Sludge drying control system and control method
By using PROFIBUS communication cables and modular design in the sludge drying control system, the problems of inconvenient fault finding and unfixed control methods in the existing technology are solved, simple and practical sludge drying control is realized, and faults are reduced rate and debugging time to ensure that the equipment is put into operation quickly.
Patent Information
- Application Number
- CN201911177617.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-11-27
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2039-11-27
AI Technical Summary
The existing sludge drying control system uses a PLC control system, which has problems such as inconvenient fault finding and inconsistent control methods, resulting in high failure rates and long debugging time.
A sludge drying control system is designed, using PROFIBUS communication cables to connect the PLC control cabinet and the frequency converter. Through modular and fixed design, remote control of the motor is achieved, and the operating status of the PLC control cabinet is monitored through the host computer. Simplify the power supply circuit and reduce the failure rate.
The sludge drying control system is simple and practical, reduces the failure rate, shortens the debugging time, and enables the sludge drying equipment to be quickly put into operation.
Smart Images

Figure CN110737238B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of sludge drying treatment, and in particular to a sludge drying control system and a control method. Background Art
[0002] At present, most sludge drying control systems use PLC (Programmable Logic Controller) control systems, which require external hardware devices to be connected to the PLC devices. The input and output control terminals of the PLC devices are the communication channels between the PLC devices and the external hardware devices. The terminal blocks and intermediate relays are the fault monitoring points of the control system. In addition, the control method of the control system has no fixed mode, which makes fault finding inconvenient. Summary of the invention
[0003] The present invention aims to solve one of the technical problems in the related art to at least some extent. To this end, one object of the present invention is to propose a sludge drying control system to achieve modularization and fixation of control and facilitate fault finding.
[0004] The second object of the present invention is to provide a sludge drying control method.
[0005] To achieve the above-mentioned purpose, the first aspect of the present invention proposes a sludge drying control system, including: a sludge drying device, the sludge drying device includes multiple motors and multiple switch cabinets, the multiple switch cabinets are arranged in a one-to-one correspondence with the multiple motors, each switch cabinet is installed with a frequency converter, and each frequency converter is connected to the motor corresponding to the switch cabinet where it is located; a PLC control cabinet, the PLC control cabinet is connected to each frequency converter respectively through a PROFIBUS communication cable, and the PLC control cabinet is used to control the motor corresponding to the switch cabinet where the frequency converter is located through the frequency converter; a power supply circuit, the input end of the power supply circuit is connected to an AC power supply, and the first output end and the second output end of the power supply circuit are both connected to the PLC control cabinet, and the power supply circuit is used to convert the AC power output by the AC power supply into a first AC power and a first DC power, and output the first AC power through the first output end, and output the first DC power through the second output end to power the PLC control cabinet.
[0006] The sludge drying control system of the embodiment of the present invention only needs one PROFIBUS communication cable to realize the remote control of the start and stop of the motor, and can realize the modularization and fixation of the sludge drying control system, so that the control system is more concise and practical, with a low failure rate, and more intuitive to find faults, which can shorten the working time of the debugging site and put the sludge drying equipment into operation as soon as possible.
[0007] As an example, the control system further includes: a host computer, which is connected to the PLC control cabinet via a network cable, and is used to obtain and display the operating status of the PLC control cabinet.
[0008] As an example, the PLC control cabinet includes: a control module, which is connected to the host computer through a network cable and is respectively connected to each frequency converter through a PROFIBUS communication cable; a power supply module, the input end of the power supply module is connected to the first output end of the power supply circuit, and the output end of the power supply module is connected to the power supply end of the control module; a digital input module, a digital output module, an analog input module and an analog output module, and the power supply ends of the digital input module, the digital output module, the analog input module and the analog output module are all connected to the second output end of the power supply circuit.
