Early dismantling of aluminum alloy formwork support structure
By early dismantling the hole connection and welding connection of the aluminum alloy formwork support structure, the problems of insufficient strength and easy corrosion of traditional formwork in construction are solved, achieving efficient, environmentally friendly support stability and efficient construction, and significantly improving construction efficiency. and quality.
Patent Information
- Application Number
- CN201911249322.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-12-10
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2039-12-10
AI Technical Summary
Traditional support formwork, such as wooden formwork, steel formwork and plastic formwork, has problems such as insufficient strength, easy corrosion, high cost, and low reuse rate during construction. It is difficult to meet the needs of modern buildings for support stability and construction efficiency.
The aluminum alloy formwork support structure is adopted early, and pins or bolts are used between each formwork for hole-to-hole connection and locking to form an overall frame to ensure the load-bearing strength and shape and size after the concrete is poured, and the aluminum alloy support columns and Welded connection to improve support stability.
An aluminum alloy formwork support structure with high strength, corrosion resistance, environmental protection and high reusability has been realized, which improves construction efficiency and quality, reduces costs and meets the requirements of modern buildings for multi-functional and efficient building materials.
Smart Images

Figure CN110886485B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of building formwork construction, and in particular relates to an early-dismantling aluminum alloy formwork supporting structure. Background Art
[0002] With the development of the national economy and the gradual improvement of people's living standards, people's requirements for living and working places are also increasing. This requires the development of multifunctional and efficient new building materials and products to meet the requirements of social progress. The use of new building materials and products can significantly improve the function of buildings, improve construction efficiency, and reduce construction costs under the same conditions.
[0003] Traditionally used supporting formworks include wooden formworks, steel formworks, and plastic formworks, all of which have their own disadvantages: wooden formworks have low strength, are not waterproof, are prone to mildew and decay, have a low reuse rate, consume wood resources, and are not conducive to the protection of the ecological environment and forest resources; steel formworks are too heavy, require the assistance of mechanical equipment for construction, are prone to rust and corrosion, and are easily bonded to concrete during concrete pouring, making demolding difficult; plastic formworks have poor rigidity, are easy to deform, and are expensive.
[0004] The support system plays a supporting role in the construction process of concrete structures, ensuring the stability of the support of floors, beam bottoms and cantilever structures. To this end, technicians are committed to researching and developing aluminum alloy formwork support structures to improve the support stability of floors, beam bottoms and cantilever structures. Summary of the invention
[0005] The task of the present invention is to provide an early-dismantling aluminum alloy formwork support structure, using pins or bolts to connect and lock holes between each formwork, so that the required bearing strength and shape and size can still be guaranteed after pouring concrete. After assembly, an overall frame is formed to achieve support stability and solve the problems existing in the above-mentioned prior art.
[0006] The technical solution of the present invention is as follows:
[0007] An early dismantling aluminum alloy formwork support structure comprises a keel, a dragon claw, a floor support head, a fifth aluminum formwork, a sixth aluminum formwork, a connecting rod, a floor single-slant head keel, a floor double-slant head keel, a support column connection head, and pins or bolts;
[0008] The fifth aluminum template is in the shape of four side plates, wherein two adjacent side plates are provided with notches, and the fifth aluminum template is arranged at the lower corner where the wall or column and the floor or beam meet;
[0009] The sixth aluminum template is in the shape of a narrow and long bow, and a plurality of vertical convex rods with a spacing are arranged on the inner surface of the bow. The sixth aluminum template is placed on the surface of the wall or column and the bottom surface of the floor or beam;
[0010] The keel has an arch-shaped cross section and is provided with a foot. The keel is installed on the bottom surface of the floor slab or beam and is located between two sixth aluminum templates and is fastened by pins or bolts.
[0011] The dragon claw cross section is provided with two parallel supporting edges, the bottom end of the supporting edge is folded outward, a cover plate is provided at the top end of the supporting edge, both sides of the cover plate extend outward respectively, a protrusion is provided on the upper side of the extension, and the protrusions on both sides of the dragon claw cover plate are supported on the keel bottom foot; connecting rods are respectively installed on the outer folded edges of the two supporting edges of the dragon claw and connected by long pins;
[0012] The cross section of the floor support head is provided with a frame, and the bottom surface of the frame is provided with two vertical and parallel support edges, and the bottom ends of the support edges are folded outwards. The floor support head is installed on the bottom surface of the floor slab or beam and is located between the two sixth aluminum templates; the support column connecting head is installed in the middle of the two support edges of the floor support head, and connecting rods are respectively installed on the outer folded edges of the two support edges of the floor support head and connected by pins or bolts;
[0013] The connecting rod is in the shape of a bow, and the notch of the bow is closely mounted on the outside of the two supporting edges of the dragon claw or the floor supporting head;
[0014] The single-slanted floor keel and the double-slanted floor keel are installed on the bottom surface of the floor slab or the beam, and the floor support head is connected to the adjustable aluminum alloy support column through the support column connecting head. After the adjustable aluminum alloy support column is adjusted to make the top surface of the floor support head reach the required height, the single-slanted floor keel and the double-slanted floor keel are respectively connected to the floor support head through dragon claws and connecting rods to form a supporting structure, and then the fifth aluminum formwork and the sixth aluminum formwork are connected to complete the aluminum alloy formwork structure required for the concrete structure.
