A grouting sleeve and its preparation method and application

By designing linear convex ribs in the grouting sleeve and using hot forging or cold forging preparation methods, the problem of insufficient anchorage of steel bar connections is solved, the anchoring effect and production efficiency of the grouting sleeve are improved, the steel bars are prevented from falling off, and production is reduced. cost.

CN110080466BActive Publication Date: 2024-10-11CHINA ACAD OF BUILDING RES +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201810081510.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2018-01-26
Publication Date
2024-10-11
Estimated Expiration
2038-01-26

AI Technical Summary

Technical Problem

In prefabricated concrete structural buildings, the anchorage of steel bar connections is insufficient, causing the steel bars to easily fall off, and the shape of the ribs of the existing grouting sleeve affects the filling uniformity and connection performance of the non-shrinkage grouting material.

Method used

A grouting sleeve with linear convex ribs is designed, which is prepared by hot forging or cold forging. The shape of the inner wall convex ribs of the grouting sleeve is improved, and the anchoring effect of non-shrinkage grouting material and steel bars is enhanced. A specific mold is used Styling methods improve production efficiency and reduce costs.

Benefits of technology

It improves the anchoring effect of steel bars and grouting sleeves, prevents steel bars from falling off, promotes uniform filling of non-shrinkage grouting materials, enhances connection performance, and reduces production costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110080466B_ABST
    Figure CN110080466B_ABST
Patent Text Reader

Abstract

The present invention relates to a grouting sleeve and its preparation method and application. The grouting sleeve includes a first end, a second end, a grouting hole, a grouting hole and a plurality of convex ribs. The first end is a positioning portion or a threaded connection portion, the second end is a constriction portion, the convex ribs are located inside the grouting sleeve, and the convex ribs are linear. The provision of the convex ribs in the present invention can effectively prevent the steel bars or grouting materials from being pulled out of the grouting sleeve after the steel bar sleeve grouting joint is formed, thereby ensuring the connection performance of the steel bar sleeve grouting joint; at the same time, the hot forging or cold forging method improves the density of the grouting sleeve end and improves the anchoring effect.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a structure for connecting steel bars of precast concrete components in prefabricated assembled buildings, and in particular to a grouting sleeve and a preparation method and application thereof, belonging to the technical field of construction engineering. Background Art

[0002] Building industrialization is the main development direction of my country's future construction industry. The development space of prefabricated and assembled concrete structure buildings is very broad. The connection problem of steel bars in prefabricated components is one of its key technologies. Under the premise of ensuring the connection performance, developing a more reasonable joint form is of great significance to the promotion of building industrialization.

[0003] In the field of prefabricated and assembled concrete structure buildings, grouting joints are usually used to connect the steel bars of prefabricated concrete components. The grouting joints are composed of a grouting sleeve, steel bars to be connected at both ends, and non-shrinkage high-strength cement mortar (grouting material). The principle is: pour the non-shrinkage grouting material into the grouting sleeve to fill the gap between the grouting sleeve and the steel bars. After the non-shrinkage grouting material hardens, it is tightly combined with the steel bars to be connected and the grouting sleeve to form an anchor connection, thereby connecting the two steel bars together.

[0004] The performance of the anchor connection between the grouting sleeve and the steel bar and the non-shrinkage grouting material depends on the shape and size of the inner cavity of the grouting sleeve (annular ribs or grooves, etc.), the shape and size of the steel bar (base circle diameter, transverse rib size, etc.) and the strength of the non-shrinkage grouting material. Among them, the non-shrinkage grouting material is required to have a 28-day compressive strength of more than 85MPa and have multiple properties such as early strength, high fluidity and micro expansion. Summary of the invention

[0005] The main purpose of the present invention is to provide a grouting sleeve and its preparation method and application. The technical problem to be solved is to provide a shape of the convex ribs inside the grouting sleeve, which improves the anchorage of the non-shrinkage grouting material with the grouting sleeve and the two steel bars to be connected. At the same time, the present invention provides a preparation method for both ends of the grouting sleeve, which improves production efficiency and reduces production costs. At the same time, it further improves the anchorage effect of the steel bars and prevents the steel bars from detaching from the grouting material.

