A comprehensive detection system and method for test pile working mechanism and process effect

Through the comprehensive detection system, the test pile is comprehensively monitored on the pile foundation working mechanism, interaction effects and construction technology, which solves the problems of difficulty in monitoring pile tip force, side friction resistance and other problems in the existing technology, and provides detailed research results and design basis. , realizing the effective detection of test piles and improving the performance of new piles.

CN108166544BActive Publication Date: 2024-10-01SHANDONG UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201810026981.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2018-01-11
Publication Date
2024-10-01
Estimated Expiration
2038-01-11

AI Technical Summary

Technical Problem

Existing pile foundation detection technology is difficult to comprehensively monitor the pile tip force, side friction resistance, pile top displacement, load influence radius and blocking effect of the test pile, which affects the understanding and design calculation of the working performance of the new pile.

Method used

A comprehensive detection system for the working mechanism and process effects of test piles is designed, including a test pile located in the soil layer, a pile displacement test tube, a soil pressure gauge, a pile top settlement measurement component and a pile end settlement measurement component. Through step-by-step loading, And destructive testing monitors the working mechanism, interaction effects and construction technology of the pile foundation, and combines the layered settlement measurement of the surface and soil to achieve a comprehensive detection of the test piles.

Benefits of technology

It realizes the monitoring of the bearing capacity of test piles and the detailed research on the working mechanism of pile foundations, provides a reliable design basis, saves manpower and material resources, and has good economic benefits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN108166544B_ABST
    Figure CN108166544B_ABST
Patent Text Reader

Abstract

The invention discloses a comprehensive detection system and method for the working mechanism and process effect of a test pile, which solves the problem that the prior art cannot realize comprehensive detection, and has the beneficial effect of realizing the monitoring of the working mechanism of the test pile foundation, the monitoring of the influence of pile foundation interaction, and the detection and analysis of the pile foundation construction process. The scheme is as follows: a comprehensive detection system for the working mechanism and process effect of a test pile, comprising a plurality of test piles arranged in a soil layer, wherein a pile body displacement test tube is arranged inside the test pile; a geotechnical exploration hole for obtaining soil samples is arranged on the side of each test pile; an earth pressure gauge is arranged at the bottom of each test pile to measure the pile end resistance; a pile top settlement measurement component is arranged at a settlement observation point of the pile top in the soil layer at the top of each test pile; and a pile end settlement measurement component is arranged at a settlement observation point of the pile bottom soil layer at the end of each test pile.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of comprehensive detection of test piles, and in particular to a comprehensive detection system and method for the working mechanism and process effect of a test pile. Background Art

[0002] With the development of pile foundation technology, new types of piles emerge in an endless stream. From invention to promotion and application, a new type of pile must go through the test pile foundation detection link. The monitoring content includes the pile end force, axial force, side friction resistance, pile end and pile top displacement of the new type of pile under load conditions, etc. In addition, the impact of the test pile on the surrounding environment should be measured and analyzed, such as the single pile influence radius under the test pile load, the pile foundation shielding effect, etc. The experimental data obtained from the on-site pile foundation detection can provide a data basis for establishing a theoretical calculation formula for the new pile type, and lay an experimental foundation for the later design calculation. Therefore, how to conduct a complete and comprehensive pile foundation detection is an important basis for the promotion and application of new piles.

[0003] Although the current pile foundation detection technology can monitor the side friction resistance and pile top displacement of the test pile under load, it cannot monitor the pile end displacement and pile end force of the test pile well, and cannot detect the load-affected radius of the pile, the blocking effect, and the effect of the pile on the soil, which is extremely unfavorable for understanding the working performance of the new type of pile. Therefore, a comprehensive and complete test pile monitoring method has broad prospects. Therefore, in response to the above phenomenon, a comprehensive detection system and method for the working mechanism and process effect of the test pile came into being. Summary of the invention

[0004] In order to overcome the shortcomings of the prior art, the present invention provides a comprehensive detection system for the working mechanism and process effect of a test pile. The detection system can realize the application of the bearing capacity of the test pile. After the test is completed, the working mechanism of the pile foundation, the influence of pile foundation interaction and the detection and analysis of the pile foundation construction process can be realized, so as to make predictions for on-site construction.

