Central air conditioning water system variable flow active energy saving automatic control system
By introducing a variable flow active energy-saving automatic control system into the central air-conditioning system, and using technologies such as PLC intelligent control and chilled water pump frequency converters, the problem of high energy consumption in large-scale building air-conditioning systems has been solved, achieving on-demand energy saving and precise temperature control, and reducing Reduce energy waste.
Patent Information
- Application Number
- CN201711494078.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2017-12-31
- Publication Date
- 2024-10-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Central air conditioning systems in large buildings have problems such as high energy consumption and difficulty in precise control and energy saving during operation. Especially in tall factories, air conditioning equipment accounts for the majority of energy consumption, and traditional fixed-flow refrigeration equipment and water circulation systems Unable to effectively save energy.
The variable flow active energy-saving automatic control system of the central air-conditioning water system is adopted, and the intelligent control of the flow of the water system of the chiller and the start-up of the temperature-controlled fan are realized through the overall system control cabinet, PLC intelligent device, chiller control cabinet and master control PLC cabinet. Stop management, combined with chilled water pump frequency converter and electric proportional valve, adjusts water flow and temperature on demand in real time, improving energy consumption utilization.
It achieves the maximum energy-saving effect of the air-conditioning system, reduces energy waste, allows flexible selection of air-conditioning start-up plans according to production needs, avoids energy waste in traditional air-conditioning modes, and achieves precise temperature control and energy-saving operation of each workshop area.
Smart Images

Figure CN108168043B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a variable flow active energy-saving automatic control system for a central air-conditioning water system. Background Art
[0002] The background technology of this project is water system centralized central air conditioning or semi-centralized central air conditioning. Generally, the system operation structure is relatively large, the internal water capacity is large, the system is large but not energy-saving, and the system has large time lag and strong coupling when running. It is difficult to achieve precise local use and control. It is particularly difficult to save energy when the air conditioning system involved in tall and large factories is cooling (heating).
[0003] The factory building in this case is a large-space building with a large square area and high vertical space. The energy consumption of air-conditioning equipment accounts for almost the vast majority of the entire building, especially the circulating water pump, air-conditioning box unit and air-conditioning refrigeration system. How to make these equipment operate efficiently is an issue that must be considered in the air-conditioning automatic control system. In view of the actual situation of this project, combined with our experience in engineering automatic control systems, the most optimized control mode is adopted to meet the functional requirements of the building and bring greater economic benefits to the building. Therefore, this design adopts the "active energy-saving" control strategy:
[0004] This solution can adjust the cooling (heating) of each workshop or each cross-area system in each workshop according to the production process requirements of each workshop. The entire air-conditioning system and automatic control system automatically output the energy required by the downstream according to the process requirements of each workshop. Thus, the energy-saving operation of the air-conditioning system of the entire workshop can be achieved.
[0005] The energy consumption of central air-conditioning systems in large buildings mainly consists of two parts: one is the energy consumption of refrigeration equipment that drives the refrigerant cycle, and the other is the transmission energy consumption that drives the water system cycle. At present, refrigeration equipment is basically fixed-flow refrigeration equipment, and the water circulation system is basically a fixed-flow circulation system. Although some water circulation systems are equipped with variable frequency energy-saving technology, they are actually controlled by constant flow or constant pressure difference to control the water system circulation. It is still impossible to avoid the water system running at a large flow and a small temperature difference, resulting in a large waste of water system energy consumption. Summary of the invention
[0006] The technical problem to be solved by the present invention is to provide a variable flow active energy-saving automatic control system for a central air-conditioning water system, which can effectively realize flexible operation on demand during use, saving energy consumption and freely selecting the air-conditioning start-up plan according to production requirements, without wasting energy due to the limitation of the traditional air-conditioning mode of fully opening.
