Basement dewatering well plugging method
By installing the steel casing of the wellhead cover plate and pre-welded snap ring on the basement precipitation well, combining the rubber pad and epoxy resin sealing mechanism, the problems of inconvenient operation and poor waterproofing effect in the prior art are solved, and rapid sealing is achieved Blocking and improving waterproofing performance extends the service life of the device.
Patent Information
- Application Number
- CN202411250279.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2020-06-01
- Publication Date
- 2024-11-26
Smart Images

Figure CN119021255A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of drainage well plugging, in particular to a basement drainage well plugging method. Background Art
[0002] A dewatering well is a well dug to lower the groundwater level. After it is dug, a water pump is used to extract groundwater to lower the groundwater level. The sealing construction technology of the foundation pit dewatering well is a key point in the entire foundation construction. It directly affects the water-stopping effect of the foundation pit dewatering well and the waterproof quality of the foundation slab concrete, thereby affecting the construction of the basement foundation. This brings challenges to the dewatering during the construction of the basement concrete slab and the sealing of the wellhead after the dewatering is completed. This requires the use of an effective wellhead sealing structure. The existing wellhead sealing structures are not uniform, of various types, inconvenient to operate, slow to seal, poor in integrity, and unsatisfactory in waterproofing effect.
[0003] 1) There are 30-40 drainage wells in the basement of existing general housing buildings. Some wellhead sealing structures are installed in multiple places using bolt connections, which has low installation efficiency.
[0004] 2) Completely blocking the precipitation well without reserving space, the low-pressure water in the precipitation well will rise later and penetrate into the upper layer of the concrete layer, causing the blocking to fail.
[0005] 3) Many patents mention that a steel casing (tube) is installed above the precipitation well, but the outer wall of the casing is not treated with waterproofing and anti-corrosion. The inside of the precipitation well is dark and humid, and electrochemical corrosion is easy to occur on the metal outer wall. Over time, the steel casing and even the entire anti-seepage structure will be corroded, reducing the durability and usability of the device. Summary of the invention
[0006] The technical problem to be solved by the present invention is to provide a method for sealing a basement drainage well, which is easy to manufacture, has a low cost and is easy to construct and operate. Construction personnel only need to perform a few simple operations to complete the packaging of the steel cover plate and the pouring of concrete in a short time, thereby achieving the goal of quickly sealing the drainage well. In addition, it can also improve the structural strength and waterproof performance of the basement floor, which is safe and effective.
[0007] In order to solve the above technical problems, the technical solution adopted by the present invention is: A method for sealing a basement dewatering well comprises the following steps: Step 1) Place the wellhead cover. After the placement is completed, apply waterproof coating on the inner wall of the central through hole of the wellhead cover; Step 2) Install the casing: pre-weld the clamping ring and shear nails on the casing; apply waterproof coating to the side wall and bottom surface of the casing below the clamping ring, and then insert it into the central through hole of the wellhead cover and place it well; after ensuring that the casing is basically not skewed, apply waterproof coating to the junction between the casing and the wellhead cover and the clamping ring to prevent the slightest water infiltration.
[0008] Step 3) pouring concrete layer: according to the basement slab foundation concrete pouring construction design drawing, pouring construction of corresponding concrete layers is carried out, mainly including the construction of concrete cushion layer, waterproof layer and reinforced concrete slab; when constructing the reinforced concrete slab, reserve the cup mouth of the casing position, and fill it after the drainage well is sealed in the later stage.
[0009] Step 4) Install the sealing mechanism inside the casing: install the rubber pad and gasket on the support rod with the second nut; after fixing, apply waterproof coating on the end face of the tray at the bottom of the support rod; then, pick up the support rod and insert it into the casing until the lower round cake of the rubber pad is exposed outside the casing; then put on the supporting bracket, align the foot blocks with their respective grooves, buckle the first nut and continue to tighten it. As the bushing ring descends, the connecting rod is forced to transmit force to the foot block until the foot block is fully engaged and stable in the groove.
[0010] Step 5) Waterproofing measures: Inject a certain amount of epoxy resin into the casing, and then pour cement mortar with anti-seepage agent until the casing is filled. Let it stand for a while, and when the strength of the cement mortar reaches the design requirements, seal it; pad a layer of rubber gasket, and then cover it with a cover plate.
[0011] Step 6) Pouring of cup mouth concrete: Pour concrete on top of the cover plate to fill the cup mouth and form a whole with the surrounding concrete base plate.
