Hydraulic ring geological exploration sampling equipment
By designing an automated drilling water extraction mechanism and sliding mechanism, the problem of low sampling efficiency of multi-layer groundwater in the prior art is solved, and rapid and pollution-free hydrocarbon geological exploration and sampling is achieved, and sampling efficiency is improved.
Patent Information
- Application Number
- CN202411144217.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-20
- Publication Date
- 2024-11-26
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing hydraulic ring geological exploration and sampling equipment is difficult to efficiently sample in a multi-layer groundwater environment, resulting in large time consumption.
A hydraulic ring geological exploration and sampling equipment is designed, using a drilling water extraction mechanism, the drill bit can automatically reach the groundwater layer and take samples. After the sampling is completed, the sample can be taken to the next layer without returning to the ground, and the triowheel drill bit mechanism and bottom are passed. The sliding mechanism of the shell ensures that the sampling holes are staggered, avoids cooling water pollution, and uses motors and water pumps to achieve automated sampling.
It realizes rapid and pollution-free sampling in a multi-layer groundwater environment, reduces time consumption, improves sampling efficiency, and avoids the pollution of the water source by cooling water.
Smart Images

Figure CN119021689A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of water conservancy and environmental geological exploration sampling, in particular to a water conservancy and environmental geological exploration sampling device. Background Art
[0002] Hydrogeological environment, which involves the exploration, development and protection of groundwater resources, as well as environmental issues related to groundwater. Hydrogeological and environmental geological survey sampling equipment is a professional tool used in this field, which helps geologists and engineers collect underground soil, rock and water samples to analyze geological structure, hydrological conditions and environmental conditions.
[0003] The underground waterways are complex, and there are often multiple layers of water in one place. At this time, water samples must be extracted separately and in sequence, which takes a lot of time. Therefore, a device is needed that can save time and sample multiple layers of groundwater at one time. Summary of the invention
[0004] The present invention provides a water conservancy and environmental geological survey sampling device. By using a drilling water sampling mechanism, the drill bit can automatically perform sampling when it reaches the groundwater. After the sampling is completed, the next layer of groundwater can be sampled without returning to the ground.
[0005] The technical solution of the present invention is as follows:
[0006] A water conservancy and environmental geological survey sampling device, comprising: a frame, a drilling water intake mechanism and an extension mechanism, the drilling water intake mechanism comprising a second shell, the top of the second shell is provided with an annular groove, the top of the second shell is symmetrically and vertically provided with a flow groove, the flow groove is connected with the annular groove, the top of the second shell is symmetrically and vertically penetrated with a delivery pipe, the delivery pipe is fixedly connected with the second shell, the top of the delivery pipe is connected with the flow groove, the bottom of the delivery pipe vertically penetrates the bottom of the second shell, the bottom of the second shell is provided with a connecting ring, the bottom of the connecting ring is provided with a bottom shell, the top of the bottom shell A transmission ring is provided, a transmission plate is provided on the top of the transmission ring, a tension spring is provided between the second outer shell and the bottom shell, one end of the tension spring is fixedly connected to the bottom of the second outer shell, and the other end of the tension spring is fixedly connected to the bottom of the inner wall of the bottom shell, a plurality of first water outlet holes are horizontally opened on the surface of the connection ring, and a plurality of second water outlet holes are horizontally opened at positions of the bottom shell corresponding to the first water outlet holes; a through pipe 1 is vertically penetrated at the center of the top of the second outer shell, and the bottom end of the through pipe 1 vertically penetrates the bottom shell, and the through pipe 1 is fixedly connected to both the second outer shell and the bottom shell; a sampling hole 2 is horizontally opened on the inner wall of one side of the through pipe 1;
[0007] Two lifting mechanisms are symmetrically arranged inside the second shell, and the lifting mechanism includes a fixing rod and a transmission rod, the bottom end of the fixing rod vertically penetrates the transmission plate, and the bottom end of the fixing rod is fixedly connected to the bottom of the inner wall of the second shell, the bottom end of the transmission rod is fixedly connected to the transmission plate, the top end of the fixing rod is rotatably connected with a shift block through a pin shaft, one end of the shift block is rotatably connected with a shift piece through a pin shaft, a torsion spring is arranged on the pin shaft, the other end of the shift block is rotatably connected to the top of the transmission rod through a pin shaft, and the bottom of the transmission rod is rotatably connected to the transmission plate through a pin shaft; two sampling bottles are arranged between the two lifting mechanisms, and a plurality of ratchets are arranged on both sides of the sampling bottles close to the lifting mechanism, and the ratchets are meshed with the shift pieces; the top of the sampling bottle is fixedly connected to the bottom of another sampling bottle, and a sampling hole 1 is horizontally opened at a position of the sampling bottle close to the second sampling hole;
[0008] A fixing frame 1 and a fixing frame 2 are arranged on one side of the sampling bottle away from the sampling hole 1, the bottom of the fixing frame 1 and the bottom of the fixing frame 2 are both fixedly connected to the transmission plate, the fixing frame 1 and the fixing frame 2 are fixedly connected, a plurality of fixing blocks are rotatably connected in the fixing frame 1 through a pin shaft, the fixing frame 2 is vertically provided with two slide grooves at the top, and a fixing plate is arranged in one of the slide grooves;
[0009] A connecting mechanism is provided on the top of the second shell, and the connecting mechanism includes a connecting protrusion, and a connecting thread 2 is provided on the surface of the connecting protrusion.