[0006] The purpose of the present invention and the solution to the technical problem are achieved by adopting the following technical solutions.

[0007] A grouting sleeve proposed in accordance with the present invention includes a first end, a second end, a grouting hole, a grouting hole and a plurality of ribs, wherein the first end is a positioning portion or a threaded connection portion, the second end is a constriction portion, the ribs are located inside the grouting sleeve, and the ribs are linear.

[0008] The purpose of the present invention and the solution to its technical problems can be further achieved by adopting the following technical measures.

[0009] Preferably, in the aforementioned grouting sleeve, the convex rib is in a straight line shape.

[0010] Preferably, in the aforementioned grouting sleeve, two adjacent convex ribs form an eight-shaped shape or an inverted eight-shaped shape.

[0011] Preferably, the aforementioned grouting sleeve defines the direction from the grouting hole to the grouting hole as the first direction, defines the first end to the grouting hole as the first part of the grouting sleeve, and two adjacent convex ribs inside the first part are in an inverted eight-shape in the first direction; or, defines the grouting hole to the grouting hole as the second part of the grouting sleeve, and two adjacent convex ribs inside the second part are in an eight-shape in the first direction; or, defines the grouting hole to the second end as the third part of the grouting sleeve, and two adjacent convex ribs inside the third part are in an inverted eight-shape in the first direction.

[0012] The purpose of the present invention and the solution to the technical problem are also achieved by adopting the following technical solutions.

[0013] A preparation method for a steel bar connection proposed in the present invention includes obtaining a grouting sleeve preform; using a hot forging or cold forging method to make one end of the grouting sleeve preform become a first plastic unit, and making the other end of the grouting sleeve preform become a second plastic unit; using a first mold to shape the first plastic unit into a positioning portion or a threaded connection portion, and using a second mold to shape the second plastic unit into a constriction portion, so as to obtain the grouting sleeve.

[0014] The purpose of the present invention and the solution to its technical problems can be further achieved by adopting the following technical measures.

[0015] Preferably, the aforementioned method for preparing a grouting sleeve further comprises extruding the outer wall of the grouting sleeve preform to obtain convex ribs, wherein the convex ribs are located inside the grouting sleeve, and the convex ribs are linear.

[0016] Preferably, in the aforementioned method for preparing a grouting sleeve, the convex rib is in the shape of a straight line, a figure eight, or an inverted figure eight.

[0017] The purpose of the present invention and the solution to the technical problem are also achieved by adopting the following technical solutions.

[0018] A steel bar grouting joint proposed in accordance with the present invention comprises a grouting sleeve, a first steel bar to be connected, a second steel bar to be connected and a non-shrinkage grouting material, wherein the non-shrinkage grouting material is used to fill the gap formed by the grouting sleeve and the first steel bar to be connected and the second steel bar to be connected, and the grouting sleeve is any one of the aforementioned items.

[0019] The purpose of the present invention and the solution to the technical problem are also achieved by adopting the following technical solutions.

[0020] According to a connection method of a steel bar grouting joint proposed by the present invention, according to the aforementioned steel bar grouting joint, the connection method includes: inserting the first steel bar to be connected from the first end of the grouting sleeve, adjusting it to the first preset position and fixing it, and sealing the gap between the first steel bar to be connected and the first end; fixing the constriction portion of the grouting sleeve on the template, and sealing the gap between the grouting sleeve and the template, respectively using the first connecting pipe and the second connecting pipe to pull the grouting hole and the grouting hole to the outside of the structural surface of the prefabricated component; pouring concrete, vibrating, and curing until the mold is removed to obtain the prefabricated component; pulling the prefabricated component to the second preset position, inserting the second steel bar to be connected from the constriction portion of the grouting sleeve, adjusting it to the third preset position and fixing it, and sealing the gap between the prefabricated component and the lower end prefabricated component; pouring non-shrinkage grouting material through the first connecting pipe until the non-shrinkage grouting material overflows from the second connecting pipe, and sealing the grouting hole and the grouting hole; after the non-shrinkage grouting material hardens, the steel bar grouting joint is obtained.

[0021] The purpose of the present invention and the solution to its technical problems can be further achieved by adopting the following technical measures.

