A steam turbine cold state rapid start heating system and method thereof

By using a fast cooling device and a temperature control system in the turbine, high-temperature compressed air is inverted for heating, the problems of power consumption and synchronous expansion during cold start are solved, and a faster and safe start process is achieved.

CN110593967BActive Publication Date: 2024-11-22JIANGSU XU MINE COMPREHENSIVE UTILIZATION POWER GENERATION CO
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910670067.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-07-24
Publication Date
2024-11-22
Estimated Expiration
2039-07-24

AI Technical Summary

Technical Problem

Existing turbines require a medium-speed warm-up process when starting in cold state, resulting in high power consumption and operation risks, and it is difficult to ensure the synchronous expansion of the cylinder and rotor, which is prone to dynamic and static bumping and grinding.

Method used

The turbine rapid cooling device and temperature control system are used to heat by inversely feeding compressed air higher than the metal wall temperature to ensure uniform expansion of the cylinder and rotor, avoid dynamic and static collisions and grinding, and optimize the heating process to reduce heat waste and electricity consumption.

Benefits of technology

It saves cold start time of 90-120 minutes, reduces fuel and electricity consumption, ensures synchronous expansion of the cylinder and rotor, avoids dynamic and static bumping and grinding, and improves the stability and safety of the startup process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110593967B_ABST
    Figure CN110593967B_ABST
Patent Text Reader

Abstract

The invention discloses a steam turbine cold state rapid start heating system and method thereof, wherein the steam turbine cold state rapid start heating system comprises a steam turbine rapid cooling device and a temperature control system. The steam turbine cold state rapid start heating system of the invention reversely sends compressed air with a higher temperature than the metal wall temperature of the steam turbine through a drain pipe into the high-pressure and medium-pressure cylinders of the steam turbine to heat the metal parts before the cold state start of the steam turbine, so as to achieve slow heating of the temperature of the dynamic and static metal parts of the steam turbine body to reach the brittle transition temperature, so that the cylinder and rotor of the steam turbine expand uniformly under the action of heat, avoid the gap reduction and the formation of dynamic and static collision and grinding phenomenon, save the rapid warm-up node in the cold state start-up process, save the start-up time by 90-120 minutes, and thus save the power consumption and fuel consumption of the plant during the start-up process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of cold-state startup of steam turbines, and in particular to a steam turbine cold-state rapid startup heating system and method thereof. Background Art

[0002] At the initial start-up of the fluidized bed boiler, about 200 tons of bed material (non-combustible fixed particles) are added to the furnace air distribution plate, and the diesel is ignited through the air duct burner to heat the primary air flowing through the air distribution plate. The heated primary air then heats the bed material by heat conduction, and the bed material is fluidized and circulated in the furnace to form the initial furnace heat source to heat the steam and water on the furnace side to form steam for the turbine to start. The steam turbine is in a cold state, that is, the static part: cylinder, holding ring, partition; the dynamic part: the rotor forging, impeller, and blade temperature are all low, below the brittle transition temperature of the metal, and medium-speed warm-up must be performed before further speed increase, otherwise the generator second-order critical speed and blade resonance speed after 2040r / min will not be passed, and the turbine manual clearly requires that the speed increase by hard intrusion is prohibited, otherwise it will cause dynamic and static friction, resulting in immeasurable losses. Therefore, the medium-speed warm-up process of cold start is essential. The turbine maintains a constant speed of 2040r / min and the high, medium and low pressure cylinders all take in air to do work. The actual air intake of the turbine is very small. The steam entering the flow section of the turbine requires low temperature and low pressure, which can meet the requirements of the run-up. On the one hand, it reduces the thermal shock of steam on metal parts; on the other hand, the rotor is light in weight and expands quickly when heated. The cylinder, especially the high pressure cylinder, is a double-layer cylinder. Under the condition of small air intake, the thermal expansion lags behind the rotor. In order to prevent the expansion of the two from exceeding the tolerance, resulting in a reduction or even disappearance of the dynamic and static clearance, resulting in dynamic and static friction, the warm-up process is strictly carried out as required.

