A vertical shaft emergency drainage lifting system and its lifting method

By designing a balance system and lifting system in the emergency drainage technology of vertical wellbore rescue and strengthening drainage, the lifting force is amplified by using pulley sets and vehicle stabilization systems, the weight limit and force balance problems are solved, safe and efficient pipeline decentralization is achieved, and installation risks are reduced.

CN110745722BActive Publication Date: 2024-11-12MECHANICAL & ELECTRICAL INSTALLATION ENG CO LTD OF CHINA COAL NO 3 CONSTR GRP CORP LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201911066397.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-11-04
Publication Date
2024-11-12
Estimated Expiration
2039-11-04

AI Technical Summary

Technical Problem

Traditional vertical wellbore rescue and strong drainage technology cannot meet the lowering limit of 300t weight, and the lifting pipeline is unevenly subjected to stress, resulting in the risk of tilting or overturning of the pipeline.

Method used

A vertical wellbore rescue and drainage lifting system including a balance system and a lifting system was designed. The pulley set and vehicle stabilization system were used to amplify the lifting force of a single wire rope, and the force balance was achieved through balanced ear plates, balance box and lower suspension triangle connection plates. , ensure vertical installation and safe improvement of pipelines.

Benefits of technology

It effectively solves the problems of weight lifting and force balance, improves safety and efficiency, ensures that pipelines weighing more than 300t can be stably lowered, and reduces installation risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110745722B_ABST
    Figure CN110745722B_ABST
Patent Text Reader

Abstract

A vertical shaft emergency strong drainage lifting system and lifting method thereof, the lifting system includes a lower balancing system and an upper lifting system, the balancing system includes an upper suspended inverted triangle balancing plate, a balancing box, a lower suspended regular triangle connecting plate and a pipeline connecting plate, the lifting system includes a derrick platform, two groups of pulley systems and four stabilizing vehicles, the stabilizing vehicles include four, two stabilizing vehicles on the same side in the left and right directions correspond to one group of pulley systems, and the remaining two stabilizing vehicles correspond to another group of pulley systems. The present invention utilizes balancing ear plates, balancing boxes and lower suspended three-star plate balancing components to effectively solve the problem of uneven force on the system during the lifting process of traditional technology, greatly improves safety, and also solves the problem of existing spatial arrangement of the lifting system, improves the efficiency of lowering, and wins time for mine emergency drainage.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of building engineering construction, in particular to a vertical shaft emergency strong drainage hoisting system and a hoisting method thereof. Background Art

[0002] In the traditional vertical shaft emergency drainage technology, four steel wire ropes are generally used to lift the drainage pipeline and the drainage pump above the wellhead. Since the lifting weight of a single steel wire rope is limited, once the drainage pipeline is too long, and the weight of the drainage pipeline and the drainage pump is too large, the existing lifting system cannot meet the limit of the lowering weight of 300t. At the same time, the traditional technology of lifting the pipeline also has the problem of unbalanced force, which makes it easy for the pipeline to tilt or even overturn during the installation of the drainage pipeline. Summary of the invention

[0003] The purpose of the present invention is to provide a vertical shaft emergency drainage lifting system and a lifting method thereof, in order to solve the technical problem that the traditional lifting system cannot meet the limit of 300t lowering weight, and also to solve the technical problem of uneven force on the lifting pipeline.

[0004] To achieve the above object, the present invention adopts the following technical solution:

[0005] A vertical shaft emergency drainage lifting system, including a lower balancing system and an upper lifting system.

[0006] The balancing system includes, from top to bottom, a vertically arranged upper suspended inverted triangle balancing plate, a horizontal balancing box, a vertically arranged lower suspended regular triangle connecting plate and a pipeline connecting plate.

[0007] The bottom corner pin of the upper hanging inverted triangle balance plate is connected to the upper center of the balance box, and the upper hanging inverted triangle balance plate can rotate left and right relative to the balance box.

[0008] Four balance box ear plates of equal height are fixedly connected to the top four corners of the balance box.

[0009] The top angle pin of the lower suspension equilateral triangle connecting plate is connected to the center and bottom of the balance box, and the lower suspension equilateral triangle connecting plate can rotate left and right relative to the balance box.

