Automatic assembly method for gas meter movement
Through automated assembly methods and production management systems, the labor intensity and environmental problems caused by manual operations in gas meter movement assembly are solved, product consistency and accuracy are improved, inventory pressure and human losses are reduced, and efficient and rapid production is achieved. production process.
Patent Information
- Application Number
- CN201711144276.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2017-11-17
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2037-11-17
AI Technical Summary
The gas meter movement assembly production line relies on manual operation, which results in high labor intensity, poor working environment, unbearable odor, high temperature, difficulty in ensuring product consistency and accuracy, and the loss of equipment and material accumulation pressure caused by human operation.
Automated assembly methods are adopted, including rocker arm folding plate assembly, constant temperature curing warehouse and negative pressure air extraction measurement tie rod steps. Precise assembly of parts is carried out through visual inspection and robot assistance. Production management is carried out in combination with ERP and MES systems to ensure the automation of the production line. and efficiency.
It has shortened the production cycle, reduced inventory pressure, improved product consistency and accuracy, reduced the loss of equipment and material accumulation pressure caused by manual operations, and improved assembly efficiency and quality.
Smart Images

Figure CN107894261B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of gas meter movement assembly, and in particular to an automatic assembly method for a gas meter movement. Background Art
[0002] The diaphragm gas meter is a mechanical instrument. The driving force of the diaphragm movement depends on the gas pressure difference at the inlet and outlet of the gas meter. Its source power is the pressure generated by the measured gas above normal pressure entering the cavity on one side of the diaphragm, which pushes the diaphragm to move to the other side and generates a driving force (that is, the torque of the vertical axis driven by the diaphragm to rotate in place). When the diaphragm moves to the limit (also called the dead point) on the other side, the torque no longer generates the force to make the diaphragm return, and the second diaphragm must generate the same force to drive the previous diaphragm to move back; when the outlet of the first diaphragm is changed to the inlet, the other side of the diaphragm has the driving force of the gas and continues to move back and forth, and can also change the movement direction of the second diaphragm. The vertical shaft driven by the diaphragm makes a reciprocating swinging motion, and drives a common crankshaft through its swing rod and connecting rod. When the torque received by the crankshaft differs by a certain period (90°), it can rotate continuously, and it drives the slide valve to change the direction of the inlet and outlet and drive the counting device to achieve the purpose of continuous automatic metering. There are many types of diaphragm gas meters due to different structures, but their metering principles are basically the same, and they are also designed and manufactured according to the above basic principles. It allows the gas to enter a metering chamber with a constant volume, and discharge it after it is full. Through a certain special mechanism, the number of cycles of inflation and exhaust is converted into a volume unit (usually m3), which is transmitted to the external indicating device of the gas meter to directly read the volume of the gas passed. Since it is difficult to discharge the gas from the inside of a metering chamber, two or more metering chambers are generally provided for alternating inflation and exhaust. Since the filling and exhaust of a single metering chamber is discontinuous and cannot make the gas meter rotate, the diaphragm gas meter generally has four metering chambers. It uses the pressure difference of the gas at the inlet and outlet of the gas meter as the driving force to push the diaphragm clamping disc assembly between the two adjacent metering chambers to make linear motion, and through a specially designed connecting rod mechanism, the valve cover is regularly opened and closed alternately, and the crank is made to make a circular motion, so that the gas meter can achieve the purpose of continuous gas supply and metering.
[0003] Gas meter movement assembly production lines are mostly manually operated, with high labor intensity, large labor volume, and poor working environment. Manual orders are placed, product cycles are long, materials and products are piled up, and inventory and raw material pressures are increased.
[0004] The information disclosed in this background technology section is only intended to enhance the understanding of the overall background of the invention and should not be regarded as an acknowledgment or any form of suggestion that the information constitutes the prior art already known to a person skilled in the art. Summary of the invention
[0005] The purpose of the present invention is to provide an automated assembly method for a gas meter movement with simple and reasonable steps, which solves the problems faced by employees of high labor intensity, poor working environment, unbearable odor and high temperature; and improves the consistency of the assembled gas meter product and the accuracy of the gas meter.
