Construction method for matched use of split type anchor rod drill carriage and heading machine

By using a split-type anchor drilling rig and tunneling machine construction method, and utilizing a separate support platform and telescopic hydraulic cylinders to control the outriggers, safe and efficient tunnel excavation in low and narrow tunnels has been achieved, solving the safety hazards and low efficiency problems of using a monorail hydraulic anchor drilling rig and tunneling machine together.

CN119308686APending Publication Date: 2025-01-14JIANGXI LANXIANG HEAVY IND +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310861255.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-07-13
Publication Date
2025-01-14

AI Technical Summary

Technical Problem

When a monorail hydraulic anchor drilling rig is used in conjunction with a tunneling machine, it is difficult for the driver to operate and poses safety hazards when encountering low and narrow tunnels. It is also impossible to achieve "left and right passing" and affects construction efficiency.

Method used

The construction method adopts a split-type anchor drilling rig used in conjunction with a tunneling machine. The telescopic outriggers are controlled by a separate support platform and support cylinders to achieve simultaneous tunneling and support. The position of the support platform is adjusted by telescopic cylinders and rotary reducers, and hydraulic pipelines are quickly connected to adapt to different roadway cross sections and spacing.

Benefits of technology

It improved the safety and efficiency of tunnel excavation, realized parallel operation of "long excavation and long support" with single-cycle and multi-row spacing, and solved the construction problem of low and narrow tunnels.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119308686A_ABST
    Figure CN119308686A_ABST
Patent Text Reader

Abstract

The invention discloses a construction method for matched use of a split type anchor rod drill carriage and a heading machine, which comprises the following steps: the heading machine reaches a head-on working face and cuts the upper part of the working face, and the split type anchor rod drill carriage grabs a separated type support platform with a steel mesh and a steel belt; the separated supporting platform reaches the interior of the cutting space, and supporting legs are opened to temporarily support a top plate; the split type anchor rod drill carriage and the split type supporting platform are unhooked and retreat, and the heading machine continues to cut the lower portion of the working face; the split type anchor rod drill carriage carries out supporting operation; after the supporting operation is completed, the heading machine is driven to the working face to continue the construction of the next cycle; the defect that a single-rail hydraulic anchor rod drill carriage is used in cooperation with a heading machine is overcome, the separated supporting platform is fully utilized, and through separation and combination, construction safety is guaranteed, and roadway heading efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnel excavation, and in particular to a construction method in which a split anchor drilling vehicle is matched with a tunneling machine. Background Art

[0002] At present, in the process of tunnel excavation construction in my country, the matching of monorail hydraulic anchor drilling vehicle and tunnel boring machine has gradually begun to be used on a small scale. This monorail hanging equipment is suspended on the suspension rail at the top of the tunnel, with its own power, and moves forward and backward on the track; while the tunnel boring machine matched with it walks on the bottom plate of the tunnel. This tunnel excavation construction process using a monorail hydraulic anchor drilling vehicle and a tunnel boring machine does not have "left and right car errors", saves auxiliary time, and has higher operating efficiency. However, since the entire main frame of the monorail hydraulic anchor drilling vehicle is suspended above the tunnel boring machine cab during support, when encountering a low and narrow tunnel, the height space between the monorail anchor drilling vehicle frame and the tunnel boring machine cab is very small, and the tunnel boring machine driver cannot sit in the cab to operate, and the monorail anchor drilling vehicle frame is suspended above the tunnel boring machine cab for construction, there are also safety hazards, which is also an important factor restricting the popularization of the matching use of monorail hydraulic anchor drilling vehicles and tunnel boring machines.

[0003] Therefore, it is an urgent problem for technical personnel in this field to provide a split-type monorail hydraulic anchor drilling vehicle and a construction method for use with a tunnel boring machine to ensure construction safety, improve tunnel excavation efficiency, and realize a new method of single-cycle multi-row "long excavation and long branch" and "excavation and branch synchronization" parallel operation. Summary of the invention

[0004] The purpose of the present invention is to provide a construction method for matching a split anchor drilling vehicle with a tunnel boring machine, so as to achieve the purpose of improving the efficiency of safe and stable tunnel boring.

