Drainage system and rail transit line for rail transit

By designing and connecting the flow discharge system in the rail transit system, using the connection terminals and the flow discharge branch line to guide stray current into the flow discharge main line, the problem of low flow discharge reliability in the existing technology is solved and higher system stability is achieved Sex and safety.

CN110758181BActive Publication Date: 2024-11-05CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910901063.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-09-23
Publication Date
2024-11-05
Estimated Expiration
2039-09-23

AI Technical Summary

Technical Problem

The existing rail transit flow discharge scheme has low reliability, resulting in the inability to effectively discharge stray currents, affecting the stability and safety of the system.

Method used

A discharge system consisting of multiple channel bed blocks, discharge main line, discharge branch line and connection terminal is designed. The stray current is discharged through the discharge branch line to the discharge main line through the connection terminal, so as to realize the discharge flow in the rail transit line. The parallel connection of the network ensures that the system only affects the discharge flow of a single area when problems occur in any branch line or track block, and improves overall reliability.

Benefits of technology

It improves the flow discharge reliability of rail transit lines, reduces construction difficulty and cost, simplifies operation management, and enhances the stability and safety of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110758181B_ABST
    Figure CN110758181B_ABST
Patent Text Reader

Abstract

The present invention provides a drainage system for rail transit and a rail transit line, comprising a plurality of ballast blocks, a drainage main line, a drainage branch line and a connection terminal arranged in the ballast block, wherein the connection terminal is connected to the drainage main line through the drainage branch line to discharge stray current to the drainage main line. The drainage system for rail transit has a connection terminal arranged in the ballast block, and the connection terminal discharges the stray current collected by the drainage network in the ballast block to the drainage main line through the drainage branch line, thereby realizing the parallel connection of the drainage network in the rail transit line, so that the drainage failure of the entire rail transit line will not be caused by the poor penetration of a drainage branch line, and has higher reliability.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of stray current discharge of rail transit, and in particular to a discharge system and a rail transit line for rail transit. Background Art

[0002] Rail transit trains use DC power as traction power, and generally use running rails as return paths. Since the running rail return system cannot be completely insulated from the ground, a potential difference is generated between the running rails and the structural steel bars when the train is running, which in turn generates stray currents. Stray currents can cause electrical corrosion to structural steel bars and underground metal pipelines. At present, rail transit uses "blocking as the main method, drainage as the auxiliary method, combining blocking and drainage, and strengthening monitoring" as the basic protection principle for the generated stray currents. The so-called "drainage" refers to the use of the electrical connectivity of the structural steel bars in the integral roadbed to establish a main stray current collection network (i.e., drainage network), collect the stray current leaking from the rails, and send it back to the traction substation through the drainage cabinet.

[0003] The average length of the ballast block in the underground section of rail transit is about 12m, and the average length of the ballast block in the elevated section is about 6m. The electrical connection is achieved through dense welding between the steel bars in the same ballast block. The traditional drainage method requires that connection terminals be set at both ends of each ballast block to interconnect with other ballast blocks. The connection terminals between different ballast blocks are connected by DC cables to achieve electrical connectivity, thereby achieving electrical connectivity of the ballast drainage network between the two traction substations. The stray current is guided to the negative pole of the traction substation through this drainage network. The above-mentioned drainage network implementation scheme has the problem of low reliability. The stray current collection networks in different ballast blocks are connected in series by cables. When any connection point or the steel bars in any ballast block are not electrically connected, the drainage network of the entire section will lose its function and the stray current in the section cannot be discharged. Summary of the invention

[0004] The object of the present invention is to provide a drainage system and a rail transit line for rail transit, so as to solve the technical problem of low reliability of drainage solutions in the prior art.

[0005] To achieve the above object, the technical solution of the present invention is achieved as follows:

[0006] The present invention provides a drainage system for rail transit, comprising a plurality of ballast blocks, a drainage main line, a drainage branch line and a connecting terminal arranged in the ballast block, wherein the connecting terminal is connected to the drainage main line through the drainage branch line to discharge stray current to the drainage main line.

[0007] Furthermore, the drainage system further comprises at least one connection part, which is arranged on the drainage main line; the connection terminal is connected to one of the connection parts through the drainage branch line to discharge the stray current to the drainage main line.

[0008] Furthermore, the connection parts are evenly arranged on the main drainage line.

[0009] Furthermore, each of the connecting parts can be connected to a plurality of the connecting terminals respectively.

[0010] Furthermore, the distance between the connection terminal and the connection portion connected thereto is smaller than the distance between the connection terminal and other connection portions.

[0011] Furthermore, the connecting portion includes a box body, a connecting copper bar and a supporting insulator, the connecting copper bar is installed in the box body through the supporting insulator, and the drainage main line and the drainage branch line are respectively connected to the connecting copper bar.

[0012] Furthermore, the drainage main line and the drainage branch line are respectively one or more of cables, copper bars, and galvanized flat steel.

[0013] Furthermore, the number of the connecting terminals in each of the ballast blocks is one.