[0005] A specific scheme of a comprehensive detection system for the working mechanism and process effect of a test pile is as follows:

[0006] A comprehensive detection system for the working mechanism and process effect of a test pile, comprising:

[0007] Several test piles are set in the soil layer, and pile displacement test tubes are set inside the test piles;

[0008] Geotechnical exploration holes for obtaining soil samples are located on the side of each test pile;

[0009] An earth pressure gauge is installed at the bottom of each test pile to measure the pile end resistance;

[0010] The pile top settlement measurement component is located at the pile top settlement observation point of the soil layer at the top of each test pile;

[0011] The pile end settlement measurement component is installed at the settlement observation point of the soil layer at the end of each test pile.

[0012] Furthermore, the test piles include at least two types of compression piles and at least two types of pull-out anchor piles.

[0013] Furthermore, it also includes a surface settlement measuring component, a surface settlement measuring component and a soil stratification settlement measuring component. The soil stratification settlement measuring component includes a sliding resistance stratification settlement meter. The sliding resistance stratification settlement meter is buried in a borehole at the observation point, and the soil stratification settlement displacement is determined by the sliding resistance stratification settlement meter. In addition, a fixed rod with greater rigidity can also be set in the borehole, the lower end of the fixed rod is inserted into the soil layer, and the upper end is led out of the ground, and cooperates with the measuring equipment to obtain the settlement displacement of different soil layers; the surface settlement measuring component includes surface steel bars, the bottom of the surface steel bars is fixed to the soil layer, the surface steel bars cooperate with the measuring equipment to obtain the surface settlement displacement, the surface steel bars are arranged around the pile top settlement measuring component, and the soil stratification measurement component is arranged around the pile body for at least three circles to obtain the settlement value around the test pile.

[0014] Furthermore, the test pile is a cast-in-place pile, and the test pile includes a steel cage, and a steel stress gauge is arranged in the steel cage.

[0015] Alternatively, the steel cage is surrounded by steel bars, and the steel stress gauge is arranged on some of the steel bars in the steel cage, and both sides of the steel stress gauge are connected to the steel bars through sleeves.

[0016] Furthermore, the pile top settlement measurement component is a pile top steel bar, the pile top steel bar is located in the center of the soil layer at the top of the test pile, and the pile top steel bar cooperates with a measuring device (such as a level gauge);

[0017] Alternatively, the pile end settlement measuring component is a pile end steel bar, which cooperates with the measuring equipment, the pile end steel bar is located inside the pile body displacement measuring tube, and the bottom of the pile end steel bar is located in the bottom soil layer of the test pile.

[0018] In order to overcome the shortcomings of the prior art, the present invention also provides a comprehensive detection method for the working mechanism and process effect of a test pile, and the specific steps are as follows:

[0019] 1) Select the test site and determine the pile type and pile foundation bearing capacity of the test pile. This step provides a basic understanding of the test site conditions and provides a basis for the loading size required for the bearing capacity test in step 3) and the theoretical calculation of future test piles;

[0020] 2) Make test piles and place them in the test site;

[0021] 3) Carry out pile foundation bearing capacity test on the test piles and monitor the test data at the same time;

[0022] 4) Monitor the working mechanism of the test pile foundation to obtain the pile axial force, side friction resistance, end resistance, pile top displacement and pile end displacement monitoring;

[0023] 5) Monitor the interaction effects of the test piles;

[0024] 6) The construction technology of the test pile foundation is tested and analyzed. By comparing the soil samples obtained before and after piling, the influence of the test pile on the soil properties can be obtained, which can explain the improvement in the bearing capacity of this type of pile.