[0010] The two bottom corners of the lower hanging equilateral triangle connecting plate are detachably connected to the water pump clamp through the pipeline connecting plate.

[0011] The hoisting system includes a derrick platform, two sets of pulley systems and four stabilizing vehicles. The derrick platform includes two platform beams, namely the first platform beam and the second platform beam. Each set of pulley systems includes four fixed pulleys and three movable pulleys. The four fixed pulleys include two first platform beam fixed pulleys and two second platform beam fixed pulleys. The three movable pulleys include two balance box movable pulleys and one balance ear plate movable pulley.

[0012] All the first platform beam fixed pulleys are fixedly connected to the first platform beam, all the second platform beam fixed pulleys are fixedly connected to the second platform beam, the four balance box movable pulleys are respectively fixedly connected to the top of the four balance box ear plates, and the two balance ear plate movable pulleys are respectively fixedly connected to the top of the two top corners of the upper hanging inverted triangle balance plate.

[0013] The stabilizing cars include four, two stabilizing cars on the same side in the left and right directions correspond to one group of pulley systems, and the other two stabilizing cars correspond to another group of pulley systems, each stabilizing car corresponds to a first platform beam fixed pulley, a balance box movable pulley and a second platform beam fixed pulley, each group of pulley systems is connected to each pulley in sequence through a pulley wire rope, and the connection order is the first platform beam fixed pulley, the balance box movable pulley, the second platform beam fixed pulley, the balance ear plate movable pulley, the second platform beam fixed pulley, the balance box movable pulley and the first platform beam fixed pulley.

[0014] The balance box is a rectangular box body, including side panels formed by four sides and a partition support plate inside the side panels. The upper hanging inverted triangle balance plate and the lower hanging regular triangle connection plate are directly opposite to each other and parallel to the side panels on the front and rear sides. The partition support plate is flush with the upper surface of the side panels.

[0015] The partition support plate includes two middle splints arranged in the center in the left and right directions, and also includes a stiffening plate fixedly connected between the middle splint and the side plate. A pair of upper ear plate connecting plates are fixedly connected to the inner side of the middle splint. The bottom angle of the upper suspended inverted triangle balance plate is inserted between the upper ear plate connecting plates and is pinned to the upper ear plate connecting plates through a pin shaft. The bottom of the middle splint extends out of the lower side surface of the side plate to form an ear. The top angle of the lower suspended regular triangle connecting plate is inserted between the ears and is pinned to the upper ear plate connecting plates through a pin shaft.

[0016] The pipeline connecting plate is composed of four clamping plates, and every two clamping plates form a clamping plate group. The top of the clamping plate group is clamped on both sides of the bottom of the lower suspended equilateral triangle connecting plate and is pin-connected thereto through a pin shaft, and the bottom of the clamping plate group is clamped on the end of the water pump clamp and is pin-connected thereto through a pin shaft.

[0017] The water pump clamp includes vertical hoop plates on both sides and a horizontal bottom plate. The hoop plates are Ω-shaped, with the middle part convex to form a circular hoop for clamping the water supply pump or the drainage pipeline. The lower surface of the hoop plates is placed on and fixedly connected to the upper surface of the bottom plate, and a circular ring of appropriate size is provided on the bottom plate opposite the circular hoop.

[0018] The stabilizing vehicles are respectively a first stabilizing vehicle, a second stabilizing vehicle, a third stabilizing vehicle and a fourth stabilizing vehicle. The first stabilizing vehicle and the second stabilizing vehicle correspond to a group of pulley systems, and the third stabilizing vehicle and the fourth stabilizing vehicle correspond to another group of pulley systems.

[0019] The fixed pulley is fixedly connected to the platform beam or is movable along the platform beam.

[0020] The pulley wire rope is the same wire rope or two wire ropes of each pulley system are connected by a temporary joint, and the temporary joint is located above the suspended inverted triangle balance board.

