A road surface transverse drainage device and installation method
By installing steel gutters and steel structures on the road surface, the problem of lateral drainage in small sections of the road arch is solved, effective integration of water flow conduits and the road surface is achieved, the risk of traffic accidents is reduced and the service life of the road surface is extended.
Patent Information
- Application Number
- CN202010204086.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-03-21
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2040-03-21
AI Technical Summary
In the design of high-grade highways, road sections with small road crown slopes lead to chaotic lateral drainage and water accumulation that cannot be effectively removed. Especially on two-way multi-lane highways, traffic accidents are prone to occur, and long-term water accumulation affects the durability of the road structure.
Design a pavement transverse drainage device, including steel water channels, anchor bolts, adjusting nuts and positioning nuts, which are fixed in the transverse grooves of the pavement structural layer through the anchor bolts, adjusting nuts and positioning nuts, and tied with longitudinal and transverse steel bars. Pouring cement concrete integrates the drainage channel with the road surface to form an effective drainage system.
It effectively solves the lateral drainage problem of road sections with small road crown slopes. It has simple technology, low cost, little impact on vehicle driving, beautiful appearance and can improve the durability of the road structure.
Smart Images

Figure CN111255049B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a road surface transverse drainage device and an installation method. Background Art
[0002] Water accumulation on the road surface can cause vehicles to skid and drift when driving at high speeds, leading to frequent traffic accidents. Therefore, generally, roads will be set up with transverse road humps that are biased toward the outside of the roadbed to facilitate the removal of water accumulation. However, in the design of high-grade roads, in order to ensure driving comfort and safety, super-high road humps are often used, that is, the road humps are biased toward the inside of the roadbed. When the general road section transitions to the over-road section, a section with no transverse road humps or a very small road humps slope will be formed, and the road drainage of this section will be chaotic. The accumulated water flowing outward along the longitudinal slope of the route needs to change direction and flow inward. The fluid movement is disordered and water accumulation is inevitable, especially on two-way six-lane or eight-lane highways. Due to the wide transverse width of the road and poor drainage capacity, the problem of water accumulation becomes more and more obvious. Therefore, in heavy rain weather, traffic accidents are very likely to occur on sections with small road humps and poor transverse drainage. In addition, long-term water accumulation will also affect the durability of the pavement structure layer and shorten the service life of the pavement.
[0003] In view of the above technical problems, it is necessary to research and develop a simple, beautiful, and less interfering lateral drainage device for vehicles to effectively solve the problem of water accumulation on roads with smaller road humps and slopes. Summary of the invention
[0004] In order to solve the technical problems in the background technology, the present invention provides a road surface lateral drainage device and an installation method, which can effectively eliminate the lateral drainage problem caused by the small lateral road crown slope of the road, and the process and method are simple, the cost is low, and the operation is easy, and the impact on the appearance of the road surface and vehicle driving is small.
[0005] In order to achieve the above technical objectives, the present invention adopts the following technical solutions:
[0006] A pavement transverse drainage device comprises a water trough, a plurality of anchor bolts, a plurality of adjusting nuts and a plurality of positioning nuts, wherein the water trough is provided with drainage holes on its upper surface, an adjusting nut and a positioning nut are installed on each anchor bolt, the water trough is fixed in a transverse groove on the surface of a pavement structure layer by means of the anchor bolts, the adjusting nuts and the positioning nuts, longitudinal steel bars and transverse steel bars are tied around the water trough, and cement concrete is poured to integrate the water trough with the pavement structure.
[0007] The anchor bolts are M12-M20 bolts, with a total bolt length of 200-800 mm and an anchoring length of 120-750 mm.
[0008] The transverse groove has a width of 500 to 800 mm and a depth of 100 to 300 mm.
[0009] The water flow trough is a steel water flow trough.
[0010] The steel water flow trough is welded by component A and component B. Component A is an inverted U-shaped steel part, which is made by cold-bent steel plate rolling or hot-rolled steel plate welding, or standard channel steel is selected, with a web width of 80 to 200 mm, a thickness of 4 to 10 mm, a flange width of 50 to 150 mm, and a thickness of 4 to 10 mm; component B is made of 5 to 12 mm thick steel plate and has a width of 150 to 500 mm.
[0011] The web of component A of the steel water trough should be provided with drainage holes with a diameter of 10 to 15 mm. The drainage holes are arranged in a square or triangle shape with a spacing of 20 to 40 mm.
[0012] A row of bolt holes is arranged on both sides of the component B of the steel water flow channel, with a bolt hole diameter of 16 to 24 mm and a spacing of 150 to 300 mm.