[0025] Alternatively, step 3), step 4) and step 5) may be performed simultaneously.

[0026] Furthermore, in the step 1), the bearing capacity of the pile foundation is determined according to the soil layer distribution, physical properties and mechanical parameters;

[0027] Alternatively, the specific method of the pile foundation bearing capacity test in step 3) is as follows:

[0028] 3-1) Load the compression piles in each test pile step by step to complete the compression destructive test;

[0029] 3-2) Conduct pull-out tests on the pull-out anchor piles in each test pile to complete the destructive test.

[0030] Furthermore, the specific method for monitoring the working mechanism of the test pile foundation in step 4) is as follows:

[0031] 4-1) Monitoring of pile axial force and lateral friction resistance: It is determined by the steel bar stress gauge of the test pile reinforcement cage; the measurement data obtained by the steel bar stress gauge is the axial force of the reinforcement of the pile section, and the axial force of the pile body at that location can be calculated through data calculation. By comparing the axial forces at two adjacent steel bar stress gauges, the lateral friction resistance value of that section can be calculated.

[0032] 4-2) Pile end resistance monitoring: The pile end resistance is measured by installing an earth pressure gauge at the bottom of the test pile reinforcement cage;

[0033] 4-3) Pile top displacement monitoring: The displacement of the pile top can be directly measured by measuring the height change of the pile top reinforcement using a measuring device (such as a dial indicator or a level).

[0034] 4-4) Pile end displacement monitoring: The pile end reinforcement is located in the pile body displacement test tube, and the end extends to the pile end. Before static loading, a mark is made at the level of the pile end reinforcement and the actual pile top. When the static loading test is completed, the actual pile top settlement can be measured by the measuring equipment as s0. The difference between the marked position and the actual pile top displacement is Δs1, and the displacement at the designed pile top elevation is s s =s0-Δs1; during the test, since the pile end reinforcement is located in the test tube and separated from the pile body, no compression is performed, so the compression amount can be obtained.

[0035] Furthermore, the specific method for monitoring the interaction effect of the test piles in step 5) is as follows:

[0036] 5-1) Single pile influence radius test: According to the surface settlement observation points set at different distances from the loaded single pile (the surface settlement measurement components include surface steel bars, the bottom of the surface steel bars is fixed to the soil layer, the surface steel bars cooperate with the measuring equipment to obtain the surface settlement displacement, the surface steel bars are set around the pile top steel bars, the measured value of the influence radius of the loaded single pile is compared with the theoretical calculated value, and a reasonable correction value of the influence radius of the loaded single pile is obtained) and the soil layer settlement measurement points, a sliding resistance layer settlement instrument is set at the soil layer settlement measurement points. The observation point is located by setting a borehole and burying a sliding resistance type stratified settlement instrument, and the soil stratified settlement displacement is determined by the sliding resistance type stratified settlement instrument. In addition, a fixed rod with greater rigidity can be set in the borehole, and the lower end of the fixed rod is inserted into the soil layer, and the upper end is led out of the ground, and cooperated with the measuring equipment to obtain the settlement displacement of different soil layers; the settlement of the surface soil at different positions from the loaded single pile and the displacement of the soil around the pile at different depths are obtained, revealing the deformation mechanism of the pile-soil system at different positions and depths from the single pile, and obtaining the influence radius of the loaded single pile;

[0037] 5-2) Pile shielding effect test: An unloaded single pile with a steel bar stress gauge arranged on the pile body is set on one side of the loaded single pile, and surface settlement observation points and soil layer settlement measurement components are set at different positions away from the loaded single pile to obtain the settlement of surface soil at different positions and the displacement of soil around the pile at different depths when the unloaded single pile exists, the influence of the loaded single pile on the displacement, axial force and lateral resistance of the unloaded single pile, and then the reduction of the displacement of the loaded single pile and the soil around the pile due to the reinforced shading effect of the unloaded pile is obtained, and the calculation method of the pile-pile and pile-soil interaction coefficients is established.