[0009] As an example, the power supply circuit includes: a first circuit breaker, wherein the input end of the first circuit breaker is connected to the AC power supply; an isolation transformer, wherein the input end of the isolation transformer is connected to the output end of the first circuit breaker; a second circuit breaker, wherein the input end of the second circuit breaker is connected to the output end of the isolation transformer, and the output end of the second circuit breaker is connected to the power supply module; a third circuit breaker, wherein the input end of the third circuit breaker is connected to the output end of the isolation transformer; a switching power supply, wherein the AC end of the switching power supply is connected to the output end of the third circuit breaker, and the DC end of the switching power supply is respectively connected to the power supply ends of the digital input module, the digital output module, the analog input module and the analog output module; a first indicator light, wherein one end of the first indicator light is connected to the output end of the first circuit breaker, and the other end of the first indicator light is grounded; a second indicator light, wherein the second indicator light is connected to the output end of the second circuit breaker; and a third indicator light, wherein the third indicator light is connected to the output end of the isolation transformer.
[0010] As an example, the power supply circuit further includes: a first fuse, which is connected to the loop where the first indicator light is located; and a second fuse, which is connected to the loop where the third indicator light is located.
[0011] As an example, the multiple motors include a first dry material collector, a second dry material collector, a drying fan, and a fluidizing fan. The sludge drying equipment also includes: a feeder, a drying main machine, a dry material bin, and a bag dust collector; a level meter, the level meter is arranged in the dry material bin, and is used to detect the material level in the dry material bin; a first temperature sensor, the first temperature sensor is arranged at the outlet of the drying main machine, and is used to detect the temperature of the outlet of the drying main machine; a second temperature sensor, the second temperature sensor is arranged at the outlet of the bag dust collector, and is used to detect the temperature of the outlet of the bag dust collector; a first pressure sensor, the first pressure sensor is arranged at the inlet of the bag dust collector, Used to detect the pressure at the inlet of the bag collector; a second pressure sensor, which is arranged at the outlet of the bag collector and is used to detect the pressure at the outlet of the bag collector; wherein the control module is also used to: when the first dry material collector operates normally, the second dry material collector operates normally, the drying fan operates normally, the fluidizing fan operates normally, the temperature at the outlet of the drying main unit is above the lower limit setting value, the material level of the dry material bin is normal, the temperature at the outlet of the bag collector is below the upper limit setting value, and the pressure difference between the inlet and outlet of the bag collector is below the pressure difference setting value, determine that the feeder meets the starting conditions and control the start of the feeder.
[0012] As an example, the control module is also used to control the feeder to stop working when any one of the following conditions is met: the drying fan stops running, the fluidizing fan stops running, the first dry material collector stops running, the second dry material collector stops running, the material level of the dry material bin is abnormal, the temperature of the bag filter outlet is above the upper limit setting value, and the pressure difference between the inlet and outlet of the bag filter is above the pressure difference setting value.
[0013] As an example, each frequency converter has a RPBA-01 communication card to implement the PROFIBUS-DP communication function with the PLC control cabinet.
[0014] To achieve the above-mentioned purpose, the second aspect of the present invention proposes a sludge drying control method, which is implemented by using the sludge drying control system of the above-mentioned embodiment. The sludge drying equipment of the sludge drying control system includes a first dry material collector, a second dry material collector, a drying fan, a fluidizing fan, a feeder, a drying main unit, a dry material bin and a bag dust collector. The control method includes the following steps: judging whether the feeder meets the starting conditions; if the first dry material collector operates normally, the second dry material collector operates normally, the drying fan operates normally, the fluidizing fan operates normally, the temperature at the outlet of the drying main unit is above the lower limit setting value, the material level of the dry material bin is normal, the temperature at the outlet of the bag dust collector is below the upper limit setting value, and the pressure difference between the inlet and outlet of the bag dust collector is below the pressure difference setting value, then judging that the feeder meets the starting conditions, and controlling the feeder to start.
[0015] The sludge drying control method of the embodiment of the present invention is implemented by using the sludge drying control system of the above embodiment. The control circuit configuration is simple, the work efficiency is greatly improved, and various cumbersome debugging methods are eliminated in the actual system debugging, thereby shortening the debugging time.
[0016] As an example, the control method also includes: when any one of the following conditions is met: the drying fan stops running, the fluidizing fan stops running, the first dry material collector stops running, the second dry material collector stops running, the material level of the dry material bin is abnormal, the temperature of the bag filter outlet is above the upper limit setting value, and the pressure difference between the inlet and outlet of the bag filter is above the pressure difference setting value, the feeder is controlled to stop working.