[0010] Preferably, the extension mechanism includes a shell 1, a ring-shaped groove is vertically opened at the bottom of the shell 1, a through hole 1 is symmetrically vertically opened at the bottom of the shell 1, the through hole 1 is connected to the ring-shaped groove, a connecting hole is vertically opened at the bottom of the shell 1, the connecting hole is located between the symmetrically vertically opened through holes 1, a connecting thread 1 is provided on the inner wall of the connecting hole, a connecting mechanism is provided on the top of the extension mechanism, and pumping holes are vertically opened on the shell 1 and the connecting protrusion.
[0011] Preferably, a buoyancy blocking mechanism is provided in the sampling bottle.
[0012] Preferably, the frame includes a top plate and a bottom plate, a lifting platform is arranged between the top plate and the bottom plate, a circular hole is vertically opened on the bottom plate, the drilling water intake mechanism is in the circular hole, the top of the top plate is fixedly connected to motor 2, a threaded rod and a plurality of sliding rods are arranged between the top plate and the bottom plate, a coupling is connected between the threaded rod and the output end of motor 2, the bottom ends of the threaded rod and the plurality of sliding rods both vertically penetrate the lifting platform, the lifting platform is slidably connected to the sliding rod, the threaded rod is threadedly connected to the lifting platform, the bottom end of the sliding rod is fixedly connected to the bottom plate, the bottom end of the threaded rod is rotatably connected to the bottom plate, the top of the lifting platform is fixedly connected to motor 1, a connecting block is arranged at the bottom of the lifting platform, the output end of motor 1 is connected to the connecting block, a water pump is arranged at the top of motor 1, a through pipe 2 is vertically arranged inside the shell 1, and the water pump is connected to through pipe 2.
[0013] Preferably, a connecting hole is vertically opened on the connecting block, a docking ring is fixedly sleeved on the connecting block, an annular groove is formed between the docking ring and the connecting block, and an injection hole is horizontally opened on the side of the docking ring, and the injection hole is communicated with the annular groove.
[0014] Preferably, a three-cone drill bit mechanism and a pressure valve are provided at the bottom of the drilling water extraction mechanism.
[0015] Preferably, a handle one is fixedly connected to the top of the sampling bottle near the top of the outer shell two, and a through hole two is vertically opened on the outer shell two and the protrusion located on the top of the outer shell two, and the through hole two is connected to the internal space of the outer shell two, and a sealing cover is arranged in the through hole two, and a handle two is arranged on the top of the sealing cover.
[0016] Compared with the prior art, the present invention has the following beneficial effects:
[0017] 1. When the three-cone drill bit mechanism of the present invention completely reaches the groundwater layer, the three-cone drill bit mechanism loses the squeeze of the rock or soil layer, the three-cone drill bit mechanism and the bottom shell slide downward due to gravity, the second water outlet follows the bottom shell to slide downward, the first water outlet hole on the surface of the connecting ring and the second water outlet hole on the side of the bottom shell are staggered, the first water outlet hole and the second water outlet hole cannot flow out cooling water to avoid polluting the water source.
[0018] 2. The bottom shell drives the transmission ring on its top surface to move downward, the transmission ring drives the transmission plate on its top to move downward, the transmission plate drives the transmission rod on its top surface to move downward, the transmission rod drives the shifting block to rotate around the fixed rod, and the shifting block drives the shifting piece to move upward, so that the sampling hole 1 opened in the sampling bottle and the sampling hole 2 opened on the surface of the through pipe 1 overlap, thereby sampling the water source. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a three-dimensional schematic diagram of the present invention;
[0020] Figure 2 It is a three-dimensional schematic diagram of another viewing angle of the present invention;
[0021] Figure 3 It is a schematic cross-sectional view of part of the structure of the present invention;
[0022] Figure 4 It is a cross-sectional schematic diagram of another viewing angle of a partial structure of the present invention;
[0023] Figure 5 It is a three-dimensional schematic diagram of the interior of a part of the structure of the present invention.