[0003] The effect of the two-hour medium-speed warm-up determines the stability of the subsequent speed increase. The boiler side must ensure that the steam temperature and pressure are stable, but as the fuel oil on the furnace side heats the bed material, the steam temperature and pressure will continue to rise. The steam parameters on the turbine side must be stable. Generally, the 4Mpa, 350℃ steam is decompressed and cooled by connecting the high and low bypasses in series and discharged into the condenser, or the furnace side is opened to release the electric valve to the air discharge, resulting in heat waste. During the medium-speed warm-up period, all auxiliary steam on the machine and furnace sides has been restored to the operating state, and the consumption of electricity is also large. In the past, every time the machine was started, the power consumption rate of the plant on that day remained high, even reaching 9%. In addition, for the machine and furnace operators, the operating pressure and operating risk of the medium-speed warm-up process are relatively high. In summary, designing a cold start mode to optimize the energy-saving system is an urgent problem that technicians in related fields need to solve. Summary of the invention

[0004] To solve the above technical problems, the technical solution provided by the present invention is: a cold-state rapid start-up heating system for a steam turbine, comprising a rapid cooling device for a steam turbine and a temperature control system, wherein the rapid cooling device for the steam turbine is arranged on one side of the steam turbine, and the rapid cooling device for the steam turbine is connected to the steam turbine through a manual control valve or an automatic control valve to control the amount and temperature of air steam entering the high-pressure cylinder and the medium-pressure cylinder of the steam turbine, and the temperature control system is divided into two sets, which are respectively connected to the high-pressure cylinder and the medium-pressure cylinder of the steam turbine to independently perform rapid cooling control on the high-pressure cylinder and the medium-pressure cylinder at different steam temperatures, and the rapid cooling device for the steam turbine is provided with a heating device, a steam collecting box, and a steam box 1 and a steam box 2, wherein the steam box 1 and the steam box 2 are respectively connected to the high-pressure cylinder and the medium-pressure cylinder of the steam turbine to supply steam for the high-pressure cylinder and the medium-pressure cylinder, and the steam box 1 and the steam box 2 are respectively connected to the steam distribution main pipe 1 and the steam distribution main pipe 2, and the output ends of the steam distribution main pipe 1 and the steam distribution main pipe 2 are connected to the steam turbine drain pipe before the drain valve through a manual stop valve.

[0005] As an improvement, the output end of the steam main pipe 1 is divided into four paths, which are respectively connected to high-pressure steam pipe 1, high-pressure steam pipe 2, high-pressure steam pipe 3, and high-pressure steam pipe 4; the output end of the steam main pipe 2 is divided into four paths, which are respectively connected to high-pressure outer cylinder 1, high-pressure outer cylinder 2, medium-pressure steam pipe 1, and medium-pressure steam pipe 2.

[0006] As an improvement, the number of manual stop valves on each output end of the steam distribution main pipe 1 and the steam distribution main pipe 2 is two.

[0007] As an improvement, the first steam box and the second steam box are connected via a valve.

[0008] As an improvement, the steam turbine rapid cooling device is a CL-240-Ⅲ control cabinet, and the steam turbine is a K156 steam turbine.

[0009] The present invention also discloses a method for realizing a cold-state rapid start-up heating system for a steam turbine, comprising the following steps:

[0010] (1) Check and open the series door of the turbine rapid cooling device.

[0011] (2) Check and close the parallel door of the turbine rapid cooling device.

[0012] (3) Check and close the cold air and steam direct-flow door of the turbine rapid cooling device.

[0013] (4) Check and close all manual isolation doors at the steam collecting box outlet.

[0014] (5) Check that the compressed air pressure is normal, open the compressed air inlet valve of the turbine rapid cooling device, and adjust the flow rate as much as possible for about 10 minutes.

[0015] (6) Close the air-steam switch of the turbine rapid cooling device control cabinet.

[0016] (7) Turn the alarm setting potentiometer to set the alarm temperature 30°C higher than the set temperature.

[0017] (8) Set the thyristor voltage regulator of the turbine rapid cooling device to the "automatic" position.

[0018] (9) When the compressed air temperature in the steam collecting box reaches the set value, steam starts to be delivered to the steam turbine. When no water flows out of the drain valves of the air inlet branch pipes and the pipe temperature rises significantly, the drain valves are closed.

[0019] (10) Open the 8 branch manual valves from each steam box of the turbine rapid cooling device to the air inlet of the high and medium pressure cylinders.

[0020] (11) During the heating process, adjust the steam outlet valve of the steam collecting box and the air intake of each branch at any time according to various control indicators.

[0021] (12) As the heating process progresses, the cylinder temperature rises. The heater operation mode must be switched in time to increase the air temperature at the cooling device outlet.

[0022] (13) The air temperature is controlled to be 30-40°C higher than the cylinder temperature, and the temperature rise rate of the first stage of the high-pressure cylinder and the first stage of the medium-pressure cylinder stator ring is 2-3°C / hour.

[0023] (14) Controlling the first-stage metal temperature of the high-pressure cylinder and the temperature of the intermediate-pressure stator ring can simultaneously meet the heating requirements.

