the present invention. The shipowner and the terminals of each port agreed that the maximum weight of the combined container was 45 tons, and the grouping principle was based on the provisions of the method. After compiling the pre-grouping plan for each port, the statistical average grouping rate was 95% (except for dangerous goods, refrigerated containers, oversized containers and single containers dropped by the grouping). A total of 6,379 combined containers were grouped, and the remaining 671 natural containers, totaling 7,050 lifting units, were loaded and unloaded 14,100 times, which was reduced by 12,758 times (26,858 times-14,100 times). Using the same number of quay cranes for loading and unloading, the loading and unloading efficiency of ships at the loading port and the unloading port (including the transit port) was improved by 90%; the time required for the ship to open and close the cabin and the container to be tied was about 2 hours, so the utilization rate of the berth was improved by 77.3%, and the efficiency of the horizontal transportation and yard operations of the terminal was simultaneously improved.

[0075] This embodiment is only a preferred embodiment of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made according to the present invention application should still fall within the scope of the patent of the present invention.

Claims

1. A vertical combined transport method for marine containers from a loading port CY, a transshipment port CY to a unloading port CY, characterized by: The enlarged container combined transport unit is used to replace the single natural container transport unit to form a combined box, and the container is grouped and loaded at the loading port CY and the transshipment port CY, and then transported by sea to the unloading port CY and unloading, including the following steps: Step (1) The shipping company determines the route for implementing the method: The shipping company negotiates with the terminal companies at the loading port, the transshipment port, and the unloading port to determine the route for implementing the method, and determines the maximum weight and grouping principle of the combined container; The maximum weight of the combined container is 30.5 tons to 60 tons. At the loading port terminal yard, two natural containers are vertically connected and grouped into a 1+1 combined container using a link lock. The maximum weight range is determined based on the maximum safe lifting load of the quay cranes equipped at the loading and unloading port terminals. The grouping principle of combined containers is to group them based on the same unloading port, same transshipment port, and same length and size of the containers. The total weight of the 20-foot and 40-foot dry cargo containers after loading shall not exceed 30.48 tons. Step (2) The shipping company provides a chain lock for container marshaling: Provide qualified chain locks for combined container marshaling to the loading port terminal of the container on the route, improve the existing intermediate twist locks for securing containers on board, and the structure includes a lock core and a lock shell. The two ends of the lock core are conical lock tongues. When the lock core is rotated 90 degrees relative to the lock shell, the conical lock tongues at the two ends of the lock core can generate tensile strength. The lifting load, that is, the pulling force, of each chain lock is 15 tons to 25 tons. Step (3) The shipping company pre-allocates export containers for the voyage and provides a pre-allocation plan: After summarizing the weight data of the export containers for this voyage, the tonnage classification and numbering are carried out according to the four-ton classification method. After the containers are loaded, the containers from 3 tons to 30 tons are divided into one tonnage according to four tonnages, namely A, B, ······, G, a total of 7 tonnages. The four containers in each tonnage are numbered. The containers of 15, 16, 17, and 18 tons in the D tonnage are numbered D1, D2, D3, and D4, and the rest are numbered by analogy. The containers with a weight tail of 14.5 to 15.4 tons are rounded off and counted as D1, and so on. After accumulating the number of containers of each tonnage, pre-allocation is carried out. Two groups of pre-allocated containers of equal weight in the same tonnage are stacked in one row, and four groups of pre-allocated containers of equal weight in different tonnages but with the same number are stacked in two rows. When all containers are pre-allocated, a voyage export container pre-allocation plan is formed. Step (4) The terminal yard prepares a container yard plan, including: a container entry plan, a container stacking plan, and a container grouping plan; The container entry plan is as follows: according to the container pre-allocation plan in step (3), one group of pre-allocated containers grouped in the same tonnage is stacked on the first and second floors of a row, and another group of pre-allocated containers is stacked on the third and fourth floors of the row; two groups of pre-allocated containers grouped between different tonnages are stacked on the first and second floors of two rows, and the rest are stacked on the third and fourth floors of the two rows. The containers stacked on the first and second floors of each row are brought to the export yard, and the containers planned to be stacked on the third and fourth floors of the export yard are brought to the auxiliary yard, so as to form a container entry plan; The stacking plan of containers is formulated by combining the number of stacking positions required for pre-allocated containers of various tonnage levels and the aforementioned container entry plan. Containers returned from customs inspection are transferred to the export yard and stacked on the same ship, the same unloading port, and the same level of positions; transshipment containers are stacked on the same ship, the same unloading port, and the same level of positions in the transshipment yard; The marshaling plan of containers, pre-allocated containers enter the yard and stack in the same group according to the container entry plan, which plays the role of actual marshaling. When marshaling in the yard according to the marshaling first and then stacking mode, the containers released by the customs can be marshaled. The containers marshaled in the export yard are stacked in place, and the containers marshaled in the auxiliary yard will be transported to the export yard according to the instructions of the stacking plan for stacking on the same ship, the same unloading port, and the same ranking. When marshaling in the synchronous mode, the containers released by the customs and stacked in the export yard are orderly arranged according to the stacking plan, and then the containers in the auxiliary yard are transferred to the export yard for stacking on the third or fourth floor of the same ship, the same unloading port, and the same ranking. Step (5) After entering the port, the containers enter different yards according to the instructions of the entry plan: the containers transported by trucks from outside the port enter the gate, and after the port entry inspection, they enter the customs inspection yard, the export yard and the auxiliary yard respectively according to the instructions of the entry plan described in step (4); the containers entering the customs inspection yard wait for customs inspection, and the remaining containers released by the gate are divided into two parts according to the instructions of the entry plan, one part enters the export yard and is stacked according to the stacking plan, and the other part enters the auxiliary yard for stacking; Step (6) marshaling of voyage export containers: the terminal yard marshaling is carried out according to the voyage export container pre-allocation plan provided by the shipping company, and the marshaling is carried out using the marshaling first and then stacking process mode according to the different loads of the loading and unloading and transportation equipment in the terminal yard; Yard marshaling, marshaling in the marshaling-before-stack mode is an operation carried out under the condition that the cranes and transport vehicles in the export yard and auxiliary yard can lift and transport the combined boxes. The containers stacked in the export yard and auxiliary yard that have been confirmed to be released by the customs can be marshaled. The process is: first, a link lock is placed in the lock hole of the top corner piece of the pre-assembled bottom box, the yard crane lifts the pre-assembled upper box to raise it, and moves it above the bottom box so that the lock hole of the bottom corner piece of the upper box is aligned with the link lock on the bottom box, and the upper box is lowered to sit on the link lock, and the locking safety device is opened after locking the link lock, or when using semi-automatic link lock marshaling, the link lock can be automatically locked when the upper box is seated; the combined boxes marshaled in the export yard are stacked on the spot according to the stacking plan, and the combined boxes marshaled in the auxiliary yard are transferred to the yard box position of the yard for stacking after waiting for the stacking instruction of the export yard; Containers waiting for synchronous marshaling are stacked and transferred in an orderly manner. Containers waiting for synchronous marshaling stacked at the export yard are sorted and ranked according to the stacking plan after customs inspection and release. Containers waiting for marshaling stacked at the auxiliary yard are transferred to the export yard according to the instructions of the stacking plan. Step (7) yard operation of combined boxes and containers to be assembled during loading: The combined box is loaded on the truck. The truck carrying the combined box drives into the lane under the crane of