[0022] Preferably, in the aforementioned method for connecting a steel bar grouting joint, the connecting portion of the first steel bar to be connected has threads, and the first end portion of the grouting sleeve is a threaded connecting portion.

[0023] By means of the above technical solution, the present invention provides a grouting sleeve and a preparation method and application thereof, which have at least the following advantages:

[0024] 1. The inner wall of the grouting sleeve provided by the present invention has linear convex ribs, which improves the anchoring effect of the non-shrinkage grouting material and the two steel bars to be connected.

[0025] The inventor of the present invention has found in long-term practical operation that the connected steel bars are easy to fall off from the anchored grouting sleeve. After many tests, it was found that the rib shape of the inner wall of the grouting sleeve is one of the reasons for the steel bars to fall off.

[0026] The existing convex ribs are in the shape of a circular ring, which affects the uniformity of the filling of the non-shrinkage grouting material, and further affects the uniformity of the force on the grouting sleeve, causing the steel bar to fall off after the connection. The linear convex ribs provided by the present invention promote the filling of the non-shrinkage grouting material in the grouting sleeve, making the distribution of the non-shrinkage grouting material in the grouting sleeve more uniform, further improving the anchoring effect of the grouting sleeve and the steel bar to be connected, and preventing the steel bar from falling off. It can effectively prevent the steel bar or grouting material from being pulled out of the grouting sleeve after the steel bar sleeve grouting joint is formed, thereby ensuring the connection performance of the steel bar sleeve grouting joint.

[0027] 2. The present invention provides a method for preparing a grouting sleeve, which improves the production efficiency of the grouting sleeve and reduces the production cost.

[0028] The present invention adopts a hot forging or cold forging preparation method to prepare the first end and the second end of the grouting sleeve. Specifically, the two ends of the preform are first prepared into plastic units by hot forging or cold forging, and then a specific mold is used to shape the plastic unit into a required shape to obtain a grouting sleeve with a positioning portion, a threaded connection portion, and a constriction portion. The preparation method provided by the present invention has a simple preparation process, is easy to operate, improves preparation efficiency, and reduces production costs.

[0029] 3. The grouting sleeve provided by the present invention further improves the anchoring effect of the steel bars.

[0030] The hot forging or cold forging preparation method adopted in the present invention changes the internal crystal structure of the grouting sleeve preform during the calcination process, so that the arrangement of the crystals at the first end and the second end is more compact, the stress degree of the first end and the second end is improved, and the first end and the second end are not easy to deform, which further improves the anchoring effect between the steel bars to be connected and the grouting sleeve, and prevents the steel bars from falling off.

[0031] The above description is only an overview of the technical solution of the present invention. In order to more clearly understand the technical means of the present invention and implement it according to the contents of the specification, the following is a detailed description of the preferred embodiments of the present invention in conjunction with the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Figure 1 Schematic diagram of a grouting sleeve provided in an embodiment of the present invention.

[0033] Figure 2 is another schematic diagram of the grouting sleeve provided in an embodiment of the present invention.

[0034] Figure 3 It is a schematic diagram of the convex ribs of the grouting sleeve provided in an embodiment of the present invention.

[0035] Figure 4is another schematic diagram of the convex ribs of the grouting sleeve provided in an embodiment of the present invention.

[0036] Figure 5 is another schematic diagram of the convex ribs of the grouting sleeve provided in an embodiment of the present invention.

[0037] Figure 6 is another schematic diagram of the convex ribs of the grouting sleeve provided in an embodiment of the present invention.

[0038] 11 steel bars to be connected, 12 steel bars to be connected, 13 steel bars to be connected, 14 steel bars to be connected, 2 grouting holes, 3 non-shrinkage grouting material, 4 grouting sleeves, 5 ribs, 51 straight ribs, 52 inverted figure eight ribs, 53 figure eight ribs, 54 inverted figure eight ribs, 501-505 ribs, 511-518 ribs, 6 slurry outlet holes, 7 positioning portion, 8 threaded connection portion, 9 tie-mouth portion. DETAILED DESCRIPTION

[0039] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined invention purpose, the following is a detailed description of a grouting sleeve and its preparation method and application according to the present invention, its specific implementation method, structure, characteristics and effects, in combination with the accompanying drawings and preferred embodiments. In the following description, different "one embodiment" or "embodiment" does not necessarily refer to the same embodiment. In addition, specific features, structures or characteristics in one or more embodiments may be combined in any suitable form.

