Cross-sectional structure of a single-hole double-track tunnel with a central partition wall using the mining method designed for the urban area D-type vehicle limit
By designing a single-hole, double-line mine method tunnel cross-section structure with a middle partition wall suitable for urban D-type vehicles, the problem of interference between vehicles and tunnel buildings and equipment in the existing technology is solved, and driving safety and engineering investment are reduced.
Patent Information
- Application Number
- CN201910974353.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-10-14
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2039-10-14
AI Technical Summary
The existing tunnel cross-section design cannot effectively match the vehicle limits of urban D-type vehicles, causing interference between vehicles and tunnel buildings and equipment, affecting driving safety. The tunnel cross-section area is large, which increases project investment.
A cross-sectional structure of a single-hole, double-line mine tunnel with a middle partition wall is designed based on the urban D-type vehicle limits. Through the cross-section design consisting of eight arc segments, vehicle limits, building limits, structural layout and equipment installation are considered, and evacuation settings are The platform and composite lining avoid interference between trains and buildings and equipment, and reduce the tunnel cross-sectional area.
It meets the requirements for train driving safety, avoids the problem of vehicle overrun, reduces the tunnel cross-sectional area and engineering investment, and achieves a reasonable and effective design.
Smart Images

Figure CN110700852B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of urban railway tunnels, and specifically relates to a single-hole double-track center-partition-wall mining method tunnel cross-section structure based on an urban D-type vehicle limit design. Background Art
[0002] Common tunnel mining methods include mining method, tunnel boring machine method, immersed tube method, jacking method, open cut method, etc. The most suitable mining method is selected based on the importance of the project, engineering geological conditions, hydrogeological conditions, construction technical conditions, economic value, construction safety conditions, environmental protection requirements, etc., combined with the technical characteristics of different mining methods.
[0003] The basic operations of the mining method include drilling and blasting, slag transportation and support lining, which is a traditional construction method. When building high-speed railways, subways and highways, when encountering geological conditions such as abundant waters and surrounded by mountains, the use of tunnels or passing through the bottom can effectively reduce detours and shorten driving time. The cross-sectional form can be divided into two types according to the number of lines: single-hole single-line and single-hole double-line. The single-hole double-line has a large excavation area and is convenient for construction machinery to turn around, but the cost is high and the operational disaster prevention ability is not strong; the single-hole single-line cost is low, and new holes need to be excavated again when the double-line is operated, which will increase the cost, but its operational disaster prevention ability is strong.
[0004] The existing tunnel cross-section forms include those designed for cars, subways and EMUs. These cross-sections are often designed differently according to specific limits. When the vehicle type changes, the unchanged cross-section form will cause the vehicle to exceed the limit, interfere with the surrounding buildings and equipment, and endanger driving safety. The urban rail connects metropolitan areas and satellite cities, and is defined as between urban rail transit and high-speed trains. The vehicle type is different from subway vehicles and high-speed EMUs. The existing tunnel cross-section cannot effectively match it, and improvements need to be made to the limits so that the cross-section area is as small as possible while meeting the vehicle limit requirements.
[0005] In order to avoid interference between vehicles and tunnel buildings and equipment and ensure the safety of train driving, the key technology that the present invention needs to solve is to reasonably design the cross-sectional structure of a single-hole double-track center partition wall mining method tunnel based on the vehicle limit of urban D-type vehicles. Summary of the invention
[0006] In response to at least one of the above defects or improvement needs in the prior art, the present invention proposes a single-hole double-track center partition wall mining tunnel cross-section structure based on the urban D-type vehicle limit design, which has a simple structure, reasonable design and easy use. The tunnel cross-section fully considers the vehicle limit, building limit, structural layout, equipment installation, personnel evacuation and other needs, meets the requirements of train driving safety, avoids interference between trains and buildings and equipment, and has strong practical value.
[0007] To achieve the above object, according to one aspect of the present invention, a single-hole double-track belt intermediate partition wall mining method tunnel cross-section structure based on the urban area D-type vehicle limit design is provided, wherein:
[0008] The tunnel section consists of eight arcs in total, including the arch arc surface, the upper arc surface on the right side, the middle arc surface on the right side, the lower arc surface on the right side, the inverted arch arc surface, the lower arc surface on the left side, the middle arc surface on the left side, and the upper arc surface on the left side. Except for the inverted arch arc surface which is not tangent to the adjacent arc surface, the other two adjacent arc surfaces are tangent.
