A sponge pavement-underground integrated pipe gallery system and construction technology

By combining the sponge pavement and the underground comprehensive pipe gallery system, the problems of rainwater accumulation and traffic jams on urban roads are solved, the efficient use of resources and economic savings are achieved, and the traffic burden and engineering costs are reduced.

CN109024673BInactive Publication Date: 2024-10-29SHENYANG UNIVERSITY OF TECHNOLOGY
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN201810728461.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2018-07-05
Publication Date
2024-10-29
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

There are serious rainwater accumulation problems and traffic jams on urban roads. The construction cost of existing sponge cities is high and it is difficult to effectively utilize rainwater resources. Underground pipeline management is complicated and maintenance is inconvenient.

Method used

A combination of sponge pavement and underground comprehensive pipe gallery system is adopted. The sponge pavement is implemented on one side of the sidewalk. The motor vehicle lane is a rigid pavement, forming a slope to collect accumulated water. The underground pipe gallery is divided into three parts: drainage warehouse, municipal pipelines and tunnel roads. In part, high-strength corrosion-resistant materials and V-shaped slopes are used for water diversion and treatment to achieve precipitation and secondary utilization of water resources.

Benefits of technology

It effectively solves the problems of road accumulation and urban waterlogging, reduces traffic burden, achieves efficient use of resources and economic savings, and improves the efficiency of space and capital utilization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN109024673B_ABST
    Figure CN109024673B_ABST
Patent Text Reader

Abstract

A sponge pavement-underground integrated pipe gallery system, comprising a sponge pavement and an underground integrated pipe gallery, which integrates the sponge pavement, the underground pipe gallery and the tunnel in a combined manner, wherein the sponge pavement and the rigid pavement are combined on the ground surface, the sponge road treatment is implemented only on one side of the sidewalk, the motor vehicle lane is a rigid pavement, and the road surface is formed with a certain slope, that is, the junction between the sidewalk and the motor vehicle lane is lower than the road level; the system effectively combines the above-ground and underground resources, on the one hand basically realizes the rational and efficient use of natural resources, reduces the traffic burden of the city and the heat island effect and other problems, and on the other hand, due to the integrated multifunctionality of the system, it is highly comprehensive and greatly saves economic costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The sponge pavement-underground integrated pipe gallery system involved in the present invention is mainly suitable for urban construction projects where there are problems such as waterlogging in urban areas, severe road surface waterlogging problems, ineffective utilization of rainwater resources and traffic congestion. Background Art

[0002] In urban road construction, dealing with rainwater accumulation has become a top priority. Existing pavement drainage technologies are divided into pavement surface drainage and pavement internal drainage. Pavement surface drainage includes pavement drainage and central median drainage. Pavement internal drainage refers to the removal or drainage of water that penetrates into the pavement structure through cracks, joints or surface gaps, or that invades the pavement structure from groundwater and stagnant water on both sides of the road. The specific drainage process is that the rainwater falling on the pavement is discharged to both sides of the road through the transverse slope of the pavement, and the other is to set a water barrier on the outer edge of the shoulder to collect the surface water of the pavement in the shallow triangular water-passing section composed of the water barrier and the shoulder pavement, and then discharge it to the foot of the embankment through the drainage outlets and rapids troughs set at a certain interval. In the face of the aging of the water supply and drainage pipelines in the old city, it is difficult to carry out centralized management and simple disassembly and merging due to the criss-crossing of underground pipelines, which is inconvenient to operate and has low construction efficiency. In the face of extreme weather, namely heavy rainfall weather, the serious water accumulation problem caused by insufficient drainage capacity has caused a series of situations such as road congestion and urban waterlogging to occur frequently.

