Method for erecting construction platform between lining rails of mine ore storage bin with single-slope bin wall

By laying poles and connectors in the single inclined space of the mine, a stable construction platform frame is formed, which solves the safety and efficiency of the construction platform erecting in a narrow space, and realizes a simple structure, convenient construction and controllable center of gravity. Construction platform erected.

CN119021752APending Publication Date: 2024-11-26KUNMING METALLURGY INST +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411192754.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-28
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

In the narrow and limited single-aberated space underground in the mine, it is difficult to lay the construction platform frame, which poses safety hazards and low construction efficiency.

Method used

Using the method of laying up rods, double vertical rods, vertical vertical rods, horizontal rods and scissors to lay down concrete pouring and layer-by-layer connecting parts are embedded into the back end of the lining rail to form a stable construction platform frame to ensure the frame and the mineral silo. Stable connection between the four walls.

Benefits of technology

It effectively avoids the risk of overturning the construction platform frame, improves the stability and safety of the construction platform, reduces construction difficulty, and improves construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119021752A_ABST
    Figure CN119021752A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of mine engineering, and particularly discloses a method for erecting a construction platform between lining rails of a mine ore storage bin with a single-slope bin wall, which comprises the following steps of: reserving a pouring plane at the bottom of the ore storage bin, erecting a vertical rod and then pouring; a front vertical face connecting piece and double vertical rods are arranged on the vertical front vertical face, one end of the front vertical face connecting piece is embedded into the lining rail, and the other end of the front vertical face connecting piece is fixed to the double vertical rods; a horizontal longitudinal rod, a transverse rod and a vertical rod are arranged on the inclined plane of the ore storage bin; one end of the inclined plane connecting piece is embedded into the lining rail, and the other end of the inclined plane connecting piece is fixed with the vertical rod; one end of the side vertical face connecting piece is embedded into the lining rail, and the other end of the side vertical face connecting piece is fixed to the horizontal cross rod; transverse and horizontal diagonal bracings are arranged in the ore storage bin; concrete is poured in the ore storage bin layer by layer, and after the next layer is poured, all the steps are repeated till layered pouring of the ore storage bin is completed layer by layer; and all the rods and the diagonal bridging are dismantled from top to bottom, and all connecting pieces of the ore wall and the vertical rods at the bottom of the bin are cut. The device has the characteristics of simple structure, convenience in construction, controllable gravity center, safety and stability.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of mining engineering, and in particular to a method for erecting a construction platform between liner rails of a mine silo with a single inclined silo wall, which has a simple structure, convenient construction, controllable center of gravity, and is safe and stable. Background Art

[0002] A silo is a structure used in mines to store ore, ore powder and other materials. Lining rails are usually laid inside the silo, especially on the slope, to enhance the structural strength and prevent direct impact and wear of materials on the silo wall. Lining rails are generally made of steel rails or other wear-resistant materials and fixed to the silo wall by welding or bolting.

[0003] In the development of mining engineering, it has always been a technical challenge to erect a reliable construction platform inside a single-slope ore bin equipped with liner rails due to its limited space, and the influence of factors such as the erection of the construction platform, the special-shaped structure of the construction platform frame, the foundation of the construction platform, and the mechanical properties of the materials used for the construction platform frame.

[0004] The traditional construction platform frame in the mine bin is arranged on a single slope. Due to the lack of effective connection and support, the frame is prone to overturning during construction and the force is concentrated on the bottom of the frame, posing serious safety hazards.

[0005] In the prior art, in order to solve the difficulty of laying out the construction platform frame in a single-slope mine bin with limited space, a temporary seal is made on the upper part of the mine bin and a movable door is set, and then concrete is poured on the foundation on the side of the movable door, and a hanging point is pre-buried and a wire rope is hung, and then a winch lifting device is set to connect the hanging basket as a construction platform, and construction is carried out in the form of a hanging basket from the upper part of the mine bin; although the structure is simple, it is difficult to take into account the side wall construction of a large horizontal range in the mine bin due to the difficulty in lateral movement of the hanging basket during hoisting, and the hoisting construction is a flexible connection, which also causes a slight force or movement of personnel during construction to cause a large shaking, which not only affects the construction accuracy and efficiency, but also poses a great safety hazard. To this end, there are also multi-layer horizontal construction platforms set up at intervals along the vertical direction in the mine bin, and the four sides of the construction platform are respectively welded to the liner rails on the corresponding bin wall or fixedly connected to the drill rods that penetrate the bin wall. If necessary, vertical support rods are arranged on the single inclined plane to support the construction platform, and then construction is carried out; although the structure is relatively simple, the force of the construction platform is dispersed to the four sides and the bottom, which basically solves the problems of force concentration and easy overturning. However, due to the liner rails set on the bin wall, the welding space is limited, and it is difficult to accurately insert the drill rod into the gap between them, which increases the difficulty of construction. Therefore, how to effectively, safely and stably construct and erect a construction platform in the narrow and limited inclined space underground in the mine has always been the research focus of mining engineering in the field of pioneering engineering technology. Summary of the invention

