A telescopic shaping mold for cast-in-place slab with water-stopping reserved holes
By designing a cast-in-place slab water-stop type reserved hole telescopic shaping mold with a tongue-and-groove type water-stop structure, the problem of waterproof performance and construction efficiency of the embedded casing and reserved hole method in building construction is solved, and the problem is achieved Flexible adjustment of hole size and improvement of construction quality simplify the process and reduce costs.
Patent Information
- Application Number
- CN201811163076.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2018-09-30
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2038-09-30
AI Technical Summary
In existing building construction, the methods of embedded casing and reserved holes have flaws in waterproofing performance and construction efficiency, resulting in high costs and poor quality. In addition, traditional embedded molds have fixed sizes and are not easy to use, causing frequent leaks. .
Design a cast-in-place slab water-stop telescopic shaping mold with reserved holes. It adopts a tongue-and-groove water-stop structure. The hole size can be flexibly adjusted through the angle steel telescopic device and the combined module. Combined with the connection of the angle steel lifting beam and U-shaped groove, it ensures Mold stability and reliability.
It improves the anti-seepage performance of reserved holes, simplifies the construction process, reduces material and labor costs, improves construction efficiency, solves the quality and cost problems in traditional methods, and supports multiple uses.
Smart Images

Figure CN110965778B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a technical field related to construction engineering, and in particular to a telescopic shaping mold for water-stopping reserved holes of a cast-in-place slab. Background Art
[0002] At present, two construction methods are commonly used for building installation and construction of water supply and drainage pipes and sanitary ware drainage pipes crossing cast-in-place slabs:
[0003] 1. According to Article 3.3.13 of the "Construction Quality Acceptance Code for Water Supply, Drainage and Heating Engineering" (GB50242-2002): Metal or plastic sleeves should be installed when pipes pass through walls and floors. The top of the sleeve installed in the floor should be 20mm higher than the decorative floor; the top of the sleeve installed in the bathroom and kitchen should be 50mm higher than the decorative floor, and the bottom should be flush with the bottom of the floor.
[0004] 2. According to Article 1.4.3 of the "Construction Technology Code for Building Installation Sub-projects" (DBJ / T01-26-2003), holes should be reserved in cooperation with civil construction, and the prefabricated mold boxes should be fixed firmly according to the marks before tying the steel bars. Paper balls and other objects should be stuffed into the box. During the concrete pouring process, a dedicated person should cooperate with the proofreading and watch over the mold boxes to prevent them from shifting.
[0005] In actual construction, since most of the specific practices in the specifications and designs are not explained in detail, different regions and different construction personnel have different degrees and angles of understanding of the specifications, and the construction practices adopted are confusing and different, resulting in many problems in the implementation of the above two methods:
[0006] The first method uses pre-buried casing: the actual design and construction generally adopt the solution of pre-buried rigid waterproof casing. The rigid waterproof casing has high production cost, complicated on-site installation process, slow installation speed and high labor cost; the casing positioning is not easy to control accurately, and it is very easy to have deviations when using the structure's beam and column positions for pre-buried casing positioning, and the casing is prone to displacement during concrete pouring, causing quality defects and cost losses in the subsequent pipeline installation due to rework; the specification requires that the top of the casing is 20 to 50 mm higher than the decorative floor, but in actual construction, the top of the casing is often flush with the floor surface, and the waterproof and anti-seepage performance cannot be achieved; the plastic casing has poor adhesion to concrete and is not compatible, the contact surface is prone to leakage, and the gap between the casing and the pipeline is not easy to fill, affecting the construction quality.
[0007] The second method of pre-reserving holes: This method is more common. During the structural construction stage, embedded parts such as wooden boxes, steel cylinders or PVC pipes are used to reserve holes in the cast-in-place slab, which are then sealed after the pipes are installed. Because the embedded parts are all straight-walled structures and the cross-section of the reserved holes is vertical, when the concrete is sealed after the pipes are installed, the secondary poured concrete shrinks and deforms, and leakage is likely to occur between the sealed concrete and the cast-in-place slab. It is difficult to effectively waterproof the water seepage in the later stage, and there are quality defects. When the wooden box and steel cylinder embedded parts are made, the reserved holes are inconsistent in size and are difficult to reuse, and the one-time investment cost is high. When PVC pipes are used as embedded parts, the pipes are often placed directly in the cast-in-place slab and are not taken out. The one-time use cost of the material is high. PVC pipes also have the problem of poor adhesion to concrete and easy leakage on the contact surface, which poses a quality risk.