the export yard. The crane lifts the combined box stacked on the box position in the yard, and after lifting, it moves to the top of the transport vehicle. The lock hole of the bottom corner piece of the combined box is aligned with the positioning cone on the flatbed of the vehicle, and the combined box is lowered to sit on the flatbed of the vehicle. The containers to be assembled are loaded and assembled. The first mode of synchronous assembly is the assembly when the yard crane cannot lift the combined box. The vehicle transporting the combined box stops at the lane under the yard crane. The yard crane first lifts the pre-assembled bottom box and loads it on the transport vehicle. Then, a link lock is placed in the lock hole of the top corner piece of the bottom box. The crane then lifts the pre-assembled upper box and raises it and moves it above the bottom box, so that the lock hole of the bottom corner piece of the upper box is aligned with the link lock of the bottom box, and the upper box is lowered to sit on the link lock of the bottom box. After locking the link lock, the locking safety device is opened; or when using a semi-automatic link lock for assembly, the link lock can be automatically locked after the upper box is seated; Step (8) Horizontal transportation of combined boxes and containers to be assembled within the terminal: transport vehicles load combined boxes or containers to be assembled and transport them from the export yard to the ship side of the terminal; Vehicles for transporting combined boxes include: special combined box trucks, which are special in-port trucks consisting of a tractor and a double trailer with sufficient load capacity; in-port trucks, which travel at a safe low speed when in use; straddle carriers and automatic guided vehicles that can safely transport combined boxes; Combined container transportation, where the transport vehicle loads the combined containers, including the combined containers arranged under the yard crane as described in step (7), and transporting them to the quayside crane at the dock at a safe speed; Transport and marshaling of containers to be marshaled, synchronous marshaling The second mode of marshaling is performed when yard cranes and horizontal transport vehicles cannot load, unload and transport combined containers. The double-hook container truck is loaded with containers to be marshaled and drives to the quay crane beside the ship. First, a link lock is placed in the lock hole of the top corner piece of the bottom box on the rear trailer. At the same time, the quay crane lifts the upper box on the front trailer and stops after it is raised. The double-hook container truck moves forward a distance of one box and stops. The quay crane lifts the upper box so that the bottom corner piece of the upper box is aligned with the link lock on the top of the bottom box, and the upper box is lowered to sit on the link lock of the bottom box. After locking the link lock, the locking safety device is opened; or when using semi-automatic lock marshaling, the link lock is automatically locked after the upper box is seated; Alternatively, two container trucks are used, one of which can carry the weight of the combined container, and loaded with two containers to be assembled, and driven to the side of the ship under the quay crane and stopped side by side. The quay crane lifts the upper container to move it above the bottom container, and the truck does not move forward. The rest of the process is the same as the first synchronous assembly mode mentioned above; Step (9) Loading of combined containers: Loading combined containers according to the combined container stowage plan reviewed by the ship's chief mate and the loading sequence plan prepared by the yard; When loading the combined container onto the ship, the quay crane lifts the combined container loaded on the transport vehicle, or continues to lift the combined container of the second synchronous mode marshaling completed at the side of the ship in step (8), and after lifting, moves horizontally to above the ship container position specified by the stowage plan on the ship, and then lowers it; when loading the container on the ship's deck, align the fastening twist lock in the lock hole of the bottom corner piece of the combined container with the lock hole of the deck positioning base below the ship container position or the lock hole of the top corner piece of the container, so that the combined container is seated in place on the ship container position; the quay crane lifts the combined container and aligns it with the container guide rail positioning entrance on the front and rear side walls of the ship container position, and lowers the combined container to the bottom surface of the cabin below the ship container position or the top surface of the container. Step (10) Transportation of the combined container at sea: using small, medium, large or ultra-large marine full container transport ships, multi-purpose container ships, open container ships with different container capacities; Before the ship sails, the chief mate on board reviews the combined box loading plan to ensure the ship's safety and stability, the fore and stern draft difference meets the regulations, and meets the longitudinal and local strength requirements of the ship; During the voyage, the ship can safely transport the loaded combined boxes and the transit combined boxes to the unloading port terminal, and can use the time saved at the terminal to slow down during the voyage; Before the ship arrives at the port, keep in close contact with the shore base and the next port to inform the ship's arrival time and the unloading status of the combined container in a timely manner; Step (11) The combined container is unloaded at the unloading port and disassembled on the shipside: The combined box is unloaded from the ship. The combined box is unloaded at the unloading port using the quay crane corresponding to step (9). The combined box lifted from the ship container position to the unloading port or transferred at the unloading port is raised and horizontally shifted to the top of the horizontal transport vehicle corresponding to step (8) waiting at the ship side wharf. The lock hole of the bottom corner piece of the combined box is aligned with the positioning cone on the vehicle platform. After being lowered, the combined box is seated on the platform of the vehicle. The combined box is disassembled at the shipside, and the combined box to be disassembled at the shipside is lifted by the quay crane and unloaded to the front semi-trailer of the in-port double-trailer truck corresponding to step (8) waiting at the dock. Then, the safety device of the link lock is closed, and the link lock is opened. The quay crane continues to lift the upper box and then removes the link lock after it is raised. The double-trailer truck moves forward a container length and then stops. The quay crane lifts the upper box and aligns it with the platform of the rear semi-trailer, and then lowers the upper box to sit on the platform of the semi-trailer. Or when two container trucks are used to assist in disassembly, the quay crane lifts the combined container and unloads it onto one of the container trucks that has the capacity to load the combined container. After disassembly, the quay crane lifts the upper container and moves it to another container truck; Step (12) Horizontal transportation of combined boxes at the unloading port: Horizontal transportation of combined containers: the vehicle loaded with combined containers is transported from the shipside to the crane under the yard of the unloading port; Horizontal transportation of transshipment combination boxes: the combination boxes transferred at the unloading port are transported by vehicles to the crane under the export yard of the transshipment ship at the unloading port; Horizontal transportation of containers that are disassembled beside the ship, transported by vehicles to the crane at the unloading port yard; Step (13) disassembling and stacking the combined boxes at the unloading port yard, stacking the combined boxes at the transshipment ship yard, loading the transshipment ship, transporting them by sea, and arriving at the unloading port; Disassembly and stacking of combined containers at the unloading port yard: The combined box is disassembled in the yard. The yard crane lifts the combined box loaded on the transport vehicle, raises it and moves it horizontally to the top of the box position specified in the import stacking plan, descends and sits it in the box position, closes the safety device of the link lock, opens the link lock, and the crane lifts the upper box again, removes the link lock, and descends to make the upper box sit on the bottom box; When the combined container is placed on the container position in the yard, the lower container has completed the stacking operation in the yard. After the container is disassembled, the crane will lift the upper container, place it on the lower container and complete the stacking operation on the lower container. For stacking of disassembled containers at the shipside, the yard crane lifts the disassembled containers loaded on the transport vehicle twice, lifts and moves them to the upper and lower levels of the container positions specified in the stacking plan of the unloading port yard for stacking; The stacking of the transshipment combination box: the crane lifts the transshipment combination box on the vehicle, lifts it up and moves it to the container position specified in the transshipment yard stacking plan, and then the crane lowers the combination box and places it on the container position for stacking; The transshipment combination box is transshipped at the unloading port yard, loaded onto the transshipment ship, and transported by sea. After the transshipment combination box arrives at the final unloading port for unloading, disassembly, and stacking.