[0015] The keel and the dragon claw are connected by welding.
[0016] Each aluminum formwork is connected and locked hole to hole using pins or bolts.
[0017] By adopting an early-disassembly aluminum alloy formwork support structure of the present invention, pins or bolts are used between each formwork for hole-to-hole connection and locking, so that the required bearing strength and shape and size can still be guaranteed after pouring concrete. After assembly, an overall frame is formed to achieve support stability.
[0018] The early dismantling aluminum alloy formwork support structure of the present invention has the characteristics of corrosion resistance, high strength, high reuse rate, environmental protection, etc. The specific features are as follows:
[0019] 1. Use pins or bolts to connect and lock each template hole to hole, so that the required bearing strength, shape and size can be guaranteed after pouring concrete. The aluminum template can be recycled after demoulding.
[0020] 2. The floor support head is connected to the adjustable aluminum alloy support column through the support column connector. After adjusting the adjustable aluminum alloy support column to make the top surface of the floor support head reach the required height, the single-slanted floor keel and the double-slanted floor keel are connected to the floor support head through claws and connecting rods to form a support structure. The keel and the claws are welded, and the claws and the connecting rods are connected by long pins. Then the fifth aluminum formwork and the sixth aluminum formwork are connected to complete the aluminum alloy formwork structure required for the concrete structure.
[0021] 3. After assembly, an overall frame is formed with excellent stability and a bearing capacity of up to 60KN per square meter.
[0022] 4. When the concrete strength of the floor slab and beam reaches C15, the fifth and sixth aluminum formworks can be dismantled, and the dismantled aluminum formworks can be transported to the upper construction surface for assembly. There is no need to wait for the dismantling of the supporting structure. Only one floor formwork and two layers of support are used to achieve a pouring speed of one layer in 3-4 days, which improves the construction efficiency and formwork turnover rate. The aluminum formwork has a high reuse rate, reduces construction costs, and has significant economic benefits.
[0023] 5. After demolding, the surface quality of concrete is flat and smooth, which can basically meet the requirements of finishing and fair-faced concrete. No plastering is required, which can save plastering costs and effectively improve the quality.
[0024] 6. The early dismantling aluminum alloy formwork support structure is made of recyclable high-strength aluminum alloy material with good corrosion resistance. The metal aluminum produced has high recycling value and can be fully recycled. The construction site is clean and tidy, no waste is generated, and it meets the requirements of environmental protection efficiency.
[0025] 7. The early dismantling aluminum alloy formwork support structure has the characteristics of light weight, high strength, large bearing capacity and corrosion resistance. It has a simple structure, is strong and reliable, easy to install and disassemble, and the installation direction is not subject to any restrictions.
[0026] 8. The processing and manufacturing of the early-dismantling aluminum alloy formwork support structure are all completed in the factory, and are sent to the construction site after being pre-assembled correctly. Therefore, there is no need for secondary cutting, cutting or re-drilling on site, and no corresponding waste or cutting noise will be generated. After the construction formwork is removed, there is no garbage on site, and the construction environment is safe, clean and tidy, which is conducive to safe and civilized construction management on site.
[0027] 9. All materials of the early dismantling aluminum alloy formwork support structure are green and environmentally friendly, and are renewable materials with a recycling rate of more than 80%, which complies with the national regulations on energy conservation, environmental protection, low carbon and emission reduction for construction projects. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a schematic diagram of an early dismantling aluminum alloy formwork support structure of the present invention.
[0029] Figure 2 yes Figure 1 Middle AA section view.
[0030] Figure 3 yes Figure 1 Middle BB cross-section.
[0031] Figure 4 It is a structural diagram of the fifth aluminum formwork.
[0032] Figure 5 It is a structural schematic diagram of the sixth aluminum template.
[0033] Figure 6 It is a schematic diagram of the keel cross section.