[0017] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 is a schematic diagram of the structure of a sludge drying control system according to an embodiment of the present invention;
[0019] Figure 2 It is a structural schematic diagram of a sludge drying control system according to an example of the present invention;
[0020] Figure 3 It is a structural schematic diagram of a power supply circuit in a sludge drying control system according to an example of the present invention;
[0021] Figure 4 is a schematic diagram of a feeder start-up control according to an example of the present invention;
[0022] Figure 5 It is a schematic structural diagram of a sludge drying device according to an example of the present invention. DETAILED DESCRIPTION
[0023] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.
[0024] The sludge drying control system and control method according to the embodiments of the present invention will be described below with reference to the accompanying drawings.
[0025] Example 1
[0026] Figure 1 It is a schematic diagram of the structure of a sludge drying control system according to an embodiment of the present invention.
[0027] like Figure 1 As shown, the sludge drying control system includes a sludge drying device 110 , a PLC control cabinet 120 and a power supply circuit 130 . Among them, the sludge drying equipment 110 includes multiple motors and multiple switch cabinets 111, and the multiple switch cabinets 111 are arranged one by one with the multiple motors. A frequency converter is installed in each switch cabinet, and each frequency converter is connected to the motor corresponding to the switch cabinet where it is located; the PLC control cabinet 120 is connected to each frequency converter through a PROFIBUS communication cable (such as a Siemens special communication cable, model 6XV18300EH10), and the PLC control cabinet 120 is used to control the motor corresponding to the switch cabinet where the frequency converter is located through the frequency converter; the input end of the power supply circuit 130 is connected to the AC power supply AC, and the first output end and the second output end of the power supply circuit 130 are both connected to the PLC control cabinet 120, and the power supply circuit 130 is used to convert the AC power output by the AC power supply AC into a first AC power and a first DC power, and output the first AC power through the first output end, and output the first DC power through the second output end to power the PLC control cabinet 120.
[0028] Each frequency converter may have a RPBA-01 communication card to implement a PROFIBUS-DP communication function with the PLC control cabinet 120 .
[0029] Specifically, the control module 121 in the PLC control cabinet 120 can adopt the S7-300 product of Siemens, model 6ES7315-2EH14-0AB0, which has 1 MPI / DP interface and 2 Ethernet PROFINET interfaces. Each motor is a transmission device, which plays the role of dragging the sludge drying equipment. All motors are selected as special frequency conversion motors, and the motors are started and controlled by corresponding frequency converters. The frequency converter can adopt the ACS580 product of ABB, which has an RPBA-01 communication card and can realize the PROFIBUS-DP communication function, and can be used as the slave station of the PLC control cabinet 120 to communicate seamlessly and long-distance with the master station.
[0030] Therefore, the sludge drying control system only needs a PROFIBUS communication cable to realize the remote control of the motor start and stop, and can automatically adjust the motor frequency through software programming to achieve the automation of sludge drying. The sludge drying control system can realize modularization and fixation in the sludge drying control system, and the control system is more concise and practical, with a low failure rate, and more intuitive to search, which can shorten the working time of the debugging site and put the sludge drying equipment into operation as soon as possible.
[0031] As an example, see Figure 1 The sludge drying equipment 110 may include 12 switch cabinets, 12 frequency converters, and 12 motors, and DP1 to DP12 are PROFIBUS-DP interfaces of the 12 frequency converters.
[0032] As an example, Figure 2 As shown, the control system also includes a host computer 140, which is connected to the PLC control cabinet 120 via a network cable. The host computer 140 is used to obtain and display the operating status of the PLC control cabinet 120. Therefore, the operating status of the PLC control cabinet 120 can be monitored through the host computer, so that the staff can know the operating status of the PLC control cabinet 120 more intuitively.
[0033] The host computer 140 may be an industrial computer with a network card, which is connected to the network port on the PLC control cabinet 120 via a network cable.
[0034] As an example, Figure 2 As shown, the PLC control cabinet 120 includes: a control module 121 , a power module 122 , a digital quantity input module 123 , a digital quantity output module 124 , an analog quantity input module 125 and an analog quantity output module 126 .