[0006] In view of the deficiencies in the prior art, the present invention provides a method for erecting a construction platform between liner rails in a mine silo with a single-sloped silo wall, which has a simple structure, convenient construction, controllable center of gravity, and is safe and stable.

[0007] The present invention is implemented in this way: including the steps of laying out poles, laying out double poles, laying out vertical poles, laying out horizontal poles, laying out scissor braces, layered pouring of ore bins, and dismantling of frames, and the specific contents are as follows: A. Arrangement of poles: Before pouring the bottom structure of the inverted wedge-shaped ore bin, a pouring plane with a length and width of 20 to 30 cm is reserved on the bottom plane of the ore bin and roughened, and then the poles of the construction platform are set up on the reserved pouring plane, and then the bottom structure of the ore bin is poured with concrete; B. Laying out double poles: a plurality of front face connectors are arranged at intervals on the vertical front face of the mine bin, and then a plurality of vertical double poles are arranged at intervals on one side close to the vertical front face, and one end of the front face connector is embedded in the rear end of the adjacent front face lining rail on the vertical front face, and the other end is connected to the double pole; C. Laying out vertical poles: multiple inclined plane connectors are arranged at intervals on the inclined plane of the ore bin, and then multiple horizontal longitudinal poles, horizontal cross bars and vertical poles are arranged at intervals on the inclined plane of the ore bin, and the intersections of the horizontal longitudinal poles, horizontal cross bars and vertical poles are connected and fixed, and one end of the inclined plane connector is embedded in the rear end of the inclined plane lining rail or between the inclined plane lining rails on the inclined plane of the ore bin, and the other end is connected to the lower end of the vertical pole; D. Laying out horizontal crossbars: Arrange multiple side facade connectors at intervals on the vertical side facades, then embed one end of the side facade connector into the rear end of the side facade lining rail or between the side facade lining rails on the vertical side facade, and connect the other end to the horizontal crossbar; E. Laying scissor braces: Laying horizontal scissor braces at intervals in the ore bin and laying transverse scissor braces parallel to the vertical front surface, wherein the transverse scissor braces and horizontal scissor braces are respectively connected and fixed to the intersection of the double vertical poles, horizontal longitudinal poles, horizontal cross poles and / or vertical poles; F. Layered pouring of the ore bin: Pour concrete into the ore bin layer by layer. After the next layer of concrete is poured, repeat the layout of steps B to E. The pouring construction of the ore bin is completed by laying and pouring layer by layer. G. Frame dismantling: After the curing period of the concrete poured in layers in the ore bin, the frame consisting of vertical poles, double vertical poles, horizontal longitudinal poles, horizontal cross poles, vertical vertical poles, transverse scissors braces and horizontal scissors braces shall be dismantled from top to bottom, and the various connecting parts of the surrounding wall of the ore bin and the vertical poles at the bottom of the ore bin shall be cut.

[0008] Furthermore, after the poles are erected on the reserved pouring plane in step A, the bottom structure of the ore bin outside the reserved pouring plane is poured with concrete, and then the reserved pouring plane is poured with concrete of a higher grade than the previous pouring.

[0009] Furthermore, the double uprights in step B are two steel pipes parallel to each other, the front facade connecting piece is an "I"-shaped structure consisting of two horizontal bars and a vertical bar connected in the middle, a horizontal bar of the front facade connecting piece is embedded in the rear end of the adjacent front facade lining rail on the vertical front facade and the vertical bar extends into the mine bin through the gap of the front facade lining rail, the vertical bar of the front facade connecting piece passes between the two steel pipes of the double uprights and the other horizontal bar is arranged on the side of the double uprights away from the vertical front facade.