[0008] Currently, no effective solution has been proposed for the problems in the related technologies. Summary of the invention
[0009] In view of the above technical problems in the related art, the present invention proposes a telescopic shaping mold for water-stopping reserved holes of cast-in-place slabs, which can solve the above technical problems.
[0010] To achieve the above technical objectives, the technical solution of the present invention is implemented as follows:
[0011] A cast-in-place slab water-stopping pre-hole telescopic shaping mold, comprising a mold body, a fixed rod fixedly connected to the cast-in-place slab bottom mold is provided at the center of the pre-hole in the middle of the mold body, the mold body is composed of four combined modules connected end to end around the fixed rod, two adjacent combined modules are slidably connected, an angle steel expansion joint is provided on each of a group of opposite sides of the mold body, an angle steel lifting beam is provided between the two angle steel expansion joints, and the middle part of the angle steel lifting beam is fixed to the fixed rod;
[0012] The combined module comprises a first component and a second component perpendicular to the first component, the first component comprises a first angle steel, a first screw is provided on one side of the first angle steel near the second component, and a first flat steel is vertically welded on the other side of the first angle steel; the second component comprises a second angle steel, a second screw is provided on one side of the second angle steel near the first component, and a second flat steel is vertically welded on the other side of the second angle steel, and a side of the first flat steel on the first component near the first screw and a side of the second flat steel on the second component near the second screw are vertically aligned with each other and welded and fixed;
[0013] The angle steel expander comprises an L-shaped angle steel body, a row of first screw adjustment holes and a row of second screw adjustment holes parallel to the row of first screw adjustment holes are arranged at both ends of a vertical side of the L-shaped angle steel body, and an angle steel handle beam connection hole is arranged in the middle of another vertical side of the L-shaped angle steel body; the angle steel expander is connected to the mold body through the first screw adjustment hole and the second screw adjustment hole;
[0014] The angle steel handle includes a fixing rod connection hole provided in the middle of the angle steel handle and connected to the fixing rod, and two U-shaped grooves symmetrically provided with the fixing rod connection hole as the center, the two ends of the angle steel handle are connected to the angle steel expansion joint through hook bolts, one end of the hook bolt is fixedly connected to the angle steel handle connection hole in the middle of the angle steel expansion joint through bolts, the other end of the hook bolt is slidably connected to the U-shaped groove, and the hook bolt is provided with a pre-tightening nut corresponding to the U-shaped groove;
[0015] The fixing rod includes a base plate fixed to the bottom mold of the cast-in-place slab, a through-thread screw arranged at the center of the base plate, and a fixing nut and an extension nut arranged on the through-thread screw. The through-thread screw passes through the fixing rod connecting hole and is fixedly connected to the angle steel beam through the fixing nut and the extension nut.
[0016] Furthermore, the first screw rod, the first flat steel and the first angle steel in the first component are fixed by continuous welding.
[0017] Furthermore, the second screw rod, the second flat steel and the second angle steel in the second component are fixed by continuous welding.
[0018] Furthermore, the width of the U-shaped groove is 9 mm.
[0019] Furthermore, the base plate and the threaded screw are fixed by welding, and the height of the fillet weld is 5 mm.
[0020] Furthermore, the bottom plate is an equilateral triangle.
[0021] Furthermore, the base plate is anchored and connected to the cast-in-place slab bottom formwork (5) by self-powered screws.
[0022] Furthermore, the bottom plate has a thickness of 3 mm.
