A pre-buried foundation and manufacturing method for a high-precision large antenna
By using a modularly designed pre-embedded foundation structure and precise installation methods, the issues of size, cost, and precision of large antenna installation foundations have been resolved, achieving efficient, low-cost, and high-precision installation.
Patent Information
- Application Number
- CN202010293049.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-04-15
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2040-04-15
AI Technical Summary
Traditional large antenna mounting foundations suffer from problems such as dimensions exceeding transportation requirements, high costs, poor rigidity, difficulty in guaranteeing accuracy, complex structures, and difficulty in interchangeability.
The embedded foundation structure consists of multiple basic templates and embedded parts, connected by anchor bolts and nuts. It is precisely installed and adjusted using GPS, leveling instruments and digital photogrammetry systems, achieving modular design and high-precision fixing.
It achieves high precision, low cost, easy transportation and interchangeability of large antenna mounting foundations, improves installation efficiency and reduces manufacturing costs.
Smart Images

Figure CN111364500B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of radar antennas, and in particular to a pre-buried foundation and a manufacturing method for a high-precision large antenna. Background Art
[0002] With the rapid development of my country in the fields of satellite communications and space exploration, large radars and antennas are playing an increasingly important role. The relevant technologies have higher and higher requirements for the position accuracy, reliability and low cost of large antenna installation foundations. On the premise of meeting the performance indicators, how to achieve a large span, high precision and high efficiency of the antenna installation foundation is an urgent problem to be solved in the project.
[0003] The traditional large-scale antenna installation foundation adopts the structure of an integral prefabricated template. The structure of the integral prefabricated template is installed on the antenna foundation for positioning. The main disadvantages are as follows:
[0004] ① Suitable for prefabricated templates for large antenna installation foundations, the scale is far beyond the transportation requirements and the cost is too high.
[0005] ② Poor stiffness, easy to produce elastic deformation, difficult to achieve high precision.
[0006] ③The overall structure is complex, and the on-site installation and adjustment efficiency is low.
[0007] ④It is difficult to achieve complete interchangeability among the constituent units of the foundation. Summary of the invention
[0008] In view of this, the present invention provides a pre-buried foundation for a high-precision large antenna and a manufacturing method. Compared with the pre-buried foundation of the existing large antenna, the pre-buried foundation has the characteristics of high precision, high rigidity, low cost, easy transportation, and high interchangeability.
[0009] In order to achieve the above object, the technical solution adopted by the present invention is:
[0010] A foundation embedded structure for a high-precision large antenna comprises a plurality of foundation templates for splicing into a circle and a first foundation embedded part for connecting two adjacent foundation templates, each first foundation embedded part comprises a connecting plate located at an upper portion, a guide plate located at a lower portion and at least three anchor bolts, the anchor bolts in the same first foundation embedded part all pass through the same guide plate and the same connecting plate; both ends of the foundation template are provided with high-precision connecting holes, the adjacent ends of the two adjacent foundation templates pass through the corresponding anchor bolts of the corresponding first foundation embedded part through their respective high-precision connecting holes, and are jointly fixed to the connecting plate of the first foundation embedded part, the guide plate and the foundation template and the connecting plate fixed together are clamped on the anchor bolts through two sets of upper and lower foundation nuts.
[0011] Furthermore, the base template is located above the connecting plate.
[0012] Furthermore, the basic template is provided with evenly distributed weight-reducing holes.
[0013] Furthermore, a second foundation embedded part is provided in the middle of each foundation template, and the second foundation embedded part includes a guide plate located at the lower part and at least three anchor bolts. The anchor bolts in the same second foundation embedded part all pass through the same guide plate. The middle part of the foundation template also has a high-precision connecting hole. The foundation template passes the anchor bolts of the corresponding second foundation embedded part through the high-precision connecting hole in the middle, and is clamped on the anchor bolts by two sets of upper and lower foundation nuts.
[0014] Furthermore, an adjustment plate is provided on the top of the first foundation embedded part, and at least three arc-shaped oblong holes are provided on the adjustment plate surrounding the central axis of the first foundation embedded part. The anchor bolts of the first foundation embedded part pass through the corresponding arc-shaped oblong holes on the adjustment plate respectively, and the adjustment plate is clamped on the top of the anchor bolts through two sets of upper and lower adjustment nuts; at least three vertical studs are also provided on the upper surface of the adjustment plate.