[0021] A hoisting method for a vertical shaft emergency strong drainage hoisting system, the steps are as follows:

[0022] Step 1: Assemble the vertical shaft emergency drainage hoisting system above the wellhead;

[0023] Step 2: transport the water pump to the wellhead, connect the water pump to the water pump clamp, and connect the water pump clamp to the pipeline connection plate; then start the four stabilizing vehicles to collect the ropes at the same time, and hoist the water pump to a position above the wellhead that exceeds the wellhead fixed platform;

[0024] Step 3: Start four stabilizers and release ropes at the same time, lower the water pump until the water pump clamp falls on the wellhead fixed platform, and remove the connection between the water pump and the pipeline connection plate;

[0025] Step 4: transport the drainage pipeline to the wellhead and connect the drainage pipeline to the water pump clamp. At the same time, start the four stabilizing vehicles to collect the ropes, hoist the drainage pipeline above the water pump, and then connect the drainage pipeline to the water pump;

[0026] Step 5: Simultaneously start the four stabilizers to release the ropes, lower the drainage pipe system consisting of the water pump and the drainage pipe until the water pump clamp falls on the fixed platform, and remove the connection between the drainage pipe and the pipe connection plate;

[0027] Step 6: Repeat steps 4 and 5 until the water pump is lowered to the designed position below the water surface, which is greater than 10m relative to the wellhead.

[0028] In the step 1, assembling the vertical shaft emergency drainage lifting system includes the following steps:

[0029] Step a: Clamp the derrick platform above the wellhead:

[0030] Step b: fixing a fixed pulley connected to the pulley system on the derrick platform;

[0031] Step c: Assemble the balancing system: sequentially connect the upper hanging inverted triangle balancing plate, the balancing box, the lower hanging regular triangle connecting plate and the pipeline connecting plate;

[0032] Step d: Fix and connect the movable pulley on the triangular balance board and the balance box;

[0033] Step e: Arrange four stabilizing vehicles, and then connect the pulleys and wire ropes in sequence to form a lifting system.

[0034] In the steps 2 to 6, the upper hanging inverted triangle balance board can rotate left and right relative to the balance box to ensure that the upper hanging inverted triangle balance board keeps the balance box level under the traction of the pulley system;

[0035] The lower suspended equilateral triangle connecting plate can be rotated left and right relative to the balance box to ensure that the lower suspended equilateral triangle connecting plate is horizontal, thereby ensuring the verticality of the vertical installation of the water pump or the drainage pipeline.

[0036] Compared with the prior art, the present invention has the following characteristics and beneficial effects:

[0037] The invention discloses a vertical shaft emergency strong drainage lifting system. The lifting system is designed with a balancing system and a lifting system. The balancing system uses the principle of a pulley block. The lifting system is equipped with 4 stabilizing vehicles and a designed balancing box to achieve synchronous lifting. The lifting force of a single steel wire rope is amplified to the safe lifting force required by the pipeline system through the pulley block, thereby solving the problem that traditional technology cannot meet the limit of lifting weight of 300t. The balancing lug plate and the balancing box in the balancing system are used to balance the lifting force of the lifting system; the lower hanging three-star plate is used to balance the lifting force received by the pipeline system.

[0038] The present invention utilizes balancing ear plates, balancing boxes and lower suspended three-star plate balancing components to effectively solve the problem of uneven force on the system during lifting with traditional technology, greatly improves safety, and simultaneously solves the difficulty of arranging the lifting system in the existing space, thereby improving the efficiency of lowering and buying time for mine rescue and drainage. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] The present invention will be further described in detail below in conjunction with the accompanying drawings.

[0040] Figure 1 It is a structural schematic diagram of the lifting system of the present invention.

[0041] Figure 2 yes Figure 1 Schematic diagram of the top view of the balancing system.

[0042] Figure 3 yes Figure 2 Schematic diagram of the structure of the balanced system.

[0043] Figure 4 yes Figure 3 An enlarged schematic diagram of the bottom.

[0044] Figure 5 It is a top view structural diagram of the balance box.

[0045] Figure 6 This is a schematic diagram of the balance box structure from an upward perspective.

[0046] Figure 7 yes Figure 6Connect the pipeline structure diagram.