[0010] Furthermore, the front facade connectors on the vertical front facade are spaced 700 to 1500 mm apart in the vertical direction, and the spacing distance in the horizontal direction is the same as the spacing distance between adjacent double uprights.

[0011] Furthermore, the slope connector in step C is an "L"-shaped structure formed by connecting two steel pipes, one steel pipe of the slope connector is embedded between or at the rear end of adjacent slope lining rails on the slope of the ore bin, and the other steel pipe is vertically arranged and connected to the lower end of the vertical pole.

[0012] Furthermore, in step D, the side facade connector is an "L"-shaped structure formed by connecting two steel pipes, one end of which is embedded between adjacent side facade rails or at the rear end on the vertical side facade, and the other end is connected to the end face of the horizontal crossbar.

[0013] Furthermore, in step E, transverse scissors braces parallel to the vertical front face are arranged in the plane where the double uprights are located and at intervals away from the vertical front face, and horizontal scissors braces are arranged horizontally between the vertical front face and the inclined surface of the ore bin.

[0014] Furthermore, in the step E, a horizontal scissors brace is arranged every two horizontal horizontal bars along the horizontal longitudinal direction, and a horizontal scissors brace is arranged every two horizontal longitudinal bars along the vertical direction.

[0015] Furthermore, in the step F, concrete is poured in layers with a depth of 1.5 to 3.0 m per layer in the ore bin, and the connectors and rods in the steps B to E are arranged and connected within the pre-cast layer height.

[0016] Furthermore, in the step G, concrete is poured into the remaining upright poles after the bottom of the ore bin is cut off until the concrete is parallel to the plane after the bottom of the ore bin is poured.

[0017] The beneficial effects of the present invention are: 1. In view of the difficulty in laying out the construction platform frame in a single-slope mine bin with limited space, the present invention innovatively arranges front facade connecting members, inclined surface connecting members and side facade connecting members that can be embedded in the rear ends of the corresponding surface lining rails or between the lining rails, and the connecting members are connected with the corresponding double uprights, vertical uprights and horizontal cross bars, so as to realize the connection between the double uprights and the vertical front facade of the mine bin, the vertical uprights and the inclined surface of the mine bin, and the horizontal cross bars and the vertical side facades, so that the final construction platform frame can form a stable connection with the four walls of the mine bin, which can effectively avoid the risk of overturning caused by the lateral shift of the center of gravity of the construction platform frame and ensure the safety of the construction platform, and can also disperse the force of the construction platform frame on the vertical side facades and the inclined surface of the mine bin, thereby ensuring the stability of the construction platform, and effectively solves the problem of setting up a construction platform between the lining rails of the single-slope mine bin with limited space.

[0018] 2. The present invention makes full use of the structural characteristics of the lining rails on the warehouse wall and the fact that the spacing is relatively small. By optimizing the structures of the front connecting pieces, the inclined connecting pieces and the side connecting pieces, one end of the connecting piece can be conveniently embedded into the rear end of the lining rail of the corresponding surface, and then the part extending out of the lining rail is connected to each rod respectively, which effectively reduces the construction difficulty.

[0019] 3. The present invention adopts the method of layered pouring and layer-by-layer arrangement of the construction platform frame. Not only can each connecting piece be embedded in the rear end of the lining rail for effective fixation through pouring, thereby stabilizing the frame of the next construction platform and providing a stable and reliable foundation for the construction of the upper construction platform frame, but also the construction platform frames arranged layer by layer will not be too high to affect the pouring construction, thereby effectively improving the construction efficiency.

[0020] In summary, the present invention has the characteristics of simple structure, convenient construction, controllable center of gravity, safety and stability. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a schematic diagram of the process of the present invention; Figure 2 It is a sectional view of the three-dimensional structure of the present invention; Figure 3 It is a schematic diagram of the construction platform frame structure of the present invention; Figure 4 It is a schematic diagram of the vertical front facade side connection structure of the present invention; Figure 5 It is a schematic diagram of the connection structure of the front facade connection member of the present invention; Figure 6 It is a schematic diagram of the connection structure between the inclined surface of the ore bin and the vertical side elevation of the present invention; Figure 7 for Figure 6 A partial enlarged view of Figure 8It is a schematic diagram of the vertical side elevation side connection structure of the present invention; Fig. 9 This is a schematic diagram of the connection structure of the inclined surface side of the ore bin of the present invention; In the figure: 11-front facade lining rail, 12-inclined lining rail, 13-side facade lining rail, 22-double vertical poles, 23-horizontal longitudinal poles, 24-horizontal crossbars, 25-vertical poles, 26-transverse scissors braces, 27-horizontal scissors braces, 31-front facade connecting piece, 32-inclined connecting piece, 33-side facade connecting piece. DETAILED DESCRIPTION

