A tunnel segment based on high-performance cement-based composite material and a construction method thereof
Through high-performance cement-based composite materials and pre-embedded steel bars, the problem of long bolt connection time and water leakage in shield tunnel segment construction is solved, efficient and durable tunnel segment connection is achieved, and the efficiency is improved. Construction speed and safety.
Patent Information
- Application Number
- CN201911006042.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-10-22
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2039-10-22
AI Technical Summary
Bolt connections in the existing shield tunnel segment construction are time-consuming, prone to water leakage, and the waterproofing measures are aging, resulting in low construction efficiency and safety hazards, and the leakage problem of bolt holes cannot be effectively avoided.
Tunnel segments based on high-performance cement-based composite materials are used, and the pre-embedded steel bars on both sides of the segments are connected through misaligned overlaps, and high-performance cement-based composite materials are poured into the connection grooves to form a sealed segment connection groove, which reduces Bolted connections for improved penetration resistance and durability.
No bolt connection is required, which significantly improves the construction speed and the overall performance of the segment, enhances permeability resistance and durability, reduces later maintenance costs, and avoids leakage problems in bolt holes.
Smart Images

Figure CN110608052B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of high-performance cement-based composite materials and tunnel segments, in particular to a tunnel segment based on high-performance cement-based composite materials and a construction method thereof. Background Art
[0002] In recent years, due to the rapid development of urban rail transit and the acceleration of urbanization, my country's demand for underground space resources has been increasing. Shield tunnel segment construction technology is widely used in today's urban subway tunnels and large-scale tunnel projects due to its advantages of high mechanization, fast construction speed, and low environmental impact. The shield tunnel is a structure formed by assembling multiple prefabricated segments on site through bolt connection. Due to the bolt connection, the joints (circumferential seams and longitudinal seams) formed between the segments and the bolt holes are prone to water leakage. In order to prevent groundwater from leaking into the segments, rubber waterproof gaskets are usually set at the segment joints, water-expandable rubber sealing rings are set at the bolt holes, and grouting and caulking treatment are performed.
[0003] Bolt connections are basically manual work, which consumes a lot of time and manpower, has a slow construction speed and a long construction period. In actual projects, after the bolts are treated with waterproof rubber rings and grouting and caulking, water leakage is still common. Once leakage occurs in the pipe segment, it will seriously threaten the safety and operation of the tunnel, especially for power tunnels and subway tunnels, causing immeasurable loss of life and property.
[0004] Application No. 201610708866.7 discloses a waterproof structure and construction method for bolt holes of shield tunnel segments. The waterproof pressure of the bolt holes is improved by two waterproof gaskets, which has better durability. However, this connection form is more complicated to construct and cannot avoid the aging problem of the waterproof gaskets.
[0005] At present, most of the domestic methods use external measures to enhance the waterproofing ability of bolt holes, and bolt connection cannot be avoided. Therefore, it is an urgent problem to find a new tunnel segment connection method and construction method that can effectively solve the waterproofing problem of bolt holes without bolt connection, which is convenient for construction, has good anti-seepage and durability, reliable connection, low cost, and can effectively solve the problem of bolt hole waterproofing. Summary of the invention
[0006] The purpose of the present invention is to provide a tunnel segment based on a high-performance cement-based composite material in view of the above-mentioned deficiencies in the prior art.
[0007] Another object of the present invention is to provide a tunnel segment assembly construction method based on high-performance cement-based composite materials.
[0008] The objective of the present invention is achieved through the following technical solutions:
[0009] A tunnel segment based on a high-performance cement-based composite material, wherein a plurality of the tunnel segments are assembled to form a tunnel ring, grooves with closed ends are respectively provided on both sides of the tunnel segment, a group of embedded steel bars are arranged in the grooves, and the embedded steel bars extend out of the grooves. When the tunnel is assembled, the grooves of two adjacent tunnel segments are correspondingly buckled to form a closed segment connection groove, and grouting holes and grouting holes are provided on the end faces of the segment connection grooves, and high-performance cement-based composite materials are poured into the segment connection grooves through the grouting holes and the grouting holes, and the embedded steel bars in the segment connection grooves are staggered and overlapped.
[0010] In a further design of the present invention, the groove is a V-shaped groove, a U-shaped groove, or an arc-shaped groove.
[0011] In a further design of the present invention, the diameter of the embedded steel bar is not less than 6 mm, and the extended anchoring length is not less than 5 times the diameter of the embedded steel bar.
[0012] In a further design of the present invention, the grouting hole is located at the lowest point of the pipe segment connection groove, and the grout outlet hole is located at the highest point of the pipe segment connection groove.
[0013] In a further design of the present invention, a layer of water-stopping pad is pasted around the groove openings of the two interlocking and spliced tunnel segments.
[0014] In a further design scheme of the present invention, the mix ratio of the above-mentioned high-performance cement-based composite material is cement: fly ash: silica ash: quartz sand: water: water reducer: steel fiber = 690:240:172:187.34:991.8:22.04:120, wherein the water reducer dosage is 2.0%, the steel fiber volume dosage is 1.5%, the sand-binder ratio is 0.9, and the water-binder ratio is 0.17.