2. A vertical combined transport method for marine containers from a loading port CY, a transshipment port CY to a unloading port CY as claimed in claim 1, characterized in that: In step (1), the shipping company and the terminal company on the route determine to implement the method and determine the maximum weight and grouping principle of the combined container; the maximum weight range of the combined container is determined to be 30.5 tons to 60 tons; the grouping principle of the combined container is to group the containers according to the principle that the containers have the same unloading port, the same transshipment port, and the same length and size; In step (2), the shipping company provides a link lock for container marshaling, which is an improved container intermediate twist lock for shipboard fastening. The lifting load, i.e., the pulling force, of each link lock is 15 tons to 25 tons. In step (3), the shipping company pre-allocates containers and provides a container pre-allocation plan, summarizes the weight of the export containers for this voyage, classifies and codes them by tonnage according to the four-ton classification method, pre-allocates the export containers for the voyage, and forms a pre-allocation plan; In step (4), the terminal yard prepares a yard plan for the export containers of the voyage, including: a container entry plan, a container stacking plan, and a container grouping plan; The container entry plan, based on the grouping of containers between and within tonnage classes as described in step (3), will enable the containers to enter different yards in an orderly manner; The container stacking plan shall be prepared according to the size of the vessel, the number of containers loaded on board, the load of the existing facilities and equipment at the terminal, and the number of stacking layers designed in the approach plan in the preceding paragraph; Container marshaling plan: The terminal selects the mode of marshaling first and then stacking or simultaneous marshaling according to the existing facilities of the yard.

