Pneumatic gangue combined filling device and coal mining method

Through the combined filling device of pneumatic gangue and coal mining method, the hydraulic support and pneumatic conveying system are used to achieve comprehensive gangue filling in the goaf, solving the problems of surface sinking and gangue mountain pollution in the existing technology, and improving filling Efficiency and reliability.

CN110130979BActive Publication Date: 2024-11-29SHANDONG DONGSHAN GUCHENG COAL MINE
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN201910476038.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-06-03
Publication Date
2024-11-29
Estimated Expiration
2039-06-03

Smart Images

  • Figure CN110130979B_ABST
    Figure CN110130979B_ABST
Patent Text Reader

Abstract

The present application relates to coal mining equipment and coal mining methods for managing the roof by gangue filling method, especially pneumatic gangue joint filling device and coal mining method, including rail chute (i.e., material transport tunnel of mining face), belt chute (i.e., coal transport tunnel of mining face), mining face, characterized in that: a support top plate is fixedly installed on the top of mining face by anchor rods, a hanging belt with two ends connected to the rail chute and belt chute is provided below the support top plate, several hydraulic supports for coal mines are installed at intervals on the front side of the hanging belt, the hanging belt is fixed behind each hydraulic support for coal mines, and a high-pressure wind power device for blowing the gangue transported on the hanging belt into the goaf of the working face behind the tail beam of the support is installed below the tail beam of each hydraulic support for coal mines. The problem of filling all the goafs is solved, the ground subsidence is reduced, and the lifting and transportation pressure is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to coal mining equipment and a coal mining method for managing roof by gangue filling method, and in particular to a pneumatic gangue combined filling device and a coal mining method. Background Art

[0002] Open-air discharge of coal gangue and ground subsidence are the main environmental problems in coal mining, and are solid wastes that affect the production process of mines. Gangue filling in goafs can reduce ground subsidence, prevent gangue from leaving the mine, and reduce the pressure of lifting and transportation. Currently, the existing underground gangue filling technology cannot achieve full filling and mining of goafs. Summary of the invention

[0003] The present application aims to solve one of the above-mentioned technical problems. The present application provides a pneumatic gangue combined filling device and a coal mining method, which have fast filling speed, simple filling method, high filling rate, strong reliability, low investment, low cost, and are widely applicable in this technical field. The technical solution adopted in the present application is: a pneumatic gangue combined filling device, including a track chute (i.e., a material transport tunnel of the mining face), a belt chute (i.e., a coal transport tunnel of the mining face), and a mining face. A transfer machine and a coal transport belt are installed on the belt chute, and a gangue transport belt is installed on the track chute. A support top plate is fixedly installed on the top of the mining face by anchor rods, and a hanging belt is provided below the support top plate, with its head and tail ends connected to the track chute and the belt chute. The hanging belt is used to receive the material from the gangue belt. The gangue transported is installed at intervals on the front side of the hanging belt with several hydraulic supports for coal mines. The hydraulic supports for coal mines adopt inclined longwall backward movement in the goaf of the working face. The hanging belt is fixed behind each hydraulic support for coal mines. The hanging belt is used to work after completing a filling cycle of coal mining. A high-pressure wind power device is installed under the tail beam of each hydraulic support for coal mines to blow the gangue transported on the hanging belt into the goaf of the working face behind the tail beam of the support.

[0004] Preferably, the high-pressure wind power device includes an air duct connected to a high-pressure fan, and a plurality of high-pressure nozzles are installed on the air duct facing the position of the hanging belt. The high-pressure nozzles blow the gangue transported on the hanging belt into the goaf of the working face behind the tail beam of the support through high-pressure airflow.

[0005] Preferably, it also includes a pneumatic conveying system, which includes a screw feeder installed on one side of the track chute, and a Roots blower as a power source is installed downstream of the screw feeder. The screw feeder receives the gangue transported by the belt conveyor through a plough-type unloader. The outlet of the Roots blower is connected to the conveying pipeline, and the gangue to be fed is transported along the pipeline to the unfilled area on the upper part of the working face.