[0022] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0023] like Figures 1 to 8 As shown, the present invention includes the steps of laying out poles, laying out double poles, laying out vertical poles, laying out horizontal poles, laying out scissor braces, layered pouring of the ore bin, and dismantling of the frame, and the specific contents are as follows: A. Arrangement of poles: Before pouring the bottom structure of the inverted wedge-shaped ore bin, a pouring plane with a length and width of 20 to 30 cm is reserved on the bottom plane of the ore bin and roughened, and then the poles of the construction platform are set up on the reserved pouring plane, and then the bottom structure of the ore bin is poured with concrete; B. Laying out double uprights: a plurality of front face connectors 31 are arranged at intervals on the vertical front face of the mine bin, and then a plurality of vertical double uprights 22 are arranged at intervals on one side close to the vertical front face, and one end of the front face connector 31 is embedded in the rear end of the adjacent front face lining rail 11 on the vertical front face, and the other end is connected to the double uprights 22; C. Arrangement of vertical poles: a plurality of inclined plane connectors 32 are arranged at intervals on the inclined plane of the ore bin, and then a plurality of horizontal longitudinal bars 23, horizontal cross bars 24 and vertical poles 25 are arranged at intervals on the inclined plane of the ore bin, and the intersections of the horizontal longitudinal bars 23, horizontal cross bars 24 and the vertical poles 25 are connected and fixed, and one end of the inclined plane connector 32 is embedded in the rear end of the inclined plane lining rail 12 or between the inclined plane lining rails 12 on the inclined plane of the ore bin, and the other end is connected to the lower end of the vertical pole 25; D. Laying out horizontal crossbars: a plurality of side facade connectors 33 are arranged at intervals on the vertical side facades, and then one end of the side facade connector 33 is embedded in the rear end of the side facade lining rail 13 on the vertical side facade or between the side facade lining rails 13, and the other end is connected to the horizontal crossbar 24; E. Arrangement of scissor braces: Arrange horizontal scissor braces 27 at intervals in the ore bin and arrange transverse scissor braces 26 parallel to the vertical front surface, wherein the transverse scissor braces 26 and the horizontal scissor braces 27 are respectively connected and fixed to the intersection of the double vertical poles 22, the horizontal longitudinal poles 23, the horizontal crossbars 24 and / or the vertical poles 25; F. Layered pouring of the ore bin: Pour concrete into the ore bin layer by layer. After the next layer of concrete is poured, repeat the layout of steps B to E. The pouring construction of the ore bin is completed by laying and pouring layer by layer. G. Dismantling of the frame: After the curing period of the concrete poured in layers in the ore bin, the frame consisting of the vertical poles, double vertical poles 22, horizontal longitudinal poles 23, horizontal cross bars 24, vertical vertical poles 25, transverse scissor braces 26 and horizontal scissor braces 27 is dismantled from top to bottom, and the various connecting parts of the surrounding wall of the ore bin and the vertical poles at the bottom of the ore bin are cut.

[0024] The minimum gap between adjacent lining rails on the vertical front surface, the ore bin inclined surface and the vertical side surface is greater than 25 mm.

[0025] The rear end of the front lining rail 11, the rear end of the inclined lining rail 12 and the rear end of the side lining rail 13 refer to the ends of the lining rails close to the corresponding warehouse walls.

[0026] After the poles are erected on the reserved pouring plane in step A, the bottom structure of the ore bin outside the reserved pouring plane is poured with concrete, and then the reserved pouring plane is poured with concrete of a higher grade than the previous pouring.

[0027] The double uprights 22 in step B are two parallel steel pipes, and the front facade connector 31 is an "I"-shaped structure consisting of two horizontal bars and a vertical bar connected in the middle. A horizontal bar of the front facade connector 31 is embedded in the rear end of the adjacent front facade lining rail 11 on the vertical front facade, and the vertical bar extends into the mine bin through the gap of the front facade lining rail 11. The vertical bar of the front facade connector 31 passes between the two steel pipes of the double uprights 22, and the other horizontal bar is arranged on the side of the double uprights 22 away from the vertical front facade.