[0005] To achieve the above object, the present invention provides the following solutions:

[0006] A construction method for using a split anchor drilling vehicle in conjunction with a tunnel boring machine comprises the following steps:

[0007] The tunnel boring machine reaches the head-on working face and cuts the upper part of the working face.

[0008] After cutting the upper space of one or more anchor bolts or anchor cable rows, the split anchor drilling vehicle grabs the separate support platform with steel mesh and steel belt, passes through the upper part of the tunneling machine, and the separate support platform reaches the cutting space, unfolds the separate support platform and fixes the steel mesh and steel belt on the top plate of the tunnel;

[0009] The split anchor drilling vehicle is uncoupled from the separate support platform and retreats, and the tunnel boring machine continues to cut the lower part of the working surface;

[0010] After the cutting is completed, the tunnel boring machine retreats to a position where it does not affect the construction of the split anchor drilling vehicle;

[0011] The split anchor drilling vehicle performs support operations;

[0012] After the support operation is completed, the tunnel boring machine moves to the working face to continue the next cycle of construction.

[0013] Preferably, the support operation steps of the split-type anchor drilling vehicle include: driving the split-type anchor drilling vehicle to the working surface, opening the anchor drilling arm, drilling anchor holes or anchor cable holes, and anchoring construction.

[0014] Preferably, the separate support platform comprises a leg seat, a plurality of telescopic legs arranged at the bottom of the leg seat, a support base arranged at the top of the leg seat, a plurality of longitudinal beams arranged on the support base and extending in a direction perpendicular to the leg seat, and support plates arranged on the plurality of longitudinal beams, the plurality of telescopic legs are hinged to the leg seat, a support cylinder is arranged on the leg seat, one end of the support cylinder is hinged to the leg seat, and the other end is slidably connected to the telescopic legs, the longitudinal beam comprises a fixed beam body and a folding beam body, a first telescopic cylinder is arranged in the fixed beam body along the direction of the fixed beam body, the first telescopic cylinder is connected to the folding beam body, a second telescopic cylinder is arranged inside the support base, and the fixed beam body is arranged on the piston rod of the telescopic cylinder and is perpendicular to the telescopic cylinder.

[0015] Preferably, the folding beam body comprises a first folding beam section and a second folding beam section hinged to each other, and a third telescopic cylinder on which the beam sections are respectively arranged on the first folding beam section and the second folding beam section.

[0016] Preferably, the telescopic leg comprises a shell hinged to the leg seat, a fourth telescopic oil cylinder disposed in the shell, and a supporting leg connected to the piston rod of the fourth telescopic oil cylinder.

[0017] Preferably, it also includes a manual flip valve seat for controlling the first telescopic oil cylinder, the second telescopic oil cylinder, the third telescopic oil cylinder and the fourth telescopic oil cylinder.

[0018] Preferably, it also includes a support arm assembly, which includes a hinge seat, a telescopic outer arm hinged to the hinge seat, a telescopic inner arm connected through a fifth telescopic cylinder, a translation seat, a rotary reducer, a rotating seat, a telescopic beam, a slide rail guide groove and a sixth telescopic cylinder, the telescopic inner arm is connected to the translation seat at one end away from the fifth telescopic cylinder, the translation seat is provided with a rotary reducer, the rotary reducer is provided with a rotating seat, the telescopic beam is installed on the rotating seat through the slide rail guide groove and the telescopic cylinder, the hinge seat is used to be connected to the main frame of the monorail anchor drilling rig, and the telescopic beam is used to be clamped with the leg seat.

[0019] Preferably, a sixth telescopic cylinder is provided between the telescopic outer wall and the hinge seat.

[0020] Preferably, a seventh telescopic oil cylinder is provided between the translation seat and the telescopic inner arm.