3. A vertical combined transport method for marine containers from a loading port CY, a transshipment port CY to a unloading port CY as claimed in claim 1, characterized in that: In step (5), after entering the port, the container enters different yards according to the instructions of the entry plan and is stacked according to the stacking plan; In step (6), the containers released by the customs in the yard are marshaled in accordance with the marshaling-first-then-stacked mode, the combined containers marshaled in the export yard are stacked on the spot, and the combined containers marshaled in the auxiliary yard are transferred to the export yard according to the instructions of the stacking plan; In step (7), the yard operation of the combined box and the containers to be assembled during the loading process: Combined container loading: The export yard crane lifts the combined container and loads it onto the transport vehicle; The containers to be assembled are loaded and assembled: The first mode of synchronous assembly is that the yard crane lifts the bottom container and the upper container one after another to load them onto the vehicle and complete the assembly.

4. A vertical combined transport method for marine containers from a loading port CY, a transshipment port CY to a unloading port CY as claimed in claim 1, characterized in that: In step (8), the combined box is transported horizontally in the loading port terminal: the transport vehicle loads the combined box, including the combined box assembled in the first mode of synchronous assembly under the yard crane in step (7), and transports it to the side of the wharf under the ship's quay crane at a safe speed; Transportation and marshaling of containers to be marshaled: The vehicles loaded with containers to be marshaled arrive under the ship's quay crane and complete the marshaling in the second mode of synchronous marshaling before loading; In step (9), the combined boxes are loaded on the ship: the quay crane lifts the combined boxes loaded on the transport vehicle, including the combined boxes assembled on the ship side in step (8), and loads them into the ship container position specified in the loading plan and places them in place.