[0007] In order to solve the above technical problems, the technical solution adopted by the present invention is: a central air-conditioning water system variable flow active energy-saving automatic control system, characterized in that: it includes an overall system control cabinet, the overall system control cabinet includes a chiller control cabinet, a master control PLC cabinet and a workshop sub-control PLC cabinet, the chiller control cabinet and the master control PLC cabinet are connected via cables, the master control PLC cabinet is connected to each workshop sub-control PLC cabinet via cables, and each workshop sub-control PLC cabinet is connected in parallel to the temperature control fan of the corresponding workshop. Through the PLC intelligent device, the flow control of the chiller water system at each point of the entire system and the start and stop control of the temperature control fan at the corresponding position are completed, the adaptive temperature adjustment is completed, the intelligent supply according to demand is realized, the conversion of energy consumption in the system is fully utilized, the energy consumption utilization rate is improved, and the waste of energy consumption in the intermediate links is effectively reduced. The sub-control PLC cabinets of each workshop are connected in parallel to the temperature control fan of the corresponding workshop to realize the start and stop control of each temperature control fan in the workshop, and the temperature control effect is direct and efficient, saving energy consumption.
[0008] As an improvement, the chiller control cabinet is provided with a multi-function multi-meter, a load switch, a chilled water pump frequency converter, a chilled water pump soft start, a constant pressure water replenishment automatic control system, and a chiller remote control system, wherein the load switch, the chilled water pump frequency converter, the chilled water pump soft start, and the constant pressure water replenishment automatic control system are connected in series to the water pipeline and in parallel with the multi-function multi-meter. The chiller remote control system is connected to the control module of the chiller control cabinet via an optical cable and realizes remote operation, and is used to control the manual and automatic operation of the chiller, the chilled water pump, and the water replenishment pump. The structure of the chilled water pump soft start is adopted, which gradually increases to the rated speed compared to the straight start, has less impact on the pump, and the service life of the system equipment is longer, and the operation is more stable and efficient.
[0009] As an improvement, the master control PLC control cabinet is equipped with a master control S7-1200PLC, an Ethernet switch, a signal isolator, and a touch screen, and the master control S7-1200PLC is connected to the signal isolator and the touch screen through a communication line. The master control PLC control cabinet is the core part of the entire system, and the PLC in the control cabinet controls all components in the system through communication protocols and signal points.
[0010] As an improvement, the master control PLC control cabinet includes a PLC central control system, a power distribution system, a water pump frequency conversion system, an automatic constant pressure water replenishment system, a display screen, a host computer control system, a remote control system, an air-cooled screw cold and hot water unit, a flow calculation bypass system and a sub-workshop PLC control cabinet group, and the power distribution system, the water pump frequency conversion system, the automatic constant pressure water replenishment system, the display screen, the host computer control system, the remote control system, the air-cooled screw cold and hot water unit, the flow calculation bypass system and the sub-workshop PLC control cabinet group are respectively connected in parallel to the PLC central control system, wherein the power distribution system communicates via the network Or analog quantity acquisition and control are connected to the PLC central control system, the water pump frequency conversion control system and the air-cooled screw hot and cold water unit are connected to the PLC central control system through the network communication mode, the automatic constant pressure water replenishment system and the flow calculation bypass system are connected to the PLC central control system through analog quantity and communication, the PLC control cabinet group in the workshop is connected to the PLC central control system through the optical fiber communication mode, the display screen and the host computer control system are connected to the PLC central control system through optical fiber, and the host computer control system is connected to the remote control system and the mobile phone APP through network communication. The connection here is preferably 4G connection mode. Both network communication and analog quantity are 485 communication mode.
[0011] As an improvement, the air-cooled screw cold and hot water machine unit includes air-cooled screw cold and hot water machines connected in parallel with the PLC central control system. They are controlled separately and in each flow section, and the energy consumption utilization rate is high.
[0012] As an improvement, each workshop sub-control PLC control cabinet is connected to the display screen system, room temperature detection device, and water volume control device respectively, and the display screen system is connected to the room temperature detection device and the water volume control device at the same time. The display screen system is connected to the corresponding workshop PLC control cabinet through a line connection mode, and the room temperature detection device and the water volume control device are connected to the corresponding workshop PLC control cabinet through an analog mode.