[0047] Figure numerals: 1-first stabilizing car, 2-second stabilizing car, 3-third stabilizing car, 4-fourth stabilizing car, 5-first platform beam fixed pulley, 6-second platform beam fixed pulley, 7-upper suspended inverted triangle balancing plate, 8-platform beam, 81-first platform beam, 82-second platform beam, 9-balancing box, 91-side plate, 92-stiffening plate, 93-middle splint, 94-upper ear plate connecting plate, 10-lower suspended equilateral triangle connecting plate, 11-pipeline connecting plate, 12-balancing box movable pulley, 13-balancing ear plate movable pulley, 14-pulley wire rope, 15-pin shaft, 16-water pump clamp, 161-hoop plate, 162-bottom plate, 17-drainage pipeline, 18-balancing box ear plate. DETAILED DESCRIPTION

[0048] See Example Figure 1-7 As shown, a vertical shaft emergency drainage lifting system includes a lower balancing system and an upper lifting system.

[0049] The balancing system includes, from top to bottom, a vertically arranged upper suspended inverted triangle balancing plate 7, a horizontal balancing box 9, a vertically arranged lower suspended regular triangle connecting plate 10 and a pipeline connecting plate 11.

[0050] The bottom corner pin of the upper hanging inverted triangle balance plate 7 is connected to the upper center of the balance box 9, and the upper hanging inverted triangle balance plate 7 can rotate left and right relative to the balance box 9.

[0051] Four balancing box ear plates 18 of the same height are fixedly connected to the four corners of the top of the balancing box 9 .

[0052] The balance box 9 is a rectangular box, including side panels 91 formed by four sides and a partition support plate inside the side panels. The upper suspended inverted triangle balance plate 7 and the lower suspended regular triangle connecting plate 10 are vertically opposite and parallel to the side panels 91 on the front and rear sides, and the partition support plate is flush with the upper surface of the side panels 91.

[0053] The partition support plate includes two middle splints 93 arranged in the center in the left and right directions, and also includes a stiffening plate 92 fixedly connected between the middle splint 93 and the side plate 91. A pair of upper ear plate connecting plates 94 are fixedly connected to the inner side of the middle splint 93. The bottom angle of the upper suspended inverted triangle balance plate 7 is inserted between the upper ear plate connecting plates 94 and pinned to them through the pin 15. The bottom of the middle splint 93 extends out of the lower surface of the side plate 91 to form an ear. The top angle of the lower suspended regular triangle connecting plate 10 is inserted between the ears and pinned to them through the pin 15.

[0054] The top angle pin of the lower suspended equilateral triangle connecting plate 10 is connected to the center and bottom of the balance box 9 , and the lower suspended equilateral triangle connecting plate 10 can rotate left and right relative to the balance box 9 .

[0055] The two bottom corners of the lower hanging equilateral triangle connecting plate 10 are detachably connected to the water pump clamp 16 through the pipeline connecting plate 11 .

[0056] The pipeline connection plate 11 is composed of four clamping plates, and every two clamping plates form a clamping plate group. The top of the clamping plate group is clamped on both sides of the bottom of the lower suspended equilateral triangle connection plate 10 and is pinned thereto through a pin shaft 15. The bottom of the clamping plate group is clamped on the end of the water pump clamp 16 and is pinned thereto through a pin shaft 15. The water pump clamp 16 includes vertical hoop plates 161 on both sides and a horizontal bottom plate 162. The hoop plate is in an Ω shape, and the middle part is convex to form a circular hoop for clamping the water supply pump or the drainage pipeline. The lower side surface of the hoop plate 161 is placed and fixedly connected to the upper side surface of the bottom plate 162. A circular ring of a suitable size is provided on the bottom plate 162 opposite to the circular hoop.

[0057] The lifting system includes a derrick platform, two sets of pulley systems and four stabilizing cars. The derrick platform includes two platform beams 8, namely a first platform beam 81 and a second platform beam 82. Each set of pulley systems includes four fixed pulleys and three movable pulleys. The four fixed pulleys include two first platform beam fixed pulleys 5 and two second platform beam fixed pulleys 6. The three movable pulleys include two balance box movable pulleys 12 and one balance ear plate movable pulley 13.