[0006] Preferably, a belt gangue interceptor is installed under the tail beam of each hydraulic support for coal mines. The belt gangue interceptor is a baffle. The upper end of the belt gangue interceptor is fixedly connected to a hydraulic jack whose top is fixed on the tail beam of the hydraulic support. A spacing space is provided below the baffle and the top of the corresponding hanging belt. The gangue interceptor is controlled by the hydraulic jack. The belt gangue interceptor is used to drop the residual gangue on the hanging belt to fill the area to be filled at the bottom of the goaf.

[0007] The hydraulic support for coal mines is an existing structure and is a commonly used device in mining areas. The hydraulic support for coal mines disclosed in the website https: / / wenku.baidu.com / view / 61b8b20c03d8ce2f00662345.html is initially selected in this application. It mainly includes an integral top beam, a base, and a pushing device. The hydraulic support for coal mines is already a commonly used equipment in coal mine support. There is no requirement for its specific structure, as long as it can achieve the pushing and compacting of gangue. This structure does not belong to the innovation of this application, but belongs to the prior art.

[0008] The pneumatic gangue combined filling coal mining method is characterized in that the working face is required to adopt an inclined long wall retreat coal mining method, including the following steps:

[0009] S1: Coal dropping, loading and transporting: Coal is cut by a coal mining machine and loaded by a common coal mining drum and a scraper conveyor. The raw coal produced by the cutting is transferred and transported out through the transfer machine and the coal conveying belt on the belt chute and the connecting lane belt (bottom layer);

[0010] S2: Frame moving and slide pushing: After the coal mining machine has cut the coal, the frame of the coal mining machine is moved; after the frame moving is completed, the slide is pushed from top to bottom or from bottom to top according to the ups and downs of the scraper conveyor on the working surface;

[0011] S3: Drop filling:

[0012] a1: Crushed Gangue:

[0013] After coal mining is completed, the waste gangue in the coal mining is selected. The gangue produced by underground excavation is first graded and crushed, and then transported to the toothed roller crusher located in the gangue bin of the mining area for crushing;

[0014] a2: Falling gangue, falling to the middle and lower part of the goaf:

[0015] The gangue filling in the goaf of the working face adopts the hanging belt on the rear side of the hydraulic support for coal mines of the pneumatic gangue combined filling device of claims 1-5 to transport the gangue, and cooperates with the belt gangue interceptor to unload the filling material to the filling point of each working face, and the gangue is transported from the tail of the machine to the head of the machine through the hanging belt, and the gangue interceptor is controlled by the hydraulic jack;

[0016] The gangue transported by the hanging belt is blown out by opening the remote-controlled wind power device, and the remaining gangue is filled by falling through the closed gangue interceptor at the rear. The gangue interceptor is controlled by a hydraulic jack.

[0017] a3: Gangue filling and compaction:

[0018] After completing a cycle of coal mining, the filling work begins. The filling sequence is as follows: from top to bottom; the coal mine uses the hydraulic support push mechanism to tamp, and then tamp from bottom to top;

[0019] a4: The pneumatic conveying system is used to fill the gangue and realize the filling and compaction of the upper part of the goaf:

[0020] The pneumatic conveying system adopts a positive pressure conveying method. The gangue is fed from the upstream belt conveyor into the screw feeder through a plow-type unloader. The Roots blower uses compressed air as the power source to transport the fed gangue along the pipeline to the working face and spray it into the goaf area.