[0009] The tunnel is a single hole with double-track tracks, the centers of the two tracks are symmetrical with respect to the center line of the tunnel, and no central partition wall is provided in the tunnel;
[0010] Evacuation platforms are arranged on both sides of the middle partition wall;
[0011] The inner side of the tunnel is provided with a composite lining;
[0012] The interior of the tunnel is composed of a track structure and a city-wide D-type train from bottom to top;
[0013] The track structure is provided with a side ditch drainage ditch on one side close to the middle partition wall, and is also provided with a drainage ditch on the other side.
[0014] Preferably, the cross-sectional centers of the arc surface of the vault and the arc surface of the invert arch are located on the center line of the tunnel.
[0015] Preferably, the effective clearance areas of the left and right single tunnels of the tunnel are both 39.7 m2.
[0016] Preferably, the arc surface of the arch is a bilaterally symmetrical 60° arc, and the inner radius of the lining is 6840 mm.
[0017] Preferably, the upper right arc surface and the upper left arc surface are bilaterally symmetrical, the inner radius of the lining is 5540 mm, and the center of the cross section is not located on the center line of the tunnel;
[0018] And / or, the right side middle arc surface and the left side middle arc surface are bilaterally symmetrical, the inner radius of the lining is 5410 mm, and the center of the cross section is not located on the center line of the tunnel;
[0019] And / or, the right lower arc surface and the left lower arc surface are bilaterally symmetrical, the inner radius of the lining is 7390 mm, and the center of the cross section is not located on the center line of the tunnel;
[0020] And / or, the arc surface of the inverted arch is bilaterally symmetrical, the inner radius of the lining is 14450 mm, and the center of the cross section is located on the center line of the tunnel.
[0021] Preferably, the composite lining includes an initial support, a waterproof layer and a secondary lining. The thickness of the composite lining at the inverted arch surface is greater than that at other arc surfaces. Specifically, the thickness at the inverted arch surface is 460 mm, and the thickness at other arc surfaces is 400 mm.
[0022] Preferably, the center distance between the two lines is 6500 mm.
[0023] Preferably, the highest point of the inner contour of the tunnel is 8030 mm away from the top surface of the inner rail.
[0024] Preferably, the track structure includes a base plate, a reinforced concrete ballast bed, fasteners and rails, and the track structure height is 560 mm.
[0025] Preferably, electrical equipment and fire-fighting equipment are provided on both sides of the track structure.
[0026] The electrical equipment includes lighting lamps, maintenance equipment boxes, high-voltage brackets, track circuit boxes, direction boxes, signal machine boxes, section wireless base stations, repeaters, and stray current sensors.
[0027] The fire fighting equipment includes interval fire fighting water pipes and wastewater pump room water pipes.
[0028] The above-mentioned preferred technical features can be combined with each other as long as they do not conflict with each other.
[0029] In general, the above technical solution conceived by the present invention has the following beneficial effects compared with the prior art:
[0030] The cross-sectional structure of the single-hole double-track belt intermediate partition wall mining tunnel based on the urban D-type vehicle limit design of the present invention fully considers the vehicle limit, building limit, structural layout, equipment installation and personnel evacuation and other requirements, meets the requirements of train driving safety, avoids the interference between trains and buildings and equipment, reasonably and effectively ensures that there will be no over-limit problems during vehicle driving, and reduces the cross-sectional area of the tunnel and reduces engineering investment. The present invention is scientifically and reasonably designed, simple in structure but has good practicality. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 This is a cross-sectional view of a single-hole double-track middle partition wall mining tunnel designed based on the urban D-type vehicle limit of an embodiment of the present invention;
[0032] Figure 2 It is an inner contour diagram of a single-hole double-track zone intermediate partition wall mining method tunnel lining based on the urban D-type vehicle limit design according to an embodiment of the present invention;
[0033] Figure 3 It is a large-scale diagram of the circle center relationship of an embodiment of the present invention;
[0034] Figure 4 It is a cross-sectional dimension table of an embodiment of the present invention.