[0040] The invention provides a grouting sleeve.

[0041] The grouting sleeve provided by the present invention comprises a first end, a second end, a grouting hole, a grouting hole and a plurality of convex ribs, wherein the first end is a positioning portion or a threaded connection portion, the second end is a constriction portion, the convex ribs are located inside the grouting sleeve, and the convex ribs are linear.

[0042] The present invention provides a grouting sleeve with linear convex ribs. It should be noted that the "linear" described in the present invention can be a linear shape, or an arc with a certain curvature, preferably a linear shape. It should be further noted that the grouting sleeve is generally cylindrical, so its inner wall usually has a certain curvature, and the convex ribs provided by the present invention can be linear convex ribs that are low at both ends and high in the middle, or can be arc-shaped convex ribs that are along the inner wall and have a certain curvature. Here, there are no excessive restrictions on the direction of the linear shape. A single grouting sleeve can have multiple convex ribs of different shapes and sizes at the same time.

[0043] Preferably, the length of the convex rib is 1mm-100mm.

[0044] Furthermore, the ribs of the grouting sleeve provided by the present invention are in a straight line shape. Figure 3As shown in 51.

[0045] It should be noted that the "straight line" here can be a straight line in a strict sense, or a "straight line" along the inner wall with a certain curvature. Here, there is no excessive restriction on the direction of the "straight line" convex rib.

[0046] The straight rib provided by the present invention can also be Figure 4 and Figure 5 The two ribs on the same cross section of the casing are located on both sides of the cross section, as shown in Figure 4 501 and 502, 504 and 505 in; Figure 5 511 and 512, 514 and 515, 517 and 518. The ribs on two adjacent cross sections are arranged alternately along the axial direction of the sleeve. Figure 4 501 and 503, 502 and 503, 504 and 503, 505 and 503; Figure 5 511 and 513, 512 and 513, 514 and 516, 515 and 516, 517 and 516, 518 and 516.

[0047] Furthermore, in the grouting sleeve provided by the present invention, two adjacent convex ribs form an eight-shaped or inverted eight-shaped shape. Figure 6 As shown, preferably, the direction from the grouting hole to the grouting hole is defined as the first direction, the first end to the grouting hole is defined as the first part of the grouting sleeve, and the two adjacent convex ribs 54 inside the first part are in an inverted eight-shaped shape in the first direction; or, the grouting hole to the grouting hole is defined as the second part of the grouting sleeve, and the two adjacent convex ribs 53 inside the second part are in an eight-shaped shape in the first direction; or, the grouting hole to the second end is defined as the third part of the grouting sleeve, and the two adjacent convex ribs 52 inside the third part are in an inverted eight-shaped shape in the first direction.

[0048] The inverted eight-shaped ribs in the third part promote the flow of the non-shrinkage grouting material in the third part, and prevent the non-shrinkage grouting material that has been poured into the third part from flowing in the third part; the eight-shaped ribs in the second part promote the flow of the non-shrinkage grouting material in the second part, speed up the filling speed of the grouting material in the second part, and prevent the flow of the grouting material that has been poured into the second part; the inverted eight-shaped ribs in the first part are more conducive to preventing the flow of the grouting material in this part. The ribs combined with the inverted eight-shaped ribs provided by the present invention promote the flow speed of the grouting material in the casing during grouting, improve the grouting speed, and prevent the flow of the grouting material in the part that has been grouted, improve the stability of the grouting, further improve the uniformity of the distribution of the non-shrinkage grouting material in the casing, and improve the anchoring effect.

[0049] The invention also provides a method for preparing a grouting sleeve.

[0050] The preparation method of the grouting sleeve provided by the present invention includes obtaining a grouting sleeve preform; using a hot forging or cold forging method to make one end of the grouting sleeve preform become a first plastic unit, and making the other end of the grouting sleeve preform become a second plastic unit; using a first mold to shape the first plastic unit into a positioning part or a threaded connection part, and using a second mold to shape the second plastic unit into a constriction part, so as to obtain the grouting sleeve.