[0014] According to another aspect of the present invention, a rail transit line is provided, comprising the above-mentioned drainage system.

[0015] The drainage system for rail transit provided by the present invention is provided with connecting terminals in the ballast block. The connecting terminals discharge the stray current collected by the drainage network in the ballast block to the drainage main line through the drainage branch line, thereby realizing the parallel connection of the drainage network in the rail transit line. In this way, the drainage failure of the entire rail transit line will not be caused by the poor penetration of a certain drainage branch line, and the reliability is higher. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 A schematic structural diagram of a drainage system for rail transit provided by an embodiment of the present invention;

[0017] Figure 2 A schematic structural diagram of a connection portion in a drainage system provided in an embodiment of the present invention;

[0018] Figure 3 for Figure 2 A cross-sectional view of the connection portion shown in FIG.

[0019] Description of reference numerals:

[0020] 10. Ballast block; 20. Drainage system; 21. Connecting terminal; 22. Drainage line; 221. Drainage main line; 222. Drainage branch line; 23. Connecting part; 231. Box body; 232. Connecting copper busbar; 233. Support insulator. DETAILED DESCRIPTION

[0021] The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.

[0022] Reference Figure 1 According to a first aspect of an embodiment of the present application, a drainage system for rail transit is provided, comprising a plurality of ballast blocks 10, a drainage main line 221, a drainage branch line 222 and a connecting terminal 21 arranged in the ballast block 10, wherein the connecting terminal 21 is connected to the drainage main line 221 through the drainage branch line 222 to discharge stray current to the drainage main line 221.

[0023] The existing drainage method of rail transit is greatly restricted by the construction quality of civil engineering projects. When the electrical connectivity of any connection point or any structural steel bar in the ballast block is interrupted, the drainage of the entire section will fail, making it impossible to discharge the stray current of the entire rail transit line. The embodiment of the present application discharges the stray current collected by the drainage network of the ballast block 10 to the drainage main line 221 through the connection terminal 21 and the drainage branch line 222, thereby limiting the spread of stray current. When there is a problem with any drainage branch line 222 or any structural steel bar in the ballast block 10 in the drainage system 20, it will only affect the discharge of stray current in a single ballast block 10, and will have no effect on the discharge of stray currents in other ballast blocks 10, thereby improving the drainage reliability of the entire rail transit line.

[0024] In the existing rail transit drainage method, it is difficult to accurately determine the location of the connection terminal. The width of the rail transit ballast seam is generally about 100mm, and the connection terminal is generally set at the edge of the ballast seam. When the connection terminal is too close to the ballast seam, the cable bending radius requirement cannot be met. Torque exists between the cable and the terminal for a long time, and the cable is easy to break free or damage the connection terminal after years.

[0025] In the drainage system of the embodiment of the present application, the connection terminal 21 is connected to the drainage main line 221 through the drainage branch line 222. There is no requirement for the bending radius of the drainage branch line 222. The length of the drainage branch line 222 depends on the position of the connection point between it and the drainage main line 221. The connection terminal 21 only needs to be set on the side of the roadbed block 10 close to the drainage main line 221. The embodiment of the present application does not have high requirements for the position of the connection terminal 21 in each roadbed block 10, and the selection is flexible. It will not be restricted by the roadbed seam, and it has good adaptability to different roadbed block 10 types and different roadbed seam widths, which reduces the difficulty of project implementation.

[0026] In some embodiments, the main drainage line 221 and the branch drainage line 222 are respectively one or more of a cable, a copper busbar, and a galvanized flat steel. Among them, the cable can be an ethylene propylene rubber insulated DC soft cable. According to the specific conditions of the project, a cross-sectional area of ​​95m 2 or 150m 2 When the main drainage line 221 and the branch drainage line 222 are made of copper bars or galvanized flat steel, they need to be insulated from other metal parts except the structural steel bars in the ballast block 10 during installation.

[0027] In the existing drainage method of rail transit, there are a large number of connection terminals. Connection terminals need to be set on both sides of the ballast seam, and each connection terminal is required to be electrically connected to the structural steel bars in the ballast. On-site construction is difficult, and after the construction is completed, connection terminals are often missed or made incorrectly. In the embodiment of the present application, the number of connection terminals 21 in each ballast block 10 is one. The number of connection terminals 21 in the embodiment of the present application is reduced by half compared to the number of connection terminals 21 in the traditional solution, which reduces costs and improves the efficiency of engineering construction.

[0028] In some embodiments, the drainage system 20 further includes at least one connection portion 23, which is disposed on the drainage main line 221; the connection terminal 21 is connected to one of the connection portions 23 through the drainage branch line 222 to discharge the stray current to the drainage main line 221. The provision of the connection portion 23 facilitates the connection between the drainage branch line 222 and the drainage main line 221. In addition, each connection portion 23 can be connected to a plurality of connection terminals 21, respectively. That is, a plurality of connection terminals 21 can be connected to the same connection portion 23, which can reduce the number of connection portions 23 and reduce construction requirements. In the embodiment of the present application, each connection portion 23 is connected to 2 to 8 connection terminals 21. The connection portion 23 can be a junction box.