[0012] The present invention provides a method for plugging a basement dewatering well, which has the following technical effects: 1) Place a wellhead cover on the precipitation well, place a steel casing on the wellhead cover, put a plugging mechanism in the steel casing, and lock it with a single nut, and finally pour the anti-seepage layer; the construction operation is convenient, and the construction personnel only need a few simple operations to complete the packaging of the steel cover and the pouring of concrete in a short time, which can achieve the goal of quickly plugging the precipitation well, safely and effectively.
[0013] 2) By pre-placing the manhole cover and steel casing, the surrounding concrete layer pouring construction can be completed first, and the cup mouth where the casing is located can be reserved at the end. After the precipitation well is sealed in the later stage, the landfill can be carried out to ensure that the precipitation well sealing construction and installation will not affect the thickness of a certain concrete pouring layer of the original design of the basement floor, so that the basement floor is connected as a whole, without protruding parts, and the whole is very flat.
[0014] 3) By welding shear nails on the outside of the steel casing, the shear nails are integrated with the surrounding concrete to form a whole; while the epoxy resin, cement mortar, etc. are injected into the steel casing. There is no chemical reaction between epoxy resin and cement mortar, and their physical properties are compatible, which improves the anti-infiltration performance of the steel casing itself. Through the combination of internal and external shear nails and anti-seepage layer, the structural strength and waterproof performance of the basement floor are guaranteed, and the durability and durability of the device are improved.
[0015] 4) By setting up a sealing mechanism and using rubber pads to seal the bottom of the steel casing, the injection of epoxy resin and cement mortar will not affect the precipitation well itself. This will reserve enough space for the precipitation well itself so that the low-pressure water at the bottom has enough storage space (if the injected material directly fills the precipitation well, the low-pressure water level will rise and damage the sealing parts and overflow to the surface of the basement).
[0016] 5) Use the support bracket to be detachably installed so that the support rod is fixed in the steel casing; use the rubber pad at the lower end of the steel casing to seal the bottom of the steel casing; during the whole process, the sealing mechanism can be disassembled, so that before the concrete in the cup mouth is poured, the sealing mechanism can be disassembled, so that when water comes out of the well during the dewatering process, re-extraction can be carried out to avoid the water level rising and flooding into the foundation pit. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The present invention will be further described below in conjunction with the accompanying drawings and embodiments: Figure 1 It is a schematic diagram of the sleeve after installation in the present invention.
[0018] Figure 2 It is a schematic diagram of the internal blocking mechanism of the casing in the present invention.
[0019] Figure 3 It is a schematic diagram after the construction and pouring of the present invention is completed.
[0020] Figure 4 It is a schematic diagram of the blocking mechanism in the present invention.
[0021] Figure 5 It is a front view of the support rod in the present invention.
[0022] Figure 6 It is a schematic diagram of the supporting bracket in the present invention.
[0023] Figure 7 It is the main cross-sectional view of the rubber pad in the present invention.
[0024] Figure 8 It is the main cross-sectional view of the gasket in the present invention.
[0025] In the figure: a drainage well 1, a wellhead cover 2, a casing 3, a groove 4, a waterproof layer 5, a shear nail 6, a concrete cushion 7, a reinforced concrete bottom plate 8, a cover plate 9, a rubber gasket 10, a foot block 11, a support rod 12, a tray 13, a rubber pad 14, a gasket 15, a second nut 16, a lining ring 17, a first nut 18, a first anti-seepage layer 19, concrete 20, a connecting rod 21, a rotating shaft 22, a retaining ring 23, and a second anti-seepage layer 24. DETAILED DESCRIPTION
[0026] like Figure 1 As shown, a basement drainage well plugging device includes a well cover plate 2, which is a reinforced concrete structure. The outer diameter of the well cover plate 2 is the same as the outer diameter of the drainage well 1 (the diameter of the cover plate can only be slightly smaller than the well diameter at most. After the cover plate is covered, cement mortar needs to be applied to the gap to block the water seepage channel. If the diameter is large, it can only be applied from the bottom, which is not easy to apply. The eye can hardly see the application quality. Only when the diameter is the same or slightly smaller, it is easy to apply). A through hole is reserved in the center of the well cover plate 2, and the diameter of the through hole is slightly larger than the outer diameter of the casing 3. The casing 3 is a steel casing structure, and a clamping ring 23 is welded at the lower end of the outer wall of the casing 3. The outer wall of the clamping ring 23 is arc-shaped or linear (which is conducive to the fitting and connection between the steel sleeve and the cover plate surface at the corners). The bottom surface of the clamping ring 23 is horizontal, and the clamping ring 23 is circumferentially welded on the steel sleeve 3. When the casing 3 is inserted into the through hole of the wellhead cover plate 2, the casing 3 is supported by the clamping ring 23 and remains vertical to the end face of the wellhead cover plate 2.