[0035] Among them, the control module 121 is connected to the host computer 140 through a network cable, and is connected to each inverter respectively through a PROFIBUS communication cable; the input end of the power module 122 is connected to the first output end of the power supply circuit 130, and the output end of the power module 122 is connected to the power supply end of the control module 121; the power supply ends of the digital input module 123, the digital output module 124, the analog input module 125 and the analog output module 126 are all connected to the second output end of the power supply circuit 130.
[0036] Optionally, the control module 121 may use 6ES7315-2EH14-0AB0, the power module 122 may use 6ES7307-1EA01-0AA0, the digital input module 123 may use 6ES7321-1BH02-4AA1, the digital output module 124 may use 6ES7322-1BH01-4AA1, the analog input module 125 may use 6ES7331-7KF02-4AB1, and the analog output module 126 may use 6ES7332-5HF00-4AB1.
[0037] As an example, Figure 3 As shown, the power supply circuit 130 includes: a first circuit breaker QF1, an isolation transformer TM, a second circuit breaker QF2, a third circuit breaker QF3, a switching power supply TC, a first indicator light HG1, a second indicator light HG2 and a third indicator light HR1.
[0038] See also Figure 3 The input end of the first circuit breaker QF1 is connected to the AC power supply AC; the input end of the isolation transformer TM is connected to the output end of the first circuit breaker QF1; the input end of the second circuit breaker QF2 is connected to the output end of the isolation transformer TM, and the output end of the second circuit breaker QF2 is connected to the power module 122; the input end of the third circuit breaker QF3 is connected to the output end of the isolation transformer TM; the AC end of the switching power supply TC is connected to the output end of the third circuit breaker QF3, and the DC end of the switching power supply TC is respectively connected to the power supply ends of the digital input module 123, the digital output module 124, the analog input module 125 and the analog output module 126; one end of the first indicator light HG1 is connected to the other end of the first circuit breaker QF1, and the other end of the first indicator light HG1 is grounded; the second indicator light HG2 is connected to the output end of the second circuit breaker QF2; the third indicator light HR1 is connected to the output end of the isolation transformer TM.
[0039] The first indicator light HG1 and the second indicator light HG2 may both be green indicator lights, and the third indicator light HR1 may be a red indicator light, so as to detect whether the power supply of the corresponding line is normal.
[0040] Further, see Figure 3The power supply circuit 130 further includes: a first fuse FU1 and a second fuse FU2. The first fuse FU1 is connected to the loop where the first indicator light HG1 is located to achieve overcurrent protection for the first indicator light HG1; the second fuse FU2 is connected to the loop where the third indicator light HR1 is located to achieve overcurrent protection for the third indicator light HR1.
[0041] Specifically, see Figure 3 , the power supply circuit 130 is a single-phase power supply, L is the live wire, N is the neutral wire, and PE is the ground wire. QF1\QF2\QF3 are circuit breakers, TM is an isolation transformer, HG\HR are green and red indicator lights, FU1 and FU2 are fuses, and TC is a switching power supply. As the system power supply part, AC 220V is used to supply power to the power module 122, and DC 24V is used to supply power to each module, input and output nodes, and other DC power supplies of the PLC control cabinet 120.
[0042] As an example, Figure 4 , Figure 5 As shown, multiple motors include a first dry material collector 1, a second dry material collector 2, a drying fan 3, and a fluidizing fan 4. The sludge drying equipment 110 also includes a drying main unit 5, a dry material bin 6, a bag dust collector 7, a level meter 8, a first temperature sensor 9, a second temperature sensor 10, a first pressure sensor 11, a second pressure sensor 12 and a feeder 13.
[0043] Among them, the material level meter 8 is arranged in the dry material bin 6, and is used to detect the material level in the dry material bin 6; the first temperature sensor 9 is arranged at the outlet of the drying main unit 5, and is used to detect the temperature of the outlet of the drying main unit 5; the second temperature sensor 10 is arranged at the outlet of the bag dust collector 7, and is used to detect the temperature of the outlet of the bag dust collector 7; the first pressure sensor 11 is arranged at the inlet of the bag dust collector 7, and is used to detect the pressure of the inlet of the bag dust collector 7; the second pressure sensor 12 is arranged at the outlet of the bag dust collector 7, and is used to detect the pressure of the outlet of the bag dust collector 7.