[0051] Preferably, when the first end is a positioning portion, the hot forging temperature is 800-1600°C, the hot forging time is 1-10s, the molding time is 1-10s, and the cold forging temperature is -60-60°C, the cold forging time is 1-10s, and the molding time is 1-10s; when the first end is a threaded connection portion, the hot forging temperature is 800-1600°C, the hot forging time is 1-10s, the molding time is 1-10s, and the cold forging temperature is -60-60°C, the cold forging time is 1-10s, and the molding time is 1-10s; the hot forging temperature of the second end is 800-1600°C, the hot forging time is 1-10s, the molding time is 1-10s, and the cold forging temperature is -60-60°C, the cold forging time is 1-10s, and the molding time is 1-10s.

[0052] It should be noted that the grouting sleeve preform of the present invention may be a preform without processing the two ends, or a preform without processing the two ends and without convex ribs.

[0053] The invention further provides a steel bar grouting joint and a connection method thereof.

[0054] The present invention provides a steel bar grouting joint, such as Figure 1 As shown, it includes a grouting sleeve 4, a first steel bar to be connected 11, a second steel bar to be connected 12 and a non-shrinkage grouting material 3, and the non-shrinkage grouting material is used to fill the gap formed by the grouting sleeve and the first steel bar to be connected and the second steel bar to be connected.

[0055] The first steel bar 11 to be connected is inserted from the first end 7 (positioning part) of the grouting sleeve 4. The positioning part 7 is formed by shrinking the diameter through hot forging or cold forging process. It is adjusted to the first preset position and then fixed to seal the gap between the first steel bar 11 to be connected and the first end 7. The constriction part 9 of the grouting sleeve 4 is fixed on the template. The constriction part 9 is formed by shrinking the diameter through hot forging or cold forging process, and the gap between the grouting sleeve 4 and the template is sealed. The grouting hole 2 and the grouting hole 6 are pulled to the preset position by the first connecting pipe and the second connecting pipe respectively. The prefabricated component is placed outside the structural surface; concrete is poured, vibrated, and cured until the formwork is removed to obtain the prefabricated component; the prefabricated component is pulled to the second preset position, the second steel bar 12 to be connected is inserted from the constriction portion 9 of the grouting sleeve 4, and it is adjusted to the third preset position and fixed to seal the gap between the prefabricated component and the lower prefabricated component; the non-shrinkage grouting material 3 is poured through the first connecting pipe until the non-shrinkage grouting material overflows from the second connecting pipe, and the grouting hole and the grouting hole are sealed; after the non-shrinkage grouting material is hardened, the steel bar grouting joint is obtained. Preferably, the steel bar to be connected in this embodiment can be a steel bar without a thread at the end.

[0056] The invention further provides a steel bar grouting joint and a connection method thereof.

[0057] The present invention provides a steel bar grouting joint, such as Figure 2 As shown, it includes a grouting sleeve 4, a steel bar to be connected 13, a steel bar to be connected 14 and a non-shrinkage grouting material 3, wherein the non-shrinkage grouting material is used to fill the gap formed by the grouting sleeve and the first steel bar to be connected and the second steel bar to be connected.