[0024] (15) During the heating operation of the turbine rapid cooling device, the monitoring personnel shall record the turbine TSI parameter cylinder temperature chart every 30 minutes.

[0025] The scheme of the present invention sends compressed air with a higher temperature than the metal wall temperature of the turbine in reverse direction through a drain pipe into the high-pressure and medium-pressure cylinders of the turbine to heat the metal parts before the cold start of the turbine, so as to achieve slow heating of the temperature of the dynamic and static metal parts of the turbine body to reach the brittle transition temperature, so that the cylinder and rotor of the turbine expand evenly under the action of heat, avoid the formation of dynamic and static collision and grinding due to the reduction of the gap, save the rapid warm-up node during the cold start-up process, save 90-120 minutes of startup time, and thus save the factory power consumption and fuel consumption during the startup process.

[0026] Specifically, the present invention has the following advantages:

[0027] 1. The present invention uses a rapid heating device in reverse, and uses compressed air with a higher temperature than the metal wall temperature of the steam turbine to slowly heat the steam turbine, so as to achieve slow heating of the temperature of the moving and static metal parts of the steam turbine body, thereby reaching the brittle transition temperature.

[0028] 2. In the present invention, the cylinder and rotor of the steam turbine expand evenly under the action of heat, thereby shortening or even avoiding the entire medium-speed warm-up process, which can effectively save 90 to 120 minutes of startup time, provide a certain free time difference for the compression of key work, and meet the dispatching requirements and power demand of the power grid.

[0029] 3. The present invention can effectively reduce fuel and plant electricity consumption due to the saved flushing time, connect to the grid for power generation as soon as possible, and achieve considerable energy-saving benefits.

[0030] 4. The most important thing in the present invention is to completely solve the medium-speed warm-up, which is the most important and most difficult to control node in the turbine startup process, at the technical level, to ensure the synchronous expansion of the cylinder and the rotor and avoid dynamic and static friction caused by uneven heating.

[0031] 5. The present invention optimizes the entire startup process to ensure that the boiler combustion can increase the temperature and pressure at a stable rate. On the one hand, there is no need to take measures such as air discharge and temperature and pressure reduction to control the stability of the start-up parameters, which will cause heat waste.

[0032] 6. When the boiler is burning with oil and the bed temperature meets the requirements, coal can be added at a jog pace to continuously increase the bed temperature and exit the oil gun operation as soon as possible. It is also of great significance to ensure the safe operation of the bag filter and control the smoke and gas environmental protection data within the qualified range. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 It is a schematic diagram of the structure of the system of the present invention. DETAILED DESCRIPTION

[0034] In conjunction with the accompanying drawings, a cold-state rapid start-up heating system for a steam turbine comprises a rapid cooling device for a steam turbine and a temperature control system. The rapid cooling device for the steam turbine is arranged on one side of the steam turbine. The rapid cooling device for the steam turbine is connected to the steam turbine through a manual control valve or an automatic control valve to control the amount and temperature of air steam entering the high-pressure cylinder and the medium-pressure cylinder of the steam turbine. The temperature control system consists of two sets, which are respectively connected to the high-pressure cylinder and the medium-pressure cylinder of the steam turbine to independently perform rapid cooling control on the high-pressure cylinder and the medium-pressure cylinder at different steam temperatures. The rapid cooling device for the steam turbine is provided with a heating device, a steam collecting box, and a first and a second steam box. The first and second steam boxes are respectively connected to the high-pressure cylinder and the medium-pressure cylinder of the steam turbine to supply steam to the high-pressure cylinder and the medium-pressure cylinder. The first and second steam boxes are respectively connected to the first and second steam distribution main pipes, and the output ends of the first and second steam distribution main pipes are connected to the steam turbine drain pipe before the drain valve through manual stop valves.

[0035] As a preferred implementation scheme of this embodiment, the output end of the steam main pipe 1 is divided into four routes, which are respectively connected to high-pressure steam pipe 1, high-pressure steam pipe 2, high-pressure steam pipe 3, and high-pressure steam pipe 4; the output end of the steam main pipe 2 is divided into four routes, which are respectively connected to high-pressure outer cylinder 1, high-pressure outer cylinder 2, medium-pressure steam pipe 1, and medium-pressure steam pipe 2.

[0036] As a preferred implementation scheme of this embodiment, the number of manual stop valves on each output end of the steam distribution main pipe 1 and the steam distribution main pipe 2 is two.

[0037] As a preferred implementation scheme of this embodiment, the steam sub-box one and the steam sub-box two are connected by a valve.

[0038] As a preferred implementation scheme of this embodiment, the turbine rapid cooling device is a CL-240-Ⅲ control cabinet, and the steam turbine is a K156 type steam turbine.