[0003] At present, the more mature construction method for road drainage is to lay sponge pavement, that is, to build a sponge city. Although this construction plan can be regarded as a specific practice of the concept of urban rainwater management, the construction of sponge cities has the characteristics of long-term, complexity and large capital costs. In addition, the construction of sponge cities is carried out on the basis of ordinary road construction in cities. It is a necessary change to the original road drainage device, not a complete transformation. Therefore, in the face of the ever-increasing speed of urban construction and the ever-expanding urban area, the original water supply and drainage system is not enough to solve the practical problem of "drainage-storage", and the underground pipelines are complicated and not conducive to renovation and maintenance. As far as sponge cities are concerned, the storage and utilization of rainwater resources are the top priority, but in the construction process, a lot of financial support is required, and the existing sponge cities that have completed the transformation have obviously insufficient output and cannot fully realize the concept of a benign water cycle.

[0004] Comprehensive pipeline corridors are important infrastructure. For sponge cities, the construction of underground comprehensive pipeline corridors is extremely necessary. However, many difficulties are encountered during the construction process, such as the lack of coordination between the two and insufficient financial support. Summary of the invention

[0005] Purpose of the invention:

[0006] The invention provides a sponge pavement-underground integrated pipe gallery system and a construction process, which aims to solve the problems of road surface waterlogging, urban waterlogging, ineffective utilization of rainwater resources and road traffic congestion.

[0007] Technical solution:

[0008] A sponge pavement-underground integrated pipe gallery system, characterized in that the system comprises a sponge pavement and an underground integrated pipe gallery, and the sponge pavement, the underground pipe gallery and the tunnel are integrated into one by a combination method. Due to the high water permeability and high load-bearing capacity of the sponge road, the ground surface is treated by combining the sponge pavement and the rigid pavement. In order to achieve the economic saving effect to the maximum extent, the sponge road (1) is only implemented on one side of the sidewalk, and the motor vehicle lane (2) is a rigid pavement, and the road surface is formed with a certain slope, that is, the junction between the sidewalk and the motor vehicle lane is slightly lower than the road level, so that the accumulated water is easy to collect and reasonably discharge;

[0009] The underground pipe gallery system is divided into three parts on both sides. One side corresponds to the sponge road (1) and serves as a drainage tank (3) to drain the accumulated water stored in the sponge road. This is the first part. The other side is divided into upper and lower parts. The upper part is used as the second part for various public pipeline tanks (4) for municipal administration, electricity, communication, and gas. The lower part is used as a tunnel road (5) for traffic. Pipeline materials with high strength and corrosion resistance are strictly selected to maximize space utilization.

[0010] A V-shaped slope (7) with high strength and corrosion resistance is also arranged below the bottom of the pipe gallery. The V-shaped slope (7) is connected to the main drainage conduit, so that the accumulated water in the drainage bin and the accumulated water in the tunnel drainage ditch can be collected in the main drainage conduit for quick and effective drainage. The V-shaped slope (7) is connected to the drainage bin (3) and the drainage ditch (6) of the tunnel road (5).

[0011] Drainage ditches (6) are arranged on both sides of the tunnel road (5), and the accumulated water in the drainage tank on the other side of the underground pipe gallery is collected in the main drainage conduit, and then introduced into sedimentation filtration, water storage tanks and other devices to supply water to municipal industries.

[0012] The construction process of a sponge pavement-underground integrated pipeline corridor system as described above is characterized in that the process includes the following steps: (1) construction of a local sponge road on the pavement; (2) coordinated connection construction of the sponge pavement and the underground pipeline corridor; (3) layout distribution of the underground integrated pipeline corridor system; (4) construction of tunnels and tunnel drainage; (5) drainage construction of the sponge pavement-underground integrated pipeline corridor.

[0013] The construction of partial sponge road on the road surface means that the sidewalk is treated with sponge road, and the motor vehicle lane is ordinary rigid road surface. The construction method is the same as that of traditional road surface, and there is a certain slope at the junction, that is, slightly lower than the motor vehicle lane, so that the accumulated water can be better collected at the sponge road for easy discharge. According to its characteristics, the sponge road has a sand and gravel layer under the permeable road surface, and the multi-porous structure allows the water on the road surface to quickly infiltrate into the ground and be stored in the water storage ditch below. Because the cost of sponge road is relatively high, the partial sponge road treatment combined with the road surface slope can solve the problem of water accumulation while saving a lot of money.