[0021] Preferably, the rotary reducer can rotate 360°.

[0022] Compared with the prior art, the present invention has achieved the following technical effects:

[0023] 1. The present invention provides a split monorail hydraulic anchor drilling vehicle and a construction method for use with a tunnel boring machine to make up for the defects of the monorail hydraulic anchor drilling vehicle and the construction method for use with a tunnel boring machine, make full use of the split support platform, and through separation and combination, support while excavating, ensure construction safety, and improve tunnel excavation efficiency.

[0024] 2. The telescopic legs in the present invention can be controlled by the supporting oil cylinder to fold, stow and open the telescopic legs. The telescopic legs are opened perpendicular to the ground and are adjusted to a suitable telescopic distance by the telescopic oil cylinder to support the ground. The net can be easily hung and the tunnel roof can be effectively supported to prevent the roof from falling and collapsing. The supporting base of the supporting platform can adjust the left and right longitudinal beams laterally by controlling the inner telescopic oil cylinder. The middle longitudinal beam is connected by bolts and the installation position can be adjusted according to the spacing requirements of the tunnel anchor rods and cables. It can adapt to various tunnel sections and various spacings between anchor rods and cables.

[0025] 3. In the present invention, the telescopic beam is installed on the rotating seat through the slide rail guide groove and the telescopic cylinder. The telescopic beam can be driven by the cylinder to loosen and clamp the support base of the support platform, and the rotating seat can be used to grab or place the support platform at any angle through the rotary reducer, so as to achieve the effect of separating and combining the support platform.

[0026] 4. In the present invention, the hydraulic pipeline can be connected by a quick connector during separation, which can be quickly plugged in and out, and quickly connected and cut off the hydraulic pipeline; when the main body of the monorail anchor drilling rig retreats, the hydraulic pipeline of the working face tunneling machine can also be quickly connected to control the various actions of the support platform; the arm assembly is used to adjust the up and down, left and right positions or the axial angle swing of the support platform. When the track beam is not centered, the support platform can be centered by swinging the arm assembly, which is suitable for the construction requirements of various different tunnels; the folding telescopic beam is installed in the left and right longitudinal beams and the middle longitudinal beam through the telescopic cylinder, and can be slid back and forth in each longitudinal beam by controlling the telescopic cylinder, and the front flip beam can be controlled to open and fold by the folding cylinder. It is the key technology for the implementation of the single-cycle long excavation and long support method: it can quickly support the empty top area after the tunneling machine cuts the tunnel into depth, and when it cuts the middle and lower part of the tunnel, as the tunnel height is extended and the tunnel may be deformed, parallel excavation and support operations are realized. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0028] Attached Figure 1 is a flow chart of the present invention;

[0029] Attached Figure 2 This is the main view of the lane;

[0030] Attached Figure 3 This is a top view of the lane;

[0031] Attached Figure 4 This is the main view of the support platform;

[0032] Attached Figure 5 It is a side view of the support platform;

[0033] Attached Figure 6 This is a top view of the support platform;

[0034] Attached Figure 7 is a structural schematic diagram of the arm assembly;

[0035] Attached Figure 8 It is a structural schematic diagram of the connection between the support platform and the main frame of the monorail anchor drilling rig through the support arm assembly;

[0036] Among them, 1. Support plate; 2. First telescopic cylinder; 3. Support cylinder; 4. Fourth telescopic cylinder; 5. Manual flip valve seat; 6. Second folding beam section; 7. First folding beam section; 8. Second telescopic cylinder; 9. Support base; 10. Longitudinal beam; 11. Rotary reducer; 12. Translation seat; 13. Eighth telescopic cylinder; 14. Telescopic inner arm; 15. Telescopic outer wall; 16. Hinge seat; 17. Fifth telescopic cylinder; 18. Seventh telescopic cylinder; 19. Sixth telescopic cylinder; 20. Slide rail guide groove; 21. Telescopic beam; 22. Third telescopic cylinder; 23. Split anchor drilling vehicle; 24. Tunneling machine. DETAILED DESCRIPTION

[0037] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0038] The purpose of the present invention is to provide a construction method for matching a split anchor drilling vehicle with a tunnel boring machine, so as to achieve the purpose of improving the efficiency of safe and stable tunnel boring.