[0058] All first platform beam fixed pulleys 5 are fixedly connected to the first platform beam 81, all second platform beam fixed pulleys 6 are fixedly connected to the second platform beam 82, four balance box movable pulleys 12 are respectively fixedly connected directly above the four balance box ear plates 18, and two balance ear plate movable pulleys 13 are respectively fixedly connected directly above the two top corners of the upper suspended inverted triangle balance plate 7.

[0059] The stabilizing cars include four, two stabilizing cars on the same side in the left and right directions correspond to a group of pulley systems, and the other two stabilizing cars correspond to another group of pulley systems. Each stabilizing car corresponds to a first platform beam fixed pulley 5, a balance box movable pulley 12 and a second platform beam fixed pulley 6. Each group of pulley systems is connected to each pulley in sequence through a pulley wire rope 14. The connection order is the first platform beam fixed pulley 5, the balance box movable pulley 12, the second platform beam fixed pulley 6, the balance ear plate movable pulley 13, the second platform beam fixed pulley 6, the balance box movable pulley 12 and the first platform beam fixed pulley 5.

[0060] The stabilizing vehicles are respectively a first stabilizing vehicle 1, a second stabilizing vehicle 2, a third stabilizing vehicle 3 and a fourth stabilizing vehicle 4. The first stabilizing vehicle and the second stabilizing vehicle correspond to a group of pulley systems, namely the first pulley system, and the third stabilizing vehicle and the fourth stabilizing vehicle correspond to another group of pulley systems, namely the second pulley system.

[0061] The fixed pulley is fixedly connected to the platform beam or is movable along the platform beam.

[0062] The pulley wire rope 14 is the same wire rope or two wire ropes of each pulley system are connected by a temporary joint, and the temporary joint is located above the suspended inverted triangle balance board 7.

[0063] A hoisting method for a vertical shaft emergency strong drainage hoisting system, the steps are as follows:

[0064] Step 1: Assemble the vertical shaft emergency drainage hoisting system above the wellhead.

[0065] In the step 1, assembling the vertical shaft emergency drainage lifting system includes the following steps:

[0066] Step a: Clamp the derrick platform above the wellhead:

[0067] Step b: fixing a fixed pulley connected to the pulley system on the derrick platform;

[0068] Step c: Assemble the balancing system: sequentially suspend the inverted triangle balancing plate 7, the balancing box 9, the equilateral triangle connecting plate 10 and the pipeline connecting plate 11;

[0069] Step d: Fixing and connecting the movable pulley on the triangular balance board and the balance box 9;

[0070] Step e: Arrange four stabilizing vehicles, and then connect the pulley wire rope 14 in sequence to form a lifting system.

[0071] Step 2: transport the water pump to the wellhead, connect the water pump to the water pump clamp 16, and connect the water pump clamp 16 to the pipeline connecting plate 11; then start the four stabilizing vehicles to collect the ropes at the same time, and hoist the water pump to a position above the wellhead that exceeds the wellhead fixed platform.

[0072] Step three, start four stabilizing vehicles and release ropes at the same time, lower the water pump until the water pump clamp 16 falls on the wellhead fixed platform, and remove the connection between the water pump and the pipeline connecting plate 11.

[0073] Step 4: transport the drainage pipe 17 to the wellhead and connect the drainage pipe 17 to the water pump clamp 16. At the same time, start the four stabilizing vehicles to collect the ropes, hoist the drainage pipe above the water pump, and then connect the drainage pipe to the water pump.

[0074] Step 5: Start four stabilizing vehicles and release ropes at the same time to lower the drainage pipeline system consisting of the water pump and the drainage pipeline until the water pump clamp falls on the fixed platform, and remove the connection between the drainage pipeline 17 and the pipeline connecting plate 11.

[0075] Step 6: Repeat steps 4 and 5 until the water pump is lowered to the designed position below the water surface, which is greater than 10m relative to the wellhead.

[0076] In steps 2 to 6, the upper suspended inverted triangle balance plate 7 can rotate left and right relative to the balance box 9, and the upper suspended inverted triangle balance plate 7 and the balance box 9 jointly balance the lifting force of the lifting system; the lower suspended equilateral triangle connecting plate 10 can rotate left and right relative to the balance box 9, and the lower suspended equilateral triangle connecting plate 10 balances the lifting force exerted on the water pump or the drainage pipeline.