[0024] In the figure:
[0025] 1. Frame; 2. Extension mechanism; 3. Drilling and water extraction mechanism; 101. Lifting platform; 102. Sliding rod; 103. Bottom plate; 104. Motor 1; 105. Motor 2; 106. Threaded rod; 107. Connecting block; 108. Injection hole; 109. Top plate; 201. Shell 1; 202. Connecting hole; 203. Connecting thread 1; 204. Through hole 1; 205. Through pipe 2; 206. Docking ring; 301. Shell 2; 302. Bottom shell; 303. Through pipe 1; 304. Connecting ring; 305. Tension spring; 306. First water outlet; 307. Second water outlet; 308. Pressure valve; 309 , transmission rod; 310, fixed rod; 311, sampling bottle; 312, ratchet; 313, shift block; 314, shift piece; 315, sampling hole one; 316, handle one; 317, buoyancy blocking mechanism; 318, annular groove; 319, flow groove; 320, connecting thread two; 321, connecting protrusion; 322, delivery pipe; 323, three-cone drill mechanism; 324, fixing frame two; 325, fixing frame one; 326, fixing plate; 327, fixing block; 328, sampling hole two; 329, sealing cover; 330, handle two; 331, through hole two; 332, transmission ring; 333, transmission plate. DETAILED DESCRIPTION
[0026] The following embodiments of the present invention are described in further detail in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0027] like Figure 1-Figure 5As shown, the present invention provides a water conservancy and environmental geological exploration sampling equipment, including: a frame 1, a drilling water intake mechanism 3 and an extension mechanism 2, the drilling water intake mechanism 3 includes a second shell 301, the top of the second shell 301 is provided with an annular groove 318, the top of the second shell 301 is symmetrically and vertically provided with a flow groove 319, the flow groove 319 is connected with the annular groove 318, the top of the second shell 301 is symmetrically and vertically penetrated with a delivery pipe 322, the delivery pipe 322 is fixedly connected to the second shell 301, the top of the delivery pipe 322 is connected with the flow groove 319, the bottom end of the delivery pipe 322 vertically penetrates the bottom of the second shell 301, the bottom of the second shell 301 is provided with a connecting ring 304, the bottom of the connecting ring 304 is provided with a bottom shell 302, and the top of the bottom shell 302 is provided with There is a transmission ring 332, a transmission plate 333 is provided on the top of the transmission ring 332, a tension spring 305 is provided between the second shell 301 and the bottom shell 302, one end of the tension spring 305 is fixedly connected to the bottom of the second shell 301, and the other end of the tension spring 305 is fixedly connected to the bottom of the inner wall of the bottom shell 302, a plurality of first water outlet holes 306 are horizontally opened on the surface of the connecting ring 304, and a plurality of second water outlet holes 307 are horizontally opened at the positions of the bottom shell 302 corresponding to the first water outlet holes 306; a through pipe 1 303 is vertically penetrated at the center of the top of the second shell 301, and the bottom end of the through pipe 1 303 vertically penetrates the bottom shell 302, and the through pipe 1 303 is fixedly connected to both the second shell 301 and the bottom shell 302; a sampling hole 2 328 is horizontally opened on the inner wall of one side of the through pipe 1 303;
[0028] Two lifting mechanisms are symmetrically arranged inside the second shell 301, and the lifting mechanisms include a fixed rod 310 and a transmission rod 309. The bottom end of the fixed rod 310 vertically penetrates the transmission plate 333, and the bottom end of the fixed rod 310 is fixedly connected to the bottom of the inner wall of the second shell 301, and the bottom end of the transmission rod 309 is fixedly connected to the transmission plate 333. The top of the fixed rod 310 is rotatably connected to a shift block 313 through a pin shaft, and one end of the shift block 313 is rotatably connected to a shift piece 314 through a pin shaft. A torsion spring is arranged on the pin shaft, and the shift block The other end of 313 is rotatably connected to the top of the transmission rod 309 through a pin shaft, and the bottom of the transmission rod 309 is rotatably connected to the transmission plate 333 through a pin shaft; two sampling bottles 311 are arranged between the two lifting mechanisms, and a plurality of ratchet teeth 312 are arranged on both sides of the sampling bottle 311 close to the lifting mechanism, and the ratchet teeth 312 are meshed with the paddle 314; the top of the sampling bottle 311 is fixedly connected to the bottom of another sampling bottle 311, and a sampling hole 1 315 is horizontally opened at a position of the sampling bottle 311 close to the sampling hole 2 328;
[0029] A fixing frame 1 325 and a fixing frame 2 324 are arranged on one side of the sampling bottle 311 away from the sampling hole 1 315. The bottom of the fixing frame 1 325 and the bottom of the fixing frame 2 324 are both fixedly connected to the transmission plate 333. The fixing frame 1 325 and the fixing frame 2 324 are fixedly connected. A plurality of fixing blocks 327 are rotatably connected in the fixing frame 1 325 through a pin shaft. The fixing frame 2 324 is vertically provided with two slide grooves at the top, and a fixing plate 326 is arranged in one of the slide grooves.