[0027] like Figure 1 As shown, shear nails 6 are welded at the middle and upper part of the casing 3, which are evenly distributed along the circumference and have moderate spacing, so as to strengthen the integrity of the casing 3 and the surrounding concrete.
[0028] like Figure 3 As shown, a water blocking and anti-seepage mechanism is installed inside the casing 3, and the water blocking and anti-seepage mechanism includes a blocking mechanism and an anti-seepage structure. The blocking mechanism is fixedly or detachably installed inside the casing 3 and blocks the bottom of the casing 3 to preliminarily prevent groundwater intrusion; the anti-seepage structure includes a first anti-seepage layer 19 and a second anti-seepage layer 24 arranged in sequence from bottom to top, and the top of the casing 3 outside the second anti-seepage layer 24 is blocked by a cover plate 9 and concrete 20. The anti-seepage structure can completely isolate water from infiltration.
[0029] Specifically, if Figure 2-3 As shown, the plugging mechanism includes a support rod 12, and a supporting bracket is provided on the upper part of the support rod 12. The supporting bracket is clamped with the inner wall of the casing 3, and the supporting bracket supports the entire plugging mechanism to prevent it from falling into the well; a plugging member is installed at the lower part of the support rod 12, and the plugging member blocks the pipe opening of the casing 3 to prevent groundwater intrusion.
[0030] like Figure 2 , Figure 4-6As shown, the support bracket includes a liner ring 17, which is sleeved on the support rod 12 and can slide up and down along the support rod 12. At least three connecting rods 21 are arranged on the outer circumference of the liner ring 17, one end of the connecting rod 21 is hinged to the liner ring 17 through a rotating shaft 22, and the other end of the connecting rod 21 is hinged to the foot block 11 through the rotating shaft 22, and the foot block 11 is inserted into the corresponding groove 4 on the inner wall of the sleeve 3. During installation, the foot block 11 is first inserted into the groove 4, and then the liner ring 17 is moved downward. The liner ring 17 applies force downward through the connecting rod 21, gradually tightens the foot block 11, and then the first nut 18 is screwed downward, and the liner ring 17 is restricted from moving upward by the first nut 18, so as to achieve the purpose of tightening.
[0031] like Figure 2 , Figure 7-8 As shown, the blocking member includes a tray 13 , a rubber pad 14 and a gasket 15 .
[0032] The tray 13 is circular and fixedly connected to the support rod 12 , and is located at the bottom of the support rod 12 .
[0033] The rubber pad 14 includes a cylindrical upper part and a pancake-shaped lower part, wherein the maximum outer diameter of the pancake-shaped lower part is 2 mm to 5 mm larger than the inner diameter of the sleeve 3, and the diameter of the cylindrical upper part is the same as the inner diameter of the sleeve 3. A circular hole is left in the center of the rubber pad 14, and the diameter of the circular hole is slightly larger than the outer diameter of the support rod 12. The rubber pad 14 passes through the support rod 12 through the circular hole and is placed on the tray 13 at the bottom end of the support rod 12. The rubber pad 14 here is made of a harder material, is corrosion-resistant, and has less deformation when subjected to force.
[0034] The gasket 15 is cylindrical with a through hole in the center. The diameter of the through hole is slightly larger than the support rod 12. The gasket 15 passes through the support rod 12 through the through hole and is placed on the rubber pad 14, which is fixed by a second nut 16 to ensure that the rubber pad 14 is not deformed as a whole during the insertion into the sleeve 3.
[0035] like Figure 3 As shown, the first anti-seepage layer 19 is epoxy resin, and the second anti-seepage layer is cement mortar, slightly expansive concrete or fast-hardening concrete. The height of the epoxy resin injection does not exceed half of the height of the casing 3 (the epoxy resin mainly blocks the gaps below and around, and is water-proof and air-proof. It is not necessary to do too much. Too much will be a waste, so it is at most half). The cement mortar, slightly expansive concrete or fast-hardening concrete is mixed with an anti-seepage agent during mixing.
[0036] A method for plugging a basement dewatering well, the steps of which are as follows: Step 1), placement of the wellhead cover plate 2: the wellhead cover plate 2 needs to be made in the factory in advance, transported to the construction site in batches, and then placed. After the placement is completed, a waterproof coating needs to be applied to the inner wall of the central through hole of the wellhead cover plate 2.