[0039] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.

[0040] refer to Figures 1 to 3 A construction method for using a split anchor drilling vehicle in conjunction with a tunnel boring machine, comprising the following steps: the tunnel boring machine arrives at the head-on working face and cuts the upper part of the working face; after cutting the upper space of one or more anchor bolts or anchor cable rows, the split anchor drilling vehicle grabs a separate support platform with a steel mesh and steel belt, passes through the upper part of the tunnel boring machine, the separate support platform arrives in the cutting space, unfolds the separate support platform and fixes the steel mesh and steel belt on the top plate of the tunnel; the split anchor drilling vehicle is unhooked from the separate support platform and retreats, and the tunnel boring machine is The machine continues to cut the lower part of the working face; after the cutting is completed, the tunnel boring machine retreats to a position where it does not affect the construction of the split anchor drilling vehicle; the split anchor drilling vehicle performs support operations; after the support operations are completed, the tunnel boring machine drives to the working face to continue the next cycle of construction; the present invention provides a split monorail hydraulic anchor drilling vehicle and a construction method for use with a tunnel boring machine to make up for the defects of the monorail hydraulic anchor drilling vehicle and the use with a tunnel boring machine, excavating and supporting at the same time, making full use of the separate support platform, and ensuring construction safety and improving tunnel excavation efficiency through separation and combination.

[0041] Furthermore, after the support operation is completed, after survey, when there is space between the support platform and the next working face for the tunnel boring machine to carry out construction on the upper part of the working face, the split anchor drilling vehicle moves forward and grabs the separated support platform, the separated support platform shrinks, and the split anchor drilling vehicle drives the separated support platform forward to the next working face, and the tunnel boring machine drives to the working face to continue the next cycle of construction; when after survey, when there is not enough space between the support platform and the working face to provide the tunnel boring machine with construction on the upper part of the working face, the split anchor drilling rig first grabs the separated support platform and retreats, and then after the tunnel boring machine drives to the working face to carry out construction in the upper space, the split anchor drilling rig grabs the separated support platform and moves forward to the upper space of the working face.

[0042] refer to Figures 4 to 8, a separated support platform comprises a leg seat, a plurality of telescopic legs arranged at the bottom of the leg seat, a support base arranged at the top of the leg seat, a plurality of longitudinal beams arranged on the support base and extending in a direction perpendicular to the leg seat, and support plates arranged on the plurality of longitudinal beams, the plurality of telescopic legs are hinged to the leg seat, a support cylinder is arranged on the leg seat, one end of the support cylinder is hinged to the leg seat, and the other end is slidably connected to the telescopic legs, the longitudinal beam comprises a fixed beam body and a folding beam body, a first telescopic cylinder is arranged in the fixed beam body along the direction of the fixed beam body, the first telescopic cylinder is connected to the folding beam body, the support base A second telescopic cylinder is arranged inside, and the fixed beam body is arranged on the piston rod of the telescopic cylinder and is perpendicular to the telescopic cylinder. In the present invention, the telescopic legs can be controlled to be folded, stowed and opened by the supporting cylinder. The telescopic legs are opened perpendicular to the ground and are adjusted to a suitable telescopic distance by the telescopic cylinder to support the ground, so that the net can be hung conveniently and the tunnel roof can be effectively supported to prevent the roof from falling and collapsing. The supporting base of the supporting platform can adjust the left and right longitudinal beams laterally by controlling the inner telescopic cylinder. The middle longitudinal beam adopts a bolt connection form, and the installation position can be adjusted according to the spacing requirements of the tunnel anchor rods and cables, and can adapt to various tunnel sections and various spacings of anchor rods and cables.