[0014] The overall structure of the sponge road surface and the underground pipe gallery is that the drainage conduits are evenly arranged, connected to the water storage ditch (8) below the sponge road surface and then connected to the drainage bin on one side of the tunnel; that is, the accumulated water that penetrates into the water storage ditch through the sponge road is introduced into the tunnel through the drainage conduits, and then the accumulated water is processed and utilized.

[0015] The underground pipe gallery is the most comprehensive in the entire system. The underground pipe gallery is divided into three parts. One side is a drainage tank for the storage and sedimentation of sponge road surface water, and the other side is divided into two parts, the upper part and the lower part.

[0016] Drainage ditches are designed on both sides of the tunnel road to solve the problem of water accumulation in the tunnel.

[0017] The underground pipe gallery drainage construction will drain the gas and other public transportation lines in the drainage tank, and use the underground tunnel road below for traffic, alleviating the current situation of ground traffic congestion. The overall underground pipe gallery is divided into three small entities with different functions, which maximizes the use of space and rationalizes the use of funds as much as possible. The water and tunnel water are collected into the main drainage pipeline. The main drainage system of the sponge pavement-underground pipe gallery complex is located on the lower side of the pipe gallery, and a V-shaped slope with high-strength corrosion-resistant materials is installed to effectively collect water resources. After sedimentation and filtration, it is introduced into the reservoir for supply to municipal industries and complete the secondary utilization of rainwater resources.

[0018] Advantages and effects:

[0019] A sponge pavement-underground integrated pipe gallery system and construction technology. The system effectively combines above-ground and underground resources. On the one hand, it basically realizes the rational and efficient utilization of natural resources and reduces the traffic burden and heat island effect in the city. On the other hand, due to the integrated multifunctionality of the system and its strong comprehensiveness, it greatly saves economic costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 The rendering of the sponge pavement-underground pipe gallery integrated system

[0021] Figure 2 The rendering of the underground pipe gallery integrated system

[0022] Figure 3 Sponge pavement rendering

[0023] Figure 4 This is the rendering of the sponge pavement-underground pipeline corridor integrated system. DETAILED DESCRIPTION

[0024] A sponge pavement-underground integrated pipe gallery system, the system comprises a sponge pavement and an underground integrated pipe gallery, the sponge pavement, the underground pipe gallery and the tunnel are integrated into one by a combination method, because the sponge pavement has high water permeability and high load-bearing capacity, the ground surface is combined with a sponge pavement and a rigid pavement, in order to achieve the maximum economic saving effect, the sponge pavement (1) is implemented only on one side of the sidewalk, the motor vehicle lane (2) is a rigid pavement, and the pavement is formed with a certain slope, that is, the junction between the sidewalk and the motor vehicle lane is slightly lower than the road level, so that the accumulated water is easy to collect and reasonably discharge;

[0025] The underground pipe gallery system is divided into three parts on both sides. One side corresponds to the sponge road (1) and serves as a drainage tank (3) to drain the accumulated water stored in the sponge road. This is the first part. The other side is divided into upper and lower parts. The upper part is used as the second part for various public pipeline tanks (4) for municipal administration, electricity, communication, and gas. The lower part is used as a tunnel road (5) for traffic. Pipeline materials with high strength and corrosion resistance are strictly selected to maximize space utilization.

[0026] A V-shaped slope (7) with high strength and corrosion resistance is also arranged below the bottom of the pipe gallery. The V-shaped slope (7) is connected to the main drainage conduit, so that the accumulated water in the drainage bin and the accumulated water in the tunnel drainage ditch can be collected in the main drainage conduit for quick and effective drainage. The V-shaped slope (7) is connected to the drainage bin (3) and the drainage ditch (6) of the tunnel road (5).