5. A vertical combined transport method for marine containers from a loading port CY, a transshipment port CY to a unloading port CY as claimed in claim 1, characterized in that: In step (10), the combined box is transported at sea: Before the ship sails: The chief mate on board reviews the combined box loading plan to ensure that the ship's stability, draft difference between bow and stern, and strength meet the regulations; During the voyage: the ship is safely sailing with combined boxes loaded and transferred, and is sailing at a reduced speed; Before the ship arrives at the port: contact the unloading port terminal to inform the ship's arrival time and the unloading status of the combined container.

6. A vertical combined transport method for marine containers from a loading port CY, a transshipment port CY to a unloading port CY as claimed in claim 1, characterized in that: In step (11), the combined box is unloaded at the unloading port and disassembled at the shipside: the quay crane at the unloading port lifts the combined box and the transfer combined box to be unloaded from the ship and places them on the transport vehicle platform waiting at the shipside of the dock; The combined container is disassembled at the shipside of the unloading port: the quay crane at the unloading port lifts the combined container to be disassembled and unloads it onto the port double-hook container truck or two port container trucks waiting at the shipside of the dock, opens the link lock, removes the link lock, and completes the disassembly; In step (12), the combined boxes are transported horizontally at the unloading port: the vehicle loaded with the combined boxes is transported from the shipside to under the crane at the import yard of the unloading port; Horizontal transportation of transshipment combination boxes: vehicles are loaded with combination boxes for transshipment at the unloading port and transported to the crane at the transshipment ship export yard at the unloading port; Horizontal transportation of de-assembled containers beside the ship: A vehicle loads two de-assembled containers beside the ship and transports them to the crane at the import yard of the unloading port.

7. A vertical combined transport method for marine containers from a loading port CY, a transshipment port CY to a unloading port CY as claimed in claim 1, characterized in that: In step (13), the combined boxes are disassembled and stacked at the unloading port yard, and the transshipped combined boxes are stacked at the transshipped ship yard. Then, the transshipped ship yard operation, loading on the transshipped ship, and sea transportation are completed. The transshipped combined boxes arrive at the final unloading port yard for disassembly and stacking. Disassembly of modular boxes at the import yard of the unloading port: The crane at the import yard of the unloading port lifts the modular boxes on the vehicle to the top of the container position specified in the stacking plan, lowers them to the seat and disassembles them; Stacking of disassembled containers at the import yard of the unloading port: The yard crane lifts the upper container that has been disassembled at the yard and places it on the corresponding bottom container for stacking; Stacking of disassembled containers at the shipside: The yard crane lifts the two disassembled containers loaded on the transport vehicle twice and moves them to the upper and lower layers of the import yard container space; Stacking and transfer operations of transshipment combination boxes at the transshipment yard of the unloading port: The transshipment combination boxes are stacked in the transshipment ship yard: the transshipment combination boxes loaded on the vehicle are lifted by the crane at the transshipment ship export yard and moved to the container position at the transshipment ship yard for stacking; Transshipment operation of transshipment combination boxes: The transshipment combination boxes stacked at the transshipment ship yard of the unloading port are loaded onto the transshipment ship by the quay crane of the transshipment port terminal, transported by sea, and the completed transshipment combination boxes arrive at the final unloading port for unloading, disassembly and stacking.

8. A four-ton graded grouping method for vertical combined transportation of marine containers from loading port CY, transshipment port CY to unloading port CY, characterized by: After the shipping company collects the weight data of the export containers of the voyage, it classifies and codes them according to the four-ton classification method. After loading, 20-foot and 40-foot dry cargo containers are divided into four tonnage classes from 3 tons to 30 tons, namely A, B, ..., G, a total of 7 tonnage classes. The four containers in each tonnage class are numbered. The 15, 16, 17, and 18-ton containers in the D tonnage class are numbered D1, D2, D3, and D4, and the rest are numbered by analogy. The containers with a weight of 14.5 to 15.4 tons are rounded off and counted as D1, and so on. After accumulating the number of containers of each tonnage, containers between or within tonnage classes are selected for pre-allocation. Containers of different tonnage classes and the same code are allocated into four groups of pre-allocated containers of equal weight and stacked in two rows. Containers of different tonnages within a tonnage class are allocated into two groups of pre-allocated containers of equal weight and stacked in one row. When the pre-allocation of all containers is completed, the voyage export container pre-allocation plan is formed.