[0013] As an improvement, the workshop sub-control PLC cabinet is located in each workshop, mainly including sub-control S7-200SMARTPLC, SMART LINE touch screen, photoelectric converter, signal isolator, and sub-control S7-200SMARTPLC is connected to SMART LINE touch screen, photoelectric converter, and signal isolator through communication cables. The system is mainly used to control the actuators and signal detection in the workshop, and can exchange data with the master control PLC.
[0014] The main control system consists of a control cabinet and a power cabinet. The communication between the control cabinet and the power cabinet uses MODBUS communication based on the RS485 network. The control cabinet mainly includes PLC, touch screen, industrial switch, signal isolator and various low-voltage components.
[0015] The main hardware and software functions of the system are connected via an integrated Ethernet interface.
[0016] The technical solution adopted by the present invention has the following beneficial effects: the water pump of the cooling water circulation system is controlled by a frequency converter, and an electric proportional valve and flow and temperature detection device are added to the branch line to control the variable flow and cooling temperature in real time as needed. The structural principle is as follows: This system is designed as an all-weather unattended machine room. The automatic control system will automatically operate and adjust the working state of the system according to the needs of the air-conditioning system, and adaptively respond to changes in the external air-conditioning load. Active energy saving of variable flow of the water system is achieved, thereby achieving maximum energy saving of the entire air-conditioning system.
[0017] The technical solution of the present invention is aimed at the actual situation of large buildings. Combined with our experience in engineering automatic control systems, the most optimized control mode is adopted to meet the functional requirements of buildings and bring greater economic benefits to buildings. Therefore, this design adopts the control strategy of "active energy saving": this case can be based on the actual needs of the end of the large building, and the system refrigeration (heat) of each end can be adjusted in real time on demand for energy saving. The entire air-conditioning system and automatic control system cooperate to automatically output the energy required by the downstream according to the actual process requirements of each building. Thus, the energy-saving operation of the air-conditioning system of the entire building is achieved.
[0018] The application of this technical solution can make the air conditioner's energy output on demand. When the system is running, it can decide to turn on the air conditioner partially or completely according to the workshop production process. The operation of equipment such as refrigeration units and water pumps is not subject to technical restrictions or air conditioning system shutdown protection due to the partial opening of the air conditioning system. The system can automatically adjust the energy output according to the changes in local operation to meet the needs of the downstream terminal.
[0019] The application of this solution greatly reduces the building energy consumption of the air-conditioning system, and operates flexibly as needed during use, which not only saves energy but also allows the free selection of air-conditioning start-up plans according to production requirements to achieve temperature control in each workshop. At the same time, the fans in relative positions are turned on and the water flow of each segmented water circulation system is controlled to achieve temperature control in each workshop and area, achieving specific and precise control based on demand, without wasting energy due to the limitation of the traditional air-conditioning mode of turning on the air at full capacity. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] The present invention will be further described below in conjunction with the accompanying drawings:
[0021] Figure 1 is a schematic diagram of the system structure of an embodiment of the present invention;
[0022] Figure 2 yes Figure 1 Enlarged view of middle Ⅰ;
[0023] Figure 3 yes Figure 1 Enlarged view of middle Ⅱ;
[0024] Figure 4 It is a schematic diagram of system operation of an embodiment of the present invention. DETAILED DESCRIPTION
[0025] like Figures 1 to 4 The structural schematic diagram of an embodiment of the present invention is shown, and the central air-conditioning water system variable flow active energy-saving automatic control system in this embodiment includes an overall system control cabinet, and the overall system control cabinet includes a chiller control cabinet, a master control PLC cabinet and a workshop sub-control PLC cabinet. The chiller control cabinet and the master control PLC cabinet are connected via cables, and the master control PLC cabinet is connected to the sub-control PLC cabinets of each workshop via cables, and the sub-control PLC cabinets of each workshop are connected in parallel to the temperature control fan of the corresponding workshop. The flow control of the chiller water system at each point of the entire system and the start and stop control of the temperature control fan at the corresponding position are completed through the PLC intelligent device, and the adaptive temperature adjustment is completed, and the intelligent supply according to demand is realized, and the conversion of energy consumption in the system is fully utilized to improve the energy consumption utilization rate, and the waste of energy consumption in the intermediate links is effectively reduced. The sub-control PLC cabinets of each workshop are connected in parallel to the temperature control fan of the corresponding workshop to realize the start and stop control of each temperature control fan of the sub-workshop. The temperature control effect is direct and efficient, and energy consumption is saved.