[0006] To achieve the above-mentioned purpose, the present invention provides an automated assembly method for a gas meter movement, which includes the following steps: first, a rocker arm folding plate assembly process; the process includes a rocker arm folding plate angle detection step, and the rocker arm folding plate angle detection step is to measure the angle between the rocker arm and the folding plate by visual photography, and then detect the press-fitting of the rocker arm and the folding plate; secondly, an assembly process for parts on both sides of the body; the process includes: sending to a constant temperature curing warehouse for curing and a negative pressure exhaust measurement pull rod step, and the negative pressure exhaust measurement pull rod step is to measure the length of the pull rod by visual photography of the middle position of the rocker arm and the crank gear, and select a pull rod of appropriate length for assembly.
[0007] Preferably, in the above technical solution, the buffer capacity of the constant temperature curing warehouse is 1.5-2 hours.
[0008] Preferably, in the above technical solution, the negative pressure exhaust measurement rod step requires connecting the gas meter's gas outlet pipeline to the negative pressure pipeline, and performing negative pressure exhaust on the gas meter movement to ensure that the membrane is in a contracted state and the rocker arm is in a closed position.
[0009] Compared with the prior art, the present invention has the following beneficial effects: the automatic assembly method of the gas meter movement solves the problems of high labor intensity, poor working environment, unbearable odor and high temperature faced by employees; improves the consistency of the gas meter after assembly and the accuracy of the gas meter; solves the damage and artificial loss of the products processed by the equipment caused by human operation during the production process. Reduces the accumulation of raw materials and the pressure of finished parts accumulation in the warehouse. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] Figure 1 It is a schematic diagram of a top view of the structure of a positioning tool for the automated assembly method of a gas meter movement of the present invention.
[0011] Figure 2 It is a schematic diagram of the main structure of the positioning tooling of the automatic assembly method of the gas meter movement of the present invention.
[0012] Figure 3 It is a schematic diagram of the bottom-up structure of the positioning tooling of the automatic assembly method of the gas meter movement of the present invention. DETAILED DESCRIPTION
[0013] The specific implementation modes of the present invention are described in detail below in conjunction with the accompanying drawings, but it should be understood that the protection scope of the present invention is not limited by the specific implementation modes.
[0014] Unless explicitly stated otherwise, throughout the specification and claims, the term “comprise” or variations such as “include” or “comprising”, etc., will be understood to include the stated elements or components but not to exclude other elements or components.
[0015] The automatic assembly method of the gas meter movement according to the specific embodiment of the present invention can overcome the shortcomings of the prior art, provide a method that can realize the production of gas meters according to orders, with a short production cycle, low inventory pressure, high assembly efficiency, fast product changeover, high product consistency, and guaranteed assembly quality. Under the joint action of the ERP system and the MES system, the automatic assembly method of the gas meter movement guides the injection molding equipment and the movement automatic production line to automatically produce the movement components, and completes the assembly from raw materials to the finished movement.
[0016] Among them, ERP system:
[0017] 1. Production plan
[0018] It arranges the types and quantities of products to be provided in future cycles based on the input of production plans, forecasts and customer orders. It converts production plans into product plans, and after balancing the needs of materials and capacity, it accurately provides a detailed schedule of time and quantity. It is the arrangement of the company's overall activities over a period of time. It is a stable plan generated by production plans, actual orders and forecasts obtained from historical sales analysis.
[0019] 2. Material Requirements Planning
[0020] After the master production plan determines how many final products to produce, the number of products to be produced by the entire enterprise is converted into the number of parts required for production according to the bill of materials, and compared with the existing inventory, the final number of how much to purchase, how much to produce, and how much to process can be obtained. This is the plan that the entire department actually follows.
[0021] 3. Capacity Requirements Planning
[0022] After the preliminary material requirement plan is drawn up, the total workload of all work centers is balanced with the capacity of the work centers to generate a detailed work plan to determine whether the generated material requirement plan is a feasible demand plan for the enterprise's production capacity. Capacity requirement planning is a short-term, currently practical plan.