[0038] Furthermore, the specific method for testing and analyzing the construction process of the test pile foundation in step 6) is as follows:

[0039] 6-1) Before piling, drill the first geotechnical exploration hole on the side of the test pile, take soil samples, do standard penetration test, conduct on-site lateral pressure test, and determine the physical parameters of the soil on the side of the pile after fixed injection;

[0040] 6-2) Conduct a second geotechnical survey on the side of the test pile, take soil samples, do standard penetration tests, and conduct on-site lateral pressure tests to determine the physical parameters of the soil on the side of the pile after fixed injection;

[0041] 6-3) Determine the physical parameters of the soil at the pile end and the side of the pile end after the pile end spraying and pressing;

[0042] 6-4) Determine the scope of spray and pressure effects.

[0043] Compared with the prior art, the present invention has the following beneficial effects:

[0044] 1) Through the setting of various devices, the working mechanism monitoring of the test pile foundation, the influence of pile foundation interaction and the detection and analysis of pile foundation construction technology can be realized, which is conducive to a more detailed study of the force transmission mechanism of the test pile and the influence of the pile on the surrounding environment, and thus can provide a reliable basis for the later design calculation of the pile.

[0045] 2) The tests of each system do not affect each other, which is convenient and fast.

[0046] 3) Multiple tests can be carried out simultaneously, saving manpower and material resources and achieving better economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS

[0047] The drawings in the specification, which constitute a part of the present application, are used to provide further understanding of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute improper limitations on the present application.

[0048] Figure 1 It is a comprehensive test pile position arrangement diagram of the present invention.

[0049] FIG. 2( a ) is a front view showing the arrangement of some components of the system of the present invention.

[0050] FIG. 2( b ) is a cross-sectional view 1 - 1 of FIG. 2( a ) of the present invention.

[0051] Figure 3 It is the geotechnical and construction effect survey arrangement diagram of the present invention.

[0052] Figure 4(a) is the layout diagram of the settlement observation points of the experimental single pile.

[0053] Figure 4(b) is the observation layout diagram of the test pile shielding effect test.

[0054] Figure 5 This is a schematic diagram of the steel bar meter installation.

[0055] Figure 6 This is a schematic diagram of the earth pressure gauge installation.

[0056] Among them: 1. Type A test pile, 2. Type B test pile, 3. Type C test pile, 4. Type A pull-out anchor pile, 5. Type B pull-out anchor pile, 6. Type C pull-out anchor pile, 7. Single pile influence radius test node, 8. Two-pile shielding effect test node, 9. Steel bar stress gauge, 10. Pile displacement test tube, 11. Wire tube, 12. Steel bar cage, 13. First geotechnical survey hole, 14. Second geotechnical survey hole, 15. Pile top settlement observation point, 16. Pile end settlement observation point, 17. Surface settlement observation point, 18. Soil layer settlement observation point, 19. Thread, 20. Soil pressure gauge, 21. Circular steel plate. DETAILED DESCRIPTION

[0057] It should be noted that the following detailed descriptions are illustrative and are intended to provide further explanation of the present application. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present application belongs.

[0058] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprise" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.

[0059] As introduced in the background technology, in order to solve the deficiencies existing in the prior art and the above technical problems, this application proposes a comprehensive detection system for the working mechanism and process effect of test piles.