[0030] A connecting mechanism is disposed on the top of the second housing 301 . The connecting mechanism includes a connecting protrusion 321 . A second connecting thread 320 is disposed on the surface of the connecting protrusion 321 .
[0031] Among them, the extension mechanism 2 includes a shell 201, a ring groove 318 is vertically opened at the bottom of the shell 201, a through hole 204 is symmetrically vertically opened at the bottom of the shell 201, and the through hole 204 is connected to the ring groove 318. A connecting hole 202 is vertically opened at the bottom of the shell 201, and the connecting hole 202 is located between the symmetrically vertically opened through holes 204. A connecting thread 203 is arranged on the inner wall of the connecting hole 202. A connecting mechanism is arranged at the top of the extension mechanism 2, and water pumping holes are vertically opened on the shell 201 and the connecting protrusion 321.
[0032] Wherein, a buoyancy blocking mechanism 317 is provided in the sampling bottle 311 .
[0033] The frame 1 includes a top plate 109 and a bottom plate 103, a lifting platform 101 is arranged between the top plate 109 and the bottom plate 103, a circular hole is vertically opened on the bottom plate 103, the drilling water intake mechanism 3 is in the circular hole, a motor 105 is fixedly connected to the top of the top plate 109, a threaded rod 106 and a plurality of sliding rods 102 are arranged between the top plate 109 and the bottom plate 103, a coupling is connected between the threaded rod 106 and the output end of the motor 105, the bottom ends of the threaded rod 106 and the plurality of sliding rods 102 vertically penetrate the lifting platform 101, and the lifting mechanism 3 is provided with a plurality of sliding rods 102. The lowering platform 101 is slidably connected to the sliding rod 102, the threaded rod 106 is threadedly connected to the lifting platform 101, the bottom end of the sliding rod 102 is fixedly connected to the bottom plate 103, the bottom end of the threaded rod 106 is rotatably connected to the bottom plate 103, the top of the lifting platform 101 is fixedly connected to a motor 104, a connecting block 107 is provided at the bottom of the lifting platform 101, the output end of the motor 104 is connected to the connecting block 107, a water pump is provided on the top of the motor 104, a through pipe 205 is vertically provided inside the shell 1 201, and the water pump is connected to the through pipe 205.
[0034] Among them, a connecting hole 202 is vertically opened on the connecting block 107, a docking ring 206 is fixedly sleeved on the connecting block 107, an annular groove 318 is formed between the docking ring 206 and the connecting block 107, and an injection hole 108 is horizontally opened on the side of the docking ring 206, and the injection hole 108 is communicated with the annular groove 318.
[0035] Wherein, a three-cone drill bit mechanism 323 and a pressure valve 308 are arranged at the bottom of the drilling water extraction mechanism 3 .
[0036] Among them, a handle 1 316 is fixedly connected to the top of the sampling bottle 311 close to the top of the shell 2 301, and a through hole 2 331 is vertically opened on the shell 2 301 and the protrusion located on the top of the shell 2 301, and the through hole 2 331 is connected to the internal space of the shell 2 301. A sealing cover 329 is arranged in the through hole 2 331, and a handle 2 330 is arranged on the top of the sealing cover 329.
[0037] Embodiment 1: First, place the drilling water extraction mechanism 3 at the circular hole of the bottom plate 103, take out the sealing cover 329 from the through hole 331 through the handle 330, place the multiple fixedly connected sampling bottles 311 on the transmission plate 333 through the through hole 331 and between the two paddles 314, take out the fixing plate 326 from a slide groove vertically opened on the top of the fixing frame 324, and insert it into the slide groove on the top of the fixing frame 324 close to the side of the fixing frame 1 325.
[0038] When the fixing plate 326 slides downward along the slide groove close to the side of the fixing frame 325, the fixing plate 326 pushes the fixing block 327 connected to the fixing frame 325 through the pin shaft to rotate, so that the fixing block 327 limits the sampling bottle 311, and then the sealing cover 329 is plugged back into the through hole 2 331.
[0039] Start the second motor 105, so that the second motor 105 drives the threaded rod 106 to rotate. Since the lifting platform 101 is threadedly connected to the threaded rod 106, and the sliding rod 102 limits the lifting platform 101, when the threaded rod 106 rotates, it drives the lifting platform 101 to descend along the threaded rod 106.