[0023] Beneficial effects of the present invention: The telescopic shaping mold for the reserved holes of the cast-in-place slab water-stopping type provided by the present invention adopts a shaping mold with a tongue-and-groove water-stopping structure, which effectively improves the anti-seepage performance of the reserved holes, and can freely adjust the size of the reserved holes according to the designed diameter of the pipeline through the telescopic structure of the mold, and has the advantages of simple structure, convenient production, strong versatility, high turnover, simple and quick installation and disassembly, high strength and no deformation, stable and reliable, etc., which solves the disadvantages of poor quality effect, large material input, and labor and material waste in the traditional construction process of reserved holes, improves the shortcomings of various traditional embedded molds that are fixed in size and cannot be universal, and have frequent leakage and poor waterproof performance, and fundamentally guarantees the construction quality and waterproof performance of the reserved hole plugging concrete pouring. It also simplifies the construction process, reduces the labor intensity of workers, saves a lot of mold materials and installation and disassembly costs, reduces construction costs, improves work efficiency, saves energy and is environmentally friendly, can be used repeatedly, and has good promotion value. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0025] Figure 1 It is a three-dimensional structural schematic diagram of a telescopic shaping mold for a water-stopping reserved hole of a cast-in-place slab according to an embodiment of the present invention;
[0026] Figure 2 It is a schematic diagram of the three-dimensional structure of a mold body in a telescopic shaping mold for a cast-in-place slab with a water-stopping reserved hole according to an embodiment of the present invention;
[0027] Figure 3 It is a schematic diagram of the three-dimensional structure of the first component in a telescopic shaping mold for a water-stopping reserved hole of a cast-in-place slab according to an embodiment of the present invention;
[0028] Figure 4 It is a side view of the first component in a telescopic shaping mold for a water-stopping reserved hole of a cast-in-place slab according to an embodiment of the present invention;
[0029] Figure 5 It is a schematic diagram of the three-dimensional structure of the second component in a telescopic shaping mold for a water-stopping reserved hole of a cast-in-place slab according to an embodiment of the present invention;
[0030] Figure 6 It is a side view of the second component in a telescopic shaping mold for a water-stopping reserved hole of a cast-in-place slab according to an embodiment of the present invention;
[0031] Figure 7 It is a front view of an angle steel expansion joint in a telescopic shaping mold for a water-stopping reserved hole of a cast-in-place slab according to an embodiment of the present invention;
[0032] Figure 8 yes Figure 7 Cross-section view in the AA direction;
[0033] Fig. 9 It is a front view of an angle steel handle in a telescopic shaping mold for a water-stopping reserved hole of a cast-in-place slab according to an embodiment of the present invention;
[0034] Fig.10 It is a structural schematic diagram of a fixing rod in a telescopic shaping mold for a water-stopping reserved hole of a cast-in-place slab according to an embodiment of the present invention;
[0035] Fig.11 This is a telescopic shaping mold for water-stop reserved holes of cast-in-place slabs according to an embodiment of the present invention. When it is used, the steel bar structure around the reserved holes is referred to the figure. DETAILED DESCRIPTION
[0036] The following will be combined with the accompanying drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field belong to the scope of protection of the present invention.
[0037] like Figure 1-11 As shown, a cast-in-place slab water-stopping reserved hole telescopic shaping mold according to an embodiment of the present invention comprises a mold body 100, a fixed rod 4 fixedly connected to a cast-in-place slab bottom mold 5 is provided at the center of the reserved hole in the middle of the mold body 100, the mold body 100 is composed of four combined modules 1 connected end to end around the fixed rod 4, two adjacent combined modules 1 are slidably connected, an angle steel expander 2 is provided on each of the opposite sides of a group of the mold body 100, an angle steel lifting beam 3 is provided between the two angle steel expanders 2, and the middle part of the angle steel lifting beam 3 is fixed to the fixed rod 4;
[0038] The combined module 1 comprises a first component 11 and a second component 12 perpendicular to the first component 11, the first component 11 comprises a first angle steel 111, a first screw 112 is provided on one side of the first angle steel 111 near the second component 12, and a first flat steel 113 is vertically welded on the other side of the first angle steel 111; the second component 12 comprises a second angle steel 121, a second screw 122 is provided on one side of the second angle steel 121 near the first component 11, and a second flat steel 123 is vertically welded on the other side of the second angle steel 121, and a side of the first flat steel 113 on the first component 11 near the first screw 112 and a side of the second flat steel 123 on the second component 12 near the second screw 122 are vertically aligned and welded to each other;
[0039] In this embodiment, the first screw 112 and the first flat steel 113 in the first component 11 are fixed to the first angle steel 111 by continuous welding; the second screw 122 and the second flat steel 123 in the second component 12 are fixed to the second angle steel 121 by continuous welding;
[0040] Among them, the first angle steel 111 in the first component 11 is a 50*75*5mm angle steel, the first screw rod 112 is an M8 through-thread screw rod, and the first flat steel 113 is an 80*100*5mm flat steel; the second angle steel 121 in the second component 12 is a 75*110*5mm angle steel, the second screw rod 122 is an M8 through-thread screw rod, and the second flat steel 123 is a 75*110*5mm flat steel.