[0026] In this embodiment, the chiller control cabinet is provided with a multi-function multi-meter, a load switch, a chilled water pump frequency converter, a chilled water pump soft start, a constant pressure water replenishment automatic control system, and a chiller remote control system, wherein the load switch, the chilled water pump frequency converter, the chilled water pump soft start, and the constant pressure water replenishment automatic control system are connected in series on the water pipeline and in parallel with the multi-function multi-meter, and the chiller remote control system is connected to the control module of the chiller control cabinet via an optical cable and realizes remote operation, and controls the manual and automatic operation of the chiller, the chilled water pump, and the water replenishment pump. The structure of the chilled water pump soft start is adopted, which is relatively straight start, and gradually increases to the rated speed, which has less impact on the pump, and the service life of the system equipment is longer, and the operation is more stable and efficient.
[0027] In this embodiment, the master control PLC control cabinet includes a master control S7-1200PLC, an Ethernet switch, a signal isolator, and a touch screen, and the master control S7-1200PLC is connected to the signal isolator and the touch screen through a communication line. The master control PLC control cabinet is the core part of the entire system, and the PLC in the control cabinet controls all components in the system through communication protocols and signal points.
[0028] In this embodiment, the master control PLC control cabinet includes a PLC central control system, a power distribution system, a water pump frequency conversion system, an automatic constant pressure water replenishment system, a display screen, a host computer control system, a remote control system, an air-cooled screw cold and hot water unit, a flow calculation bypass system and a sub-workshop PLC control cabinet group, and the power distribution system, the water pump frequency conversion system, the automatic constant pressure water replenishment system, the display screen, the host computer control system, the remote control system, the air-cooled screw cold and hot water unit, the flow calculation bypass system and the sub-workshop PLC control cabinet group are respectively connected in parallel to the PLC central control system, wherein the power distribution system communicates via a network Or analog quantity acquisition and control are connected to the PLC central control system, the water pump frequency conversion control system and the air-cooled screw hot and cold water unit are connected to the PLC central control system through the network communication mode, the automatic constant pressure water replenishment system and the flow calculation bypass system are connected to the PLC central control system through analog quantity and communication, the PLC control cabinet group in the workshop is connected to the PLC central control system through the optical fiber communication mode, the display screen and the host computer control system are connected to the PLC central control system through optical fiber, and the host computer control system is connected to the remote control system and the mobile phone APP through network communication. The connection here is preferably 4G connection mode. Both network communication and analog quantity are 485 communication mode.
[0029] In this embodiment, the air-cooled screw cold and hot water machine unit includes air-cooled screw cold and hot water machines connected in parallel with the PLC central control system.
[0030] In this embodiment, each workshop PLC control cabinet is connected to the display screen system, the room temperature detection device, and the water volume control device respectively. The display screen system is connected to the room temperature detection device and the water volume control device at the same time. The display screen system is connected to the corresponding workshop PLC control cabinet through a line connection mode, and the room temperature detection device and the water volume control device are connected to the corresponding workshop PLC control cabinet through an analog mode.
[0031] In this embodiment, the workshop sub-control PLC cabinet is located in each workshop, mainly including sub-control S7-200SMARTPLC, SMART LINE touch screen, photoelectric converter, signal isolator, and sub-control S7-200SMARTPLC is connected to SMART LINE touch screen, photoelectric converter, and signal isolator through communication cables. The system is mainly used to control the actuators and signal detection in the workshop, and can exchange data with the master control PLC.
[0032] The main control system consists of a control cabinet and a power cabinet. The communication between the control cabinet and the power cabinet uses MODBUS communication based on the RS485 network. The control cabinet mainly includes PLC, touch screen, industrial switch, signal isolator and various low-voltage components.
[0033] In this embodiment, the system mainly includes hardware and software functions and an integrated Ethernet interface.