[0040] When the lifting platform 101 descends to the same height as the drilling water intake mechanism 3, the second connecting thread 320 located on the connecting protrusion 321 on the top of the second outer shell 301 cooperates with the first connecting thread 203 on the inner wall of the vertically opened connecting hole 202 on the connecting block 107, thereby connecting the second outer shell 301 and the connecting block 107.
[0041] The injection hole 108 is connected to cooling water, and the cooling water flows from the injection hole 108 into the annular groove 318 formed between the docking ring 206 and the connecting block 107. Since the outer shell 301 and the connecting block 107 are connected, the annular groove 318 opened on the top of the outer shell 301 is connected to the annular groove 318 formed between the docking ring 206 and the connecting block 107, so that the cooling water enters the annular groove 318 opened on the top of the outer shell 301. Since the annular groove 318 opened on the top of the outer shell 301 is connected with the flow groove 319 and the delivery pipe 322, the cooling water flows along the flow groove 319 and the delivery pipe 322 to the connecting ring 304.
[0042] When the shell 2 301 and the connecting block 107 are connected, the motor 1 104 and the motor 2 105 are started at the same time. The motor 104 drives the shell 2 301 and the connecting block 107 to rotate, and the motor 2 105 continues to drive the lifting platform 101 to descend, so that the three-cone drill bit mechanism 323 starts to drill holes in the ground to be surveyed.
[0043] During the drilling process of the three-roller drill bit mechanism 323, there is pressure between the three-roller drill bit mechanism 323 and the ground, so that the tension spring 305 is compressed and the bottom shell 302 rises along the connecting ring 304, so that the first water outlet 306 horizontally opened on the connecting ring 304 is connected with the second water outlet 307 horizontally opened on the bottom shell 302, so that cooling water flows out from the first water outlet 306 and the second water outlet 307, thereby cooling the three-roller drill bit mechanism 323 that is drilling.
[0044] It should be noted that the mud and gravel generated by the three-cone drill bit mechanism 323 during drilling are mixed with the cooling water after the three-cone drill bit mechanism 323 is cooled down, and the water pump is started to pump the cooling water mixed with the mud and gravel out from the through pipe 1 303.
[0045] As the bottom shell 302 rises along the connecting ring 304, the bottom shell 302 drives the transmission ring 332 and the transmission plate 333 to rise in the outer shell 301. Since one end of the transmission rod 309 is rotatably connected to the transmission plate 333, and the other end of the transmission rod 309 is connected to the shift block 313 via a pin, and the shift block 313 is connected to the fixed rod 310 via a pin, during the rising process of the transmission plate 333, the transmission rod 309 drives the shift block 313 to rotate with the connection position of the shift block 313 and the fixed rod 310 as the center, and the shift piece 314 rotates with the shift block 313, thereby releasing the meshing state of the shift piece 314 and the ratchet 312 set on the sampling bottle 311.
[0046] When the lifting platform 101 moves to the bottom of the transmission rod 309, the motor 104, the water pump and the motor 2 105 are stopped, the lifting platform 101 stops descending, the extension mechanism 2 stops rotating, the drilling water intake mechanism 3 also stops rotating, the supply of cooling water is stopped, the motor 104 is controlled to reverse, the connection block 107 is disconnected from the top of the extension mechanism 2, the motor 2 105 is controlled to reverse, the motor 2 105 drives the threaded rod 106 to reverse, and the lifting platform 101 rises through the threaded rod 106 through the limit of the slide bar 102, and the extension mechanism 2 is installed between the connection block 107 and the drilling water intake mechanism 3, and the connection thread 2 321 located on the top of the shell 2 301 is connected. 0 cooperates with the connecting thread 1 203 on the inner wall of the connecting hole 202 vertically opened on the bottom of the shell 1 201, so as to connect the shell 2 301 and the shell 1 201, start the motor 2 105, the motor 2 105 drives the threaded rod 106 to rotate, the threaded rod 106 drives the lifting platform 101 to move, the lifting platform 101 is reduced by the restriction of the sliding rod 102, the lifting platform 101 drives the connecting block 107 to descend, and then the connecting thread 2 320 on the connecting protrusion 321 at the top of the shell 1 201 cooperates with the connecting thread 1 203 on the inner wall of the connecting hole 202 vertically opened on the connecting block 107, so as to connect the shell 1 201 and the connecting block 107.
[0047] Cooling water continues to be supplied through the injection hole 108. At this time, the cooling water flows through the injection hole 108 to the annular groove 318 formed between the docking ring 206 and the connecting block 107, flows into the annular groove 318 horizontally opened on the top of the extension mechanism 2, and then flows into the flow groove 319 horizontally opened in the shell 1 201, passes through the through hole 1 204 vertically opened in the shell 1 201, and then flows through the shell 1 201 to the annular groove 318 connected to the bottom of the shell 1 201. At the same time, the motor 104 and the motor 2 105 are started, the motor 104 drives the shell 1 201 and the connecting block 107 to rotate, the shell 1 201 drives the shell 2 301 to rotate, and the motor 2 105 continues to drive the lifting platform 101 to descend, so that the three-tooth roller drill bit mechanism 323 starts to drill holes in the ground to be surveyed.