[0044] In this example, the control module 121 is also used to determine that the feeder 13 meets the start-up conditions and control the feeder 13 to start when the first dry material collector 1 operates normally, the second dry material collector 2 operates normally, the drying fan 3 operates normally, the fluidizing fan 4 operates normally, the temperature at the outlet of the drying main machine 5 is above the lower limit setting value (such as 90°C), the material level of the dry material bin 6 is normal, the temperature at the outlet of the bag filter 7 is below the upper limit setting value (such as 180°C), and the pressure difference between the inlet and outlet of the bag filter 7 is below the pressure difference setting value (such as -2000Pa).
[0045] Further, see Figure 5The control module 121 is also used to control the feeder 13 to stop working when any one of the following conditions is met: the drying fan 3 stops running, the fluidizing fan 4 stops running, the first dry material collector 1 stops running, the second dry material collector 2 stops running, the material level of the dry material bin 6 is abnormal, the temperature at the outlet of the bag filter 7 is above the upper limit setting value, and the pressure difference between the inlet and outlet of the bag filter 7 is above the pressure difference setting value.
[0046] Among them, the material level of the dry material bin 6 is normal, that is, the material level is below the material level setting value (such as 90% of the full material level); the material level of the dry material bin 6 is abnormal, that is, the material level is greater than the material level setting value.
[0047] See also Figure 4 In order to ensure the safety of the start-up and the stability of the operation of the feeder 13, when the above start-up conditions are met, it can be further determined whether the duration of each condition being met is greater than or equal to a preset time, such as 3s. Of course, if all the above start-up conditions are met, but the duration of any one of them does not reach the preset time, the feeder 13 is also controlled to stop working.
[0048] As an example, the control module 121 can use the control hardware of the S7-300 system, the model is 6ES73152EH140AB0; the input and output modules are 6ES73211BL000AA0 and 6ES73221BL000AA0. In order to realize the control of the sludge drying equipment, the S7-300 can be programmed using STEP7 software, and the programming language can use S7-SCL (Structured Control Language). S7-SCL is a high-level programming language similar to Pasical and Deliphi. The programming is intuitive and clear, and the program is easier to maintain. For debuggers, the standardization of program production efficiency is improved.
[0049] Programming is as follows:
[0050] FUNCTION FC1 : VOID
[0051] / /
[0052] / / Start and stop logic control under all motor interlocking states
[0053] / /
[0054] AUTHOR:SK
[0055] VAR_TEMP
[0056] / / Temporary variables
[0057] LTIME:WORD;
[0058] Feedmoto_T:S5TIME;
[0059] Feedmoto_S:BOOL;
[0060] Feedmoto_Q:BOOL;
[0061] Feedmoto_R:BOOL;
[0062] END_VAR
[0063] / / / / ***Fluidizing fan / / / / Start fluidizing fan unconditionally
[0064] IF DB6.HMI_Vulcanize_fan_1.Start=1
[0065] AND DB1.Vulcanize_fan_1.Error=0
[0066] AND DB1.Vulcanize_fan_1.Remote_Local=1
[0067] THEN
[0068] / / start up
[0069] DB1.Vulcanize_fan_1.Start:=1;
[0070] DB1.Vulcanize_fan_1.Stop:=0;
[0071] ELSE
[0072] / / closure
[0073] DB1.Vulcanize_fan_1.Start:=0;
[0074] DB1.Vulcanize_fan_1.Stop:=1;
[0075] DB6.HMI_Vulcanize_fan_1.Start:=0;
[0076] END_IF;
[0077] / / / / ***Drying fan / / / / Start the drying fan without restrictions
[0078] IF DB6.HMI_Drying_fan_1.Start=1