[0021] Preferably, the specific process of gangue filling and tamping in step a3 in S3 is as follows:

[0022] a. After cutting one step of coal according to the regular cycle, move the rack and push the coal;

[0023] b. Extend the nose, middle and tail of the hanging machine into place, check the integrity of each component of the filling system, and prepare to start the filling work;

[0024] c. First, start the hanging belt for filling on the working face, and then start the conveyor and other transportation equipment upwards in turn to fill the goaf with gangue; the gangue is repeatedly filled in the goaf from the tail to the head of the machine and from the head to the tail of the machine through the hanging belt;

[0025] d. Stop filling materials in the goaf, and carry out coal mining, frame moving and chute pushing. Try to ensure the straightness of the coal wall of the working face after coal cutting, the linearity of the frame after frame moving, and make the frame moving step distance reach 0.6m for each coal cutting progress; after cutting the second piece of coal, that is, after cutting coal, moving the frame and pushing the chute, adjust the filling belt at the rear of the filling support and make preparations for the second cycle of gangue filling.

[0026] Preferably, the specific process of filling the gangue in the pneumatic conveying system in step a4 in S3 to achieve filling and compaction of the upper part of the goaf is as follows:

[0027] e. Before starting the drop filling operation, enter the rear of the support, connect the delivery pipeline, and use 10# iron wire to fix the filling pipeline flat and straight;

[0028] f. After the falling filling operation is completed, the upper space is filled using a pneumatic conveying system;

[0029] Lower the plow type discharger, start the Roots blower, and after the blower is operating normally, start the feeder and run the gangue belt to complete the filling operation and compaction.

[0030] Preferably, the step a also includes pulling a wire to move the rack during the rack moving process to ensure that the racks are in a straight line after the rack moving.

[0031] Preferably, the gangue in step a1 is crushed to a particle size less than or equal to 50 mm.

[0032] The beneficial effects of the present application are as follows: the problem of full filling of the goaf is achieved, surface subsidence is reduced, lifting and transportation pressure is alleviated, and at the same time, waste gangue generated by coal mining is refilled into the goaf, reducing the area occupied and pollution of the gangue mountain; the filling speed is fast, the filling method is simple, the filling rate is high, the reliability is strong, the investment is small, the cost is low, and it has wide practicality in this technical field. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] In order to more clearly illustrate the specific embodiments of the present application or the technical solutions in the prior art, the following is a brief introduction to the drawings required for the specific embodiments or the prior art description. In all drawings, similar elements or components are generally identified by similar reference numerals. In the drawings, the elements or components are not necessarily drawn according to the actual scale.

[0034] Figure 1 This is a schematic diagram of the positional relationship arrangement of this application.

[0035] Figure 2 for Figure 1 In - A magnified schematic cross-section of .

[0036] Figure 3 for Figure 1 In - Enlarged cross-sectional diagram.

[0037] Figure 4 for Figure 1 A locally enlarged schematic diagram of AA in FIG.

[0038] Figure 5 for Figure 1 A partial enlarged schematic diagram of the BB in FIG.

[0039] In the figure, 1. hydraulic support for coal mine; 2. gangue; 3. hanging belt; 4. high-pressure wind power device; 5. conveying pipeline; 6. belt gangue interceptor; 7. gangue transport belt; 8. baffle; 9. transfer machine; 10. coal transport belt; 11. Roots blower; 12. screw feeder; 13. anchor rod; 14. roof; 15. track chute; 16. belt chute; 17. high-pressure nozzle; 18. unfilled area; 19. goaf. DETAILED DESCRIPTION

[0040] The following embodiments of the technical solution of the present application are described in detail in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present application, and are therefore only used as examples, and cannot be used to limit the scope of protection of the present application.