[0048] It should be noted that: when the lifting platform 101 moves to the bottom end of the threaded rod 106, the above steps are repeated to install the extension mechanism 2, so that the drilling and water extraction mechanism 3 continues to descend, so as to achieve drilling deeper underground.
[0049] When the three-roller drill bit mechanism 323 completely reaches the groundwater layer, the three-roller drill bit mechanism 323 loses the squeeze of the rock or soil layer, the three-roller drill bit mechanism 323 and the bottom shell 302 slide downward due to gravity, the second water outlet hole 307 slides downward with the bottom shell 302, the first water outlet hole 306 on the surface of the connecting ring 304 and the second water outlet hole 307 on the side of the bottom shell 302 are staggered, and the first water outlet hole 306 and the second water outlet hole 307 cannot flow out cooling water.
[0050] When the first water outlet 306 and the second water outlet 307 are staggered, the bottom shell 302 drives the transmission ring 332 on its top surface to move downward, the transmission ring 332 drives the transmission plate 333 on its top to move downward, the transmission plate 333 drives the transmission rod 309 on its top surface to move downward, the transmission rod 309 drives the shift block 313 to rotate around the fixed rod 310, the shift block 313 drives the shift piece 314 to move upward, the bottom of the shift piece 314 and the side connected to the shift block 313 are against each other, the shift piece 314 pushes the ratchet teeth 312 on both sides of the sampling bottle 311, and the sampling bottle 311 moves upward through the ratchet teeth 312, just making the second water outlet 306 and the second water outlet 307 close to the bottom shell 302 The sampling hole 1 315 opened on the sampling bottle 311 at the top and the sampling hole 2 328 opened on the surface of the through pipe 1 303 overlap. When the first water outlet 306 and the second water outlet 307 stop discharging cooling water, when the water pump extracts groundwater, the groundwater can flow into the corresponding sampling bottle 311 through the sampling hole 1 315 and the sampling hole 2 328 when passing through the through pipe 1 303. When the water level in the sampling bottle 311 rises, the buoyancy blocking mechanism 317 floats up through the buoyancy in the groundwater until the buoyancy blocking mechanism 317 is full of water and blocks the sampling hole 1 315 on the surface of the sampling bottle 311, and the groundwater stops entering.
[0051] It should be noted that: by releasing and stretching the tension spring 305, the falling speed of the bottom shell 302 is slowed down. When the first water outlet hole 306 set in the connecting ring 304 and the second water outlet hole 307 set in the bottom shell 302 are staggered, the sampling hole 1 315 and the sampling hole 2 328 gradually overlap. In the process of the gradual overlap of the sampling hole 1 315 and the sampling hole 2 328, the water pump can extract the groundwater mixed with cooling water and sediment. When the sampling hole 1 315 of the sampling bottle 311 and the sampling hole 2 328 of the through pipe 1 303 overlap, the groundwater entering the sampling bottle 311 can reduce the possibility of being contaminated by sediment or cooling water.
[0052] When the sampling bottle 311 near the top of the second shell 301 completes sampling, the motor 1 104 and the motor 2 105 continue to operate. When the three-cone drill bit mechanism 323 hits the rock layer or soil layer again, the second shell 301 applies pressure to the three-cone drill bit mechanism 323, the distance between the bottom shell 302 and the second shell 301 becomes smaller, the cavity between the connecting ring 304 and the bottom shell 302 becomes smaller, and the pressure valve 308 at the bottom of the bottom shell 302 releases part of the cooling water until the first water outlet 306 and the second water outlet 307 coincide with each other. The cooling water can flow out through the first water outlet 306 and the second water outlet 307, and the pressure of the cooling water in the connecting ring 304 and the bottom shell 302 decreases. The valve 308 stops discharging water, the second shell 301 moves downward, and the bottom shell 302 drives the transmission ring 332 and the transmission plate 333 to rise in the second shell 301. Since one end of the transmission rod 309 is rotatably connected to the transmission plate 333, and the other end of the transmission rod 309 is connected to the shift block 313 through a pin shaft, and the shift block 313 is connected to the fixed rod 310 through a pin shaft, during the rising process of the transmission plate 333, the transmission rod 309 drives the shift block 313 to rotate with the connection position of the shift block 313 and the fixed rod 310 as the center of the circle, and the shift piece 314 rotates with the shift block 313, thereby releasing the meshing state of the shift piece 314 and the ratchet 312 set on the sampling bottle 311.