[0058] One end of the grouting sleeve 4 is processed with a threaded connection part 8 with a reduced inner diameter. The threaded connection part 8 is formed by reducing the diameter through hot forging and then processing the inner thread. The other end of the grouting sleeve 4 is processed with a constriction part 9 with a reduced inner diameter. The constriction part 9 is formed by reducing the diameter through hot forging or cold forging. The steel bar 13 to be connected, which is processed with an external thread, is connected to the threaded connection part 8 of the grouting sleeve 4 through a thread; the steel bar 14 to be connected is inserted from the end of the grouting sleeve 4 with the constriction part 9, and then the non-shrinkage grouting material 3 enters the grouting sleeve 4 through the grouting hole 2. When it overflows from the grouting hole 6, it means that it has filled the gaps between the steel bars 13 to be connected, the steel bars 14 to be connected and the grouting sleeve 4. After it hardens, the grouting joint connection is completed. In the specific construction, at the prefabrication stage of the component, the end of the steel bar 13 to be connected is first processed with an external thread, and then the steel bar 13 to be connected is connected to the threaded connection part 8 of the grouting sleeve 4 by threading, and then the end of the grouting sleeve 4 with the tie mouth 9 is fixed on the template, and the gap between the end of the grouting sleeve 4 and the template is sealed, and the grouting hole 2 and the grouting hole 6 of the grouting sleeve 4 are led to the outside of the prefabricated component structure surface through the connecting pipe. Pour the concrete, vibrate and maintain until the mold is removed, and the component is completed. During on-site installation, the prefabricated component is hoisted to the specified position, and another steel bar 14 to be connected of the prefabricated component is inserted into the grouting sleeve 4 of the component, fixed, and the grouting seam between the components is blocked. Then, the non-shrinkage grouting material 3 is poured from the reserved grouting hole 2 until the non-shrinkage grouting material 3 overflows from the grouting hole 6 in sequence, and the grouting hole 2 and the grouting hole 6 on each connecting sleeve 4 are blocked. After the non-shrinkage grouting material 3 hardens, the steel bar connection of the two components is completed, and the two components are also connected together.

[0059] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0060] It is understandable that the related features in the above devices can be referenced to each other. In addition, the "first", "second" and the like in the above embodiments are used to distinguish the various embodiments, and do not represent the advantages and disadvantages of the various embodiments.

[0061] In the description provided herein, a large number of specific details are described. However, it is understood that embodiments of the present invention can be practiced without these specific details. In some instances, well-known structures and technologies are not shown in detail so as not to obscure the understanding of this description.

[0062] Similarly, it should be understood that in order to streamline the present disclosure and aid in understanding one or more of the various inventive aspects, in the above description of exemplary embodiments of the present invention, various features of the present invention are sometimes grouped together into a single embodiment, figure, or description thereof. However, the disclosed apparatus should not be interpreted as reflecting the intent that the claimed invention requires more features than those expressly recited in each claim. Rather, as reflected in the claims below, inventive aspects lie in less than all of the features of the individual embodiments disclosed above. Therefore, the claims that follow the specific embodiment are hereby expressly incorporated into the specific embodiment, with each claim itself serving as a separate embodiment of the present invention.

[0063] Those skilled in the art will appreciate that the components in the devices in the embodiments may be adaptively changed and arranged in one or more devices different from the embodiments. The components in the embodiments may be combined into one component, and further may be divided into multiple subcomponents. All features disclosed in this specification (including the accompanying claims, abstracts and drawings) and all components of any device so disclosed may be combined in any combination, except that at least some of such features are mutually exclusive. Unless otherwise expressly stated, each feature disclosed in this specification (including the accompanying claims, abstracts and drawings) may be replaced by an alternative feature that provides the same, equivalent or similar purpose.

[0064] In addition, it will be appreciated by those skilled in the art that although some embodiments described herein include certain features included in other embodiments but not other features, the combination of features of different embodiments is meant to be within the scope of the present invention and to form different embodiments. For example, in the claims below, any one of the claimed embodiments may be used in any combination. The various component embodiments of the present invention may be implemented in hardware, or in combination thereof.

[0065] It should be noted that the above embodiments illustrate the present invention rather than limit it, and that those skilled in the art may design alternative embodiments without departing from the scope of the appended claims. In the claims, any reference symbol between brackets shall not be construed as a limitation on the claims. The word "comprising" does not exclude the presence of parts or components not listed in the claims. The word "one" or "an" preceding a part or component does not exclude the presence of a plurality of such parts or components. The present invention may be implemented by means of a device comprising several different parts. In a claim listing several parts, several of these parts may be embodied by the same component item. The use of the words first, second, and third, etc. does not indicate any order. These words may be interpreted as names.

[0066] The numerical range described in the present invention includes all numerical values ​​within this range, and includes the range value composed of any two numerical values ​​within this range.

[0067] The technical features in the claims and / or the specification of the present invention may be combined, and the combination is not limited to the combination obtained by reference in the claims. The technical solution obtained by combining the technical features in the claims and / or the specification is also within the protection scope of the present invention.

[0068] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Any simple modification, equivalent change and modification made to the above embodiment according to the technical essence of the present invention still falls within the scope of the technical solution of the present invention.