[0029] Furthermore, the connection parts 23 are evenly arranged on the drainage main line 221. The even arrangement of the connection parts 23 can make the distance between each connection terminal 21 and the connection part 23 not differ too much, and can control the length of the drainage branch line 222 and reduce costs. In other embodiments, the distance between the connection terminal 21 and the connection part 23 connected thereto is smaller than the distance between the connection terminal 21 and other connection parts 23. Select the connection part 23 closest to the connection terminal 21 for connection, minimize the length of the drainage branch line 222, and reduce costs.

[0030] In some embodiments, the connection part 23 includes a box body 231, a connection copper bar 232 and a support insulator 233. The connection copper bar 232 is installed in the box body 231 through the support insulator 233, and the main drainage line 221 and the branch drainage line 222 are respectively connected to the connection copper bar 232. In the embodiment of the present application, the connection part 23 is a junction box, and the main components arranged therein are the connection copper bar 232 and the support insulator 233. The connection copper bar 232 is provided with 4 to 8 connection conditions for connecting with the branch drainage line 222 and the main drainage line 221. The specification of the connection copper bar 232 is selected from 80mm*5mm, 100mm*5mm or other specifications. The length of the connection copper bar 232 is determined according to the number of the connection parts 23, and is generally selected from 150mm to 250mm. The setting of the support insulator 233 can ensure that the connection copper bar 232 is insulated from the box body 231, and can discharge the stray current through the main drainage line 221. The connection part 23 can be selected to adopt various inlet and outlet modes such as side inlet and outlet and / or bottom inlet and outlet. The connection part 23 is fixed to the structural surface of the rail transit line by anchor bolts or fixed to the bracket of the drainage line 22 by bolts.

[0031] The second aspect of the embodiment of the present application provides a rail transit line, which includes the above-mentioned drainage system 20. A connection terminal 21 is provided in each ballast block 10. The above-mentioned rail transit line is provided with a connection terminal 21 in the ballast block 10, and the stray current collected by the drainage network of the ballast block 10 is discharged to the drainage main line 221 through the drainage branch line 222, thereby limiting the spread of the stray current. When any of the drainage branch lines 222 or the structural steel bars in any ballast block 10 cannot be electrically connected, it will only affect the discharge of stray current in a single ballast block 10, and will have no effect on the discharge of stray current in other ballast blocks 10, thereby improving the drainage reliability of the entire rail transit line.

[0032] The drainage system for rail transit of the embodiment of the present application can greatly reduce the difficulty of construction, optimize the structure of the rail transit line, increase the reliability of drainage, and simplify the difficulty of operation and management. The scheme of the embodiment of the present application is simple, reliable, economical and practical, and has a very wide range of practical value. It can be widely used in rail transit power supply system lines such as subways, light rails, medium and low speed magnetic levitation, straddled monorails, intercity railways, and trams that use DC contact network (rail) power supply and rail return; it can be used in new lines and in renovation projects.

[0033] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be covered within the protection scope of the present invention. In addition, the technical solutions between the various embodiments of the present invention can be combined with each other, but it must be based on the ability of ordinary technicians in the field to implement. When the combination of technical solutions is contradictory or cannot be implemented, it should be considered that such a combination of technical solutions does not exist and is not within the protection scope of the present invention. Therefore, the protection scope of the present invention shall be based on the protection scope of the claims.

Claims

1. A drainage system for rail transit, Features: It comprises a plurality of ballast blocks, a drainage main line, a drainage branch line and a connection terminal arranged in the ballast block, wherein the connection terminal is connected with the drainage main line through the drainage branch line to discharge the stray current to the drainage main line; The drainage system further comprises at least one connection part, which is arranged on the drainage main line; the connection terminal is connected to one of the connection parts through the drainage branch line to discharge the stray current to the drainage main line; The connecting part comprises a box body, a connecting copper bar and a supporting insulator. The connecting copper bar is installed in the box body through the supporting insulator. The main drainage line and the branch drainage line are respectively connected to the connecting copper bar.

2. The drainage system for rail transit according to claim 1, It is characterized in that The connecting parts are evenly arranged on the main drainage line.

3. The drainage system for rail transit according to claim 1, It is characterized in that Each of the connection parts may be communicated with a plurality of the connection terminals respectively.

4. The drainage system for rail transit according to claim 1, It is characterized in that The distance between the connection terminal and the connection portion communicating therewith is smaller than the distance between the connection terminal and the other connection portions.

5. The drainage system for rail transit according to any one of claims 1 to 4, It is characterized in that The main drainage line and the branch drainage line are respectively one or more of cables, copper bars, and galvanized flat steel.

6. The drainage system for rail transit according to any one of claims 1 to 4, It is characterized in that The number of the connecting terminal in each ballast block is one.

7. A rail transit line, Features: A drainage system comprising any one of claims 1 to 6.