[0037] Step 2), installation of casing 3: the clamping ring 23 and shear nail 6 on the casing 3 are welded in advance; then the part of the casing 3 below the clamping ring 23 and the bottom surface of the casing 3 are coated with waterproof coating, and finally inserted into the middle hole of the wellhead cover 2 and placed well, ensuring that the casing 3 is basically not skewed, and then the junction of the casing 3 and the wellhead cover 2 and the clamping ring 23 are coated with waterproof coating to prevent the formation of a channel for the infiltration of fine water.
[0038] Note: In steps 1) to 2), the wellhead cover plate 2 and the casing 3 can be pre-assembled and fixed in the factory, or they can be directly installed on the construction site without being assembled.
[0039] Step 3) Concrete layer pouring construction: According to the basement slab foundation concrete pouring construction design drawing, the corresponding concrete layer pouring construction is carried out, mainly including the construction of concrete cushion layer 7, waterproof layer 5, reinforced concrete bottom plate 8, such as Figure 2 When the reinforced concrete bottom plate 8 is constructed, a cup opening is reserved for the location of the casing 3, and the landfill is performed after the drainage well 1 is sealed.
[0040] Step 4) Installation of the sealing mechanism inside the casing 3: Pass the rubber pad 14 and the gasket 15 through the support rod 12 in sequence, and then tighten them with the second nut 16. After assembly, apply waterproof paint on the end surface of the tray 13 at the bottom of the support rod 12 to prevent groundwater erosion. Then, pick up the support rod 12 and insert it into the casing 3 until the lower round cake of the rubber pad 14 is exposed outside the casing 3, as shown in the following figure. Figure 2 Then, the support bracket is put on, the foot block 11 is aligned with the respective groove 4, and the first nut 18 is buckled and tightened continuously, and as the liner ring 17 descends, the connecting rod 21 is forced to transmit force to the foot block 11 until the foot block 11 and the groove 4 are completely engaged and stable.
[0041] Step 5), waterproofing measures: Next, inject a certain amount of epoxy resin into the casing 3, and make sure that the amount does not exceed half of the height of the casing 3. Then pour cement mortar with anti-seepage agent until the casing 3 is filled. Let it stand for a while, and when the strength of the cement mortar reaches the design requirements, seal it. Cover the cover plate 9, and before covering the cover plate 9, put a layer of rubber gasket 10 on the top surface of the casing 3.
[0042] Step 6), pouring of cup mouth concrete: pour concrete 20 on the cover plate 9 to fill the cup mouth and form a whole with the surrounding concrete bottom plate.
Claims
1. A method for plugging a basement drainage well, comprising the following steps: Step 1), placing the wellhead cover plate (2), after which a waterproof coating is applied to the inner wall of the central through hole of the wellhead cover plate (2); Step 2), installing the casing (3): pre-welding the clamping ring (23) and the shear nail (6) on the casing (3); applying a waterproof coating to the side wall and the bottom surface of the casing (3) below the clamping ring (23), and then inserting the casing (3) into the central through hole of the wellhead cover (2) and placing it; after ensuring that the casing (3) is basically not skewed, applying a waterproof coating to the junction between the casing (3) and the wellhead cover (2) and the clamping ring (23) to prevent the slightest water infiltration. Step 3), perform concrete layer pouring construction: perform corresponding concrete layer pouring construction according to the basement slab foundation concrete pouring construction design drawing, mainly including the construction of concrete cushion layer (7), waterproof layer (5), and reinforced concrete slab (8); wherein, when performing the construction of reinforced concrete slab (8), a cup mouth at the location of casing (3) is reserved, and landfill is performed after the drainage well (1) is sealed in the later stage. Step 4) Install the internal sealing mechanism of the sleeve (3): install the rubber pad (14) and the gasket (15) on the support rod (12) with the second nut (16); after fixing, apply waterproof coating on the end surface of the tray (13) at the bottom end of the support rod (12); then, pick up the support rod (12) and insert it into the sleeve (3) until the lower round cake of the rubber pad (14) is exposed outside the sleeve (3); then put on the supporting bracket, align the foot block (11) with the respective groove (4), buckle the first nut (18) and continue to tighten it, and as the lining ring (17) descends, the connecting rod (21) is forced to transmit force to the foot block (11) until the foot block (11) and the groove (4) are completely engaged and stable. Step 5), waterproofing measures: a certain amount of epoxy resin is then injected into the casing (3), and then cement mortar with anti-seepage agent is poured until the casing (3) is filled. The casing is left to stand for a period of time, and the cement mortar is sealed when the strength reaches the design requirements; a layer of rubber gasket (10) is placed, and then the cover plate (9) is covered. Step 6), pouring of cup mouth concrete: pouring concrete (20) on the cover plate (9) to fill the cup mouth and form a whole with the surrounding concrete bottom plate.