Claims

1. A grouting sleeve, characterized in that: include, A first end, a second end, a grouting hole, a grouting hole and a plurality of convex ribs; two adjacent convex ribs form an eight-shaped or inverted eight-shaped shape; the direction from the grouting hole to the grouting hole is defined as the first direction, the first end to the grouting hole is defined as the first part of the grouting sleeve, and two adjacent convex ribs in the first part are in an inverted eight-shaped shape in the first direction; or, the grouting hole to the grouting hole is defined as the second part of the grouting sleeve, and two adjacent convex ribs in the second part are in an eight-shaped shape in the first direction; or, the grouting hole to the second end is defined as the third part of the grouting sleeve, and two adjacent convex ribs in the third part are in an inverted eight-shaped shape in the first direction; the length of the convex rib is 1mm-100mm; wherein, the first end is a positioning portion or a threaded connection portion, and the second end is a constriction portion; The convex rib is located inside the grouting sleeve, and the convex rib is linear.

2. A method for preparing a grouting sleeve according to claim 1, characterized in that: include, Obtaining a grouting sleeve prefabricated body; Using hot forging or cold forging methods, one end of the grouting sleeve preform becomes a first plastic unit, and the other end of the grouting sleeve preform becomes a second plastic unit; The first plastic unit is formed into a positioning portion or a threaded connection portion by using a first mold, and the second plastic unit is formed into a constriction portion by using a second mold, thereby obtaining the grouting sleeve.

3. A method for preparing a grouting sleeve according to claim 2, characterized in that: The preparation method further comprises extruding the outer wall of the grouting sleeve preform to obtain convex ribs, wherein the convex ribs are located inside the grouting sleeve and are in a straight line shape.

4. A method for preparing a grouting sleeve according to claim 2, characterized in that: When the first end is a positioning part, the hot forging temperature is 800-1600°C, the hot forging time is 1-10s, the molding time is 1-10s, and the cold forging temperature is -60-60°C, the cold forging time is 1-10s, and the molding time is 1-10s; when the first end is a threaded connection part, the hot forging temperature is 800-1600°C, the hot forging time is 1-10s, the molding time is 1-10s, and the cold forging temperature is -60-60°C, the cold forging time is 1-10s, and the molding time is 1-10s; the hot forging temperature of the second end is 800-1600°C, the hot forging time is 1-10s, the molding time is 1-10s, and the cold forging temperature is -60-60°C, the cold forging time is 1-10s, and the molding time is 1-10s.

5. A steel bar grouting joint, characterized in that: include, Grouting sleeve, first steel bar to be connected, second steel bar to be connected and non-shrinkage grouting material, The non-shrinkage grouting material is used to fill the gap formed by the grouting sleeve and the first steel bar to be connected and the second steel bar to be connected. The grouting sleeve is as described in claim 1.

6. A method for connecting a steel bar grouting joint, characterized in that: According to the steel bar grouting joint of claim 5, the connection method comprises: Inserting the first steel bar to be connected from the first end of the grouting sleeve, adjusting it to a first preset position and fixing it, so as to seal the gap between the first steel bar to be connected and the first end; The constriction portion of the grouting sleeve is fixed on the template, and the gap between the grouting sleeve and the template is sealed, and the grouting hole and the grouting hole are pulled to the outside of the structural surface of the prefabricated component by using the first connecting pipe and the second connecting pipe respectively; Pouring concrete, vibrating, and curing until demoulding to obtain prefabricated components; The prefabricated component is pulled to a second preset position, the second steel bar to be connected is inserted from the constriction portion of the grouting sleeve, and the prefabricated component is adjusted to a third preset position and then fixed to seal the gap between the prefabricated component and the lower prefabricated component; Pour the non-shrinkage grouting material through the first connecting pipe until the non-shrinkage grouting material overflows from the second connecting pipe, and seals the grouting hole and the grouting hole; After the non-shrinkage grouting material hardens, the steel bar grouting joint is obtained.

7. A method for connecting a steel bar grouting joint according to claim 6, characterized in that: The connecting portion of the first steel bar to be connected has threads, and the first end of the grouting sleeve is a threaded connecting portion.