[0034] Figure 7 This is a schematic diagram of the cross section of a dragon claw.
[0035] Figure 8 It is a schematic diagram of the cross section of the floor support head.
[0036] Fig. 9 It is a schematic diagram of the connecting rod cross section.
[0037] Reference numerals:
[0038] 1 is a keel, 2 is a dragon claw, 3 is a floor support head, 5 is the fifth aluminum formwork, 6 is the sixth aluminum formwork, 7 is a connecting rod, 8 is a single-slanted keel for the floor, 9 is a double-slanted keel for the floor, 10 is a wall or column, 11 is a floor slab or beam, 12 is a support column connecting head, and 13 is a long pin. DETAILED DESCRIPTION
[0039] The present invention is described in detail below with reference to the accompanying drawings and embodiments.
[0040] See also Figures 1 to 3 The present invention provides an early-dismantling aluminum alloy formwork support structure, which is mainly composed of a keel 1, a dragon claw 2, a floor support head 3, a fifth aluminum formwork 5, a sixth aluminum formwork 6, a connecting rod 7, a floor single-slanted head keel 8, a floor double-slanted head keel 9, a support column connecting head 12 and pins or bolts.
[0041] See also Figure 4 The fifth aluminum template 5 is surrounded by four side plates, and two adjacent side plates are provided with gaps. Figure 1 As shown in FIG. 1 , the fifth aluminum formwork 5 is arranged at the lower corner where the wall or column 10 and the floor slab or beam 11 meet. Figure 1 In the figure, the fifth aluminum formwork 5 is respectively arranged at the intersection of the left end of the floor slab or beam 11 and the left wall or column 10 and at the intersection of the right end of the floor slab or beam 11 and the right wall or column 10.
[0042] See also Figure 5The sixth aluminum template 6 is in the shape of a narrow and long bow, and a plurality of vertical protruding rods with a spacing distance are arranged on the inner surface of the bow. Figures 1 to 3 As shown in FIG. 1 , the sixth aluminum formwork 6 is placed on the surface of the wall or column 10 and the bottom surface of the floor slab or beam 11 .
[0043] See also Figure 6 The keel 1 has a bow-shaped cross section and is provided with a foot. Figure 2 As shown in FIG. 1 , the keel 1 is installed on the bottom surface of the floor slab or beam 11 and is located between two sixth aluminum formworks 6 and is fastened by pins or bolts.
[0044] See also Figure 7 The cross section of the dragon claw 2 is provided with two parallel supporting edges, the bottom end of the supporting edge is folded outward, and a cover plate is provided at the top end of the supporting edge. Both sides of the cover plate extend outward respectively, and a protrusion is provided on the upper side of the extension. Figure 2 As shown in the figure, the protrusions on both sides of the dragon claw 2 cover plate are supported on the bottom foot of the keel 1. The connecting rods 7 are respectively installed on the outer folding edges of the two supporting edges of the dragon claw 2 and are connected by long pins 13.
[0045] See also Figure 8 , a frame is set at the 3-section of the floor support head, and two vertical and parallel support edges are set at the bottom of the frame, and the bottom ends of the support edges are folded outwards. Figure 1 and Figure 3 As shown in FIG. 1 , the floor support head 3 is installed on the bottom surface of the floor slab or beam 11 and is located between two sixth aluminum formworks 6. A support column connector 12 is installed in the middle of the two supporting edges of the floor support head 3. Connecting rods 7 are respectively installed on the outer folded edges of the two supporting edges of the floor support head 3 and connected by pins or bolts.
[0046] See also Fig. 9 , the connecting rod 7 is in a bow shape, such as Figure 1 and Figure 2 As shown in , the notch of the curved bow-shaped body is closely mounted on the outside of the two supporting edges of the dragon claw 2. Figure 1 and Figure 3 As shown in , the notch portion of the curved bow-shaped body is also closely installed on the outside of the two supporting edges of the floor supporting head 3.
[0047] See also Figures 1 to 3 The single-slanted floor keel 8 and the double-slanted floor keel 9 are installed on the bottom surface of the floor slab or beam 11, and the floor support head 3 is connected to the adjustable aluminum alloy support column through the support column connecting head 12. After the adjustable aluminum alloy support column is adjusted to make the top surface of the floor support head 3 reach the required height, the single-slanted floor keel 8 and the double-slanted floor keel 9 are respectively connected to the floor support head 3 through the dragon claw 2 and the connecting rod 7 to form a supporting structure; then the fifth aluminum formwork 5 and the sixth aluminum formwork 6 are connected to complete the aluminum alloy formwork structure required for the concrete structure.