[0015] A foundation embedded part of a high-precision large antenna comprises a connecting plate at an upper portion, a guide plate at a lower portion, an adjustment plate at a top portion and at least three anchor bolts, wherein the anchor bolts all pass through the same guide plate, the same connecting plate and the same adjustment plate; the guide plate, the connecting plate and the adjustment plate are all clamped on the anchor bolts by two sets of upper and lower foundation nuts; the adjustment plate is provided with an arc-shaped oblong hole corresponding to the anchor bolt, and the upper surface of the adjustment plate is also provided with a vertical stud; the adjustment plate is also provided with a ball node with a bottom plate, and the bottom plate of the ball node is provided with a radial oblong hole corresponding to the stud, and the inner diameter of the radial oblong hole is larger than the inner diameter of the stud.
[0016] A pre-embedded foundation for a high-precision large antenna comprises a plurality of pre-embedded foundation parts as described above which are evenly distributed on the same circumference and fixed in a cast body, wherein only the part of the pre-embedded foundation parts above the ball node bottom plate is exposed outside the cast body.
[0017] A method for manufacturing a pre-buried foundation for a high-precision large antenna, used to manufacture the pre-buried foundation as described above, comprises the following steps:
[0018] Step 1: Determine the maximum dimensions and specifications of the anchor bolts according to the user's performance index requirements and finite element analysis results; use cold-rolled steel to process the guide plate, and connect the anchor bolts and the guide plate through standard nuts and washers to form an anchor bolt group;
[0019] Step 2: According to the distribution position of the anchor bolt group and the mechanical simulation results, determine the pitch circle diameter size and connection position of the foundation template, and design the connection plate and foundation template in turn; use cold-rolled steel plates to process the connection plate and foundation template; process high-precision connection holes and process holes on the foundation template and connection plate, and the position accuracy of the high-precision connection holes is controlled within ±3mm; the process holes of the foundation template correspond to the process holes of the connection plate;
[0020] Step 3: Use GPS equipment to accurately calibrate the antenna foundation piles where the anchor bolts are placed. After placing the anchor bolts in sequence on the calibrated antenna foundation piles, install the connecting plates on each anchor bolt group in sequence, and then install the foundation template on the anchor bolt group, and fix the foundation template to the connecting plate through process holes and bolts; use a level to adjust the horizontality of the foundation template, and finally fix the foundation template and the connecting plate on the anchor bolts through foundation nuts;
[0021] Step 4: After the foundation formwork is installed in place, pouring and settlement are carried out. The top position of the pouring body is located at the upper surface of the foundation formwork. After the settlement meets the requirements, all foundation formworks are removed, and then adjustment plates are installed on the top of each anchor bolt group;
[0022] Step 5: Use a digital photogrammetry system to accurately measure the coordinates of the bottom ball node of the antenna skeleton. The bottom ball node has a bottom plate. According to the measurement results, the bottom ball node is adjusted circumferentially by adjusting the arc-shaped oblong hole of the plate; in addition, the ball node is adjusted in the radial direction through the radial oblong hole on the bottom plate of the ball node; with the help of a level, the ball node is adjusted in the normal direction by adjusting the nuts on the upper and lower sides of the plate; after repeated measurement and adjustment until the ball node reaches a position accuracy of 1mm, the ball node is fixed in the final position by nuts and washers;
[0023] Step six, after the adjustment in step five is completed, secondary pouring and settlement are carried out. After the secondary pouring, the top position of the cast body is located at the bottom plate of the ball node.
[0024] The beneficial effects of the above technical solution of the present invention are:
[0025] 1. The present invention performs coarse adjustment on the antenna skeleton installation foundation through a basic template, and performs fine adjustment on the antenna skeleton installation foundation through an adjustment plate, thereby achieving a higher position and posture accuracy of a large-scale antenna skeleton installation foundation.