[0023] 4. Workshop control
[0024] This is a dynamic work plan that changes over time. It sorts the jobs, allocates them to specific workshops, manages them, and monitors them.
[0025] 5. Manufacturing standards
[0026] A lot of basic production information is needed in planning. This basic information is the manufacturing standards, including parts, product structure, processes and work centers, all of which are identified in the computer with unique codes.
[0027] Movement orders are initiated from the ERP system (e.g. Figure 1 As shown in the figure, the ERP system automatically calculates the start time of the order based on the order demand date, order quantity, production line efficiency and on-site production status; based on the ERP's management of the order, the MES system starts the equipment in a timely manner to produce the movement.
[0028] MES system: MES is positioned as an execution layer between the planning layer and the field automation system, and is mainly responsible for workshop production management and scheduling execution. A well-designed MES system can integrate management functions such as production scheduling, product tracking, quality control, equipment failure analysis, network reports, etc. on a unified platform. It can provide workshop management information services for production departments, quality inspection departments, process departments, logistics departments, etc. at the same time by using a unified database and network connection. The system helps enterprises implement complete closed-loop production by emphasizing the overall optimization of the manufacturing process, and assists enterprises in establishing an integrated and real-time ERP / MES / SFC information system.
[0029] Injection molding production line: Because the main raw materials of the movement production line are made of injection molding products, and because the injection molding parts need to be processed under constant temperature and humidity conditions, the injection molding workshop must be operated under constant temperature and humidity conditions to ensure the consistency of the injection molding products. Due to the characteristics of the injection molding products themselves, there may be burrs and material handles during the demoulding process of the injection molding parts. (such as Figure 2 (as shown) Injection workshop process MES system starts - injection molding machine injection molding products - online size detection - qualified product coding - automatic unloading and stacking - material personnel turnover to the movement production line
[0030] This process can ensure that the product can be used and injected at any time. 1. Reduce the inventory pressure of raw materials and finished injection molded parts. 2. Online size detection: Use a 5-megapixel industrial camera to take pictures of the appearance of the injection molded product, and compare the actual photographed size with the drawing size by writing a program. If the size tolerance of the injection molded product meets the drawing size, it is a qualified product. Otherwise, it is unqualified. (The machine vision inspection system uses a CCD camera to convert the detected target into an image signal, which is transmitted to a dedicated image processing system. According to the pixel distribution, brightness, color and other information, it is converted into a digital signal. The image processing system performs various operations on these signals to extract the characteristics of the target, such as area, quantity, position, length, and then outputs the results according to the preset tolerance and other conditions, including size, angle, number, qualified / unqualified, presence / absence, etc., to achieve automatic recognition function.)
[0031] The specific steps of the automatic assembly method of the gas meter movement include:
[0032] First, the rocker arm folding plate assembly process includes:
[0033] Step00: Manual loading of the cavity
[0034] Materials are taken manually from the material turnover basket and placed on the chain plate line. The chain plate line can cache 30 metering shells. The purpose is to relieve the work fatigue of personnel, and personnel do not have to work in rhythm.
[0035] Step 01: Vertical shaft cup installation
[0036] The vertical shaft leather cup is loaded by a vibration plate, and the vertical shaft leather cup is vibrated out by the vibration plate. After the two vertical shaft leather cups are vibrated out, the dislocation mechanism separates the vertical shaft leather cups. The vertical shaft leather cup is picked up by the three-axis servo module and accurately installed in the metering housing.
[0037] Step 02: Spray oil and install the vertical shaft sleeve
[0038] The oil sprayer sprays oil on the vertical shaft leather cup, and the vibration plate vibrates the vertical shaft sleeve out. The two vertical shaft sleeves vibrated out are separated by the dislocation mechanism. The vertical shaft sleeve is picked up by the three-axis servo module and accurately installed in the metering housing. The servo performs a slight downward pressure action, pressing down to 1 / 3 of the depth of the vertical shaft leather cup.