[0041] like Figure 1-5 As shown in the figure, the pneumatic gangue 2 combined filling device includes a track chute 15 (i.e., a material transport tunnel of the mining face), a belt chute 16 (i.e., a coal transport tunnel of the mining face), and a mining face. A transfer machine 9 and a coal transport belt 10 are installed on the belt chute 16. A gangue transport belt 7 is installed on the track chute 15. A support top plate 14 is fixedly installed on the top of the mining face through an anchor rod 13. A hanging belt 3 is provided below the support top plate 14, with its head and tail ends connected to the track chute 15 and the belt chute 16. The hanging belt 3 is used to receive the gangue transport belt 7 transports the gangue 2, and a plurality of hydraulic supports 1 for coal mines are installed at intervals on the front side of the hanging belt 3. The hydraulic supports 1 for coal mines adopt inclined longwall backward movement in the goaf 19 of the working face. The hanging belt 3 is fixed at the rear of each hydraulic support 1 for coal mines. The hanging belt 3 is used to work after completing a filling cycle of coal mining. A high-pressure wind power device 4 is installed under the tail beam of each hydraulic support 1 for coal mines, which is used to blow the gangue 2 transported on the hanging belt 3 into the goaf 19 of the working face behind the tail beam of the support.

[0042] Preferably, the high-pressure wind power device 4 includes an air duct connected to a high-pressure fan, and a plurality of high-pressure nozzles 17 are installed on the air duct facing the position of the hanging belt 3. The high-pressure nozzles 17 blow the gangue 2 transported on the hanging belt 3 into the goaf 19 of the working face behind the tail beam of the support through high-pressure airflow.

[0043] Preferably, it also includes a pneumatic conveying system, which includes a screw feeder installed on one side of the track chute 15, and a Roots blower 11 as a power source is installed downstream of the screw feeder. The screw feeder receives the gangue 2 transported by the belt conveyor through a plow-type unloader. The outlet of the Roots blower 11 is connected to the conveying pipeline, and the gangue 2 to be fed is transported along the pipeline to the unfilled area 18 on the upper part of the working face.

[0044] Preferably, a belt gangue interceptor 6 is installed under the tail beam of each hydraulic support 1 for coal mines. The belt gangue interceptor 6 is a baffle 8. The upper end of the belt gangue interceptor 6 is fixedly connected to a hydraulic jack whose top is fixed on the tail beam of the hydraulic support. A spacing space is provided below the baffle 8 and the top of the corresponding hanging belt 3. The gangue interceptor is controlled by the hydraulic jack. The belt gangue interceptor 6 is used to drop the residual gangue 2 on the hanging belt 3 to fill the area to be filled at the lower part of the goaf 19.

[0045] The hydraulic support 1 for coal mines is an existing structure and is a commonly used device in mining areas. The hydraulic support 1 for coal mines disclosed in the website https: / / wenku.baidu.com / view / 61b8b20c03d8ce2f00662345.html is initially selected in this application. It mainly includes an integral top beam, a base, and a pushing device. The hydraulic support 1 for coal mines is already a commonly used equipment in coal mine support. There is no requirement for its specific structure, as long as it can realize the pushing and compacting of the gangue 2. This structure does not belong to the innovation of this application, but belongs to the prior art.

[0046] The pneumatic gangue 2 combined filling coal mining method is characterized in that the working face is required to adopt an inclined long wall retreat coal mining method, including the following steps:

[0047] S1: Coal dropping, loading and transporting: Coal is cut by a coal mining machine and loaded by a common coal mining drum and a scraper conveyor. The raw coal produced by the cutting is transferred and transported out by a transfer machine 9 and a coal conveying belt 10 on a belt chute 16 and a connecting lane belt (bottom layer);

[0048] S2: Frame moving and slide pushing: After the coal mining machine has cut the coal, the frame of the coal mining machine is moved; after the frame moving is completed, the slide is pushed from top to bottom or from bottom to top according to the ups and downs of the scraper conveyor on the working surface;

[0049] S3: Drop filling:

[0050] a1: Crushed Gangue 2:

[0051] After the coal mining is completed, the waste gangue 2 in the coal mining is selected, and the gangue 2 generated by underground excavation is first graded and crushed, and then transported to the toothed roller crusher set in the gangue 2 bin of the mining area for crushing;

[0052] a2: Falling waste rock 2, falling to the middle and lower part of goaf 19:

[0053] The gangue 2 of the goaf 19 of the working face is filled by using the hanging belt 3 on the rear side of the hydraulic support 1 for coal mines of the pneumatic gangue 2 combined filling device of claims 1-5 to transport the gangue, and the filling material is unloaded to the filling point of each working face through the belt gangue interceptor 6, and the gangue 2 is transported from the tail of the machine to the head of the machine through the hanging belt 3, and the gangue interceptor is controlled by a hydraulic jack;

[0054] The gangue 2 transported by the hanging belt 3 is blown out by opening the remote control wind power device, and the remaining gangue 2 passes through the closed gangue interceptor at the rear to achieve falling filling, and the gangue interceptor is controlled by a hydraulic jack;

[0055] a3: Gangue 2 filling and compaction:

[0056] After completing one cycle of coal mining, the filling work begins. The filling sequence is as follows: from top to bottom; the coal mine uses the hydraulic support 1 to tamp the pushing mechanism, and then tamp from bottom to top;

[0057] a4: The pneumatic conveying system fills the gangue 2 to achieve filling and compaction of the upper part of the goaf 19:

[0058] The pneumatic conveying system adopts a positive pressure conveying method. The gangue 2 is fed into the screw feeder from the upstream belt conveyor through a plow-type unloader; a Roots blower is used with compressed air as the power source to transport the fed gangue 2 along the pipeline to the working face and spray it into the goaf 19 area.

[0059] Preferably, the specific process of filling and compacting the gangue 2 in step a3 in S3 is as follows:

[0060] a. After cutting one step of coal according to the regular cycle, move the rack and push the coal;

[0061] b. Extend the nose, middle and tail of the hanging machine into place, check the integrity of each component of the filling system, and prepare to start the filling work;

[0062] c. First, start the hanging belt 3 for filling the working face, and then start the conveyor and other transportation equipment upwards in turn to fill the goaf 19 with the gangue 2; the gangue 2 passes through the hanging belt 3 from the tail of the machine to the head of the machine, and from the head to the tail of the machine to repeatedly fill the goaf 19;

[0063] d. Stop filling materials in goaf 19, and carry out coal mining, frame moving and chute pushing. Try to ensure the straightness of the coal wall of the working face after coal cutting, the linearity of the frame after frame moving, and make the frame moving step distance reach 0.6m each time coal cutting progresses; after cutting the second piece of coal, that is, after coal cutting, frame moving and chute pushing, adjust the filling belt at the rear of the filling support and make preparations for the second cycle of gangue filling.

[0064] Preferably, the specific process of filling the gangue 2 with the pneumatic conveying system in step a4 in S3 to achieve filling and compaction of the upper part of the goaf 19 is as follows:

[0065] e. Before starting the drop filling operation, enter the rear of the support, connect the delivery pipeline, and use 10# iron wire to fix the filling pipeline flat and straight;

[0066] f. After the falling filling operation is completed, the upper space is filled using a pneumatic conveying system;

[0067] Lower the plough discharger, start the Roots blower 11, and after the blower operates normally, start the feeder and run the gangue 2 belt to realize the filling operation and compaction.

[0068] Preferably, the step a also includes pulling a wire to move the rack during the rack moving process to ensure that the racks are in a straight line after the rack moving.

[0069] Preferably, in step a1, the gangue 2 is crushed to a particle size of less than or equal to 50 mm.

[0070] Drop filling: After completing a cycle of coal mining, extend the tensioning cylinders at the front and rear of the filling belt and tighten the belt, check the filling system and start filling, start the frame and hang the belt 3, and then start other transportation equipment in sequence; the gangue 2 passes through the hanging belt 3 from the tail to the front of the machine, and the high-pressure wind power device 4 under the support tail beam blows the gangue 2 transported by the hanging belt 3 into the rear of the support tail beam; fill from bottom to top, tamp from top to bottom, and fill the goaf 19 with gangue 2;

[0071] The working face adopts inclined longwall retreat mining method, comprehensive mechanized coal mining, double drum coal mining machine to cut coal, cutting height of 2.5±0.2m, cutting depth of 0.6m, gangue 2 filling method to manage the roof 14, two cuts for a filling cycle.