[0060] In a typical implementation of the present application, Figure 1 As shown in FIG2 , a comprehensive detection system for the working mechanism and process effect of a test pile comprises a plurality of test piles arranged in a soil layer, wherein a pile displacement test tube 10 is arranged inside the test pile, and a displacement meter is arranged inside the pile displacement test tube 10; a first geotechnical exploration hole 13 is arranged on the side of each test pile; an earth pressure meter 20 is arranged at the bottom of each test pile to measure the pile end resistance, specifically, a circular steel plate 21 is arranged at the bottom of the test pile reinforcement cage 12, and an earth pressure box 20 is arranged at the bottom of the circular steel plate 21; a pile top settlement measurement component is arranged at a pile top settlement observation point 15 at the top of each test pile; and a pile end settlement measurement component is arranged at a pile end settlement observation point 16 at the end of each test pile.

[0061] Furthermore, in order to ensure the comprehensiveness of the test results, a comparative analysis with other pile types is conducted, which has a more comprehensive measurement significance. The test piles include at least two types of compression piles and at least two types of pull-out anchor piles, including type A test piles 1, type B test piles 2, type C test piles 3, type A pull-out anchor piles 4, type B pull-out anchor piles 5 and type C pull-out anchor piles 6. Figure 3 As shown, 16 test piles can be arranged, 3 test piles are arranged in the first row, C-type pull-out anchor piles 6 are arranged on both sides of the C-type test piles 3, and the B-type test piles 2 and the A-type pull-out anchor piles 4 in the second row are arranged at intervals, and the A-type test piles 1 are also arranged in the second row. In the third row, C-type test piles 3 and B-type test piles 2 are arranged, and B-type pull-out anchor piles 5 are arranged on both sides of the B-type test piles 2.

[0062] The detection system also includes a surface settlement measuring component arranged at a surface settlement observation point 17 and a soil layer settlement measuring component arranged at a soil layer settlement observation point 18. The surface settlement measuring component is a Φ8 surface steel bar. The soil layer settlement measuring component includes a sliding resistance layer settlement instrument. The sliding resistance layer settlement instrument is buried by setting a borehole at the observation point. The soil layer settlement displacement is determined by the sliding resistance layer settlement instrument. In addition, a fixed rod with greater rigidity can also be set in the borehole. The lower end of the fixed rod is inserted into the soil layer, and the upper end is led out of the ground to cooperate with the measuring equipment to obtain the settlement displacement of different soil layers; the surface settlement measuring component includes surface steel bars. The bottom of the surface steel bars is fixed to the soil layer. The surface steel bars cooperate with the measuring equipment to obtain the surface settlement displacement. The surface steel bars are arranged around the pile top settlement measuring component. The soil layer settlement measuring component is arranged around the pile body for at least three circles to obtain the settlement value around the test pile, as shown in Figures 4(a) and 4(b).

[0063] The electric wire of the earth pressure gauge 20 is arranged in the wire tube 11, and the wire tube is a polyethylene wire tube, and this wire tube is arranged in the steel cage, such as Figure 6 shown.

[0064] The test pile is a cast-in-place pile. The test pile includes a steel cage. After various measuring components are set in the steel cage, the pipe column concrete is filled and a steel stress gauge is set in the steel cage. The stress gauge can be used to obtain the axial force and lateral friction resistance data of the pile body.

[0065] Alternatively, the steel cage 12 is surrounded by steel bars, and the steel strain gauge 9 is arranged on some of the steel bars in the steel cage 12. Both sides of the steel strain gauge 9 are connected to the steel bars through sleeves, that is, a row of steel strain gauges are arranged on both sides of the steel cage, and the row of steel strain gauges is arranged at the steel bars. The steel bars include multiple sections, and adjacent steel bars are arranged at intervals. Sleeves are arranged between adjacent steel bars, and two sleeves are fixed to the steel strain gauges. The end of the steel bar close to the sleeve is provided with a thread 19 to achieve connection with the sleeve, such as Figure 5 shown.

[0066] Furthermore, the pile top settlement measurement component is a pre-buried steel bar, and the pre-buried steel bar is located in the center of the soil layer on the pile top;

[0067] Alternatively, the pile end settlement measuring component is a Φ30 pile end steel bar (with adjustable diameter), which is located inside the pile body displacement measuring tube 10, and whose bottom leads to the pile bottom and is fixed to the pile bottom soil layer.