[0034] The control relationship diagram of the system, the overall control device is the PLC central control system,
[0035] The control cabinet can complete all functions listed in all technical requirements through communication and input and output signals. The main functions are as follows: monitor the operating status, operating parameters, fault status, manual / automatic mode of the chiller, and perform remote start and stop control and energy control.
[0036] According to the independent start-up requirements of each branch of each plant building, the supply / return water temperature of the chilled water supply / return main pipe, and the total water supply flow of the refrigeration station, the cooling load is calculated, and the number of air-cooled screw module units and the corresponding water pumps to be started are determined according to the changes in the cooling load. The number and proportional levels of each air-cooled screw module unit can be controlled to make the chiller work in the best state, thereby achieving the goal of energy saving to the maximum extent.
[0037] The corresponding water pumps are started and stopped according to the number of units in operation, and the corresponding interlocking and linkage are performed. At the same time, the speed of the water pump motor is automatically adjusted to achieve the purpose of energy saving.
[0038] Effectively protect the equipment: display the system operating status and main parameters; automatically record and print system data, and save historical operating data according to usage requirements; reasonable group control to make the system more comfortable, avoid overcooling, and make it easier to meet design requirements.
[0039] The unit starts up all equipment smoothly according to the requirements of the air-conditioning control system. The starting sequence is: branch proportional valve in the plant - chilled water pump - chiller; the shutdown sequence is: chiller - chilled water pump - branch proportional valve in the plant.
[0040] The voltage, total current, total power consumption and other data of the unit are monitored and saved in real time through the network protocol, and the power consumption in each period of time can be counted at any time.
[0041] Start the chilled water pump and the corresponding electric butterfly valve, and determine whether the chilled water flow is established. If not, the control system determines that the chilled water pump is faulty, stops the operation of the faulty pump, issues a fault alarm, and automatically starts the standby chilled water pump.
[0042] The water pumps in the system are operated according to the following embodiments. For example, three water pumps are controlled in a two-in-one standby mode. When only one chiller is in use, the other two water pumps are enabled, and the enabled and standby pumps are started alternately at a certain time. When the two units are started at the same time, the corresponding two water pumps are enabled and one is on standby. The enabled and standby pumps are started alternately at a certain time, and the rotation time of the enabled and standby water pumps can be set on the interface.
[0043] Each chilled water pump is controlled by an independent frequency converter. The operation and fault signals of the frequency converter should be interlocked and linked with the air-cooled screw unit. The relevant data of the frequency converter is collected to the control system through the communication line.
[0044] According to the minimum flow requirement of the air-cooled screw unit and the cooling capacity of the plant, the pressure difference of the water system supply and return main pipes is automatically adjusted through the electric proportional pressure difference bypass valve between the supply and return main pipes to stabilize the system and achieve energy saving.
[0045] The outdoor environment temperature and humidity are collected by a temperature and humidity sensor. The collected temperature value is compared with the temperature in the factory and the set value to determine whether the air-cooled screw unit should be started.
[0046] A set of temperature sensors is installed in each area of the factory, and the data is collected to the control system. The temperature of each point can be monitored at the terminal, and the opening of the electric proportional valve on each branch can be automatically controlled based on the comparison between the temperature value and the set temperature value of the factory.
[0047] The power cabinet mainly contains multi-function instruments, voltage and current meters, frequency converters, soft starters and various low-voltage components. The power cabinet is controlled by the control cabinet through communication line transmission signals, and has a mechanism for manually starting the circulating water pump, chiller, and constant pressure water pump in the event of control system failure. Manual adjustment buttons are set on each corresponding component.
[0048] The constant-pressure water-making device includes two water pumps, one for use and one for backup. The two water pumps are replaced in turn. The remote pressure gauge installed on the constant-pressure water-making device is connected to the automatic control system through a communication line. The signal is collected to the automatic control system, and the low liquid level switch is also collected to the automatic control system. The start and stop of the water pump are automatically controlled according to the collected remote pressure gauge signal and the constant pressure requirement of the chilled water circuit. The rotation replacement time and constant pressure value can be written automatically by the touch screen. The collected low liquid level signal protects the water pump from running dry.