[0039] The rapid cooling device is divided into two air intake boxes, which can be operated in series or in parallel. The steam box one and the steam box two supply air to the high-pressure cylinder and the medium-pressure cylinder respectively. Each gas distribution main pipe is overlapped with the steam turbine body drain pipe through a pipeline and two manual stop valves before the drain valve. The heated compressed air enters the various flow areas inside the steam turbine through the steam turbine body drain pipes to realize convection heat exchange.

[0040] The present invention also discloses a method for realizing a cold-state rapid start-up heating system for a steam turbine, comprising the following steps:

[0041] (1) Check and open the series door of the turbine rapid cooling device.

[0042] (2) Check and close the parallel door of the turbine rapid cooling device.

[0043] (3) Check and close the cold air and steam direct-flow door of the turbine rapid cooling device.

[0044] (4) Check and close all manual isolation doors at the steam collecting box outlet.

[0045] (5) Check that the compressed air pressure is normal, open the compressed air inlet valve of the turbine rapid cooling device, and adjust the flow rate as much as possible for about 10 minutes.

[0046] (6) Close the air-steam switch of the turbine rapid cooling device control cabinet.

[0047] (7) Turn the alarm setting potentiometer to set the alarm temperature 30°C higher than the set temperature.

[0048] (8) Set the thyristor voltage regulator of the turbine rapid cooling device to the "automatic" position.

[0049] (9) When the compressed air temperature in the steam collecting box reaches the set value, steam starts to be delivered to the steam turbine. When no water flows out of the drain valves of the air inlet branch pipes and the pipe temperature rises significantly, the drain valves are closed.

[0050] (10) Open the 8 branch manual valves from each steam box of the turbine rapid cooling device to the air inlet of the high and medium pressure cylinders.

[0051] (11) During the heating process, adjust the steam outlet valve of the steam collecting box and the air intake of each branch at any time according to various control indicators.

[0052] (12) As the heating process progresses, the cylinder temperature rises. The heater operation mode must be switched in time to increase the air temperature at the cooling device outlet.

[0053] (13) The air temperature is controlled to be 30-40°C higher than the cylinder temperature, and the temperature rise rate of the first stage of the high-pressure cylinder and the first stage of the medium-pressure cylinder stator ring is 2-3°C / hour.

[0054] (14) Controlling the first-stage metal temperature of the high-pressure cylinder and the temperature of the intermediate-pressure stator ring can simultaneously meet the heating requirements.

[0055] (15) During the heating operation of the turbine rapid cooling device, the monitoring personnel shall record the turbine TSI parameter cylinder temperature chart every 30 minutes.

[0056] 1. Use Case

[0057] 1. Details of first use

[0058] On October 18, 2016, the electrical and steam professionals of the mid-shift maintenance department of Jiangsu Xukuang Comprehensive Utilization Power Generation Co., Ltd. conducted insulation measurements on the rapid device and contacted the operator to supply power. The on-duty operator restored relevant safety measures and conducted the device trial operation by opening the drain and air drain valves instead of opening the primary and secondary sub-doors of the air inlet cylinder. The rapid device heated the compressed air to a temperature of 350°C, which means the first step was qualified, and then the second step was entered:

[0059] (1) The on-duty operator contacted the Guohua turbine maintenance personnel to open the four manhole doors on the north and south sides of the #1 steam turbine low-pressure cylinder. The maintenance personnel prepared the work and materials for reinstalling the two manhole doors;

[0060] (2) Start the main engine lubricating oil and sealing oil system, add main engine jacking oil and cranking operation;

[0061] (3) Open the primary and secondary manual valves from the drain tank to the trench in front of the high-pressure cylinder exhaust check valve;

[0062] (4) Close all steam-actuated steam traps of high and medium pressure cylinders;

[0063] (5) Put into use the quick device to warm up the pipes and drain water;

[0064] (6) Ensure that the heated compressed air is 56°C superheated than the high and medium pressure cylinder wall temperature. Open the 4 air intake manual valves to the high and medium pressure cylinders. The operating personnel read the cylinder temperature gauge every half an hour and adjust the air intake volume and air intake temperature of each branch according to the actual situation to control the temperature rise rate of the metal wall temperature of the high and medium pressure cylinders at 2-3°C / H.

[0065] (7) The maximum metal wall temperature of high and medium pressure cylinders is 180°C, and this temperature must be maintained after reaching this value.