[0026] 2. All the components of the embedded foundation of the present invention have realized modular and standardized design, and the same parts are completely interchangeable and easy to transport.
[0027] 3. During the manufacturing process of the embedded foundation of the present invention, the position of each foundation embedded part is constrained by a foundation template, thereby improving the position accuracy of the foundation embedded parts. In addition, after one pouring, the foundation template can be removed to achieve reuse of the foundation template, thereby reducing the processing and manufacturing cost of the embedded foundation. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a schematic diagram of the structure of the antenna frame and the embedded foundation in an embodiment of the present invention.
[0029] Figure 2 It is a schematic diagram of the foundation pre-buried structure in an embodiment of the present invention.
[0030] Figure 3 yes Figure 2 Schematic diagram of the partial structure of a foundation embedded part.
[0031] Figure 4 It is a cross-sectional view of a basic embedded part in an embodiment of the present invention.
[0032] Figure 5 It is a schematic diagram of a circular structure formed by a basic template in an embodiment of the present invention.
[0033] Figure 6 Schematic diagram of a connecting plate in an embodiment of the present invention.
[0034] Figure 7 Schematic diagram of a ball node in an embodiment of the present invention.
[0035] Figure 8 Schematic diagram of an adjustment plate in an embodiment of the present invention
[0036] In the figure: 1. foundation formwork group, 2. foundation embedded parts, 3. foundation formwork, 4. connecting plate, 5. anchor bolts, 6. adjustment plate, 7. guide plate. DETAILED DESCRIPTION
[0037] The present invention is further described below in conjunction with the accompanying drawings and specific embodiments.
[0038] A foundation embedded structure for a high-precision large antenna comprises a plurality of foundation templates 3 for splicing into a circle and a first foundation embedded part 2 for connecting two adjacent foundation templates, each first foundation embedded part comprises a connecting plate 4 located at the top, a guide plate 7 located at the bottom and at least three anchor bolts 5, the anchor bolts 5 in the same first foundation embedded part all pass through the same guide plate 7 and the same connecting plate 4; both ends of the foundation template are provided with high-precision connecting holes, the adjacent ends of two adjacent foundation templates 3 pass through the corresponding anchor bolts 5 of the corresponding first foundation embedded part through their respective high-precision connecting holes, and are jointly fixed to the connecting plate 4 of the first foundation embedded part, the guide plate 7 and the foundation template 3 and the connecting plate 4 fixed together are clamped on the anchor bolts 5 through two sets of upper and lower foundation nuts.
[0039] The base template 3 is located above the connecting plate 4 .
[0040] The basic template is also provided with evenly distributed weight-reducing holes.
[0041] A second foundation embedded part is also provided in the middle of each foundation template. The second foundation embedded part includes a guide plate located at the lower part and at least three anchor bolts. The anchor bolts in the same second foundation embedded part all pass through the same guide plate. The middle part of the foundation template also has a high-precision connecting hole. The foundation template passes the anchor bolts of the corresponding second foundation embedded part through the high-precision connecting hole in the middle, and is clamped on the anchor bolts by two sets of upper and lower foundation nuts.
[0042] An adjustment plate is also provided on the top of the first foundation embedded part, and at least three arc-shaped oblong holes surrounding the central axis of the first foundation embedded part are provided on the adjustment plate. The anchor bolts of the first foundation embedded part pass through the corresponding arc-shaped oblong holes on the adjustment plate 6 respectively, and the adjustment plate is clamped on the top of the anchor bolts through two sets of upper and lower adjustment nuts; at least three vertical studs are also provided on the upper surface of the adjustment plate.
[0043] A foundation embedded part of a high-precision large antenna, comprising a connecting plate at the top, a guide plate at the bottom, an adjustment plate 6 at the top and at least three anchor bolts, wherein the anchor bolts all pass through the same guide plate, the same connecting plate and the same adjustment plate; the guide plate, the connecting plate and the adjustment plate are all clamped on the anchor bolts by two sets of upper and lower foundation nuts; the adjustment plate is provided with an arc-shaped oblong hole corresponding to the anchor bolt, and the upper surface of the adjustment plate is also provided with a vertical stud; the adjustment plate 6 is also provided with a ball node with a bottom plate, and the bottom plate of the ball node is provided with a radial oblong hole corresponding to the stud, and the inner diameter of the radial oblong hole is larger than the inner diameter of the stud.