[0068] In order to overcome the shortcomings of the prior art, the present invention also provides a comprehensive detection method for the working mechanism and process effect of a test pile, and the specific steps are as follows:

[0069] 1) Select the test site and determine the pile type and pile foundation bearing capacity of the test pile. This step provides a basic understanding of the test site conditions and provides a basis for the loading size required for the bearing capacity test in step 3) and the theoretical calculation of future test piles;

[0070] 2) Make test piles and place them in the test site;

[0071] 3) Carry out pile foundation bearing capacity test on the test piles and monitor the test data at the same time;

[0072] 4) Monitor the working mechanism of the test pile foundation to obtain the pile axial force, side friction resistance, end resistance, pile top displacement and pile end displacement monitoring;

[0073] 5) Monitor the interaction effects of the test piles;

[0074] 6) The construction technology of the test pile foundation is tested and analyzed. By comparing the soil samples obtained before and after piling, the influence of the test pile on the soil properties can be obtained, which can explain the improvement in the bearing capacity of this type of pile.

[0075] Alternatively, step 3), step 4) and step 5) may be performed simultaneously.

[0076] Furthermore, in the step 1), the bearing capacity of the pile foundation is determined according to the soil layer distribution, physical properties and mechanical parameters;

[0077] Alternatively, the specific method of the pile foundation bearing capacity test in step 3) is as follows:

[0078] 3-1) Load the compression piles in each test pile step by step to complete the compression destructive test;

[0079] 3-2) Conduct pull-out tests on the pull-out anchor piles in each test pile to complete the destructive test.

[0080] Furthermore, the specific method for monitoring the working mechanism of the test pile foundation in step 4) is as follows:

[0081] 4-1) Monitoring of pile axial force and lateral friction resistance: It is determined by the steel bar stress gauge of the test pile reinforcement cage; the measurement data obtained by the steel bar stress gauge is the axial force of the reinforcement of the pile section, and the axial force of the pile body at that location can be calculated through data calculation. By comparing the axial forces at two adjacent steel bar stress gauges, the lateral friction resistance value of that section can be calculated.

[0082] 4-2) Pile end resistance monitoring: The pile end resistance is measured by installing an earth pressure gauge at the bottom of the test pile reinforcement cage;

[0083] 4-3) Pile top displacement monitoring: The displacement of the pile top can be directly measured by measuring the height change of the pile top reinforcement using measuring equipment (such as theodolite).

[0084] 4-4) Pile end displacement monitoring: The pile end reinforcement is located in the pile body displacement test tube, and the end extends to the pile end. Before static loading, a mark is made at the level of the pile end reinforcement and the actual pile top. When the static loading test is completed, the actual pile top settlement can be measured by the measuring equipment as s0. The difference between the marked position and the actual pile top displacement is Δs1, and the displacement at the designed pile top elevation is s s =s0-Δs1; during the test, since the pile end reinforcement is located in the test tube and separated from the pile body, no compression is performed, so the compression amount can be obtained.

[0085] Furthermore, the specific method for monitoring the interaction effect of the test piles in step 5) is as follows:

[0086] 5-1) Single pile influence radius test: Based on the surface settlement observation points set at different positions from the loaded single pile (surface steel bars are buried in the ground, and the displacement is measured by external measuring equipment (such as a dial indicator or a level, and the surface steel bars are set around the pile top steel bars) and the soil layer settlement measurement components (measured by the fixed rod method: a fixed rod with large rigidity is buried by setting a drill hole at the observation point, the lower end of the fixed rod is inserted into the soil layer, and the upper end is led out of the ground, and the vertical displacement is measured by a dial indicator or a level), the settlement of the surface soil at different positions from the loaded single pile and the displacement of the soil around the pile at different depths are obtained, and the measured value of the influence radius of the loaded single pile is compared with the theoretical calculated value to obtain a reasonable correction value of the influence radius of the loaded single pile;