[0079] AND DB1.Drying_fan_1.Error=0
[0080] AND DB1.Drying_fan_1.Remote_Local=1
[0081] THEN
[0082] / / start up
[0083] DB1.Drying_fan_1.Start:=1;
[0084] DB1.Drying_fan_1.Stop:=0;
[0085] ELSE
[0086] / / closure
[0087] DB1.Drying_fan_1.Start:=0;
[0088] DB1.Drying_fan_1.Stop:=1;
[0089] DB6.HMI_Drying_fan_1.Start:=0;
[0090] END_IF;
[0091] / / / / ***Dry material collection machine A / / / Dry material collection machine A starts
[0092] DB1.Drier_motor_1A.Start:=1;
[0093] DB1.Drier_motor_1A.Stop:=0;
[0094] ELSE
[0095] / / Close the dry material feeder A
[0096] DB1.Drier_motor_1A.Start:=0;
[0097] DB1.Drier_motor_1A.Stop:=1;
[0098] DB6.HMI_Drier_motor_1A.Start:=0;
[0099] END_IF;
[0100] / / / / ***Dry material collection machine B / / / / Dry material collection machine B starts
[0101] DB1.Drier_motor_1B.Start:=1;
[0102] DB1.Drier_motor_1B.Stop := 0;
[0103] ELSE
[0104] / / Dry material collecting machine B is closed
[0105] DB1.Drier_motor_1B.Start := 0;
[0106] DB1.Drier_motor_1B.Stop := 1;
[0107] DB6.HMI_Drier_motor_1B.Start := 0;
[0108] END_IF;
[0109] / / / / ***Feeder / / / / Feeder startup conditions
[0110] IF (DB1.Drier_motor_1A.Runing = 1) AND (DB1.Drier_motor_1A.Error = 0) / / Dry collecting machine A is running normally
[0111] AND DB6.DBX175.0 = 0 / / DB1.Drier_motor_1A.Current < DB6.HMI_Drier_motor_1A.Current, current of dry collecting machine A is lower than the setting
[0112] AND (DB1.Drier_motor_1B.Runing = 1) AND (DB1.Drier_motor_1B.Error = 0) / / Dry collecting machine B is running normally
[0113] AND DB6.DBX175.1 = 0 / / DB1.Drier_motor_1B.Current > DB6.HMI_Drier_motor_1B.Current, current of dry collecting machine B is lower than the setting
[0114] AND (DB1.Vulcanize_fan_1.Runing = 1) AND (DB1.Vulcanize_fan_1.Error = 0) / / Fluidization fan is running normally
[0115] AND (DB1.Drying_fan_1.Runing = 1) AND (DB1.Drying_fan_1.Error = 0) / / Drying fan is running normally
[0116] AND DB6.DBX178.0=0 / / (DB3.Dry_TEMP1>DB6.HMI_Dry_TEMP1L) The outlet temperature of the drying main machine is higher than the set low value
[0117] AND DB6.DBX178.2=0 / / DB3.Bag_TEMP1<DB6.HMI_Bag_TEMP1H The temperature of the bag filter is lower than the high setting
[0118] AND DB6.DBX176.0=0 / / ((DB3.Dry_PA1 - DB3.Bag_PA1)<DB6.HMI_Give_PA1) The pressure difference is below the set value
[0119] AND DB6.DBX176.2=0 / / (DB2.Binwarn_1=1) The material bin level is normal
[0120] THEN
[0121] / / Start the feeder
[0122] DB6.HMI_Give_motor_1.Start:=1;
[0123] DB1.Give_motor_1.Start:=1;
[0124] DB1.Give_motor_1.Stop:=0;
[0125] ELSE
[0126] / / Stop the feeder
[0127] DB6.HMI_Give_motor_1.Start:=0;
[0128] DB1.Give_motor_1.Start:=0;
[0129] DB1.Give_motor_1.Stop:=1;
[0130] END_IF;
[0131] END_FUNCTION)
[0132] In summary, the sludge drying control system of the embodiment of the present invention has a simple and clear framework. The PLC control cabinet is connected to the on-site system equipment by only one communication line. The PLC control cabinet interacts with 12 on-site motors through the PROFIBUS-DP communication protocol to achieve remote control and monitoring. A switch cabinet is set for the on-site frequency converter, and a modular and standardized design is adopted. One switch cabinet is installed with one frequency converter to control one motor. The control circuits are exactly the same, the configuration is simple, and the work efficiency is greatly improved. The software of the control system is completely solid-state, which can realize curing process and batch production, thereby eliminating various cumbersome debugging methods in actual system debugging, shortening the debugging time, and ensuring that the process system is put into operation as soon as possible.