[0044] A pre-embedded foundation for a high-precision large antenna comprises a plurality of foundation pre-embedded parts as claimed in claim 6 which are evenly distributed on the same circumference and fixed in a cast body, wherein only the part of the foundation pre-embedded parts above the bottom plate of the ball node is exposed outside the cast body.
[0045] A method for manufacturing a pre-buried foundation for a high-precision large antenna, used to manufacture the pre-buried foundation as described above, comprises the following steps:
[0046] Step 1: Determine the maximum dimensions and specifications of the anchor bolts according to the user's performance index requirements and finite element analysis results; use cold-rolled steel to process the guide plate, and connect the anchor bolts and the guide plate through standard nuts and washers to form an anchor bolt group;
[0047] Step 2: According to the distribution position of the anchor bolt group and the mechanical simulation results, determine the pitch circle diameter size and connection position of the foundation template, and design the connection plate and foundation template in turn; use cold-rolled steel plates to process the connection plate and foundation template; process high-precision connection holes and process holes on the foundation template and connection plate, and the position accuracy of the high-precision connection holes is controlled within ±3mm; the process holes of the foundation template correspond to the process holes of the connection plate;
[0048] Step 3: Use GPS equipment to accurately calibrate the antenna foundation piles where the anchor bolt groups are placed. After the anchor bolts are placed in sequence on the calibrated antenna foundation piles, the connecting plates are installed on the anchor bolt groups in sequence. Then, the foundation template is installed on the anchor bolt groups, and the foundation template is fixedly connected to the connecting plate through process holes and bolts to form a foundation template group 1. The horizontality of the foundation template is adjusted with the help of a level meter, and finally the foundation template group 1 is fixed to the anchor bolts through the foundation nuts.
[0049] Step 4: After the foundation formwork is installed in place, pouring and settlement are carried out. The top position of the pouring body is located at the upper surface of the foundation formwork. After the settlement meets the requirements, all foundation formworks are removed, and then adjustment plates are installed on the top of each anchor bolt group;
[0050] Step 5: Use a digital photogrammetry system to accurately measure the coordinates of the bottom ball node of the antenna skeleton. The bottom ball node has a bottom plate. According to the measurement results, the bottom ball node is adjusted circumferentially by adjusting the arc-shaped oblong hole of the plate; in addition, the ball node is radially adjusted through the radial oblong holes on the bottom plate of the ball node; with the help of a level, the ball node is axially adjusted by adjusting the nuts on the upper and lower sides of the plate; after repeated measurement and adjustment until the ball node reaches a position accuracy of 1mm, the ball node is finally fixed in position by nuts and washers;
[0051] Step six, after the adjustment in step five is completed, secondary pouring and settlement are carried out. After the secondary pouring, the top position of the cast body is located at the bottom plate of the ball node.
[0052] The following is a more specific embodiment:
[0053] Reference Figures 1 to 6 The best embodiment of the present invention takes the embedded foundation with an equivalent diameter of 8 meters as an example. Figure 1 It is a schematic diagram of the basic pre-embedded structure installation structure of the antenna according to an embodiment of the present invention; it includes basic pre-embedded parts of the array and a basic template group.
[0054] This embodiment is a pre-embedded foundation structure for a high-precision sliced large-scale antenna. It proposes a two-level adjustment principle of coarse adjustment of the foundation template group and fine adjustment of the adjustment plate, achieving a high posture accuracy of the large-scale antenna skeleton installation foundation. At the same time, it also greatly reduces the processing and manufacturing costs while ensuring the accuracy of the large-scale antenna foundation, and is easy to adjust. This pre-embedded foundation overcomes the defects of high cost and complex adjustment of traditional integral template components. All component units of the pre-embedded foundation of the antenna have realized modular and standardized design, and the same parts are completely interchangeable. This meets the requirements of high precision, high rigidity, low cost, easy transportation, good interchangeability, and high reliability of the pre-embedded foundation of large-scale antennas.