[0015] The above-mentioned construction method of the tunnel segment based on the high-performance cement-based composite material comprises the following specific steps:
[0016] Step 1: Design and make the tunnel segment mold, place the steel cage in the tunnel segment mold, reserve the steel bars extending out of the groove, and stick a thin water stop pad around the groove.
[0017] Step 2: Assemble the tunnel segments from the bottom right to the top. After the grooves of the tunnel segments are fitted into tight contact, a closed segment connection groove is formed. A grouting hole and a grouting hole are opened at one end of the segment connection groove. The grouting hole is opened at the lowest position, and the grouting hole is opened at the highest position.
[0018] Step 3: Use a high-pressure grouting machine to inject high-performance cement-based composite materials into the segment connection groove from the grouting hole. When high-performance cement-based composite material slurry flows out of the upper slurry hole, stop grouting, plug the opening in time, and use the same method to splice the remaining tunnel segments.
[0019] In a further design scheme of the present invention, the mix ratio of the above-mentioned high-performance cement-based composite material is cement: fly ash: silica ash: quartz sand: water: water reducer: steel fiber = 690:240:172:187.34:991.8:22.04:120, wherein the water reducer dosage is 2.0%, the steel fiber volume dosage is 1.5%, the sand-binder ratio is 0.9, and the water-binder ratio is 0.17.
[0020] The present invention has the following outstanding beneficial effects:
[0021] The invention does not require bolt connection, which overcomes the problems of manual tightening during bolt connection, which consumes a lot of time and manpower, slow construction speed, long construction period, etc. It also overcomes the problems of easy water leakage in bolt holes, easy aging of bolt water-stopping sealing rings, and great difficulty in later maintenance during bolt connection.
[0022] The high-performance cement-based composite material in the present invention has the characteristics of high toughness, high durability and low permeability. By pouring the high-performance cement-based composite material for connection, the permeability resistance and durability of the segment nodes are greatly improved, the waterproof effect is good, and the subsequent maintenance cost is low.
[0023] In the present invention, the steel bars are connected by staggered overlap, which does not require precise positioning and is easy to construct. The steel bars of the pipe segment are reliably anchored and then cast with high-strength, high-performance cement-based composite materials, which significantly improves the overall performance and seismic resistance of the pipe segment. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 is a schematic diagram of a tunnel segment structure based on a high-performance cement-based composite material in an embodiment;
[0025] Figure 2 This is a bottom assembly diagram of a tunnel segment in an embodiment;
[0026] Figure 3 It is a diagram of tunnel segments assembled into a ring in the embodiment;
[0027] Figure 4 Schematic diagram of openings on the pipe segment connection grooves at different splicing locations in the embodiment
[0028] In the figure, 1-embedded steel bars, 4-groove, 5-tunnel segment, 7-grouting hole, 8-slurry outlet hole, 9-rebar cage, 10-grouting hole, 11-slurry outlet hole, 12-tunnel segment, 13-tunnel segment, 14-tunnel segment, 15-segment connecting groove, 16-segment connecting groove, 17-segment connecting groove, 18-grouting hole, 19-slurry outlet hole. DETAILED DESCRIPTION
[0029] The present invention will be further described below in conjunction with the accompanying drawings and embodiments. Example
[0030] See attached Figure 1 A tunnel segment based on high-performance cement-based composite material is assembled by a number of tunnel segments 5 to form a tunnel ring. Each tunnel segment is provided with a V-shaped groove 4 with closed ends on both sides. A group of embedded steel bars 1 with a diameter of not less than 6 mm are arranged in the groove 4. The embedded steel bars 1 extend out of the groove 4, and the extended anchoring length is not less than 5 times the diameter of the embedded steel bars; the extended anchoring length refers to the part extending from the prefabricated segment and not wrapped by concrete. When the tunnel is assembled, the openings of the grooves 4 of the two adjacent tunnel segments 5 are correspondingly buckled to form a closed segment connection groove, and a layer of water stop pad is pasted around the groove openings of the two interlocking and spliced tunnel segments. The end face of the segment connection groove is provided with a grouting hole and a grouting hole. The grouting hole is located at the lowest point of the segment connection groove, and the grouting hole is located at the highest point of the segment connection groove. The high-performance cement-based composite material is poured into the segment connection groove through the grouting hole and the grouting hole, and the embedded steel bars in the segment connection groove are staggered and overlapped. The staggered lap joint means that the steel bars are staggered, offset and non-contacting. The purpose of this is to avoid the need to consider the precise positioning between the steel bars, which can also be reflected in the advantages of confined spaces. The mass mix ratio of high-performance cement-based composite materials is cement: fly ash: silica fume: quartz sand: water: water reducer: steel fiber = 690:240:172:187.34:991.8:22.04:120, of which the water reducer content is 2.0%, the steel fiber volume content is 1.5% (volume ratio), the sand-binder ratio is 0.9 (the ratio of the mass of quartz sand to the mass of all cementitious materials), and the water-binder ratio is 0.17 (the ratio of the mass of water to the mass of all cementitious materials).