[0072] After completing a filling cycle of coal mining work, the suspension belt 3 is adjusted to carry out the filling operation. The filling work is coordinated and carried out by 4 filling workers at the same time.

[0073] After the falling filling operation is completed, the unfilled space above the goaf 19 is filled with a pneumatic conveying system, and the system is composed of a Roots blower 11, a screw feeder, a Φ219mm pipeline, elbows and other accessories.

[0074] The operator enters the unfilled upper space behind the support, connects the conveying pipeline, and uses the pneumatic conveying system for filling. After checking the integrity of the top plate 14, the conveying pipeline is connected with bolts, and the filling pipeline is fixed flat and straight with wire. Roots blower 11 and screw feeder are installed on the inner side of the working face gangue 2 transport belt. The belt conveyor feeds the gangue 2 into the screw feeder through the plow type discharger. Drop the plow type discharger, start the Roots blower 11, and start the screw feeder after the blower is operating normally. Using the Roots blower 11 as the power source, the fed gangue 2 is transported to the working face along the pipeline and sprayed into the goaf 19 area. The equipment shutdown sequence is carried out in the reverse order. Ensure that all the gangue 2 in the screw feeder is transported before shutting down.

[0075] A metal mesh is hung before the roof 14 is moved in the roof control area of ​​the working face, and anchor rods 13 are driven at appropriate intervals between the supports to control the roof 14, thereby slowing down the sinking speed of the roof 14 behind the goaf 19, so that the working face can achieve the designed filling effect.

[0076] The working face is equipped with coal mining machine, filling support, end support, scraper conveyor, hanging belt 3 and other equipment, and the belt chute 16 is equipped with crusher, transfer machine 9, coal conveyor belt 10;

[0077] The track drift 15 is equipped with a gangue conveyor belt 7, a Roots blower 11, a screw feeder and other equipment; a Roots blower 11 and a screw feeder are installed and arranged on the inner side of the belt in the gangue transport lane 2, 160m away from the working face; the belt conveyor installed in the air intake connecting lane is a two-way pulling transportation equipment, the upward belt is connected to the gangue bin 2 in the mining area to transfer the filled gangue 2 to the gangue conveyor belt 7, and the bottom belt transfers the coal transported by the coal transport belt 10, which is transported up the mountain via the raw coal transport; emulsification pumps and other equipment are installed in the connecting lane outside the working face for remote high-pressure fluid supply.

[0078] The above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents. These modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present application, and they should all be included in the scope of the claims and description of the present application. For those skilled in the art, any replacement, improvement or change made to the implementation mode of the present application falls within the protection scope of the present application.

[0079] The matters not described in detail in this application are all known technologies to those skilled in the art.