[0035] The unit of dimensions in the chart is cm, each O point represents the center of a circle, each r represents the inner radius of the lining, each R represents the outer radius of the lining, each a represents the horizontal / vertical distance between the corresponding center of the circle, b1 represents the maximum half-width in the tunnel, b2 represents the half-width of the bottom of the tunnel, h represents the distance between the highest point of the inner contour of the tunnel and the top surface of the inner rail, and H represents the distance between the highest point of the outer contour of the tunnel and the outer end elevation of the arc surface of the invert. DETAILED DESCRIPTION
[0036] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention. In addition, the technical features involved in each embodiment of the present invention described below can be combined with each other as long as they do not conflict with each other. The present invention is further described in detail below in conjunction with specific embodiments.
[0037] As a preferred embodiment of the present invention, Figure 1-4 As shown, the present invention provides a single-hole double-track belt intermediate partition wall mining method tunnel cross-section structure based on the urban area D-type vehicle limit design, wherein:
[0038] The tunnel cross section is composed of a total of eight arcs, including the arch arc surface 1, the right upper arc surface 2, the right middle arc surface 3, the right lower arc surface 4, the inverted arch arc surface 6, the left lower arc surface 10, the left middle arc surface 11, and the left upper arc surface 12; except that the inverted arch arc surface 6 is not tangent to the adjacent arc surface, the other two adjacent arc surfaces are tangent. Figure 2 The tunnel inner contour 14, tunnel construction limit 15, and tunnel basic construction limit 16 are shown. The train passage area of the tunnel section should meet the vehicle limit and construction limit requirements of urban D-type vehicles.
[0039] The tunnel is a single hole with double-track tracks, the centers of the two tracks are symmetrical with respect to the center line of the tunnel, and a middle partition wall 7 is arranged in the middle of the tunnel. Evacuation platforms 8 are arranged on both sides of the middle partition wall 7.
[0040] The inner side of the tunnel is provided with a composite lining 13. Preferably, the composite lining 13 includes an initial support, a waterproof layer and a secondary lining. The thickness of the composite lining 2 at the inverted arch surface 6 is greater than that at other arc surfaces. Specifically, the thickness at the inverted arch surface 6 is 450 mm, and the thickness at other arc surfaces is 350 mm. The type of the composite lining 13 is a limited discharge type.
[0041] From bottom to top, the tunnel is composed of a track structure 9 and a city D-type vehicle. The track structure 9 is provided with a side ditch 5 on one side of the middle partition wall 7, and a drainage ditch 5 is also provided on the other side. The track structure 9 includes a bottom plate, a reinforced concrete ballast, fasteners and rails, and the track structure height is 560 mm.
[0042] The cross-sectional centers of the arch arc surface 1 and the invert arc surface 6 are located on the tunnel centerline.
[0043] The effective clearance area of the two single tunnels on the left and right sides of the tunnel is 39.7 square meters.
[0044] When the tunnel is not widened, that is, the standard width or the widening is 0, such as Figure 1-4 As shown, the arch arc surface 1 is a 60° arc with a symmetrical inner radius of 6840mm. The upper arc surface 2 on the right and the upper arc surface 12 on the left are symmetrical with an inner radius of 5540mm, and the center of the cross section is not located on the center line of the tunnel; and / or, the middle arc surface 3 on the right and the middle arc surface 11 on the left are symmetrical with an inner radius of 5410mm, and the center of the cross section is not located on the center line of the tunnel; and / or, the lower arc surface 4 on the right and the lower arc surface 10 on the left are symmetrical with an inner radius of 7390mm, and the center of the cross section is not located on the center line of the tunnel; and / or, the inverted arch arc surface 6 is symmetrical with an inner radius of 14450mm, and the center of the cross section is located on the center line of the tunnel.
[0045] The center distance between the two lines is 6500mm.
[0046] The highest point of the inner contour of the tunnel is 8030 mm away from the top surface of the inner rail.
[0047] Electrical equipment and fire-fighting equipment are arranged on both sides of the track structure 9.