[0039] Step 03: Installation of left and right folding plates
[0040] The left and right folding plates are loaded through a vibrating plate, which vibrates out one folding plate at a time. An ABB Yumi dual-arm robot is set up in this process. The purpose of setting up a dual-arm robot is to ensure the consistency of the assembled products. After installation, the folding plate is pushed to the center surface of the body to ensure that the folding plate will not fall off during the process of the metering shell being transferred to the next station.
[0041] Step 04: Assembly of rocker arm vertical shaft assembly
[0042] The rocker arm vertical shaft assembly is placed on the turnover pallet in the injection molding workshop, and is picked up by the ABB six-axis robot and inserted into the metering shell and into the folding plate. At the same time, the robot is used to ensure the angle between the folding plate and the rocker arm and complete the pre-pressure to ensure the angle between the rocker arm and the folding plate, thereby completing the assembly of the rocker arm vertical shaft assembly.
[0043] Step 05: Press-fitting the vertical shaft sleeve
[0044] The vertical shaft sleeve is pressed by a pressing head driven by a cylinder.
[0045] Step 06: Press-fit the rocker arm shaft
[0046] The folding plate is padded by the mechanical structure, and the left and right folding plates are brought close to the metering center. The rocker arm folding plate assembly is press-fitted by the press-fitting head driven by the cylinder.
[0047] Step06': Rocker arm folding plate angle detection
[0048] Adding a rocker arm folding plate angle detection process (manual craft does not have this process) can improve product consistency and ensure product accuracy. That is, the angle between the rocker arm and the folding plate is measured by visual photography, and then the press-fitting of the rocker arm and the folding plate is detected.
[0049] During the gas meter assembly process, ensuring the angle between the rocker arm and the folding plate is a prerequisite for ensuring the metering accuracy of the gas meter. The angle between the rocker arm and the folding plate is measured by visual photography to determine whether the rocker arm angle is 38 degrees and 18 minutes. A positive or negative deviation of 0.5 degrees is considered qualified. The rocker arm and the folding plate angle detection here can be used to detect the press-fitting of the rocker arm and the folding plate. Products whose angles cannot be guaranteed after press-fitting are judged as unqualified products, reducing repeated assembly caused by unqualified products. At the same time, the angles between the rocker arm and the folding plate are counted and data analysis is performed to provide data analysis for adjusting the equipment.
[0050] Step 07: Valve shaft assembly
[0051] The valve shaft is loaded by the vibration plate, and the three-axis servo module takes the material and installs the valve shaft into the metering housing, completing the press fitting.
[0052] Secondly, the assembly process of the parts on both sides of the body includes:
[0053] Step 08: Install the sealing ring on the A side (manually). If the product structure does not require a sealing ring, this process can be omitted.
[0054] Due to the limitations of the sealing ring material and shape, if the automated assembly is realized, the cost and recovery period are disproportionate. The implementation is difficult and the economic efficiency is poor.
[0055] Transfer workstation (This transfer workstation is to connect the previous product to the A side assembly, and then from the A side to the B side rubber ring manual assembly line, these three places are carried out)
[0056] The metering shell with the rubber ring is transferred to the A side installation ring line by the robot of the transfer workstation, and the assembled products on the A side are placed on the manual assembly line on the B side.
[0057] Diaphragm assembly machine: The diaphragm assembly machine consists of a six-station turntable workbench. In process one, the diaphragm clamp is loaded from the vibration disk, and then picked up by the three-axis servo module into the six-station turntable tooling. In process two, the diaphragm is loaded from the diaphragm loading transmission line, and the diaphragm is picked up by the copying suction cup and installed on the two-point positioning columns of the diaphragm clamp. In process three, the parallel plate is loaded from the vibration disk, and is sucked and installed by the combination of the three-axis servo module and the suction cup.
[0058] Step 09: Assemble the A-side diaphragm assembly
[0059] The diaphragm assembly robot assembles the diaphragm assemblies on both sides of the A side and the B side respectively.
[0060] Step 10: Assemble the A-side diaphragm pressure plate
[0061] The diaphragm pressing plate is fed through the feeding channel, and the diaphragm pressing plate is made to slide down by the counterweight, and then the robot completes the actions from picking to assembly.