[0013] A method for installing a road lateral drainage device should be carried out according to the following specific steps:
[0014] Step 1: Make component A, which is an inverted U-shaped steel member, made by cold-bent steel plate rolling or hot-rolled steel plate welding or directly using standard channel steel, with a web width of 80-200 mm, a thickness of 4-10 mm, a flange width of 50-150 mm, and a thickness of 4-10 mm;
[0015] Step 2: Drill drainage holes on the web of component A. The diameter of the drainage holes is 10-15 mm. They are arranged in a square or triangle shape with a spacing of 20-40 mm.
[0016] Step 3: Make component B. Component B is made of 5-12mm thick steel plate and 150-500mm wide. Bolt holes should be drilled on component B with a hole diameter of 16-24mm, one row on each side, 20-60mm away from the edge, and a spacing of 150-300mm.
[0017] Step 4: Weld component A and component B to form a water flow channel;
[0018] Step 5: Dig a trench horizontally on the surface of the pavement structure layer with a width of 500-800mm and a depth of 100-300mm. Clean the surface of the trench after digging.
[0019] Step 6: Drill holes at the corresponding bolt positions in the grooves, with a hole diameter of 40-90mm and a depth of 130-760mm, insert anchor bolts, and use M20-M40 cement mortar or pure slurry for anchoring after adjusting the position. Use M12-M20 bolts for anchor bolts, with a total length of 200-800mm and an anchoring length of 120-750mm.
[0020] Step 7: After the cement mortar or slurry reaches the design strength, install an adjusting nut on each anchor bolt, and then install the water trough. All anchor bolts are required to be inserted into the bolt holes reserved on component B. Twist all adjusting nuts to make the height of the water trough flush with the road surface. Install a positioning nut on each anchor bolt, and finally use the positioning nut to fix the position;
[0021] Step 8: Pour cement slurry to initially fix the water trough. Use M20-M40 cement slurry for pouring. When pouring, ensure that the bottom of the steel plate of component B and the area around the bolts are dense;
[0022] Step 9: Tie the longitudinal reinforcement along the route and the transverse reinforcement perpendicular to the route. The diameter of the reinforcement is Φ8-16mm, the spacing between the longitudinal reinforcement is 100-400mm, and the spacing between the transverse reinforcement is 60-120mm.
[0023] Step 10: Pour C40-C60 cement concrete to integrate the water channel with the pavement structure. After maintenance, the water channel installation is completed and traffic is open.
[0024] The present invention can effectively eliminate the lateral drainage problem caused by the small lateral road crown slope of the road, and has simple process and method, low cost, easy operation, and little impact on the appearance of the road surface and vehicle driving. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a schematic diagram of the structure of the device of the present invention. DETAILED DESCRIPTION
[0026] The present invention will be further described below in conjunction with the accompanying drawings.
[0027] like Figure 1 As shown, the pavement transverse drainage device of the present invention comprises a water trough 1, a plurality of anchor bolts 4, a plurality of adjusting nuts 3, and a plurality of positioning nuts 2, and is characterized in that: the upper surface of the water trough 1 is provided with drainage holes 1-3, and an adjusting nut 3 and a positioning nut 2 are installed on each anchor bolt 4. The water trough 1 is fixed in the transverse groove on the surface of the pavement structure layer by the anchor bolts 2, the adjusting nuts 3 and the positioning nuts 2. The longitudinal steel bars 5 and the transverse steel bars 6 are tied around the water trough 1, and cement concrete is poured to integrate the water trough 1 with the pavement structure. The anchor bolts are M20 bolts, with a total bolt length of 600mm and an anchoring length of 450mm. The transverse groove is 600mm wide and 200mm deep.
[0028] The water flow trough is a steel water flow trough. The steel water flow trough is welded by component A and component B. Component A is an inverted U-shaped steel part, which is rolled by cold-bent steel plate, or welded by hot-rolled steel plate, or a standard channel steel is selected, with a web width of 100mm, a thickness of 6mm, a flange width of 80mm, and a thickness of 6mm; component B is made of 6mm thick steel plate with a width of 300mm. The web of component A of the steel water flow trough should be provided with drainage holes with a diameter of 15mm. The drainage holes are arranged in a square or triangular shape with a spacing of 20mm. A row of bolt holes are arranged on both sides of component B of the steel water flow trough, with a bolt hole diameter of 22mm and a spacing of 150mm.
[0029] A method for installing a road lateral drainage device should be carried out according to the following specific steps:
[0030] Step 1: Make component A. Component A is an inverted U-shaped steel member, which is rolled from cold-bent steel plates, with a web width of 100 mm and a thickness of 6 mm, and a flange width of 80 mm and a thickness of 6 mm;
[0031] Step 2: Drill drainage holes on the web of component A. The diameter of the drainage holes is 15 mm. They are arranged in a square or triangle shape with a spacing of 20 mm.