[0066] 2. Use effect: The rapid heating device was put into use from 18:00 on the 18th to 14:48 on the 20th, with a total of 44 hours of use. Because the unit start-up node was delayed until 6:08 on the 21st, the main engine was not started, and the interval between shutdown and start-up was 16 hours, the cylinder metal wall temperature dropped to a certain extent. The main parameters of the main engine are detailed in the following table:

[0067]

[0068] 2. Multiple Use Details

[0069] This technology was first used on October 10, 2016. After continuous improvement and optimization, it has been successfully implemented 4 times until August 2017. Please see the table below for detailed statistics:

[0070]

[0071] This technology has been successfully used many times on different units, and through continuous exploration and experience accumulation by steam turbine professionals, it has become a mature technology that can be safely controlled.

[0072] In the present invention, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more unless otherwise clearly and specifically defined.

[0073] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0074] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0075] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations on the present invention. A person skilled in the art may change, modify, replace and modify the above embodiments within the scope of the present invention without departing from the principles and intent of the present invention.

Claims

1. A steam turbine cold state rapid start heating system, characterized in that: It comprises a steam turbine rapid cooling device and a temperature control system. The steam turbine rapid cooling device is arranged on one side of the steam turbine. The steam turbine rapid cooling device is connected to the steam turbine through a manual control valve or an automatic control valve to control the amount and temperature of air steam entering the high-pressure cylinder and the medium-pressure cylinder of the steam turbine. The temperature control system is composed of two sets, which are respectively connected to the high-pressure cylinder and the medium-pressure cylinder of the steam turbine to independently perform rapid cooling control on the high-pressure cylinder and the medium-pressure cylinder at different steam temperatures. The steam turbine rapid cooling device is provided with a heating device, a steam collecting box, and a first steam box and a second steam box. The first steam box and the second steam box are respectively connected to the high-pressure cylinder and the medium-pressure cylinder of the steam turbine to supply steam for the high-pressure cylinder and the medium-pressure cylinder. The first steam box and the second steam box are respectively connected to the first steam distribution main pipe and the second steam distribution main pipe. The output ends of the first steam distribution main pipe and the second steam distribution main pipe are connected to the steam turbine drain pipeline before the drain valve through a manual stop valve; The output end of the steam distribution main pipe 1 is divided into four paths, which are respectively connected to the high-pressure steam pipe 1, the high-pressure steam pipe 2, the high-pressure steam pipe 3, and the high-pressure steam pipe 4; the output end of the steam distribution main pipe 2 is divided into four paths, which are respectively connected to the high-pressure outer cylinder 1, the high-pressure outer cylinder 2, the medium-pressure steam pipe 1, and the medium-pressure steam pipe 2; The number of manual stop valves on each output end of the steam distribution main pipe 1 and the steam distribution main pipe 2 is two; The first steam box and the second steam box are connected via a valve; The steam turbine rapid cooling device is a CL-240-Ⅲ control cabinet, and the steam turbine is a K156 type steam turbine; The implementation method includes the following steps: (1) Check and open the series door of the turbine rapid cooling device; (2) Check and close the parallel door of the turbine rapid cooling device; (3) Check and close the cold air and steam direct-flow door of the steam turbine rapid cooling device; (4) Check and close all manual isolation doors at the steam collector outlet; (5) Check that the compressed air pressure is normal, open the compressed air inlet valve of the turbine rapid cooling device, and increase the flow rate for 10 minutes; (6) Close the air-steam switch of the turbine rapid cooling device control cabinet; (7) Turn the alarm setting potentiometer to set the alarm temperature 30°C higher than the set temperature; (8) Set the thyristor voltage regulator of the steam turbine rapid cooling device to the "automatic" position; (9) When the compressed air temperature in the steam collecting box reaches the set value, steam starts to be delivered to the steam turbine. When no water flows out of the drain valves of the air inlet branch pipes and the pipe temperature rises significantly, the drain valves are closed; (10) Open the 8 branch manual valves from each steam box of the turbine rapid cooling device to the high and medium pressure cylinders; (11) During the heating process, adjust the steam outlet valve of the steam collecting box and the air intake of each branch at any time according to various control indicators; (12) As the heating process progresses, the cylinder temperature rises accordingly. The heater operation mode should be switched in time to increase the air temperature at the cooling device outlet. (13) The air temperature is controlled to be 30-40°C higher than the cylinder temperature, and the temperature rise rate of the first stage of the high pressure cylinder and the first stage of the intermediate pressure cylinder stator ring is 2-3°C / hour; (14) Control the first-stage metal temperature of the high-pressure cylinder and the temperature of the intermediate-pressure stator ring to simultaneously meet the heating requirements; (15) During the heating operation of the turbine rapid cooling device, the monitoring personnel shall record the turbine TSI parameter cylinder temperature chart every 30 minutes.