[0028] The vertical connection members 31 on the vertical facade are spaced 700 to 1500 mm apart in the vertical direction and are spaced the same as the spacing between adjacent double uprights 22 in the horizontal direction.

[0029] In step C, the inclined surface connector 32 is an "L"-shaped structure formed by connecting two steel pipes, one steel pipe of the inclined surface connector 32 is embedded between or at the rear end of adjacent inclined surface lining rails 12 on the inclined surface of the ore bin, and the other steel pipe is vertically arranged and connected to the lower end of the vertical pole 25.

[0030] In step D, the side facade connector 33 is an "L"-shaped structure formed by connecting two steel pipes. One steel pipe of the side facade connector 33 is embedded between adjacent side facade rails 13 on the vertical side facade or at the rear end, and the other end is connected to the end face of the horizontal crossbar 24.

[0031] In step E, transverse scissors braces 26 parallel to the vertical front face are arranged in the plane where the double uprights 22 are located and away from the vertical front face at intervals and in an inclined manner, and horizontal scissors braces 27 are arranged horizontally between the vertical front face and the inclined surface of the ore bin.

[0032] In the step E, a horizontal scissors brace 26 is arranged every two horizontal horizontal bars 24 along the horizontal longitudinal direction, and a horizontal scissors brace 27 is arranged every four horizontal longitudinal bars 23 along the vertical direction.

[0033] In the step F, concrete is poured in layers with a height of 1.5 to 3.0 m per layer in the ore bin, and the connectors and rods in the steps B to E are arranged and connected within the pre-cast layer height.

[0034] In the step D, the horizontal cross bars 24 in each precast layer of the construction platform are connected to the side facade connectors 33 at intervals.

[0035] In the step G, concrete is poured into the remaining upright poles after the bottom of the ore bin is cut off until the upright poles are parallel to the plane after the bottom of the ore bin is poured.

[0036] Example 1 like Figures 1 to 8 As shown, it is known that the underground mine bin is an inverted wedge-shaped structure, and due to the influence of the lowered ore, a liner rail must be embedded in the surrounding wall of the bin to protect the bin wall. A construction platform is set up in the bin. The specific process is as follows: S100: Before pouring the bottom structure of the inverted wedge-shaped structure ore bin, a pouring plane with a length and width of 20 cm is reserved and the surface is roughened, and then the vertical poles (steel pipes) of the construction platform are set up on the reserved pouring plane, and then the bottom structure of the ore bin outside the reserved pouring plane is poured with concrete, and then the reserved pouring plane is poured with concrete of a higher grade than the previous pouring.

[0037] S200: A plurality of I-shaped front facade connectors 31 are arranged at intervals of 1500mm in the vertical direction on the vertical front facade of the mine bin, wherein the I-shaped front facade connectors 31 are made of 25mm round steel, one of the cross bars of the front facade connector 31 is 520mm long, the other cross bar is 200mm long, and the vertical bar connecting the two cross bars is 220mm long; then a plurality of vertical double uprights 22 (steel pipes) are arranged at intervals on one side close to the vertical front facade, and the cross bar of the front facade connector 31 with a length of 520mm is embedded in the rear end of the adjacent front facade lining rail 11 on the vertical front facade, the vertical bar with a length of 220mm passes through the gap between the adjacent front facade lining rail 11 and the double uprights 22 in sequence, and the cross bar with a length of 200mm at the other end is welded or fastened to the double uprights 22.

[0038] S300: A plurality of "L"-shaped inclined plane connectors 32 with an angle of 135° are arranged at intervals on the inclined plane of the mine bin, wherein the inclined plane connectors 32 are made of 25mm round steel and the lengths of both sides are 300mm; then a plurality of horizontal longitudinal bars 23 (steel pipes), horizontal cross bars 24 (steel pipes) and vertical upright bars 25 (steel pipes) are arranged at intervals on the inclined plane of the mine bin, and the intersections of the horizontal longitudinal bars 23, horizontal cross bars 24 and vertical upright bars 25 are welded or fastened, and one side of the inclined plane connector 32 is embedded in the rear end of the inclined plane liner rail 12 on the inclined plane of the mine bin, and the other side is embedded in the lower end of the vertical upright bar 25.