[0049] When the electric proportional valve is in the four modes, it must be interlocked with the relevant air-conditioning terminal equipment of each branch, that is, the total power supply of the air-conditioning terminal equipment can be connected only after the control switch of the electric proportional valve is turned on, and each air-conditioning terminal equipment can be started and stopped independently.
[0050] When the electric proportional valve is under manual control, the electric proportional valve is first opened to the fully open position, and the middle air-conditioning terminal fan on each branch is automatically started. The start and stop switches of other air-conditioning terminal devices are independently and manually controlled by the start and stop switches of each device on the centralized control box, and there are corresponding indicator lights. A temperature sensor is installed at the return air outlet of the automatically started air-conditioning terminal device to automatically detect the workshop temperature and upload it to the sub-control system. At the same time, its temperature value is displayed on the touch screen of the independent sub-control system. After a certain period of time, the independent control system can control the opening degree of the electric proportional valve on its branch based on the comparison of the detected temperature with the set temperature (which can be set by the independent controller).
[0051] When the electric proportional valve is in automatic gear, the electric proportional valve opens to the fully open position first, and then one of the air-conditioning end fans of each branch starts automatically. The start and stop switches of other air-conditioning end devices are independently and manually controlled by the start and stop switches of each device on the centralized control box, and there are corresponding indicator lights. A temperature sensor is installed at the return air outlet of the automatically started air-conditioning end device to automatically detect the workshop temperature and upload it to the main control system. After a certain period of time, the main control system automatically controls the opening degree of the electric proportional valve on its branch based on the comparison of the collected temperature with the set temperature of the control room.
[0052] When the electric proportional valve is in the air supply bar, it is not open and is in a closed state. The air conditioning terminal equipment in the workshop can be started and stopped independently by the control button of each device in the centralized control box, and there are indicator lights. This situation is suitable for workshops that do not need a cold source but only need air supply for ventilation.
[0053] When the electric proportional valve is in the stop bar, the electric proportional valve is in a closed state and the air-conditioning terminal equipment is also in a stopped state.
[0054] The main hardware and software functions of the system are the integrated Ethernet interface, which connects and has the following performance: integrated power supply in the form of a wide AC or DC power supply (85-264V AC or 24V DC); integrated digital output 24V DC or relay; integrated 24V DC digital input; integrated analog input 0-10V; pulse train output (PTO) with a frequency of up to 100kHz; pulse width modulation (PWM) output with a frequency of up to 100kHz; high-speed counter (HSC) with a frequency of up to 100kHz; modularity and scalability are achieved by connecting additional communication modules (such as RS 485 or RS232); modularity and scalability are achieved by expanding analog or digital signals directly on the CPU through signal boards (while maintaining the original CPU space); modularity and scalability are achieved through a large number of analog and digital input and output signals of signal modules (CPU 1211C except); optional memory (SIMATIC memory card); PLCopen motion control for simple motion control; PID controller with self-tuning function; integrated real-time clock; password protection; time interrupt; hardware interrupt; library function; online / offline diagnosis. The hardware and software function modules of the above system, all the terminals on the modules are detachable.
[0055] The analog quantity described in the above embodiment is the proportional data of water flow as the relative value describing the water flow, rather than the conventional unit L or milliliter or ton, etc. This makes it easier to break through the limitations of conventional units and limit the water flow demand by the final effect, which is more direct and convenient for detection.
[0056] In the above embodiment, five temperature control areas are preferred but the number is not limited to that of temperature control areas. The number of systems can be adjusted according to the number of control areas actually required, with the ultimate goal of adapting to the control effect to achieve the control effect.
[0057] In addition to the above preferred embodiments, the present invention has other implementation modes. Those skilled in the art may make various changes and modifications based on the present invention. As long as they do not depart from the spirit of the present invention, they should all fall within the scope defined by the claims attached to the present invention.