[0087] 5-2) Pile shielding effect test: In the two-pile shielding effect test node 8, an unloaded single pile with a steel stress gauge arranged on the pile body is set on one side of the loaded single pile, and surface settlement observation points and soil layer settlement measurement components are set at different positions away from the loaded single pile to obtain the settlement of surface soil at different positions and the displacement of soil around the pile at different depths when the unloaded single pile exists, the influence of the loaded single pile on the displacement, axial force and lateral resistance of the unloaded single pile, and then the reduction of the displacement of the loaded single pile and the soil around the pile due to the reinforced shading effect of the unloaded pile is obtained, and the calculation method of the pile-pile and pile-soil interaction coefficients is established.

[0088] Furthermore, the specific method for testing and analyzing the construction process of the test pile foundation in step 6) is as follows:

[0089] 6-1) Before piling, drill the first geotechnical exploration hole 13 on the side of the test pile position, take soil samples, do standard penetration, conduct on-site lateral pressure test, and determine the physical parameters of the soil on the side of the pile after fixed injection.

[0090] 6-2) Conduct a second geotechnical survey through the second geotechnical survey hole 14 (located on the side of the test pile) on the side of the test pile, take soil samples, do standard penetration tests, conduct on-site lateral pressure tests, and determine the physical parameters of the soil on the side of the pile after fixed injection;

[0091] 6-3) Determine the physical parameters of the soil at the pile end and the side of the pile end after the pile end spraying and pressing;

[0092] 6-4) Determine the scope of spray and pressure effects.

[0093] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. A comprehensive detection system for the working mechanism and process effect of a test pile, characterized in that: include: Several test piles are set in the soil layer, and pile displacement test tubes are set inside the test piles; Geotechnical exploration holes for obtaining soil samples are located on the side of each test pile; An earth pressure gauge is installed at the bottom of each test pile to measure the pile end resistance; The pile top settlement measurement component is located at the settlement observation point of the soil layer at the top of each test pile; the pile end settlement measurement component is located at the settlement observation point of the soil layer at the bottom of each test pile; The test piles include at least two types of compression piles and at least two types of pull-out anchor piles; The pile end settlement measurement component is a pile end steel bar, which cooperates with the measuring equipment, is located inside the pile body displacement test tube, and the bottom of the pile end steel bar is located in the bottom soil layer of the test pile; It also includes a surface settlement measurement component and a soil layer settlement measurement component. The surface settlement measurement component includes a surface steel bar, the bottom of the surface steel bar is fixed to the soil layer, and the surface steel bar cooperates with the measuring equipment to obtain the surface settlement displacement; The test pile is a cast-in-place pile, and the test pile includes a steel cage, and a steel stress meter is arranged in the steel cage.

2. A comprehensive detection system for the working mechanism and process effect of a test pile according to claim 1, characterized in that: The steel cage is surrounded by steel bars, and the steel stress gauge is arranged on some of the steel bars in the steel cage. Both sides of the steel stress gauge are connected to the steel bars through sleeves.

3. A comprehensive detection system for the working mechanism and process effect of a test pile according to claim 1, characterized in that: The pile top settlement measuring component is a pile top steel bar, which is located in the center of the soil layer at the top of the test pile, and cooperates with the measuring equipment.

4. A method for comprehensive detection of working mechanism and process effect of a test pile, using a comprehensive detection system for working mechanism and process effect of a test pile as claimed in claim 1, characterized in that: The specific steps are as follows: 1) Select the test site and determine the type of test pile and the bearing capacity of the pile foundation; 2) Make test piles and place them in the test site; 3) Carry out pile foundation bearing capacity test on the test piles and monitor the test data at the same time; 4) Monitor the working mechanism of the test pile foundation to obtain the pile axial force, side friction resistance, end resistance, pile top displacement and pile end displacement monitoring; 5) Monitor the interaction effects of the test piles; 6) Conduct inspection and analysis on the construction technology of the test pile foundation.