[0055] S1: Design and manufacture anchor bolt sets.
[0056] In the embodiment, 12 groups of anchor bolts are composed of guide plates and anchor bolts. There are 12 groups of guide plates, which are circular plates with a thickness of 10 mm and are made by machining from commercially available steel plate Q345B; there are 48 groups of anchor bolts, which are M36 and are made by machining from commercially available round steel 20. Four groups of anchor bolts and one group of guide plates are connected by commercially available standard nuts and washers to form one group of anchor bolts.
[0057] S2: Design and manufacture basic template.
[0058] In the embodiment, the basic template group is composed of a connecting plate and a basic template. There are 12 groups of connecting plates, which are short arc plates with a thickness of 12mm, with process holes with a diameter of φ500 distributed in the center, and are made by machining on commercially available steel plate Q345B material; there are 6 groups of sliced basic templates, which are long arc plates with a thickness of 12mm, with 10 process holes with a diameter of φ500 evenly distributed in the circumferential direction, and are made by machining on commercially available steel plate Q345B material. After the basic template is assembled in the factory, a series of high-precision connecting holes are processed with the help of special tooling, and the position accuracy of the high-precision connecting holes is controlled within ±3mm; the process holes of the basic template correspond one-to-one with the connecting plates, thereby completing the manufacture of the basic template.
[0059] S3: Design and manufacture adjustment plate set:
[0060] In the embodiment, the adjustment plate group is composed of an adjustment plate and a stud. There are 12 groups of adjustment plates, with specifications of 12mm thick circular plates, and evenly distributed arc-shaped oblong holes on the adjustment plates. They are made by machine processing of commercially available steel plates Q345B; there are 48 groups of studs, which are made of commercially available bolts, and the specifications are M36 full-threaded ordinary bolts. With the help of special tooling, the studs are welded to the corresponding positions of the adjustment plates in sequence, thereby completing the manufacture of the adjustment plate group. There are four groups of reference installation points P1-P4 on each adjustment plate. The posture coordinates of the reference installation points P1-P4 directly reflect the circumferential position accuracy of the center of the antenna skeleton base.
[0061] S4: Design and manufacture antenna frame.
[0062] According to the technical indicators of the customer and the theoretical calculation results, the outline size and distribution position of the antenna skeleton are determined. The antenna skeleton is composed of a main support truss and a ball node at the bottom. The main support truss and the ball node are designed in sequence; the main support truss is manufactured by welding commercially available round steel and steel plates, the ball node is cast by commercially available cast steel, and the ball node is welded at the corresponding position of the main support truss with the help of special tooling; the bottom of the ball node is equipped with a radial oblong hole as the reference installation point, thereby completing the manufacture of the antenna skeleton.
[0063] The main support truss is welded from commercially available round steel 20 and steel plate Q345B, and the ball node is cast and processed from commercially available cast steel Z340. There are four sets of reference installation points P5-P8 at the bottom of each ball node. The position coordinates of the reference installation points P5-P8 directly reflect the radial position accuracy of the center of the antenna skeleton base.
[0064] S5: Install the embedded foundation.
[0065] 12 groups of anchor bolts are installed one by one in the 12 pre-calibrated antenna piles, and the pitch circle diameter of the center of the 12 antenna piles is 12360mm. The connecting plates are installed in the corresponding positions of the anchor bolts in turn, and the foundation template is flattened with the help of special tooling; the connecting plates and the foundation template are staggered and connected at the corresponding connection positions, and the horizontality of the upper surface of the foundation template is adjusted with the help of a level, and finally the standard parts are fixed at the corresponding positions of the connecting plates and the foundation template; after the foundation template group is installed in place, the adjustment plate group is installed at the corresponding positions of the anchor bolts, and the antenna skeleton is installed in turn at the corresponding connection positions above the adjustment plate group; finally, the corresponding connection positions of the adjustment plate group and the ball node are fixed with bolts; thereby determining the relative position of the antenna skeleton installation foundation, and realizing the rough adjustment of the antenna skeleton installation foundation posture. The high-precision connection holes in the foundation template ensure that the radial and circumferential position tolerances of the antenna skeleton installation foundation meet the order of ±3mm.