Claims

1. A pneumatic gangue joint filling device, comprising a track chute, a belt chute, and a mining face, a transfer machine and a coal conveying belt are installed on the belt chute, a gangue conveying belt is installed on the track chute, a support top plate is fixedly installed on the top of the mining face through anchor rods, a hanging belt with one end connected to the track chute and the belt chute is provided below the support top plate, the hanging belt is used to receive the gangue transported by the gangue conveying belt, a plurality of hydraulic supports for coal mines are installed at intervals on the front side of the hanging belt, the hydraulic supports for coal mines adopt an inclined longwall backward movement in the goaf of the working face, the hanging belt is fixed behind each of the hydraulic supports for coal mines, the hanging belt is used to work after completing a filling cycle of coal mining, and a high-pressure wind power device for blowing the gangue transported on the hanging belt into the goaf of the working face behind the tail beam of the support is installed below the tail beam of each hydraulic support for coal mines; The high-pressure wind power device includes an air duct connected to the high-pressure fan, and a plurality of high-pressure nozzles are installed on the air duct facing the position of the hanging belt. The high-pressure nozzles blow the gangue transported on the hanging belt into the goaf of the working face behind the support tail beam through high-pressure airflow; It also includes a pneumatic conveying system, which includes a screw feeder installed on one side of the track chute, a Roots blower as a power source installed downstream of the screw feeder, the screw feeder receives the gangue transported by the belt conveyor through a plow-type discharger, the outlet of the Roots blower is connected to the conveying pipeline, and the gangue to be fed is transported along the pipeline to the unfilled area on the upper part of the working surface through the conveying pipeline; A belt waste blocker is installed under the tail beam of each hydraulic support for coal mines. The belt waste blocker is a baffle. The upper end of the belt waste blocker is fixedly connected to a hydraulic jack whose top is fixed on the tail beam of the hydraulic support. A spacing space is provided below the baffle and the top of the corresponding hanging belt. The waste blocker is controlled by the hydraulic jack. The belt waste blocker is used to drop the residual waste rock on the hanging belt to fill it into the area to be filled at the bottom of the goaf.

2. A pneumatic gangue combined filling coal mining method using the pneumatic gangue combined filling device as claimed in claim 1, characterized in that: The working face is required to adopt the inclined long wall retreat coal mining method, including the following steps: S1: Coal dropping, loading and transporting: Coal is cut by a coal mining machine and loaded by a common coal mining drum and a scraper conveyor. The raw coal produced by the coal mining is transported out by a transfer machine and the coal conveying belt on the belt chute and the contact lane belt; S2: Frame moving and slide pushing: After the coal mining machine has cut the coal, the frame of the coal mining machine is moved; after the frame moving is completed, the slide is pushed from top to bottom or from bottom to top according to the ups and downs of the scraper conveyor on the working surface; S3: Drop filling: After completing a cycle of coal mining, extend the tensioning cylinders at the front and rear of the filling belt and tighten the belt, check the filling system and start filling, start the frame and hang the belt, and then start other transportation equipment in sequence; the gangue is transported from the tail to the front through the hanging belt, and the high-pressure wind power device under the support tail beam blows the gangue transported by the hanging belt into the rear of the support tail beam; fill from bottom to top, tamp from top to bottom, and fill the goaf with gangue; The working face adopts the inclined longwall retreat mining method, comprehensive mechanized coal mining, double drum coal mining machine to cut coal, the cutting height is 2.5±0.2m, the cutting depth is 0.6m, the gangue filling method is used to manage the roof, and two cuts are one filling cycle; After completing a filling cycle of coal mining, the hanging belt is adjusted for filling operation. The filling work is coordinated by 4 filling workers at the same time. After the drop filling operation is completed, the unfilled space above the goaf is filled with a pneumatic conveying system. The system consists of a Roots blower, a screw feeder, Φ219mm pipes, elbows and other accessories. The operator enters the unfilled upper space behind the support, connects the conveying pipeline, and uses the pneumatic conveying system for filling; after checking the integrity of the roof, the conveying pipeline is connected with bolts, and the filling pipeline is fixed flat and straight with wire; the Roots blower and screw feeder are installed on the inner side of the gangue transport belt of the working face, and the belt conveyor feeds the gangue into the screw feeder through the plow-type discharger; the plow-type discharger is dropped, the Roots blower is started, and the screw feeder is started after the blower is running normally; the Roots blower is used as the power source to transport the fed gangue along the pipeline to the working face and spray it into the goaf area; the equipment shutdown sequence is carried out in the reverse order; it is ensured that all the gangue in the screw feeder is transported, and then the machine is shut down; In the roof control area of ​​the working face, a metal mesh is hung before the roof moving frame and anchor rods are driven at appropriate intervals between the supports to control the roof, thereby slowing down the roof sinking speed behind the goaf and achieving the designed filling effect on the working face; a1: Crushed Gangue: After coal mining is completed, the waste gangue in the coal mining is selected. The gangue produced by underground excavation is first graded and crushed, and then transported to the toothed roller crusher located in the gangue bin of the mining area for crushing; a2: Falling gangue, falling to the middle and lower part of the goaf: The gangue filling in the goaf of the working face adopts the hanging belt on the rear side of the hydraulic support for coal mines of the above-mentioned pneumatic gangue combined filling device to transport the gangue, and cooperates with the belt gangue interceptor to unload the filling material to the filling point of each working face. The gangue is transported from the tail of the machine to the head of the machine through the hanging belt, and the gangue interceptor is controlled by the hydraulic jack; The gangue transported by the hanging belt is blown out by opening the remote-controlled wind power device, and the remaining gangue is filled by falling through the closed gangue interceptor at the rear. The gangue interceptor is controlled by a hydraulic jack. a3: Gangue filling and compaction: After completing a cycle of coal mining, the filling work begins. The filling sequence is as follows: from top to bottom; the coal mine uses the hydraulic support push mechanism to tamp, and then tamp from bottom to top; a4: The pneumatic conveying system is used to fill the gangue and realize the filling and compaction of the upper part of the goaf: The pneumatic conveying system adopts a positive pressure conveying method. The gangue is fed from the upstream belt conveyor into the screw feeder through a plow-type unloader. The Roots blower uses compressed air as the power source to transport the fed gangue along the pipeline to the working face and spray it into the goaf area.