Claims

1. A vertical shaft emergency drainage lifting system, characterized by: It includes the lower balance system and the upper lifting system. The balancing system comprises, from top to bottom, a vertically arranged upper suspended inverted triangle balancing plate (7), a horizontal balancing box (9), a vertically arranged lower suspended regular triangle connecting plate (10) and a pipeline connecting plate (11). The bottom corner pin of the upper hanging inverted triangle balance plate (7) is connected to the center upper part of the balance box (9), and the upper hanging inverted triangle balance plate (7) can rotate left and right relative to the balance box (9). Four balancing box ear plates (18) of equal height are fixedly connected to the top four corners of the balancing box (9). The top angle pin of the lower hanging equilateral triangle connecting plate (10) is connected to the center lower part of the balance box (9), and the lower hanging equilateral triangle connecting plate (10) can rotate left and right relative to the balance box (9). The two bottom corners of the lower hanging equilateral triangle connecting plate (10) are respectively detachably connected to the water pump clamp (16) via the pipeline connecting plate (11). The lifting system comprises a derrick platform, two sets of pulley systems and four stabilizing vehicles. The derrick platform comprises two platform beams (8), namely a first platform beam (81) and a second platform beam (82). Each set of pulley systems comprises four fixed pulleys and three movable pulleys. The four fixed pulleys comprise two first platform beam fixed pulleys (5) and two second platform beam fixed pulleys (6). The three movable pulleys comprise two balance box movable pulleys (12) and one balance ear plate movable pulley (13). All first platform beam fixed pulleys (5) are fixedly connected to the first platform beam (81), all second platform beam fixed pulleys (6) are fixedly connected to the second platform beam (82), four balancing box movable pulleys (12) are respectively fixedly connected to the top of four balancing box ear plates (18), and two balancing ear plate movable pulleys (13) are respectively fixedly connected to the top of two top corners of the upper hanging inverted triangle balancing plate (7). The stabilizing vehicles include four stabilizing vehicles, two stabilizing vehicles on the same side in the left and right directions correspond to a group of pulley systems, and the remaining two stabilizing vehicles correspond to another group of pulley systems, each stabilizing vehicle corresponds to a first platform beam fixed pulley (5), a balance box movable pulley (12) and a second platform beam fixed pulley (6), and each group of pulley systems is connected to each pulley in sequence through a pulley wire rope (14), and the connection order is the first platform beam fixed pulley (5), the balance box movable pulley (12), the second platform beam fixed pulley (6), the balance ear plate movable pulley (13), the second platform beam fixed pulley (6), the balance box movable pulley (12) and the first platform beam fixed pulley (5); The fixed pulley is fixedly connected to the platform beam or movable along the platform beam; The pulley wire rope (14) is the same wire rope or two wire ropes of each pulley system are connected by a temporary joint, and the temporary joint is located above the suspended inverted triangle balance plate (7).

2. The vertical shaft emergency drainage lifting system according to claim 1 is characterized by: The balance box (9) is a rectangular box body, comprising side panels (91) formed by four sides and a partition support plate inside the side panels, the upper hanging inverted triangle balance plate (7) and the lower hanging regular triangle connection plate (10) are vertically opposite and parallel to the side panels (91) at the front and rear sides, and the partition support plate is flush with the upper surface of the side panels (91). The partition support plate includes two middle clamping plates (93) arranged in the middle in the left and right directions, and also includes a stiffening plate (92) fixedly connected between the middle clamping plate (93) and the side plate (91); a pair of upper ear plate connecting plates (94) are fixedly connected to the inner side of the middle clamping plate (93); the bottom corner of the upper suspended inverted triangle balance plate (7) is inserted between the upper ear plate connecting plates (94) and is pinned to the upper ear plate connecting plates (94) through a pin shaft (15); the bottom of the middle clamping plate (93) extends out of the lower side surface of the side plate (91) to form an ear; the top corner of the lower suspended regular triangle connecting plate (10) is inserted between the ear and is pinned to the upper ear plate connecting plates through a pin shaft (15).