[0066] In the embodiment, the connecting plates are sequentially installed to the corresponding positions on the upper part of the anchor bolt assembly, and then the foundation template and the pre-installed connecting plates are staggered and connected at the corresponding connection positions; with the help of a level, the horizontality of the upper surface of the foundation template is within 10″ by longitudinally moving the adjusting nuts of the anchor bolts located on the upper surface of the foundation template and the lower surface of the connecting plates; finally, the standard parts are fixed at the corresponding positions of the connecting plates and the foundation template.
[0067] S6: After the foundation formwork group is installed in place, a layer of pouring foundation is formed.
[0068] After the above steps in the embodiment are completed, a pouring is performed at the corresponding position of the foundation according to the relevant "Building Construction Specifications", and natural settlement is carried out according to the national standard; after the settlement conditions meet the requirements, the foundation templates are removed in turn, and the manufacturing of the pouring foundation is completed. The total height of the pouring foundation is 1860mm, and the top position is located at the upper surface of the foundation template group.
[0069] S7: Install the adjustment plate assembly and antenna frame.
[0070] After that, the adjustment plate group is installed at the corresponding position of the anchor bolt, and the antenna frame is installed in turn at the corresponding connection position of the adjustment plate group; finally, the corresponding connection positions of the 12 adjustment plate groups and the 12 ball nodes are fixed with bolts; thereby determining the relative position of the antenna frame installation foundation.
[0071] S7: Fine-tune the basic installation position of the antenna frame.
[0072] The measurement pier is set at the external position of the antenna frame, and the coordinates of the antenna frame foundation installation point are accurately measured using a digital photogrammetry system. Based on the measurement results, the circumferential adjustment of the antenna frame foundation installation point position can be achieved through the arc-shaped oblong hole of the adjustment plate; the radial adjustment of the antenna frame foundation installation point position can be achieved through the radial oblong hole of the ball node; the normal adjustment of the antenna frame foundation installation point position can be achieved by adjusting the nuts on the upper and lower sides of the plate with the help of a level. Repeated measurement and adjustment until each antenna frame foundation installation point reaches a position accuracy of 1mm, and then fix it with nuts and washers to complete the fine adjustment of the antenna frame installation foundation position.
[0073] S8: After the antenna frame installation foundation is fine-tuned into place, the second layer of casting foundation is formed.
[0074] In the embodiment, after the antenna skeleton installation foundation is fine-tuned, the secondary pouring is carried out at the primary pouring position according to the relevant "Building Construction Specifications", and natural settlement is carried out according to the national standard; after the settlement conditions meet the requirements, the secondary pouring foundation is manufactured. The total height of the secondary pouring foundation is 300mm, and the top position is flush with the bottom of the ball node.
[0075] The above is only the best embodiment of the present invention and does not limit the present invention in any way. Any simple modification, change and equivalent structural change made to the above embodiment based on the technical essence of the present invention still falls within the protection scope of the technical solution of the present invention.
Claims
1. A basic pre-buried structure for high-precision large antennas. It is characterized in that It comprises a plurality of basic templates for splicing into a circle and a first basic embedded part for connecting two adjacent basic templates, each of the first basic embedded parts comprises a connecting plate located at the upper part, a guide plate located at the lower part and at least three anchor bolts, and the anchor bolts in the same first basic embedded part all pass through the same guide plate and the same connecting plate; both ends of the basic template are provided with high-precision connecting holes, and the adjacent ends of the two adjacent basic templates pass through the corresponding anchor bolts of the corresponding first basic embedded parts through their respective high-precision connecting holes and are jointly fixed to the connecting plate of the first basic embedded part, and the guide plate and the basic template and the connecting plate fixed together are clamped on the anchor bolts through two sets of upper and lower basic nuts; A second foundation embedded part is also provided in the middle of each foundation template. The second foundation embedded part includes a guide plate at the bottom and at least three anchor bolts. The anchor bolts in the same second foundation embedded part all pass through the same guide plate. The middle of the foundation template also has a high-precision connection hole. The foundation template passes the anchor bolts of the corresponding second foundation embedded part through the high-precision connection hole in the middle, and is clamped on the anchor bolts through two sets of upper and lower foundation nuts. An adjustment plate is also provided on the top of the first foundation embedded part, and at least three arc-shaped oblong holes are provided on the adjustment plate surrounding the central axis of the first foundation embedded part. The anchor bolts of the first foundation embedded part pass through the corresponding arc-shaped oblong holes on the adjustment plate respectively, and the adjustment plate is clamped on the top of the anchor bolts through two sets of upper and lower adjustment nuts; at least three vertical studs are also provided on the upper surface of the adjustment plate.