[0133] Example 2
[0134] The present invention proposes a sludge drying control method, which is implemented using the sludge drying control system of the above-mentioned embodiment. The sludge drying equipment of the sludge drying control system includes a first dry material collector, a second dry material collector, a drying fan, a fluidizing fan, a feeder, a drying main unit, a dry material bin and a bag dust collector.
[0135] In this embodiment, the control method includes the following steps:
[0136] S1, determine whether the feeder meets the starting conditions.
[0137] S2: If the first dry material collector operates normally, the second dry material collector operates normally, the drying fan operates normally, the fluidizing fan operates normally, the temperature at the outlet of the drying main machine is above the lower limit setting value, the material level in the dry material bin is normal, the temperature at the outlet of the bag filter is below the upper limit setting value, and the pressure difference between the inlet and outlet of the bag filter is below the pressure difference setting value, then it is judged that the feeder meets the start-up conditions and the feeder is controlled to start.
[0138] Furthermore, the sludge drying equipment also includes a feeder, and the control method also includes: when any one of the following conditions is met: the drying fan stops running, the fluidizing fan stops running, the first dry material collector stops running, the second dry material collector stops running, the dry material bin level meter alarms, the temperature of the bag filter outlet is above the upper limit setting value, and the pressure difference between the bag filter inlet and outlet is above the pressure difference setting value, the feeder is controlled to stop working.
[0139] Among them, the material level of the dry material bin 6 is normal, that is, the material level is below the material level setting value; the material level of the dry material bin 6 is abnormal, that is, the material level is greater than the material level setting value.
[0140] See also Figure 4In order to ensure the safety of the start-up and the stability of the operation of the feeder 13, when the above start-up conditions are met, it can be further determined whether the duration of each condition being met is greater than or equal to a preset time, such as 3s. Of course, if all the above start-up conditions are met, but the duration of any one of them does not reach the preset time, the feeder 13 is also controlled to stop working.
[0141] The sludge drying control method of the embodiment of the present invention is implemented by using the sludge drying control system of the above embodiment. The control circuit configuration is simple, the work efficiency is greatly improved, and the debugging method is simple in actual system debugging, which shortens the debugging time.
[0142] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.
Claims
1. A sludge drying control system, characterized in that: The control system comprises: Sludge drying equipment, the sludge drying equipment comprising a plurality of motors and a plurality of switch cabinets, the plurality of switch cabinets being arranged in one-to-one correspondence with the plurality of motors, each switch cabinet being equipped with a frequency converter, and each frequency converter being connected to the motor corresponding to the switch cabinet in which it is located; A PLC control cabinet, the PLC control cabinet is used to control the motor corresponding to the switch cabinet where the frequency converter is located through the frequency converter; A power supply circuit, wherein the input end of the power supply circuit is connected to an AC power supply, and the first output end and the second output end of the power supply circuit are both connected to the PLC control cabinet, and the power supply circuit is used to convert the AC power output by the AC power supply into a first AC power and a first DC power, and output the first AC power through the first output end, and output the first DC power through the second output end, so as to supply power to the PLC control cabinet: A host computer, the host computer is connected to the PLC control cabinet via a network cable, and the host computer is used to obtain the operating status of the PLC control cabinet and display it; The PLC control cabinet also includes: a control module, which is connected to the host computer via a network cable and is respectively connected to each inverter via a PROFIBUS communication cable; a power module, the input end of the power module is connected to the first output end, and the output end of the power module is connected to the power supply end of the control module; a digital input module, a digital output module, an analog input module and an analog output module, and the power supply ends of the digital input module, the digital output module, the analog input module and the analog output module are all connected to the second output end; wherein, The plurality of motors include a first dry material collector, a second dry material collector, a drying fan, and a fluidizing fan; The sludge drying equipment also includes: Feeder, drying host, dry material silo and bag dust collector; A material level meter, which is arranged in the dry material bin and is used to detect the material level in the dry material bin; A first temperature sensor, which is disposed at the outlet of the drying main unit and is used to detect the temperature of the outlet of the drying main unit; A second temperature sensor, the second temperature sensor is arranged at the outlet of the bag filter, and is used to detect the temperature of the outlet of the bag filter; a first pressure sensor, the first pressure sensor being disposed at the inlet of the bag filter and used for detecting the pressure at the inlet of the bag filter; a second pressure sensor, the second pressure sensor being disposed at the outlet of the bag filter and used for detecting the pressure at the outlet of the bag filter; Among them, the control module is also used to: when the first dry material collector operates normally, the second dry material collector operates normally, the drying fan operates normally, the fluidizing fan operates normally, the temperature of the outlet of the drying main machine is above the lower limit setting value, the material level of the dry material bin is normal, the temperature of the bag dust collector outlet is below the upper limit setting value, and the pressure difference between the inlet and outlet of the bag dust collector is below the pressure difference setting value, determine that the feeder meets the start-up conditions and control the feeder to start; and when any one of the following is met: the drying fan stops running, the fluidizing fan stops running, the first dry material collector stops running, the second dry material collector stops running, the material level of the dry material bin is abnormal, the temperature of the bag dust collector outlet is above the upper limit setting value, and the pressure difference between the inlet and outlet of the bag dust collector is above the pressure difference setting value, control the feeder to stop working.