5. A comprehensive detection method for the working mechanism and process effect of a test pile according to claim 4, characterized in that: In the step 1), the bearing capacity of the pile foundation is determined according to the soil layer distribution, physical properties and mechanical parameters; Alternatively, the specific method of the pile foundation bearing capacity test in step 3) is as follows: 3-1) Load the compression piles in each test pile step by step to complete the compression destructive test; 3-2) Perform a pull-out test on the pull-out anchor piles in each test pile to complete the destructive test; Alternatively, step 3), step 4) and step 5) may be performed simultaneously.

6. A comprehensive detection method for the working mechanism and process effect of a test pile according to claim 4, characterized in that: The specific method for monitoring the working mechanism of the test pile foundation in step 4) is as follows: 4-1) Monitoring of pile axial force and lateral friction resistance: The axial force and lateral friction resistance of the pile body are determined by the steel bar stress gauge of the test pile steel cage. The measurement data obtained by the steel bar stress gauge is the axial force of the steel bar in the pile section. The axial force of the pile body at that location can be calculated through data calculation. By comparing the axial forces at two adjacent steel bar stress gauges, the lateral friction resistance value of that section can be calculated. 4-2) Pile end resistance monitoring: The pile end resistance is measured by installing an earth pressure gauge at the bottom of the test pile reinforcement cage; 4-3) Pile top displacement monitoring: The displacement of the pile top can be directly measured by measuring the height change of the pile top reinforcement with measuring equipment; 4-4) Pile end displacement monitoring: The pile end reinforcement is located in the pile body displacement test tube, and the end extends to the pile end.

7. A comprehensive detection method for the working mechanism and process effect of a test pile according to claim 4, characterized in that: The specific method for monitoring the interaction effect of the test piles in step 5) is as follows: 5-1) Single pile influence radius test: Based on the surface settlement measurement components and soil layer settlement measurement components set at different positions from the loaded single pile, the settlement of the surface soil at different positions from the loaded single pile and the displacement of the soil around the pile at different depths are obtained, the deformation mechanism of the pile-soil system at different positions and depths from the single pile is revealed, and the influence radius of the loaded single pile is obtained; the measured value of the influence radius of the loaded single pile is compared with the theoretical calculated value to obtain a reasonable correction value of the influence radius of the loaded single pile; 5-2) Pile shielding effect test: An unloaded single pile with a steel bar stress gauge arranged on the pile body is set on one side of the loaded single pile, and surface settlement measurement components and soil layer settlement measurement components are set at different positions away from the loaded single pile to obtain the settlement of the surface soil at different positions and the displacement of the soil around the pile at different depths when the unloaded single pile exists, the influence of the loaded single pile on the displacement, axial force and lateral resistance of the unloaded single pile, and then the reduction of the displacement of the loaded single pile and the soil around the pile due to the reinforced shading effect of the unloaded pile is obtained, and the calculation method of the pile-pile and pile-soil interaction coefficients is established.

8. A comprehensive detection method for the working mechanism and process effect of a test pile according to claim 4, characterized in that: The specific method for testing and analyzing the construction process of the test pile foundation in step 6) is as follows: 6-1) Before piling, drill the first geotechnical investigation hole on the side of the test pile position, take soil samples, do standard penetration, conduct on-site lateral pressure test, and determine the physical parameters of the soil on the side of the pile after fixed injection; 6-2) After piling, conduct a second geotechnical survey on the side of the test pile, take soil samples, do standard penetration tests, conduct on-site lateral pressure tests, and determine the physical parameters of the soil on the side of the pile after fixed injection; 6-3) Determine the physical parameters of the soil at the pile end and the side of the pile end after the pile end spraying and pressing; 6-4) Determine the scope of spray and pressure effects.