[0062] Step 11: Ultrasonic welding of side A (diaphragm)
[0063] In this station, an ultrasonic welder is used to weld the 12-point (or 10-point) columns of the metering housing flat, fix the diaphragm assembly on the metering housing, and achieve sealing.
[0064] Step 12: Glue the side cover A
[0065] The glue coating machine applies glue along the specified track in the glue groove of the side cover
[0066] Step 13: Install the metering chamber cover on the A side
[0067] The metering chamber cover is loaded from the material channel, and the side cover slides down with the help of the counterweight, and then the robot completes the actions from picking up to assembling.
[0068] Step 14: Insert A rivet (according to the structure of the gas meter, if the movement has no rivets, this step can be omitted)
[0069] The rivets are vibrated out by the vibrating plate and then fed into the four rivet holes of the body by a rivet feeding device (DEPRAG brand or other brands).
[0070] Step 15: Rivet connection on side A
[0071] This process presses the product after the rivet is inserted in the previous process.
[0072] Step 10-step 15 The main body is assembled on one side on a circular line. After assembly, the transfer robot will flip it over and transfer it to assemble the other side.
[0073] Step 16: Put the rubber ring on the sealing ring on the B side
[0074] B side sealing ring installation (manual) If the product structure does not require a sealing ring, this process can be omitted.
[0075] Due to the limitations of the sealing ring material and shape, if the automated assembly is realized, the cost and recovery period are disproportionate. The implementation is difficult and the economic efficiency is poor.
[0076] Step 17: B cavity sleeve diaphragm
[0077] The diaphragm assembly robot assembles the diaphragm assemblies on both sides of the A side and the B side (sharing the same robot with step 9 process)
[0078] Step 18: Assembly of the B-side diaphragm pressure plate (same as step 10)
[0079] The B-side diaphragm pressing plate is fed through the feeding channel, and the diaphragm pressing plate is made to slide down by the counterweight, and then the robot completes the actions from picking to assembly.
[0080] Step 19: B ultrasonic welding (diaphragm) (same as step 11)
[0081] In this station, an ultrasonic welder is used to weld the 12-point (or 10-point) columns of the metering housing flat and fix the diaphragm assembly on the metering housing.
[0082] Step 20: Apply glue to side cover B (same as Step 12)
[0083] The glue coating machine applies glue along the specified route in the glue groove of the side cover
[0084] Step 21: Install the metering chamber cover on the B side (same as step 13)
[0085] The metering chamber cover is loaded from the material channel, and the side cover slides down with the help of the counterweight, and then the robot completes the actions from picking up to assembling.
[0086] Step 22: Install the metering chamber cover on the B side (same as step 14)
[0087] Step 23: Insert B rivet (according to the structure of the gas meter, if the movement has no rivets, this process can be omitted) (same as step 15)
[0088] The rivets are vibrated out by the vibrating plate and then fed into the four rivet holes of the body by a rivet feeding device (DEPRAG brand or other brands).
[0089] Step 24: Rivet on side A (same as step 15)
[0090] This process presses the product after the rivet is inserted in the previous process.
[0091] Step 25: Inner and outer cavity sealing test
[0092] Two sealing test devices are placed at a 90-degree angle. The robot grabs the unqualified products placed on the two sealing test devices and places them on the NG line. The qualified products are placed on the subsequent transmission line.
[0093] Step 26: Apply glue to the valve grid
[0094] Since the length of the valve grid glue path is relatively long, one glue coating machine cannot meet the requirements at a cycle of 7s / piece. Therefore, the glue path is divided into two parts and two glue coating machines are used to coat the valve grid with glue.
[0095] Step 27: Valve grid installation
[0096] The valve grid is loaded from the material channel, and the robot is used to pick up the material and install the valve grid on the body, and the downward pressing action is performed to ensure the flatness of the rubber surface.
[0097] Step 28: Valve cover installation
[0098] The valve cover is loaded by the vibrating plate, and then the three-axis robot takes the material and places it on the metering shell body.
[0099] Step 29: Apply glue to the valve gate outlet
[0100] Use a glue coating machine to apply glue to the glue path at the air outlet of the valve grid surface.