2. The sludge drying control system according to claim 1, characterized in that: The power supply circuit comprises: A first circuit breaker, wherein an input terminal of the first circuit breaker is connected to the AC power source; an isolation transformer, wherein an input end of the isolation transformer is connected to an output end of the first circuit breaker; a second circuit breaker, wherein an input end of the second circuit breaker is connected to an output end of the isolation transformer, and an output end of the second circuit breaker is connected to the power module; A third circuit breaker, wherein an input end of the third circuit breaker is connected to an output end of the isolation transformer; A switching power supply, wherein the AC end of the switching power supply is connected to the output end of the third circuit breaker, and the DC end of the switching power supply is respectively connected to the power supply ends of the digital input module, the digital output module, the analog input module, and the analog output module; a first indicator light, wherein one end of the first indicator light is connected to the output end of the first circuit breaker, and the other end of the first indicator light is grounded; a second indicator light, the second indicator light being connected to an output end of the second circuit breaker; A third indicator light is connected to the output end of the isolation transformer.
3. The sludge drying control system according to claim 2, characterized in that: The power supply circuit also includes: A first fuse, wherein the first fuse is connected to a circuit where the first indicator light is located; A second fuse, wherein the second fuse is connected to the loop where the third indicator light is located.
4. The sludge drying control system according to claim 1, characterized in that: Each frequency converter has a RPBA-01 communication card to realize the PROFIBUS-DP communication function with the PLC control cabinet.
5. A sludge drying control method, characterized in that: The control method is implemented by using the sludge drying control system according to any one of claims 1 to 4, wherein the sludge drying equipment of the sludge drying control system includes a first dry material collector, a second dry material collector, a drying fan, a fluidizing fan, a feeder, a drying main machine, a dry material bin and a bag dust collector, and the control method includes the following steps: Determining whether the feeder meets the starting conditions; If the first dry material collector operates normally, the second dry material collector operates normally, the drying fan operates normally, the fluidizing fan operates normally, the temperature at the outlet of the drying main unit is above the lower limit setting value, the material level of the dry material bin is normal, the temperature at the outlet of the bag filter is below the upper limit setting value, and the pressure difference between the inlet and outlet of the bag filter is below the pressure difference setting value, then it is determined that the feeder meets the start-up conditions, and the feeder is controlled to start.
6. The sludge drying control method according to claim 5, characterized in that: The control method further comprises: When any one of the following conditions is met: the drying fan stops running, the fluidizing fan stops running, the first dry material collector stops running, the second dry material collector stops running, the material level of the dry material bin is abnormal, the temperature of the bag filter outlet is above the upper limit setting value, and the pressure difference between the inlet and outlet of the bag filter is above the pressure difference setting value, the feeder is controlled to stop working.
Citation Information
Patent Citations
Split-type pulse dust collector for drying and burning sludge
CN102107107A
Sludge dehydration, desiccation and incineration integrated control system
CN103941661A
Electrical control device for thick-wall steel tube thermal treatment production line
CN104263903A
Sludge anhydration and burning process, and its systematic device
CN1800062A
Supply circuit with surge restriction function
CN208299683U