[0039] S400: A plurality of right-angled side facade connectors 33 are arranged at intervals on the vertical side facade, wherein the side facade connectors 33 are made of 25mm round steel, and the lengths of the two sides are 400mm and 600mm respectively; then one side of the side facade connector 33 with a length of 400mm is embedded in the rear end of the side facade liner rail 13 on the vertical side facade, and the other end is embedded in the lower end of the horizontal cross bar 24 (the horizontal cross bar 24 along the inclination direction of the inclined surface of the ore bin is connected to the side facade connector 33 at intervals).

[0040] S500: In the plane where the double vertical poles 22 in the mine bin are located and on the side away from the vertical front face, a horizontal scissors brace 26 (steel pipe) parallel to the vertical front face is obliquely arranged every two horizontal cross bars 24 along the horizontal longitudinal direction; a horizontal scissors brace 27 (steel pipe) is arranged every two horizontal longitudinal bars 23 along the vertical direction between the vertical front face and the inclined surface of the mine bin; the horizontal scissors brace 26 and the horizontal scissors brace 27 are respectively welded or fastened to the intersection of the double vertical poles 22, the horizontal longitudinal bars 23, the horizontal cross bars 24 and / or the vertical poles 25.

[0041] S600: Pour concrete into the ore bin in layers with a depth of 1.5 m per layer. After the next layer of concrete is poured, repeat steps S200 to S500 to lay out the frame of the previous layer. The frames laid out in steps S200 to S500 are all within the pre-poured layer height. The pouring construction of the ore bin is completed by laying and pouring layer by layer.

[0042] S700: After the curing period of the concrete poured in layers in the mine bin, the frame consisting of the vertical poles, double vertical poles 22, horizontal longitudinal poles 23, horizontal cross bars 24, vertical vertical poles 25, transverse scissor braces 26 and horizontal scissor braces 27 is removed from top to bottom, the connecting parts of the mine bin peripheral wall and the vertical poles at the bottom of the mine bin are cut, and then concrete is poured into the vertical poles remaining after cutting off the bottom of the mine bin until they are parallel to the plane after pouring the bottom of the mine bin.

[0043] Example 2 like Figures 1 to 8 As shown, it is known that the underground mine bin is an inverted wedge-shaped structure, and due to the influence of the lowered ore, a liner rail must be embedded in the surrounding wall of the bin to protect the bin wall. A construction platform is set up in the bin. The specific process is as follows: S100: Before pouring the bottom structure of the inverted wedge-shaped structure ore bin, a pouring plane with a length and width of 30 cm is reserved and the surface is roughened, and then the vertical poles (steel pipes) of the construction platform are set up on the reserved pouring plane, and then the bottom structure of the ore bin outside the reserved pouring plane is poured with concrete, and then the reserved pouring plane is poured with concrete of a higher grade than the previous pouring.

[0044] S200: A plurality of I-shaped front facade connectors 31 are arranged at intervals of 700 mm in the vertical direction on the vertical front facade of the mine bin, wherein the I-shaped front facade connectors 31 are made of 25 mm round steel, one of the cross bars of the front facade connector 31 is 520 mm long, the other cross bar is 200 mm long, and the vertical bar connecting the two cross bars is 220 mm long; then a plurality of vertical double uprights 22 (steel pipes) are arranged at intervals on one side close to the vertical front facade, and the cross bar of the front facade connector 31 with a length of 520 mm is embedded in the rear end of the adjacent front facade lining rail 11 on the vertical front facade, the vertical bar with a length of 220 mm sequentially passes through the gap between the adjacent front facade lining rail 11 and the double uprights 22, and the cross bar with a length of 200 mm at the other end is welded or fastened to the double uprights 22.

[0045] S300: A plurality of "L"-shaped inclined plane connectors 32 with an angle of 135° are arranged at intervals on the inclined plane of the mine bin, wherein the inclined plane connectors 32 are made of 25mm round steel and the lengths of both sides are 300mm; then a plurality of horizontal longitudinal bars 23 (steel pipes), horizontal cross bars 24 (steel pipes) and vertical upright bars 25 (steel pipes) are arranged at intervals on the inclined plane of the mine bin, and the intersections of the horizontal longitudinal bars 23, horizontal cross bars 24 and vertical upright bars 25 are welded or fastened, and one side of the inclined plane connector 32 is embedded between the inclined plane lining rails 12 on the inclined plane of the mine bin, and the other side is embedded in the lower end of the vertical upright bar 25.