[0101] Step 30: Install the exhaust pipe
[0102] The air outlet pipe is fed by a vibrating plate and then mounted on the metering housing through a three-axis servo mechanism.
[0103] Step 31: Fasten the valve gate outlet
[0104] The screws are fed by a vibrating plate and then tightened simultaneously by the DEPRAG automatic tightening machine.
[0105] Step 31': Send to constant temperature curing warehouse for curing
[0106] In this process, a constant temperature curing warehouse is added, with a temperature of 40 degrees and a humidity of 60%. Since the valve grid, air outlet, and side cover have been coated with glue, the glue has not yet been cured. Therefore, the usual process requires waiting for the glue to dry before the next process can be carried out. According to the characteristics of the glue and the linear curve, the constant temperature curing warehouse buffer volume is set to 1.5-2 hours. At this time, the glue has reached surface dryness (the glue has dried to more than 50%). After passing through the constant temperature curing warehouse, the product can directly proceed to the next process. Greatly shortening the product cycle.
[0107] Step 32: Movement sealing test
[0108] Use a robot to grab the previous movement from the production line and place it on the movement sealing detection equipment. After the detection is completed, qualified products are placed on the production line, and unqualified products are placed on the unqualified product line.
[0109] Step 33: Bracket Assembly
[0110] The bracket components are manually assembled in advance, placed manually on a positioning tray, and then installed by a six-axis robot.
[0111] Step 34: Fasten the bracket (use clamp ring or screw, use DEPRAG screw fastening system)
[0112] The clamp ring is loaded by the vibration plate, then displaced by the material distribution mechanism, and then installed on the bracket positioning column by the three-axis manipulator.
[0113] Step 35: Crank gear installation
[0114] The crank gear is loaded by a vibrating plate and then rotated and installed by a 4-axis robot to ensure the meshing between the gears.
[0115] Step 36: Negative pressure suction to measure the length of the pull rod
[0116] Place the gas meter on the tooling, connect the outlet pipe to the negative pressure pipeline, and perform negative pressure pumping on the gas meter movement. The purpose of negative pressure pumping is to ensure that the membrane is in the extreme contraction state. At this time, the rocker arm is in the extreme closed position. (Negative pressure pumping simulates the normal operation of the gas meter. If the rocker arm is placed in the closed position by tooling or other means in this process, it cannot ensure that the rocker arm and the folding plate are in a natural state, and the state achieved is not real.) The purpose of measuring the length of the tie rod is to select a suitable tie rod. Selecting a tie rod of the appropriate length can ensure the accuracy of measurement (currently, all manual comparisons are performed, and manual comparisons require extremely high manual skills and proficiency, and there are many human judgment factors.) Therefore, a visual inspection device is set here. By visually photographing the center point of the tie rod positioning column on the rocker arm and the center point of the crank gear, measuring the distance between the two points, the length of the tie rod used can be obtained. The length of the tie rod is measured by taking photos, and a tie rod of the appropriate length is selected for assembly. The assembly action here can be completed manually or by robots.
[0117] Step 37: Movement running-in
[0118] The products are manually taken from the production line and placed on a manual running-in machine for running-in (this process can also be automated, but in view of the poor payback economy, the labor intensity of manual operation at this station is not high, so this process can be automated or kept manual).