Claims
1. Central air conditioning water system variable flow active energy-saving automatic control system, characterized by : It includes an overall system control cabinet, which includes a chiller control cabinet, a master control PLC cabinet and a workshop sub-control PLC cabinet. The chiller control cabinet and the master control PLC cabinet are connected via cables. The master control PLC cabinet is connected to the sub-control PLC cabinets of each workshop through cables. The sub-control PLC cabinets of each workshop are connected in parallel to the temperature control fan of the corresponding workshop. The master control PLC cabinet includes a PLC central control system, a power distribution system, a water pump frequency conversion system, an automatic constant pressure water replenishment system, a display screen, a host computer control system, a remote control system, an air-cooled screw hot and cold water unit, a flow calculation bypass system and a sub-workshop PLC control cabinet group. The power distribution system, the water pump frequency conversion system, the automatic constant pressure water replenishment system, the display screen, the host computer control system, the remote control system, the air-cooled screw The hot and cold water units, flow calculation bypass system and PLC control cabinet group in the workshop are respectively connected in parallel to the PLC central control system. Among them, the power distribution system is connected to the PLC central control system through network communication or analog quantity acquisition and control, the water pump frequency conversion control system and the air-cooled screw hot and cold water units are connected to the PLC central control system through network communication mode, the automatic constant pressure water replenishment system and the flow calculation bypass system are connected to the PLC central control system through analog quantity and communication, the PLC control cabinet group in the workshop is connected to the PLC central control system through optical fiber communication mode, the display screen and the host computer control system are connected to the PLC central control system through optical fiber, and the host computer control system is connected to the remote control system and the mobile phone APP through network communication. The connection here is a 4G connection mode.
2. The central air conditioning water system variable flow active energy-saving automatic control system according to claim 1 is characterized in that The chiller control cabinet is provided with a multi-function multi-meter, a load switch, a chilled water pump frequency converter, a chilled water pump soft start, a constant pressure water make-up automatic control system, and a chiller remote control system. The load switch, the chilled water pump frequency converter, the chilled water pump soft start, and the constant pressure water make-up automatic control system are connected in series to the water pipeline and in parallel with the multi-function multi-meter. The chiller remote control system is connected to the control module of the chiller control cabinet via an optical cable and realizes remote operation, which is used to control the manual and automatic operation of the chiller, the chilled water pump, and the make-up water pump.
3. The central air conditioning water system variable flow active energy-saving automatic control system according to claim 1 is characterized in that The master control PLC cabinet is equipped with a master control S7-1200PLC, an Ethernet switch, a signal isolator, and a touch screen. The master control S7-1200PLC is connected to the signal isolator and the touch screen through a communication line.
4. The central air conditioning water system variable flow active energy-saving automatic control system according to claim 1 is characterized in that The air-cooled screw cold and hot water machine unit includes air-cooled screw cold and hot water machines connected in parallel with the PLC central control system.
5. The central air conditioning water system variable flow active energy-saving automatic control system according to claim 1 is characterized in that : Each workshop sub-control PLC control cabinet is connected to the display screen system, room temperature detection device, and water volume control device respectively. The display screen system is connected to the room temperature detection device and the water volume control device at the same time. The display screen system is connected to the corresponding workshop PLC control cabinet through a line connection mode, and the room temperature detection device and the water volume control device are connected to the corresponding workshop PLC control cabinet through an analog mode.
6. The central air conditioning water system variable flow active energy-saving automatic control system according to claim 1 is characterized in that The workshop sub-control PLC cabinet is located in each workshop, and is mainly equipped with sub-control S7-200SMARTPLC, SMART LINE touch screen, photoelectric converter, and signal isolator. The sub-control S7-200SMARTPLC is connected to the SMARTLINE touch screen, photoelectric converter, and signal isolator through communication cables.
Citation Information
Patent Citations
Digital integrated intelligent control system of central air conditioner and adjusting method thereof
CN102147146A
Method and device for control on air conditioner cold water system based on tail end cold quantity active adjustment
CN103411293A
Fresh air conditioner control system
CN201637032U
Energy -conserving autonomous system of central air conditioning water system unsteady flow volume initiative
CN208025747U
Central air-conditioning system
US20150044961A1