3. The pneumatic gangue combined filling coal mining method according to claim 2 is characterized in that: The specific process of gangue filling and tamping in step a3 in S3 is as follows: a. After cutting one step of coal according to the regular cycle, move the rack and push the coal; b. Extend the nose, middle and tail of the hanging machine into place, check the integrity of each component of the filling system, and prepare to start the filling work; c. First, start the hanging belt for filling on the working face, and then start the conveyor and other transportation equipment upwards in turn to fill the goaf with gangue; the gangue is repeatedly filled in the goaf from the tail to the head of the machine and from the head to the tail of the machine through the hanging belt; d. Stop filling materials in the goaf, and carry out coal mining, frame moving and chute pushing. Try to ensure the straightness of the coal wall of the working face after coal cutting, the linearity of the frame after frame moving, and make the frame moving step distance reach 0.6m for each coal cutting progress; after cutting the second piece of coal, that is, after cutting coal, moving the frame and pushing the chute, adjust the filling belt at the rear of the filling support and make preparations for the second cycle of gangue filling.

4. The pneumatic gangue combined filling coal mining method according to claim 3 is characterized in that: The specific process of filling the gangue in the pneumatic conveying system in step a4 of S3 to achieve filling and compaction of the upper part of the goaf is as follows: e. Before starting the drop filling operation, enter the rear of the support, connect the delivery pipeline, and use wire to fix the filling pipeline flat and straight; f. After the falling filling operation is completed, the upper space is filled using a pneumatic conveying system; Lower the plow type discharger, start the Roots blower, and after the blower is operating normally, start the feeder and run the gangue belt to complete the filling operation and compaction.

5. The pneumatic gangue combined filling coal mining method according to claim 4 is characterized in that: The step a also includes pulling a wire to move the rack during the rack moving process to ensure that the racks are in a straight line after the rack moving.

6. The pneumatic gangue combined filling coal mining method according to claim 5 is characterized in that: In the step a1, the gangue is crushed to a particle size of less than or equal to 50 mm.

Citation Information

Patent Citations

  • Impact wind pressure type pipe waste rock discharge device

    CN101592040A

  • Automatic coal and gangue sorting system and method

    CN106269576A

  • Method for filling goaf by gangue

    CN1807843A

  • Aerodynamic gangue combined filling device

    CN210919148U