[0041] The angle steel expander 2 comprises an L-shaped angle steel body, a row of first screw adjustment holes 21 and a row of second screw adjustment holes 22 parallel to the row of first screw adjustment holes 21 are provided at both ends of a vertical side of the L-shaped angle steel body, and an angle steel handle beam connection hole 23 is provided in the middle of another vertical side of the L-shaped angle steel body; the angle steel expander 2 is connected to the mold body 100 through the first screw adjustment hole 21 and the second screw adjustment hole 22;
[0042] In this embodiment, the angle steel expander 2 is made of 40*40*4mm angle steel, and the angle steel is 300mm long. The diameters of the first screw adjustment hole 21 and the second screw adjustment hole 22 are both 10mm.
[0043] The angle steel handle 3 includes a fixing rod connection hole 31 provided in the middle of the angle steel handle 3 and connected to the fixing rod 4, and two U-shaped grooves 32 symmetrically provided with the fixing rod connection hole 31 as the center. Both ends of the angle steel handle 3 are connected to the angle steel expansion joint 2 through hook bolts 33. One end of the hook bolt 33 is fixedly connected to the angle steel handle connection hole 23 in the middle of the angle steel expansion joint 2 through bolts. The other end of the hook bolt 33 is slidably connected in the U-shaped groove 32. The hook bolt 33 is provided with a pre-tightening nut corresponding to the U-shaped groove 32.
[0044] In this embodiment, the angle steel handle beam 3 is made of 50*50*5mm angle steel, and the angle steel is 260mm long; the vertical surface part is cut within 60mm at both ends; a 60mm long U-shaped notch is cut along the center line at both ends of the plane, the groove width is 9mm, and the fixing rod connection hole 31 is drilled at the center as a bolt hole with a diameter of 14mm;
[0045] The fixing rod 4 includes a bottom plate 41 fixed to the cast-in-place slab bottom form 5, a threaded screw 42 arranged at the center of the bottom plate 41, and a fixing nut 43 and an extension nut 44 arranged on the threaded screw 42. The threaded screw 42 passes through the fixing rod connecting hole 31 and is fixedly connected to the angle steel beam 3 through the fixing nut 43 and the extension nut 44.
[0046] In this embodiment, the threaded screw 42 is an M12 threaded screw with a length of 315 mm; the base plate 41 and the threaded screw 42 are fixed by welding, and the height of the fillet weld is 5 mm; the base plate 41 is a regular triangle with a side length of 60 mm; the base plate 41 is pre-drilled with three screw holes with a diameter of 5 mm, and is equipped with three 4.8*18 mm self-tapping screws, which are anchored and connected to the cast-in-place slab bottom mold 5 through self-tapping screws; the base plate 41 is 3 mm thick.
[0047] When using it, the operation steps are as follows:
[0048] (1) Determine the size of the reserved hole
[0049] The reserved holes shall be carried out in coordination with the civil construction. If there is no requirement for the reserved dimensions in the design, they shall be implemented in accordance with the provisions of Table 1.
[0050] Table 1 Reserved hole size (mm)
[0051]
[0052]
[0053] (2) Technical disclosure
[0054] Before using the finalized mold, the installation team should be given a technical briefing to clearly explain the installation, use and disassembly methods of the mold, and require that the pre-buried positioning and support fixation meet the technical requirements of pipeline installation.
[0055] (3) Measurement and layout
[0056] According to the professional design drawings and pipeline installation detailed drawings, the center position of the pipeline and the cross lines in the vertical and horizontal directions are laid out, marked with red paint, and numbered according to the axis order.
[0057] (4) Installation of the final mold
[0058] When installing the shaping mold on site, first assemble the module according to the size of the reserved holes. The first screw adjustment hole 21 and the second screw adjustment hole 22 on the angle steel expander can be flexibly combined into a forming mold with side lengths including 100mm, 120mm, 140mm, 160mm, 180mm and 200mm. The first screw adjustment holes 21 and the second screw adjustment holes 22 of the two angle steel expanders correspond to the first screw 112 and the second screw 122 on the combined module respectively; tighten the nuts and use the angle steel expander to connect and lock the four combined modules into a shaping mold, and place them in place according to the designed position. Insert the M8 hook bolt into the opening of the vertical surface of the angle steel expansion joint, and insert it into the corresponding U-shaped notch of the angle steel beam. The size of the shaping mold can be adjusted through the U-shaped notch of the angle steel beam. Tighten the pre-tightening nut of the hook bolt to connect the angle steel beam, angle steel expansion joint and shaping mold into a whole. First, insert the M12 extension nut into the fixing rod, and insert it into the M14 bolt hole in the middle of the angle steel beam from the upper end. The center of the fixing rod corresponds to the center position of the pipeline. Use self-tapping screws to anchor the triangular steel plate welded to the bottom of the fixing rod to the bottom mold of the cast-in-place slab, and then insert the M12 fixing nut so that it is located on the upper part of the angle steel beam. Adjust the extension nut and fixing nut on the upper and lower parts of the fixing rod, lock the angle steel beam, and make the overall shaping mold firmly connected.