[0043] refer to Figure 4 The folding beam body includes a first folding beam section and a second folding beam section hinged to each other, and a third telescopic cylinder respectively arranged on the first folding beam section and the second folding beam section.

[0044] refer to Figure 4 The telescopic leg includes a shell hinged to the leg seat, a fourth telescopic oil cylinder arranged in the shell, and a supporting leg connected to the piston rod of the fourth telescopic oil cylinder.

[0045] refer to Figure 4 , and also includes a manual flip valve seat for controlling the first telescopic oil cylinder, the second telescopic oil cylinder, the third telescopic oil cylinder and the fourth telescopic oil cylinder.

[0046] refer to Figures 7 and 8, also includes a support arm assembly, the support arm assembly includes a hinge seat, a telescopic outer arm hinged to the hinge seat, a telescopic inner arm connected by a fifth telescopic oil cylinder, a translation seat, a rotary reducer, a rotating seat, a telescopic beam, a slide rail guide groove and a sixth telescopic oil cylinder, the telescopic inner arm is connected to the translation seat at one end away from the fifth telescopic oil cylinder, the translation seat is provided with a rotary reducer, the rotary reducer is provided with a rotating seat, the telescopic beam is installed on the rotating seat through the slide rail guide groove and the telescopic oil cylinder, the hinge seat is used to be connected to the main frame of the monorail anchor drilling rig, and the telescopic beam is used to be clamped with the leg seat; the telescopic beam is installed on the rotating seat through the slide rail guide groove and the telescopic oil cylinder, the telescopic beam can be driven by the oil cylinder to loosen and clamp the support base of the support platform, and the rotary reducer can be used to enable the rotating seat to grab or place the support platform at any angle, so as to achieve the separation and combination of the support platform. Effect: When separated, the hydraulic pipeline can be connected with a quick connector, which can be quickly plugged in and out, and quickly connected and cut off the hydraulic pipeline; when the main body of the monorail anchor drilling rig retreats, the hydraulic pipeline of the working face tunneling machine can also be quickly connected to control the various actions of the support platform; the arm assembly is used to adjust the up and down, left and right positions or the axial angle swing of the support platform. When the track beam is not centered, the support platform can be centered by swinging the arm assembly, which is suitable for the construction requirements of various different tunnels; the folding telescopic beam is installed in the left and right longitudinal beams and the middle longitudinal beam through the telescopic cylinder. It can slide back and forth in each longitudinal beam by controlling the telescopic cylinder, and the front flip beam can be controlled to open and fold by the folding cylinder. It is the key technology for the implementation of the single-cycle long excavation and long support method: it can quickly support the empty top area after the tunneling machine cuts the tunnel into depth, and when it cuts the middle and lower part of the tunnel, as the tunnel height is extended and the tunnel may be deformed, parallel excavation and support operations are realized.

[0047] refer to Figure 7 A seventh telescopic oil cylinder is arranged between the telescopic outer wall and the hinge seat.

[0048] refer to Figure 7 An eighth telescopic oil cylinder is arranged between the translation seat and the telescopic inner arm.

[0049] Furthermore, the slewing reducer can be rotated 360°.

[0050] Adaptive changes made according to actual needs are all within the protection scope of the present invention.

[0051] It should be noted that it is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.

Claims

1. A construction method for using a split anchor drilling vehicle in conjunction with a tunnel boring machine, characterized in that: The following steps are involved: The tunnel boring machine reaches the head-on working face and cuts the upper part of the working face. After cutting the upper space of one or more anchor bolts or anchor cable rows, the split anchor drilling vehicle grabs the separate support platform with steel mesh and steel belt, passes through the upper part of the tunneling machine, and the separate support platform reaches the cutting space, unfolds the separate support platform and fixes the steel mesh and steel belt on the top plate of the tunnel; The split anchor drilling vehicle is uncoupled from the separate support platform and retreats, and the tunnel boring machine continues to cut the lower part of the working surface; After the cutting is completed, the tunnel boring machine retreats to a position where it does not affect the construction of the split anchor drilling vehicle; The split anchor drilling vehicle performs support operations; After the support operation is completed, the tunnel boring machine moves to the working face to continue the next cycle of construction.