[0032] Step 3: Make component B. Component B is made of 6mm thick steel plate and 300mm wide. Bolt holes should be drilled on component B with a hole diameter of 22mm, one row on each side, 20mm away from the edge, and 150mm apart;
[0033] Step 4: Weld component A and component B to form a water flow channel;
[0034] Step 5: Dig a trench horizontally on the surface of the pavement structure layer with a width of 600mm and a depth of 200mm. Clean the surface of the trench after digging.
[0035] Step 6. Drill holes at the corresponding positions of the bolts in the grooves, with a hole diameter of 40mm and a depth of 450mm, insert the anchor bolts, and use M20 cement mortar or pure mortar for anchoring after adjusting the position. The anchor bolts are M20 bolts, with a total length of 600mm and an anchoring length of 450mm.
[0036] Step 7: After the cement mortar or slurry reaches the design strength, install an adjusting nut on each anchor bolt, and then install the water trough. All anchor bolts are required to be inserted into the bolt holes reserved on component B. Twist all adjusting nuts to make the height of the water trough flush with the road surface. Install a positioning nut on each anchor bolt, and finally use the positioning nut to fix the position;
[0037] Step 8: Pour cement slurry to initially fix the water trough. Use M40 cement slurry for pouring. When pouring, ensure that the bottom of the steel plate of component B and the area around the bolts are dense;
[0038] Step 9: Tie the longitudinal reinforcement along the route and the transverse reinforcement perpendicular to the route. The diameter of the reinforcement is Φ8mm, the spacing between the longitudinal reinforcement is 200mm, and the spacing between the transverse reinforcement is 60mm.
[0039] Step 10: Pour C40 cement concrete to integrate the gutter with the pavement structure. After maintenance, the gutter is installed and open to traffic.
Claims
1. A method for installing a road transverse drainage device, the road transverse drainage device comprising a water trough, a plurality of anchor bolts, a plurality of adjusting nuts, and a plurality of positioning nuts, the upper surface of the water trough is provided with drainage holes, an adjusting nut and a positioning nut are installed on each anchor bolt, the water trough is fixed in a transverse groove on the surface of a road surface structure layer by the anchor bolts, the adjusting nuts and the positioning nuts, longitudinal steel bars and transverse steel bars are tied around the water trough, and cement concrete is poured to integrate the water trough with the road surface structure; Features Follow these steps: Step 1: Make component A, which is an inverted U-shaped steel member, made by cold-bent steel plate rolling or hot-rolled steel plate welding or directly using standard channel steel, with a web width of 80-200 mm, a thickness of 4-10 mm, a flange width of 50-150 mm, and a thickness of 4-10 mm; Step 2: Drill drainage holes on the web of component A. The diameter of the drainage holes is 10-15 mm. They are arranged in a square or triangle shape with a spacing of 20-40 mm. Step 3: Make component B. Component B is made of 5-12mm thick steel plate and 150-500mm wide. Bolt holes should be drilled on component B with a hole diameter of 16-24mm, one row on each side, 20-60mm away from the edge, and a spacing of 150-300mm. Step 4: Weld component A and component B to form a water flow channel; Step 5: Dig a trench horizontally on the surface of the pavement structure layer with a width of 500-800mm and a depth of 100-300mm. Clean the surface of the trench after digging. Step 6: Drill holes at the corresponding bolt positions in the grooves, with a hole diameter of 40-90mm and a depth of 130-760mm, insert anchor bolts, and use M20-M40 cement mortar or pure slurry for anchoring after adjusting the position. Use M12-M20 bolts for anchor bolts, with a total length of 200-800mm and an anchoring length of 120-750mm. Step 7: After the cement mortar or slurry reaches the design strength, install an adjusting nut on each anchor bolt, and then install the water trough. All anchor bolts are required to be inserted into the bolt holes reserved on component B. Twist all adjusting nuts to make the height of the water trough flush with the road surface. Install a positioning nut on each anchor bolt, and finally use the positioning nut to fix the position; Step 8: Pour cement slurry to initially fix the water trough. Use M20-M40 cement slurry for pouring. When pouring, ensure that the bottom of the steel plate of component B and the area around the bolts are dense; Step 9: Tie the longitudinal reinforcement along the route and the transverse reinforcement perpendicular to the route. The diameter of the reinforcement is Φ8-16mm, the spacing between the longitudinal reinforcement is 100-400mm, and the spacing between the transverse reinforcement is 60-120mm. Step 10: Pour C40-C60 cement concrete to integrate the water channel with the pavement structure. After maintenance, the water channel installation is completed and traffic is open.
Citation Information
Patent Citations
Installation and construction method of grate support, installation fittings and drain, and attached draining separating tank
CN102234975A
Road surface transverse drainage device
CN212053129U