[0059] (5) Cast-in-place slab reinforcement binding
[0060] After the finalized mold is installed and fixed, the cast-in-place slab reinforcement is tied. The original steel bar material and the size of the cut material meet the design requirements. The steel mesh and the negative bending moment reinforcement on the top of the slab are tied firmly and accurately. The protective layer pads and steel bar horse stools are set in accordance with the specifications. The spacing, quantity and thickness of the steel bars and the protective layer should meet the design specifications. Fig.11 : Refer to the atlas for the steel bar structure around the reserved holes.
[0061] (6) Cast-in-place slab concrete pouring
[0062] The cast-in-place slab is pumped into the mold with commercial concrete. The temperature of the concrete entering the mold should not be lower than 5℃ and should not be higher than 35℃. When the daily average temperature reaches above 30℃, cooling measures should be taken according to the requirements of high-temperature construction. When the daily average temperature is below 5℃ for 5 consecutive days, winter construction measures should be taken. High-altitude operations should be stopped in strong winds of level 6 or above, and concrete pouring is prohibited on rainy days.
[0063] Before pouring cast-in-place concrete, the on-site quality inspector will conduct quality inspection on the elevation of the bottom of the slab, the reinforcement of the formwork and scaffolding, the quality of the steel bar binding and installation, and the installation and fixation of the reserved hole shaping mold. After meeting the design and specification requirements, the inspection and acceptance will be reported. After passing the inspection, the cast-in-place concrete can be poured. During the pouring and finishing of the surface, the construction workers should be careful not to step on the shaping mold or be tripped by it, and avoid directly impacting the mold when pouring concrete or pouring concrete into the mold. When vibrating, the vibrator should also be avoided from touching the mold to prevent the mold from shifting due to impact and vibration.
[0064] (7) Disassembly of the molding die
[0065] When the cast-in-place slab concrete reaches final setting, the final setting mold is disassembled. The final setting time of concrete is related to the type of cement, setting conditions, type and quantity of admixtures used, and should be determined by test. It can be mastered on site 8 hours after concrete pouring. First, remove the fixing nut above the fixing rod, use a wrench to rotate the M12 extension nut below the fixing rod, and support the angle steel lifting beam to drive the angle steel expansion joint and the combination module to move up, and the overall demoulding can be completed. Then use a hand drill to remove the self-tapping screws at the connection between the fixing rod and the template, and the final mold can be disassembled.
[0066] (8) Cleaning and standby
[0067] After the shaping mold is disassembled, clean the surface mortar immediately, apply the release agent and continue to use it. Damaged parts need to be replaced in time, stored in a dry place, and treated with anti-corrosion and anti-rust for subsequent construction use.
[0068] (9) Sealing reserved holes
[0069] After the pipeline is installed, the hole must be sealed and smoothed with concrete of not lower than the structural grade in time to prevent the pipeline from shifting. First, roughen the concrete around the hole, clean up the debris and dust, and clean it. Use a special mold to seal the lower end of the reserved hole to be flush with the bottom of the floor slab. After it is firmly fixed, use fine stone concrete of the same grade as the cast-in-place slab to seal it, and add an appropriate amount of expansion agent. The reserved hole is sealed by pouring twice. The first time is sealed to the tongue-and-groove joint of the reserved hole, with a thickness of 80mm, and it is manually inserted and vibrated. When the concrete is initially set, it is poured again to be flush with the floor slab surface. After final setting, sprinkle water and cover with film for maintenance. The maintenance time is not less than 7 days.
[0070] In summary, with the help of the above technical scheme of the present invention, the telescopic shaping mold for the water-stopping reserved holes of the cast-in-place slab provided by the present invention adopts a shaping mold with a tongue-and-groove water-stopping structure, which effectively improves the anti-seepage performance of the reserved holes, and can freely adjust the size of the reserved holes according to the designed diameter of the pipeline through the telescopic structure of the mold, and has the advantages of simple structure, convenient production, strong versatility, high turnover, simple and quick installation and disassembly, high strength and no deformation, stable and reliable, etc., which solves the disadvantages of poor quality effect, large material investment, and labor and material waste in the traditional construction process of reserved holes, improves the shortcomings of various traditional embedded molds that are fixed in size and cannot be universal, and have frequent leakage and poor waterproofness, and fundamentally guarantees the construction quality and waterproof performance of the reserved hole blocking concrete pouring. It also simplifies the construction process, reduces the labor intensity of workers, saves a lot of mold materials and installation and disassembly costs, reduces construction costs, improves work efficiency, saves energy and is environmentally friendly, can be used repeatedly, and has good promotion value.