[0048] The keel 1 and the claw 2 in the early dismantling aluminum alloy formwork support structure of the present invention are connected by welding, and the claw 2 and the connecting rod 7 are connected by long pins. Pins or bolts are used to connect and lock each aluminum formwork hole to hole, so that the required bearing strength, shape and size can still be guaranteed after pouring concrete, and the aluminum formwork can continue to be recycled after demoulding.
[0049] After the early dismantling aluminum alloy formwork support structure of the present invention is assembled, it forms an integral frame with excellent stability and a bearing capacity of 60KN per square meter. When the concrete strength of the floor slab and beam reaches C15, the fifth aluminum formwork and the sixth aluminum formwork can be dismantled, and the dismantled aluminum formwork is transported to the upper construction surface for assembly. There is no need to wait for the dismantling of the support structure. Only one floor formwork and two layers of support are used to achieve a pouring speed of one layer in 3-4 days, which improves the construction efficiency and formwork turnover rate, and the aluminum formwork has a high reuse rate, reduces the construction cost, and has significant economic benefits.
[0050] Of course, those skilled in the art should realize that the above embodiments are only used to illustrate the present invention, and are not used to limit the present invention. As long as they are within the spirit of the present invention, changes and modifications to the above embodiments will fall within the scope of the claims of the present invention.
Claims
1. An early dismantling aluminum alloy formwork support structure, characterized in that: It comprises a keel (1), a claw (2), a floor support head (3), a fifth aluminum formwork (5), a sixth aluminum formwork (6), a connecting rod (7), a single-slanted-head keel (8) for the floor, a double-slanted-head keel (9) for the floor, a support column connecting head (12), and pins or bolts; The fifth aluminum template (5) is in the shape of being surrounded by four side plates, wherein two adjacent side plates are provided with notches, and the fifth aluminum template (5) is arranged at the lower corner where the wall or column (10) and the floor slab or beam (11) meet; The sixth aluminum template (6) is in the shape of a narrow and long bow, and a plurality of vertical protruding rods with a certain distance between them are arranged on the inner surface of the bow. The sixth aluminum template (6) is placed on the surface of a wall or a column (10) and the bottom surface of a floor slab or a beam (11); The keel (1) has an arch-shaped cross section and is provided with a foot. The keel (1) is installed on the bottom surface of the floor slab or beam (11) and is located between two sixth aluminum templates (6) and is fastened by pins or bolts. The cross section of the dragon claw (2) is provided with two parallel supporting edges, the bottom ends of the supporting edges are folded outwards, a cover plate is provided at the top end of the supporting edges, the two sides of the cover plate are respectively extended outwards, a protrusion is provided on the upper side of the extended portion of the cover plate, and the protrusions on both sides of the dragon claw (2) cover plate are supported on the bottom foot of the keel (1); connecting rods (7) are respectively installed on the outer folded edges of the two supporting edges of the dragon claw (2) and are connected by a long pin (13); The cross section of the floor support head (3) is provided with a frame, and the bottom surface of the frame is provided with two vertical and parallel support edges, the bottom ends of the support edges are folded outwards, and the floor support head (3) is installed on the bottom surface of the floor slab or beam (11) and is located between two sixth aluminum templates (6); a support column connecting head (12) is installed in the middle of the two support edges of the floor support head (3), and connecting rods (7) are respectively installed on the outer folded edges of the two support edges of the floor support head (3) and connected by pins or bolts; The connecting rod (7) is in the shape of a bow, and the notch portion of the bow-shaped body of the connecting rod is closely mounted on the outside of the two supporting edges of the dragon claw (2) or the floor supporting head (3); The single-slanted floor keel (8) and the double-slanted floor keel (9) are installed on the bottom surface of the floor slab or beam (11); the floor support head (3) is connected to the adjustable aluminum alloy support column via the support column connecting head (12); after the adjustable aluminum alloy support column is adjusted so that the top surface of the floor support head (3) reaches the required height, the single-slanted floor keel (8) and the double-slanted floor keel (9) are respectively connected to the floor support head (3) via the dragon claw (2) and the connecting rod (7) to form a support structure; then the fifth aluminum formwork (5) and the sixth aluminum formwork (6) are connected to complete the aluminum alloy formwork structure required for the concrete structure.
2. The early dismantling aluminum alloy formwork support structure according to claim 1 is characterized in that: The keel (1) and the dragon claw (2) are connected by welding.
3. The early dismantling aluminum alloy formwork support structure according to claim 1 is characterized in that: Each aluminum formwork is connected and locked hole to hole using pins or bolts.