[0119] In addition, the original gas meter positioning tooling is based on the bottom and is carried by the tooling pallet. Because the metering shell is an injection molded product and the bottom of the metering shell is not a size that must be guaranteed for quality control, the bottom of the metering shell is placed in the tooling pallet according to the shape, and the tooling pallet is stopped and then re-positioned. This positioning method increases the cumulative error. The effect is very poor during the product assembly process. Figures 1 to 3 As shown, in order to reduce assembly errors and ensure that the assembly positioning center coincides with the positioning center of the product, the automated assembly method of the gas meter movement of the present application includes a positioning tooling including: a folding plate support block 5, a gantry support mechanism 6, a chain plate line channel 7, and a metering housing positioning clamping block 1, 3 and a folding plate positioning block 8, 9 installed on the gantry support mechanism. The metering housing positioning clamping blocks 1, 3 are installed on the clamping cylinder 4 for clamping the metering housing 2. The folding plate positioning blocks 8, 9 are installed on the gantry support mechanism; the folding plate support block 5 is arranged below the folding plate positioning blocks 8, 9 for cooperating with the folding plate positioning blocks 8, 9 to position and clamp the folding plate. The gantry support mechanism 6 is used to ensure force support for clamping. The chain plate line channel 7 is arranged at the bottom of the gantry support mechanism 6. During the entire assembly process, the product is stopped by the blocking mechanism in each assembly unit, and then the metering housing positioning clamping blocks 1, 3 clamp the product in accordance with the shape. The positioning center of the metering housing 2 is located in the center of the product. The above positioning method can ensure that the assembly positioning center coincides with the positioning center of the product, thereby reducing assembly errors and being more suitable for product assembly.
[0120] In summary, the automated assembly method of the gas meter movement solves the problems faced by employees, such as high labor intensity, poor working environment, unbearable odor and high temperature; improves the consistency of the gas meter after assembly and the accuracy of the gas meter; solves the damage and human loss of the products processed by the equipment caused by human operation during the production process. It reduces the accumulation of raw materials and the pressure of finished parts accumulation in the warehouse.
[0121] The foregoing description of specific exemplary embodiments of the present invention is for the purpose of illustration and demonstration. These descriptions are not intended to limit the present invention to the precise form disclosed, and it is clear that many changes and variations can be made based on the above teachings. The purpose of selecting and describing the exemplary embodiments is to explain the specific principles of the present invention and its practical application, so that those skilled in the art can realize and utilize various different exemplary embodiments of the present invention and various different selections and changes. The scope of the present invention is intended to be limited by the claims and their equivalents.
Claims
1. An automated assembly method for a gas meter movement, characterized in that: The following steps are involved: First, the rocker arm folding plate assembly process; The process includes a rocker arm folding plate angle detection step, wherein the rocker arm folding plate angle detection step is to measure the angle between the rocker arm and the folding plate by visually taking photos, and then to detect the press-fitting of the rocker arm and the folding plate; Secondly, the assembly process of parts on both sides of the body; The process includes: sending to a constant temperature curing warehouse for curing and a negative pressure exhaust measurement rod step, wherein the negative pressure exhaust measurement rod step is to measure the length of the pull rod by visually photographing the middle position of the rocker arm and the crank gear, and select a pull rod of a suitable length for assembly; wherein the buffer capacity of the constant temperature curing warehouse is 1.5-2 hours; the negative pressure exhaust measurement rod step requires connecting the gas meter outlet pipeline to the negative pressure pipeline, and performing negative pressure exhaust on the gas meter movement to ensure that the membrane is in a contracted state and the rocker arm is in a closed position; In order to reduce assembly errors and ensure that the assembly positioning center coincides with the positioning center of the product, the positioning tooling includes: a folding plate support block (5), a gantry support mechanism (6), a chain plate line channel (7), and a metering housing positioning first clamping block (1), a metering housing positioning second clamping block (3) and a first folding plate positioning block (8), and a second folding plate positioning block (9) installed on the gantry support mechanism; the metering housing positioning first clamping block (1) and the metering housing positioning second clamping block (3) are installed on the clamping cylinder (4) for clamping the metering housing (2); the first folding plate positioning block (8) and the second folding plate positioning block (9) are installed on the gantry support mechanism. The folding plate support block (5) is arranged below the first folding plate positioning block (8) and the second folding plate positioning block (9) and is used to cooperate with the first folding plate positioning block (8) and the second folding plate positioning block (9) to position and clamp the folding plate; the gantry support mechanism (6) is used to ensure the force support of clamping; the chain plate line channel (7) is arranged below the gantry support mechanism (6); during the entire assembly process, the blocking mechanism stops the product in each assembly unit, and then the metering housing positioning first clamping block (1) and the metering housing positioning second clamping block (3) clamp the product in accordance with the shape; the positioning center of the metering housing (2) is located at the center of the product.