[0027] Drainage ditches (6) are arranged on both sides of the tunnel road (5), and the accumulated water in the drainage tank on the other side of the underground pipe gallery is collected in the main drainage conduit, and then introduced into sedimentation filtration, water storage tanks and other devices to supply water to municipal industries.

[0028] The construction process of a sponge pavement-underground integrated pipeline corridor system as described above includes the following steps: (1) construction of a local sponge road on the pavement; (2) coordinated connection construction of the sponge pavement and the underground pipeline corridor; (3) layout of the underground integrated pipeline corridor system; (4) construction of tunnels and tunnel drainage; and (5) drainage construction of the sponge pavement-underground integrated pipeline corridor.

[0029] The construction of partial sponge road on the road surface means that the sidewalk is treated with sponge road, and the motor vehicle lane is ordinary rigid road surface. The construction method is the same as that of traditional road surface, and there is a certain slope at the junction, that is, slightly lower than the motor vehicle lane, so that the accumulated water can be better collected at the sponge road for easy discharge. According to its characteristics, the sponge road has a sand and gravel layer under the permeable road surface, and the multi-porous structure allows the water on the road surface to quickly infiltrate into the ground and be stored in the water storage ditch below. Because the cost of sponge road is relatively high, the partial sponge road treatment combined with the road surface slope can solve the problem of water accumulation while saving a lot of money.

[0030] The overall structure of the sponge road surface and the underground pipe gallery is that the drainage conduits are evenly arranged, connected to the water storage ditch (8) below the sponge road surface and then connected to the drainage bin on one side of the tunnel; that is, the accumulated water that penetrates into the water storage ditch through the sponge road is introduced into the tunnel through the drainage conduits, and then the accumulated water is processed and utilized.

[0031] The underground pipe gallery is the most comprehensive in the entire system. The underground pipe gallery is divided into three parts. One side is a drainage tank for the storage and sedimentation of sponge road surface water, and the other side is divided into two parts, the upper part and the lower part. The upper part is used for urban municipal water supply and drainage, electricity, and drainage ditches are designed on both sides of the tunnel road to solve the problem of tunnel water accumulation.

[0032] The underground pipe gallery drainage construction will drain the gas and other public transportation lines in the drainage tank, and use the underground tunnel road below for traffic, alleviating the current situation of ground traffic congestion. The overall underground pipe gallery is divided into three small entities with different functions, which maximizes the use of space and rationalizes the use of funds as much as possible. The water and tunnel water are collected into the main drainage pipeline. The main drainage system of the sponge pavement-underground pipe gallery complex is located on the lower side of the pipe gallery, and a V-shaped slope with high-strength corrosion-resistant materials is installed to effectively collect water resources. After sedimentation and filtration, it is introduced into the reservoir for supply to municipal industries and complete the secondary utilization of rainwater resources.

[0033] In summary, the sponge pavement-underground pipe gallery integrated system combines the three projects of sponge pavement, underground pipe gallery and tunnel into a whole. When rain and flood come, the accumulated water is collected from the sloped road to the sponge road. Under the sponge pavement is a specially treated sand and gravel layer. With its permeable and multi-porous structure, the accumulated water quickly seeps into the ground and is cached in the water storage ditch below. Then, it is introduced into the drainage tank through the drainage pipe connecting the water storage ditch and the pipe gallery for sedimentation. After filtering, rainwater treatment and other existing purification devices, it is stored in the reservoir. When needed by municipal and other industries, it is discharged to the ground through the pump station to implement water supply such as green irrigation. The combination of sponge pavement and underground pipe gallery makes the entire drainage system complete, with strong integrated functionality, and reduces engineering costs.