[0053] When the three-cone drill bit mechanism 323 reaches the next groundwater layer again, the above-mentioned water extraction steps are repeated to sample the groundwater.
[0054] When sampling is completed again, the control motor 2 105 is reversed, and the motor 2 105 drives the threaded rod 106 to reverse. The lifting platform 101 is limited by the sliding rod 102, so that it rises along the threaded rod 106. The lifting platform 101 drives the bottom extension mechanism 2 to rise through the connecting block 107. When it rises to the top, the extension mechanism 2 in the round hole is fixed, and the extension mechanism 2 at the top is rotated in the opposite direction of the connecting thread 1 203, so that the connection thread 1 203 and the connecting thread 2 320 at the top of the extension mechanism 2 and the top of the connecting block 107 are disconnected, and the adjacent extension mechanisms 2 are connected through the connecting thread 1 203 and the connecting thread 2 320, so that the top extension mechanism 2 can be removed by rotating the top extension mechanism 2. The extension mechanism 2 controls the motor 2 105 to rotate, and the motor 2 105 drives the threaded rod 106 to rotate. The lifting platform 101 is restricted by the slide bar 102 and driven to move downward by the threaded rod 106. When it moves to the top of the extension mechanism 2 in the round hole, the fixation of the extension mechanism 2 in the round hole is released, and the connecting thread 1 203 of the fixing block 327 is connected with the connecting thread 2 320 at the top of the shell 1 201 of the extension mechanism 2 in the round hole. This is repeated until the drilling water intake mechanism 3 reaches the top, and the drilling water intake mechanism 3 is disassembled, and the handle 2 330 fixedly connected to the top of the sealing cover 329 is pulled to open the sealing cover 329, and then the sampling bottle 311 is taken out through the handle 1 316 to complete the sampling.
[0055] The embodiments of the present invention are provided for the purpose of illustration and description. Although the embodiments of the present invention have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations of the present invention. Ordinary technicians in this field can change, modify, replace and modify the above embodiments within the scope of the present invention.
Claims
1. A water conservancy and environmental geological survey sampling device, comprising: A frame (1), a drilling water intake mechanism (3) and an extension mechanism (2), characterized in that: the drilling water intake mechanism (3) comprises a second shell (301), the top of the second shell (301) is provided with an annular groove (318), the top of the second shell (301) is symmetrically and vertically provided with a flow groove (319), the flow groove (319) is connected with the annular groove (318), the top of the second shell (301) is symmetrically and vertically penetrated with a delivery pipe (322), the delivery pipe (322) is fixedly connected with the second shell (301), the top end of the delivery pipe (322) is connected with the flow groove (319), the bottom end of the delivery pipe (322) vertically penetrates the bottom of the second shell (301), the bottom of the second shell (301) is provided with a connecting ring (304), the bottom of the connecting ring (304) is provided with a bottom shell (302), the top of the bottom shell (302) is provided with a transmission ring (332), A transmission plate (333) is provided on the top of the transmission ring (332), a tension spring (305) is provided between the second shell (301) and the bottom shell (302), one end of the tension spring (305) is fixedly connected to the bottom of the second shell (301), and the other end of the tension spring (305) is fixedly connected to the bottom of the inner wall of the bottom shell (302), a plurality of first water outlet holes (306) are horizontally opened on the surface of the connection ring (304), and the bottom shell (302) corresponds to A plurality of second water outlet holes (307) are horizontally provided at the position of the first water outlet hole (306); a through pipe (303) is vertically provided at the center of the top of the second shell (301); the bottom end of the through pipe (303) vertically penetrates the bottom shell (302); the through pipe (303) is fixedly connected to the second shell (301) and the bottom shell (302); a sampling hole (328) is horizontally provided on the inner wall of one side of the through pipe (303); Two lifting mechanisms are symmetrically arranged inside the second shell (301), and the lifting mechanisms include a fixed rod (310) and a transmission rod (309). The bottom end of the fixed rod (310) vertically penetrates the transmission plate (333), and the bottom end of the fixed rod (310) is fixedly connected to the bottom of the inner wall of the second shell (301). The bottom end of the transmission rod (309) is fixedly connected to the transmission plate (333). The top end of the fixed rod (310) is rotatably connected to a shifting block (313) through a pin shaft, and one end of the shifting block (313) is rotatably connected to a shifting piece (314) through a pin shaft. A torsion spring is arranged on the pin shaft. The other end of the lifting mechanism (313) is rotatably connected to the top of the transmission rod (309) through a pin shaft, and the bottom of the transmission rod (309) is rotatably connected to the transmission plate (333) through a pin shaft; two sampling bottles (311) are arranged between the two lifting mechanisms, and a plurality of ratchets (312) are arranged on both sides of the sampling bottle (311) close to the lifting mechanism, and the ratchets (312) are meshed with the paddle (314); the top of the sampling bottle (311) is fixedly connected to the bottom of another sampling bottle (311), and a sampling hole 1 (315) is horizontally opened at a position of the sampling bottle (311) close to the sampling hole 2 (328); A fixing frame 1 (325) and a fixing frame 2 (324) are provided on one side of the sampling bottle (311) away from the sampling hole 1 (315); the bottom of the fixing frame 1 (325) and the bottom of the fixing frame 2 (324) are both fixedly connected to the transmission plate (333); the fixing frame 1 (325) and the fixing frame 2 (324) are fixedly connected; a plurality of fixing blocks (327) are rotatably connected in the fixing frame 1 (325) via a pin shaft; the fixing frame 2 (324) is vertically provided with two slide grooves at the top, and a fixing plate (326) is provided in one of the slide grooves. A connecting mechanism is provided on the top of the second shell (301), and the connecting mechanism comprises a connecting protrusion (321), and a connecting thread 2 (320) is provided on the surface of the connecting protrusion (321).