3. The vertical shaft emergency drainage lifting system according to claim 1 is characterized by: The pipeline connection plate (11) is composed of four clamping plates, each two clamping plates forming a clamping plate group, the top of the clamping plate group being clamped on both sides of the bottom of the lower suspended equilateral triangle connection plate (10) and being pin-connected thereto via a pin shaft (15), and the bottom of the clamping plate group being clamped on the end of a water pump clamp (16) and being pin-connected thereto via a pin shaft (15).

4. The vertical shaft emergency drainage lifting system according to claim 1 is characterized by: The water pump clamp (16) comprises vertical hoop plates (161) on both sides and a horizontal bottom plate (162); the hoop plates are Ω-shaped, with a central portion protruding outward to form a circular hoop for clamping a water supply pump or a drainage pipeline; the lower surface of the hoop plate (161) is placed on and fixedly connected to the upper surface of the bottom plate (162); and a circular ring of a suitable size is provided on the bottom plate (162) opposite the circular hoop.

5. The vertical shaft emergency drainage lifting system according to claim 1 is characterized in that: The stabilizing vehicles are respectively a first stabilizing vehicle (1), a second stabilizing vehicle (2), a third stabilizing vehicle (3) and a fourth stabilizing vehicle (4). The first stabilizing vehicle and the second stabilizing vehicle correspond to a group of pulley systems, namely a first pulley system, and the third stabilizing vehicle and the fourth stabilizing vehicle correspond to another group of pulley systems, namely a second pulley system.

6. The method for hoisting a vertical shaft emergency drainage hoisting system according to any one of claims 1 to 5, characterized in that: Here are the steps: Step 1: Assemble the vertical shaft emergency drainage hoisting system above the wellhead; Step 2: transport the water pump to the wellhead, connect the water pump to the water pump clamp (16), and connect the water pump clamp (16) to the pipeline connection plate (11); then simultaneously start the four stabilizing vehicles to reel in the ropes, and hoist the water pump to a position above the wellhead that exceeds the wellhead fixed platform; Step 3: simultaneously start four stabilizing vehicles and release ropes, lower the water pump until the water pump clamp (16) falls on the wellhead fixed platform, and remove the connection between the water pump and the pipeline connection plate (11); Step 4: transport the drainage pipe (17) to the wellhead, connect the drainage pipe (17) to the water pump clamp (16), start the four stabilizing vehicles to collect the ropes, hoist the drainage pipe above the water pump, and then connect the drainage pipe to the water pump; Step 5: simultaneously start the four stabilizing vehicles to release the ropes, lower the drainage pipeline system consisting of the water pump and the drainage pipeline, until the water pump clamp falls on the fixed platform, and remove the connection between the drainage pipeline (17) and the pipeline connection plate (11); Step 6: Repeat steps 4 and 5 until the water pump is lowered to the designed position below the water surface, which is greater than 10m relative to the wellhead.

7. The method for hoisting the vertical shaft emergency drainage hoisting system according to claim 6 is characterized in that: In the step 1, assembling the vertical shaft emergency drainage lifting system includes the following steps: Step a: Clamp the derrick platform above the wellhead: Step b: fixing a fixed pulley connected to the pulley system on the derrick platform; Step c: Assembling the balancing system: sequentially connecting the upper suspended inverted triangle balancing plate (7), the balancing box (9), the lower suspended regular triangle connecting plate (10) and the pipeline connecting plate (11); Step d: Fixing and connecting the movable pulley on the triangular balance plate and the balance box (9); Step e: Arrange four stabilizing vehicles, and then connect the pulley wire ropes (14) in sequence to form a lifting system.

8. The method for hoisting the vertical shaft emergency drainage hoisting system according to claim 6 is characterized in that: In the steps 2 to 6, the upper hanging inverted triangle balance plate (7) can rotate left and right relative to the balance box (9), and the upper hanging inverted triangle balance plate (7) and the balance box (9) jointly balance the lifting force of the lifting system; The lower suspended equilateral triangle connecting plate (10) can rotate left and right relative to the balance box (9), and the lower suspended equilateral triangle connecting plate (10) balances the lifting force exerted on the water pump or the drainage pipeline.