[0034] After the surface water flows into the drainage tank in the tunnel, it continues to be discharged through the tunnel's main drainage system. In addition to one side of the drainage tank, the other side of the entire underground tunnel space also includes common pipelines and tunnel roads. Urban municipal water supply and drainage, electricity, gas and other transportation lines are concentrated above the tunnel, and the lower part is used as a tunnel road for traffic, which reduces the burden of ground traffic, maximizes space utilization, and is highly practical.

[0035] When there is water accumulation in the tunnel of the pipeline corridor, in order to maximize the drainage effect, a certain downward slope is made on both sides of the tunnel pavement during construction, and the accumulated water flows into the drainage ditches on both sides of the road through the pavement slope.

[0036] The accumulated water in the drainage ditch and the water resources in the drainage tank will eventually converge into the main drainage pipe. In order to facilitate the collection, a V-shaped slope made of high-strength and corrosion-resistant materials is adopted under the pipe gallery to effectively collect and drain the water resources into the main drainage duct, and then introduce them into various purification devices to complete the virtuous water cycle of "drainage-storage-secondary utilization".

[0037] After continuously optimizing the construction process, the present invention has formed a comprehensive system integrating sponge pavement, underground pipeline gallery and tunnel highway, which effectively solves the problem of "drainage-storage-secondary utilization" of road surface water, while also reducing the burden on road traffic and ensuring maximum space utilization and economic rationalization.

Claims

1. A sponge pavement-underground integrated pipe gallery system, characterized by: The system includes two parts, a sponge pavement and an underground comprehensive pipe gallery. The sponge pavement, the underground pipe gallery and the tunnel are integrated into one by a combination method. The ground surface is treated by a combination of a sponge pavement and a rigid pavement. The sponge pavement (1) is implemented only on one side of the sidewalk. The motor vehicle lane (2) is a rigid pavement, and the road surface is formed with a certain slope, that is, the junction between the sidewalk and the motor vehicle lane is lower than the road level. The underground pipe gallery system is divided into two sides with a total of three parts. One side corresponds to the sponge road (1) as a drainage tank (3) for draining the accumulated water stored in the sponge road, which is the first part. The other side is divided into upper and lower parts. The upper part is used as the second part for municipal, electricity, communication, gas and other public pipeline tanks (4). The lower part is used as a tunnel road (5) for traffic. A V-shaped slope (7) with high strength and corrosion resistance is also arranged below the bottom of the pipe gallery, and the V-shaped slope (7) is connected to the main drainage conduit; the V-shaped slope (7) is connected to the drainage bin (3) and the drainage ditch (6) of the tunnel road (5); The overall structure of the sponge road surface and the underground pipe gallery is that the drainage conduits are evenly arranged, connected to the water storage ditch (8) below the sponge road surface and then connected to the drainage bin on one side of the tunnel; that is, the accumulated water that penetrates into the water storage ditch through the sponge road is introduced into the tunnel through the drainage conduits, and then the accumulated water is processed and utilized.

2. The sponge pavement-underground integrated pipe gallery system according to claim 1 is characterized in that: Drainage ditches (6) are arranged on both sides of the tunnel road (5).

3. A construction process of a sponge pavement-underground integrated pipe gallery system as claimed in claim 1, characterized in that: The process includes the following steps: (1) construction of local sponge road on the pavement; (2) coordinated connection construction of sponge pavement and underground pipe gallery; (3) layout of underground comprehensive pipe gallery system; (4) construction of tunnels and tunnel drainage; (5) drainage construction of sponge pavement-underground comprehensive pipe gallery.

4. The construction process according to claim 3, characterized in that: Partial sponge road construction on the pavement means that the sidewalk is treated with sponge road, and the motor vehicle lane is an ordinary rigid pavement. The construction method is the same as the traditional construction method, and there is a certain slope at the junction, that is, it is slightly lower than the motor vehicle lane. According to its characteristics, the sponge road has a sand and gravel layer under the permeable pavement, and the multi-porous structure allows the water on the road surface to quickly infiltrate into the ground.