2. The water conservancy and environmental geological survey sampling equipment according to claim 1, characterized in that: The extension mechanism (2) comprises a shell (201), an annular groove (318) is vertically opened at the bottom of the shell (201), a through hole (204) is symmetrically vertically opened at the bottom of the shell (201), the through hole (204) is connected to the annular groove (318), a connecting hole (202) is vertically opened at the bottom of the shell (201), the connecting hole (202) is located between the symmetrically vertically opened through holes (204), a connecting thread (203) is arranged on the inner wall of the connecting hole (202), a connecting mechanism is arranged at the top of the extension mechanism (2), and a water pumping hole is vertically opened on the shell (201) and the connecting protrusion (321).
3. The water conservancy and environmental geological survey sampling equipment according to claim 1, characterized in that: The sampling bottle (311) is provided with a buoyancy blocking mechanism (317).
4. The water conservancy and environmental geological survey sampling equipment according to claim 1, characterized in that: The frame (1) comprises a top plate (109) and a bottom plate (103), a lifting platform (101) is arranged between the top plate (109) and the bottom plate (103), a circular hole is vertically opened on the bottom plate (103), the drilling water intake mechanism (3) is in the circular hole, the top of the top plate (109) is fixedly connected to the second motor (105), a threaded rod (106) and a plurality of sliding rods (102) are arranged between the top plate (109) and the bottom plate (103), a coupling is connected between the threaded rod (106) and the output end of the second motor (105), the bottom ends of the threaded rod (106) and the plurality of sliding rods (102) vertically penetrate the lifting platform (101), and the lifting platform (101) is provided with a plurality of sliding rods (102). The lowering platform (101) is slidably connected to the sliding rod (102), the threaded rod (106) is threadedly connected to the lifting platform (101), the bottom end of the sliding rod (102) is fixedly connected to the bottom plate (103), the bottom end of the threaded rod (106) is rotatably connected to the bottom plate (103), the top of the lifting platform (101) is fixedly connected to a motor 1 (104), a connecting block (107) is provided at the bottom of the lifting platform (101), the output end of the motor 1 (104) is connected to the connecting block (107), a water pump is provided at the top of the motor 1 (104), and a through pipe 2 (205) is vertically provided inside the housing 1 (201), and the water pump is connected to the through pipe 2 (205).
5. The water conservancy and environmental geological survey sampling equipment as claimed in claim 4, characterized in that: A connecting hole (202) is vertically provided on the connecting block (107), a docking ring (206) is fixedly sleeved on the connecting block (107), an annular groove (318) is formed between the docking ring (206) and the connecting block (107), and a liquid injection hole (108) is horizontally provided on the side surface of the docking ring (206), and the liquid injection hole (108) is communicated with the annular groove (318).
6. The water conservancy and environmental geological survey sampling equipment according to claim 1, characterized in that: A three-cone drill bit mechanism (323) and a pressure valve (308) are provided at the bottom of the drilling water extraction mechanism (3).
7. The water conservancy and environmental geological survey sampling equipment according to claim 1, characterized in that: A handle one (316) is fixedly connected to the top of the sampling bottle (311) near the top of the second shell (301), and a through hole two (331) is vertically opened on the second shell (301) and the protrusion located on the top of the second shell (301), and the through hole two (331) is connected to the internal space of the second shell (301), and a sealing cover (329) is arranged in the second through hole (331), and a handle two (330) is arranged on the top of the sealing cover (329).
Citation Information
Cited By
PDC (Polycrystalline Diamond Compact) bit adaptable to geology
CN120312112A
A PDC drill bit adaptable to geology
CN120312112B
Geological exploration drilling method for architectural design
CN120592621A