[0071] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A cast-in-place slab water-stopping reserved hole telescopic shaping mold, characterized in that: The mold body (100) comprises a fixed rod (4) fixedly connected to the cast-in-place slab bottom mold (5) at the center of a reserved hole in the middle of the mold body (100), the mold body (100) comprises four combination modules (1) connected end to end around the fixed rod (4), two adjacent combination modules (1) are slidably connected, an angle steel expansion joint (2) is provided on each of a group of opposite sides of the mold body (100), an angle steel lifting beam (3) is provided between the two angle steel expansion joints (2), and the middle part of the angle steel lifting beam (3) is fixed to the fixed rod (4); The combined module (1) comprises a first component (11) and a second component (12) perpendicular to the first component (11), the first component (11) comprising a first angle steel (111), a first screw rod (112) being provided on one side of the first angle steel (111) near the second component (12), and a first flat steel (113) being vertically welded on the other side of the first angle steel (111); the second component (12) comprising a second angle steel (121), a second screw rod (122) being provided on one side of the second angle steel (121) near the first component (11), and a second flat steel (123) being vertically welded on the other side of the second angle steel (121), and a side of the first flat steel (113) on the first component (11) near the first screw rod (112) and a side of the second flat steel (123) on the second component (12) near the second screw rod (122) are vertically aligned with each other and welded and fixed; The angle steel expander (2) comprises an L-shaped angle steel body, a row of first screw adjustment holes (21) and a row of second screw adjustment holes (22) parallel to the row of first screw adjustment holes (21) are provided at both ends of a vertical side of the L-shaped angle steel body, and an angle steel handle beam connection hole (23) is provided in the middle of another vertical side of the L-shaped angle steel body; the angle steel expander (2) is connected to the mold body (100) via the first screw adjustment hole (21) and the second screw adjustment hole (22); The angle steel handle (3) comprises a fixing rod connection hole (31) provided in the middle of the angle steel handle (3) and connected to the fixing rod (4), and two U-shaped grooves (32) symmetrically arranged with the fixing rod connection hole (31) as the center, the two ends of the angle steel handle (3) being connected to the angle steel expansion joint (2) via hook bolts (33), one end of the hook bolt (33) being fixedly connected to the angle steel handle connection hole (23) in the middle of the angle steel expansion joint (2) via bolts, the other end of the hook bolt (33) being slidably connected in the U-shaped groove (32), and the hook bolt (33) being provided with a pre-tightening nut corresponding to the U-shaped groove (32); The fixing rod (4) comprises a bottom plate (41) fixed to the bottom formwork (5) of the cast-in-place slab, a threaded screw (42) arranged at the center of the bottom plate (41), and a fixing nut (43) and an extension nut (44) arranged on the threaded screw (42); the threaded screw (42) passes through the fixing rod connection hole (31) and is fixedly connected to the angle steel handle beam (3) via the fixing nut (43) and the extension nut (44); The first screw rod (112) and the first flat steel (113) in the first component (11) are fixed to the first angle steel (111) by continuous welding; The second screw rod (122) and the second flat steel (123) in the second component (12) are fixed to the second angle steel (121) by continuous welding.
2. The cast-in-place slab water-stopping reserved hole telescopic shaping mold according to claim 1, characterized in that: The U-shaped groove (32) has a groove width of 9 mm.
3. The cast-in-place slab water-stopping reserved hole telescopic shaping mold according to claim 1, characterized in that: The bottom plate (41) and the threaded screw (42) are fixed by welding, and the height of the fillet weld is 5 mm.
4. The telescopic shaping die for water-stopping reserved holes of cast-in-place slab according to claim 3, characterized in that: The bottom plate (41) is in the shape of an equilateral triangle.
5. The telescopic shaping mold for water-stopping reserved holes of cast-in-place slab according to claim 4, characterized in that: The bottom plate (41) is anchored and connected to the cast-in-place slab bottom formwork (5) via self-powered screws.
6. The cast-in-place slab water-stopping reserved hole telescopic shaping mold according to claim 5, characterized in that: The bottom plate (41) has a thickness of 3 mm.