2. The pre-buried foundation structure of a high-precision large antenna according to claim 1, It is characterized in that The basic template is located above the connecting plate.
3. The pre-buried foundation structure of a high-precision large antenna according to claim 1, It is characterized in that The basic template is also provided with evenly distributed weight-reducing holes.
4. A method for manufacturing a pre-embedded foundation for a high-precision large antenna, which is used to manufacture a pre-embedded foundation, wherein the pre-embedded foundation includes multiple foundation embedded parts evenly distributed on the same circumference and fixed in a cast body, wherein only the part of the foundation embedded part above the ball node bottom plate is exposed outside the cast body; The foundation embedded part comprises a connecting plate at the top, a guide plate at the bottom, an adjustment plate at the top and at least three anchor bolts, and the anchor bolts all pass through the same guide plate, the same connecting plate and the same adjustment plate; the guide plate, the connecting plate and the adjustment plate are all clamped on the anchor bolts by two sets of upper and lower foundation nuts; the adjustment plate is provided with an arc-shaped oblong hole corresponding to the anchor bolt, and the upper surface of the adjustment plate is also provided with a vertical stud; the adjustment plate is also provided with a ball node with a bottom plate, and the bottom plate of the ball node is provided with a radial oblong hole corresponding to the stud, and the inner diameter of the radial oblong hole is larger than the inner diameter of the stud; It is characterized in that The following steps are involved: Step 1: Determine the maximum dimensions and specifications of the anchor bolts according to the user's performance index requirements and finite element analysis results; use cold-rolled steel to process the guide plate, and connect the anchor bolts and the guide plate through standard nuts and washers to form an anchor bolt group; Step 2: According to the distribution position of the anchor bolt group and the mechanical simulation results, determine the pitch circle diameter size and connection position of the foundation template, and design the connection plate and foundation template in turn; use cold-rolled steel plates to process the connection plate and foundation template; process high-precision connection holes and process holes on the foundation template and connection plate, and the position accuracy of the high-precision connection holes is controlled within ±3mm; the process holes of the foundation template correspond to the process holes of the connection plate; Step 3: Use GPS equipment to accurately calibrate the antenna foundation piles where the anchor bolts are placed. After placing the anchor bolts in sequence on the calibrated antenna foundation piles, install the connecting plates on each anchor bolt group in sequence, and then install the foundation template on the anchor bolt group, and fix the foundation template to the connecting plate through process holes and bolts; use a level to adjust the horizontality of the foundation template, and finally fix the foundation template and the connecting plate on the anchor bolts through foundation nuts; Step 4: After the foundation formwork is installed in place, pouring and settlement are carried out. The top position of the pouring body is located at the upper surface of the foundation formwork. After the settlement meets the requirements, all foundation formworks are removed, and then adjustment plates are installed on the top of each anchor bolt group; Step 5: Use a digital photogrammetry system to accurately measure the coordinates of the bottom ball node of the antenna skeleton. The bottom ball node has a bottom plate. According to the measurement results, the bottom ball node is adjusted circumferentially by adjusting the arc-shaped oblong hole of the plate; in addition, the ball node is radially adjusted through the radial oblong holes on the bottom plate of the ball node; with the help of a level, the ball node is axially adjusted by adjusting the nuts on the upper and lower sides of the plate; after repeated measurement and adjustment until the ball node reaches a position accuracy of 1mm, the ball node is finally fixed in position by nuts and washers; Step six, after the adjustment in step five is completed, secondary pouring and settlement are performed. After the secondary pouring, the top position of the cast body is located at the bottom plate of the ball node.