[0048] The electrical equipment includes lighting lamps, maintenance equipment boxes, high-voltage brackets, track circuit boxes, direction boxes, signal machine boxes, section wireless base stations, repeaters, and stray current sensors.
[0049] The fire fighting equipment includes interval fire fighting water pipes and wastewater pump room water pipes.
[0050] The cross-sectional structure of the single-hole double-track belt intermediate partition wall mining tunnel based on the urban D-type vehicle limit design of the present invention fully considers the vehicle limit, building limit, structural layout, equipment installation and personnel evacuation and other requirements, meets the requirements of train driving safety, avoids the interference between trains and buildings and equipment, reasonably and effectively ensures that there will be no over-limit problems during vehicle driving, and reduces the cross-sectional area of the tunnel and reduces engineering investment. The present invention is scientifically and reasonably designed, simple in structure but has good practicality.
[0051] It will be easily understood by those skilled in the art that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A cross-sectional structure of a single-hole double-track tunnel with a central partition wall mining method based on the urban D-type vehicle limit design. Features: The tunnel cross section is composed of eight arcs in total, including, in sequence, an arch arc surface (1), a right upper arc surface (2), a right middle arc surface (3), a right lower arc surface (4), an inverted arch arc surface (6), a left lower arc surface (10), a left middle arc surface (11), and a left upper arc surface (12); except that the inverted arch arc surface (6) is not tangent to the adjacent arc surface, the other two adjacent arc surfaces are tangent; The arched arc surface (1) is a bilaterally symmetrical 60° arc, the inner radius of the lining is 6840 mm, and the cross-sectional center of the arched arc surface (1) is located on the tunnel centerline; The right upper arc surface (2) and the left upper arc surface (12) are bilaterally symmetrical, the inner radius of the lining is 5540 mm, and the center of the cross section is not located on the center line of the tunnel; The right side middle arc surface (3) and the left side middle arc surface (11) are bilaterally symmetrical, the inner radius of the lining is 5410 mm, and the center of the cross section is not located on the center line of the tunnel; The right lower arc surface (4) and the left lower arc surface (10) are bilaterally symmetrical, the inner radius of the lining is 7390 mm, and the center of the cross section is not located on the center line of the tunnel; The inverted arch circular arc surface (6) is bilaterally symmetrical, the inner radius of the lining is 14450 mm, and the cross-sectional center of the inverted arch circular arc surface (6) is located on the tunnel centerline; The tunnel is a single hole with a double track inside. The track centers of the two tracks are symmetrical with respect to the tunnel center line. A middle partition wall (7) is arranged in the middle of the tunnel. The track center distance of the two tracks is 6500 mm. Evacuation platforms (8) are provided on both sides of the middle partition wall (7); The inner side of the tunnel is provided with a composite lining (13); The interior of the tunnel is composed of a track structure (9) and a city-wide D-type train from bottom to top; The track structure (9) is provided with a side ditch drainage ditch (5) on one side close to the middle partition wall (7), and also provided with a drainage ditch (5) on the other side; The highest point of the inner contour of the tunnel is 8030 mm away from the top surface of the inner rail.
2. The cross-sectional structure of a single-hole double-track middle partition wall mining tunnel based on the urban D-type vehicle limit design according to claim 1, Features: The effective clearance area of the two single tunnels on the left and right sides of the tunnel is 39.7 square meters.
3. The cross-sectional structure of a single-hole double-track middle partition wall mining tunnel based on the urban D-type vehicle limit design as claimed in claim 1, Features: The composite lining (13) comprises an initial support, a waterproof layer and a secondary lining.
4. The cross-sectional structure of a single-hole double-track belt intermediate partition wall mining method tunnel based on the urban D-type vehicle limit design according to claim 1, Features: The track structure (9) comprises a base plate, a reinforced concrete ballast bed, fasteners and rails, and the track structure height is 560 mm.
Citation Information
Patent Citations
Double partition two-arch tunnel
CN101519969A
Three-layer-structure subway double-line single-pipe circular tunnel
CN103195440A
Shield segment structure and shield tunnel
CN103306685A
Construction method for improving usage rate of effective section of road tunnel
CN103711502A
Arrangement structure with traffic tunnel and rubber belt conveyor combined together
CN106194247A