2. The construction method of using a split anchor drilling vehicle in conjunction with a tunnel boring machine according to claim 1, characterized in that: The supporting operation steps of the split anchor drilling vehicle include: driving the split anchor drilling vehicle to the working surface, opening the anchor drilling arm, drilling anchor or anchor cable holes, and anchoring construction.

3. The construction method of using a split anchor drilling vehicle in conjunction with a tunnel boring machine according to claim 1, characterized in that: The separate support platform comprises a leg seat, a plurality of telescopic legs arranged at the bottom of the leg seat, a support base arranged at the top of the leg seat, a plurality of longitudinal beams arranged on the support base and extending in a direction perpendicular to the leg seat, and support plates arranged on the plurality of longitudinal beams. The plurality of telescopic legs are hinged to the leg seat, a support cylinder is arranged on the leg seat, one end of the support cylinder is hinged to the leg seat, and the other end is slidably connected to the telescopic legs, the longitudinal beam comprises a fixed beam body and a folding beam body, a first telescopic cylinder is arranged in the fixed beam body along the direction of the fixed beam body, the first telescopic cylinder is connected to the folding beam body, a second telescopic cylinder is arranged inside the support base, and the fixed beam body is arranged on the piston rod of the telescopic cylinder and is perpendicular to the telescopic cylinder.

4. The construction method of using a split anchor drilling vehicle in conjunction with a tunnel boring machine according to claim 3, characterized in that: The folding beam body comprises a first folding beam section and a second folding beam section hinged to each other, and a third telescopic cylinder on which the beam sections are respectively arranged.

5. The construction method of using a split anchor drilling vehicle in conjunction with a tunnel boring machine according to claim 4, characterized in that: The telescopic leg comprises a shell hinged to the leg seat, a fourth telescopic oil cylinder arranged in the shell, and a supporting leg connected to the piston rod of the fourth telescopic oil cylinder.

6. The construction method of using a split anchor drilling vehicle in conjunction with a tunnel boring machine according to claim 4, characterized in that: It also includes a manual flip valve seat for controlling the first telescopic oil cylinder, the second telescopic oil cylinder, the third telescopic oil cylinder and the fourth telescopic oil cylinder.

7. The construction method of using a split anchor drilling vehicle in conjunction with a tunnel boring machine according to claim 3, characterized in that: It also includes an arm assembly, which includes a hinge seat, a telescopic outer arm hinged to the hinge seat, a telescopic inner arm connected through a fifth telescopic cylinder, a translation seat, a rotary reducer, a rotating seat, a telescopic beam, a slide rail guide groove and a sixth telescopic cylinder, the telescopic inner arm is connected to the translation seat at one end away from the fifth telescopic cylinder, the translation seat is provided with a rotary reducer, the rotary reducer is provided with a rotating seat, the telescopic beam is installed on the rotating seat through the slide rail guide groove and the telescopic cylinder, the hinge seat is used to be connected to the main frame of the monorail anchor drilling rig, and the telescopic beam is used to be clamped with the leg seat.

8. The construction method of using a split anchor drilling vehicle in conjunction with a tunnel boring machine according to claim 7, characterized in that: A sixth telescopic oil cylinder is arranged between the telescopic outer wall and the hinge seat.

9. The construction method of using a split anchor drilling vehicle in conjunction with a tunnel boring machine according to claim 7, characterized in that: A seventh telescopic oil cylinder is arranged between the translation seat and the telescopic inner arm.

10. The construction method of using a split anchor drilling vehicle in conjunction with a tunnel boring machine according to claim 7, characterized in that: The rotary reducer can rotate 360 ​​degrees.