[0046] S400: A plurality of right-angled side facade connectors 33 are arranged at intervals on the vertical side facade, wherein the side facade connectors 33 are made of 25mm round steel, and the lengths of the two sides are 400mm and 600mm respectively; then one side of the side facade connector 33 with a length of 400mm is embedded between the side facade lining rails 13 on the vertical side facade, and the other end is embedded in the lower end of the horizontal cross bar 24 (the horizontal cross bar 24 along the inclination direction of the inclined surface of the ore bin is connected to the side facade connector 33 at intervals).

[0047] S500: In the plane where the double vertical poles 22 in the mine bin are located and on the side away from the vertical front face, a horizontal scissors brace 26 (steel pipe) parallel to the vertical front face is obliquely arranged every two horizontal cross bars 24 along the horizontal longitudinal direction; a horizontal scissors brace 27 (steel pipe) is arranged every two horizontal longitudinal bars 23 along the vertical direction between the vertical front face and the inclined surface of the mine bin; the horizontal scissors brace 26 and the horizontal scissors brace 27 are respectively welded or fastened to the intersection of the double vertical poles 22, the horizontal longitudinal bars 23, the horizontal cross bars 24 and / or the vertical poles 25.

[0048] S600: Pour concrete into the ore bin in layers with a height of 3.0 m per layer. After the next layer of concrete is poured, repeat steps S200 to S500 to lay out the frame of the previous layer. The frames laid out in steps S200 to S500 are all within the pre-poured layer height. The pouring construction of the ore bin is completed by laying and pouring layer by layer.

[0049] S700: After the curing period of the concrete poured in layers in the mine bin, the frame consisting of the vertical poles, double vertical poles 22, horizontal longitudinal poles 23, horizontal cross bars 24, vertical vertical poles 25, transverse scissor braces 26 and horizontal scissor braces 27 is removed from top to bottom, the connecting parts of the mine bin peripheral wall and the vertical poles at the bottom of the mine bin are cut, and then concrete is poured into the vertical poles remaining after cutting off the bottom of the mine bin until they are parallel to the plane after pouring the bottom of the mine bin.

[0050] The above is only a preferred specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily thought of by any technician familiar with the technical field within the technical scope disclosed by the present invention should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.

Claims

1. A method for erecting a construction platform between lining rails in a mine silo with a single slope silo wall. Features It includes the steps of laying out poles, laying out double poles, laying out vertical poles, laying out horizontal poles, laying out scissor braces, layered pouring of the ore bin, and dismantling of the frame. The specific contents are as follows: A. Arrangement of poles: Before pouring the bottom structure of the inverted wedge-shaped ore bin, a pouring plane with a length and width of 20 to 30 cm is reserved on the bottom plane of the ore bin and roughened, and then the poles of the construction platform are set up on the reserved pouring plane, and then the bottom structure of the ore bin is poured with concrete; B. Arranging double vertical poles: a plurality of vertical surface connection pieces (31) are arranged at intervals on the vertical vertical surface of the mine bin, and a plurality of vertical double vertical poles (22) are arranged at intervals on one side close to the vertical vertical surface, and one end of the vertical surface connection piece (31) is embedded in the rear end of the adjacent vertical surface lining rail (11) on the vertical vertical surface, and the other end is connected to the double vertical pole (22); C. Arranging vertical poles: a plurality of inclined plane connecting members (32) are arranged at intervals on the inclined plane of the ore bin, and then a plurality of horizontal longitudinal rods (23), horizontal cross rods (24) and vertical poles (25) are arranged at intervals on the inclined plane of the ore bin, and the intersections of the horizontal longitudinal rods (23), horizontal cross rods (24) and the vertical poles (25) are connected and fixed, and one end of the inclined plane connecting member (32) is embedded in the rear end of the inclined plane lining rail (12) or between the inclined plane lining rails (12) on the inclined plane of the ore bin, and the other end is connected to the lower end of the vertical pole (25); D. Arrangement of horizontal cross bars: a plurality of side elevation connectors (33) are arranged at intervals on the vertical side elevations, and then one end of the side elevation connector (33) is embedded in the rear end of the side elevation lining rail (13) on the vertical side elevation or between the side elevation lining rails (13), and the other end is connected to the horizontal cross bar (24); E. Arranging scissor braces: arranging horizontal scissor braces (27) at intervals in the mine bin and arranging transverse scissor braces (26) parallel to the vertical front surface, wherein the transverse scissor braces (26) and the horizontal scissor braces (27) are respectively connected and fixed to the intersection of the double vertical poles (22), the horizontal longitudinal poles (23), the horizontal cross poles (24) and / or the vertical vertical poles (25); F. Layered pouring of the ore bin: Pour concrete into the ore bin layer by layer. After the next layer of concrete is poured, repeat the layout of steps B to E. The pouring construction of the ore bin is completed by laying and pouring layer by layer. G. Dismantling of the frame: After the curing period of the concrete poured in layers in the ore bin, the frame consisting of the vertical poles, double vertical poles (22), horizontal longitudinal poles (23), horizontal cross poles (24), vertical vertical poles (25), transverse scissor braces (26) and horizontal scissor braces (27) is dismantled from top to bottom, and the various connecting parts of the surrounding wall of the ore bin and the vertical poles at the bottom of the ore bin are cut.