[0031] When the tunnel segments of the present invention are used for assembly construction, bolt connection is not required. When assembling, the groove openings of two adjacent tunnel segments are correspondingly buckled to form a closed rhombus segment connection groove. The embedded steel bars in the groove can be connected by staggered overlap, and the groove is injected with high-performance cement-based composite materials for connection. Take three tunnel segments to form a tunnel ring as an example, see the attached Figure 2-4 , specifically including the following steps:
[0032] Step 1: Design and make a tunnel segment mold, place the steel cage 9 in the tunnel segment mold, and reserve the steel bar 1 extending out of the groove 4. To ensure that the contact part of the tunnel segment has a better waterproof effect, a thin waterproof pad is pasted around the groove 4. Tunnel segments 12, 13 and 14 are obtained.
[0033] Step 2: Assemble the tunnel segments from bottom to top, first assemble the tunnel segments 12 and 13 at the bottom, after the tunnel segments are assembled and in close contact, a rhombus-shaped segment connection groove 15 is formed inside the contact part, and two holes, a grouting hole 7 and a grouting hole 8, are opened on one side of the segment connection groove 15, the grouting hole 7 is at the lowest position, and the grouting hole 8 is at the highest position. After assembling the tunnel segments 12 and 13, assemble the tunnel segments 14 in the same way, the tunnel segments 14 are respectively buckled with the tunnel segments 12 and 13 to form a rhombus-shaped segment connection groove 17 and a segment connection groove 16, one end of the segment connection groove 16 is opened with a grouting hole 10 and a grouting hole 11, and one end of the segment connection groove 17 is opened with a grouting hole 18 and a grouting hole 19.
[0034] Step 3: Use a high-pressure grouting machine to inject the high-performance cement-based composite material into the pipe segment connection groove 15 from the grouting hole 7. When the high-performance cement-based composite material slurry flows out of the upper slurry outlet hole 8, stop grouting, block the grouting hole 7 and the slurry outlet hole 8 in time, and use the same method to fill the remaining pipe segment connection grooves in turn.
[0035] The mix ratio of high-performance cement-based composite materials is cement: fly ash: silica fume: quartz sand: water: water-reducing agent: steel fiber = 690:240:172:187.34:991.8:22.04:120, of which the water-reducing agent dosage is 2.0%, the steel fiber volume dosage is 1.5%, the sand-binder ratio is 0.9, and the water-binder ratio is 0.17.
[0036] The above are preferred embodiments of the present invention. Any changes made according to the technical solution of the present invention, as long as the resulting functions do not exceed the scope of the technical solution of the present invention, belong to the protection scope of the present invention.
Claims
1. A tunnel segment assembly construction method based on high-performance cement-based composite materials, wherein: A number of the tunnel segments are assembled to form a tunnel ring, characterized in that grooves with closed ends are respectively provided on both sides of the tunnel segments, a group of embedded steel bars are arranged in the grooves, and the embedded steel bars extend out of the grooves. When the tunnel is assembled, the grooves of two adjacent tunnel segments are correspondingly buckled to form a closed segment connection groove, and the end faces of the segment connection grooves are provided with grouting holes and grouting holes, and high-performance cement-based composite materials are poured into the segment connection grooves through the grouting holes and the grouting holes. The embedded steel bars in the segment connection grooves The staggered overlap connection is performed; the mass ratio of the high-performance cement-based composite material is cement: fly ash: silica fume: quartz sand: water: water-reducing agent: steel fiber = 690:240:172:187.34:991.8:22.04:120, wherein the water-reducing agent dosage is 2.0%, the steel fiber volume dosage is 1.5% by volume, the sand-binder ratio is 0.9, and the sand-binder ratio is the ratio of the mass of quartz sand to the mass of all cementitious materials; the water-binder ratio is 0.17, and the water-binder ratio is the ratio of the mass of water to the mass of all cementitious materials; The tunnel segment assembly construction method includes the following specific steps: Step 1: Design and make the tunnel segment mold, place the steel cage in the tunnel segment mold, reserve the steel bars extending into the groove, and stick a thin water stop pad around the groove; Step 2: Assemble the tunnel segments from the bottom right to the top. After the grooves of the tunnel segments are correspondingly buckled and tightly contacted, a closed segment connection groove is formed. A grouting hole and a grouting hole are opened at one end of the segment connection groove. The grouting hole is opened at the lowest position, and the grouting hole is opened at the highest position. Step 3: Use a high-pressure grouting machine to inject high-performance cement-based composite materials into the segment connection groove from the grouting hole. When high-performance cement-based composite material slurry flows out of the upper slurry hole, stop grouting, plug the opening in time, and use the same method to splice the remaining tunnel segments.
2. The tunnel segment assembly construction method based on high-performance cement-based composite materials according to claim 1 is characterized in that: The groove is a V-shaped groove, a U-shaped groove or an arc-shaped groove.
3. The tunnel segment assembly construction method based on high-performance cement-based composite materials according to claim 1 is characterized in that: The diameter of the embedded steel bar is not less than 6 mm, and the extended anchor length is not less than 5 times the diameter of the embedded steel bar.