2. The method for erecting a construction platform between rail linings in a mine silo with a single slope silo wall according to claim 1, It is characterized in that After the poles are erected on the reserved pouring plane in step A, the bottom structure of the ore bin outside the reserved pouring plane is poured with concrete, and then the reserved pouring plane is poured with concrete of a higher grade than the previous pouring.

3. The method for erecting a construction platform between rail linings in a mine silo with a single slope silo wall according to claim 1, It is characterized in that The double vertical poles (22) in step B are two parallel steel pipes, the front elevation connection piece (31) is an "I"-shaped structure consisting of two horizontal poles and a vertical pole connected in the middle, one horizontal pole of the front elevation connection piece (31) is embedded in the rear end of the adjacent front elevation lining rail (11) on the vertical front elevation, and the vertical pole passes through the gap of the front elevation lining rail (11) and extends into the ore bin, the vertical pole of the front elevation connection piece (31) passes between the two steel pipes of the double vertical poles (22), and the other horizontal pole is arranged on the side of the double vertical poles (22) away from the vertical front elevation.

4. The method for erecting a construction platform between rail linings in a mine silo with a single slope silo wall according to claim 3, It is characterized in that The front face connecting members (31) on the vertical front face are spaced 700 to 1500 mm apart in the vertical direction and are spaced the same distance in the horizontal direction as the spacing between adjacent double upright poles (22).

5. The method for erecting a construction platform between lining rails of a mine silo with a single slope silo wall according to claim 1, It is characterized in that In step C, the inclined surface connecting member (32) is an "L"-shaped structure formed by connecting two steel pipes, one steel pipe of the inclined surface connecting member (32) is embedded between or at the rear end of adjacent inclined surface lining rails (12) on the inclined surface of the ore bin, and the other steel pipe is vertically arranged and connected to the lower end of the vertical upright pole (25).

6. The method for erecting a construction platform between rail linings in a mine silo with a single slope silo wall according to claim 1, It is characterized in that In step D, the side facade connecting member (33) is an "L"-shaped structure formed by connecting two steel pipes. One steel pipe of the side facade connecting member (33) is embedded between adjacent side facade lining rails (13) on the vertical side facade or at the rear end, and the other end is connected to the end face of the horizontal crossbar (24).

7. The method for erecting a construction platform between rail linings in a mine silo with a single slope silo wall according to claim 1, It is characterized in that In step E, transverse scissors braces (26) parallel to the vertical front face are arranged at intervals and in an inclined manner in the plane where the double uprights (22) are located and away from the vertical front face, and horizontal scissors braces (27) are arranged horizontally between the vertical front face and the inclined surface of the ore bin.

8. The method for erecting a construction platform between rail linings in a mine silo with a single slope silo wall according to claim 7, It is characterized in that In step E, a horizontal scissors brace (26) is arranged every two horizontal horizontal bars (24) along the horizontal longitudinal direction, and a horizontal scissors brace (27) is arranged every two horizontal longitudinal bars (23) along the vertical direction.

9. A method for erecting a construction platform between rail linings in a mine silo with a single-slope silo wall according to any one of claims 1 to 8, It is characterized in that In the step F, concrete is poured in layers with a height of 1.5 to 3.0 m per layer in the ore bin, and the connectors and rods in the steps B to E are arranged and connected within the pre-cast layer height.

10. The method for erecting a construction platform between rail linings in a mine silo with a single slope silo wall according to claim 9, Features In the step G, concrete is poured into the remaining upright poles after the bottom of the ore bin is cut off until the upright poles are parallel to the plane after the bottom of the ore bin is poured.