A roadbed transition structure
Through the combined structure of filler subgrade, transitional subgrade, retaining board and box subgrade, the problem of high volume and high cost of the subgrade transition structure is solved, and the structure is lightweight and universally improved.
Patent Information
- Application Number
- CN202010356157.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-04-29
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2040-04-29
AI Technical Summary
The transition section of the existing subgrade transition structure has a large volume, high cost, low universality, and is difficult to effectively reduce.
The combined structure of filler subgrade, transitional subgrade, retaining board and box subgrade is used. The transition section is formed by connecting the retaining board with the transitional subgrade and box subgrade, thereby reducing the volume and project cost of the transition section.
This reduces the volume and cost of the subgrade transition structure, while improving its universality and being suitable for various types of subgrade connections.
Smart Images

Figure CN111395085B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of roadbed engineering, and more specifically, relates to a roadbed transition structure. Background Art
[0002] The roadbed transition structure is a special section set up between the two to achieve the connection and transition between roadbeds or between roadbeds and structures. Its structure includes a roadbed section and a transition section. The roadbed section is set at both ends of the transition section and connected to the transition section to ensure the smoothness and safety and reliability of the roadbed line. The relevant roadbed transition structure has abutments set in the transition section. The abutments are large in volume and expensive in cost. They are mainly suitable for the connection between the bridge deck roadbed and other roadbeds, and have low universality. Summary of the invention
[0003] In view of this, the main purpose of the present invention is to provide a roadbed transition structure to solve the technical problem of how to reduce the volume of the transition section of the roadbed transition structure and the engineering cost.
[0004] To achieve the above object, the technical solution of the present invention is achieved as follows:
[0005] An embodiment of the present invention provides a roadbed transition structure, comprising: a filling roadbed; a transition roadbed, which is arranged at one end of the filling roadbed along the length extension direction of the filling roadbed, and the end face of one end of the transition roadbed contacts the end face of the one end of the filling roadbed; a retaining plate, which is arranged at the other end opposite to the one end of the transition roadbed and is fixedly connected to the end face of the other end; and a box-type roadbed, which is arranged adjacent to the retaining plate.
[0006] Furthermore, the box-type roadbed includes a top plate and at least two support members, wherein the top plate is connected to the top ends of the support members; wherein the retaining plate is adjacent to both the end faces of the top plate and the end faces of the support members.
[0007] Furthermore, the first side surface of the retaining plate is in contact with both the end surface of the top plate and the end surface of the support member, and the first side surface is perpendicular to the upper surface of the top plate.
[0008] Furthermore, the retaining plate has a second side surface that is in contact with the transition roadbed, and the second side surface is parallel to the first side surface.
[0009] Furthermore, the roadbed transition structure further comprises:
[0010] A first reinforcing rib is arranged in the retaining plate and the top plate;
[0011] The second reinforcing rib is arranged in the retaining plate, the extension direction of the second reinforcing rib is perpendicular to the extension direction of the first reinforcing rib, and the second reinforcing rib is fixedly connected to the end of the first reinforcing rib.
[0012] Furthermore, the box-type roadbed also includes a base plate, and the bottom ends of the at least two support members are connected to the base plate.
[0013] Furthermore, the roadbed transition structure further comprises:
[0014] A third reinforcing rib is arranged along the height direction of the retaining plate and in one end of the retaining plate and in the bottom plate;
[0015] The fourth reinforcing rib is arranged along the height direction of the retaining plate at the other end opposite to the one end of the retaining plate and in the top plate.
[0016] Furthermore, the roadbed transition structure further comprises:
[0017] A fifth reinforcing rib is arranged in the retaining plate, connecting the third reinforcing rib and the fourth reinforcing rib, and the extension direction of the fifth reinforcing rib is perpendicular to the extension directions of the third reinforcing rib and the fourth reinforcing rib;
[0018] a sixth reinforcing rib, arranged in the retaining plate, located at the one end of the retaining plate, and fixedly connected to the end of the third reinforcing rib;
[0019] The seventh reinforcing rib is arranged in the retaining plate, is located at the other end of the retaining plate, and is fixedly connected to the end of the fourth reinforcing rib.
[0020] Furthermore, the width of the first side surface is greater than the distance between two of the support members that are farthest apart.
[0021] Furthermore, the roadbed transition structure also includes a tapered slope, which is located at one end of the box-type roadbed along an extension direction perpendicular to the box-type roadbed and is arranged adjacent to both the retaining plate and the box-type roadbed.
[0022] A roadbed transition structure provided by the present invention includes a filling roadbed, a transition roadbed, a retaining plate and a box-type roadbed, wherein one side of the retaining plate is connected to the transition roadbed, and the other side is connected to the box-type roadbed. By arranging a transition roadbed and a retaining plate between the filling roadbed and the box-type roadbed, the transition roadbed and the retaining plate are combined to form a transition section of the roadbed transition structure, thereby realizing the connection and transition of the filling roadbed and the box-type roadbed. The retaining plate is small in size, light in weight, and easy to construct, thereby reducing the volume and engineering cost of the transition section of the roadbed transition structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is the principle schematic diagram of the relevant roadbed transition structure;
[0024] Figure 2 A schematic diagram of a roadbed transition structure according to an embodiment of the present invention;
[0025] Figure 3 It is a schematic cross-sectional view of a box-type roadbed structure in the aa direction;
[0026] Figure 4 It is a schematic cross-sectional view of another box-type roadbed structure in the aa direction;
[0027] Figure 5 for Figure 2 A partial enlarged schematic diagram of the structure at A in the middle;
[0028] Figure 6 A schematic diagram of the structure of the first reinforcing rib and the second reinforcing rib according to an embodiment of the present invention;
[0029] Figure 7 for Figure 6 A partial enlarged schematic diagram of the structure at B in the middle;
[0030] Figure 8 It is a schematic cross-sectional view of a box-type roadbed structure with a bottom plate in the aa direction;
[0031] Fig. 9 is a schematic structural diagram of a third reinforcing rib and a fourth reinforcing rib according to an embodiment of the present invention;
[0032] Fig.10 It is a schematic structural diagram of the fifth reinforcing rib, the sixth reinforcing rib and the seventh reinforcing rib according to an embodiment of the present invention;
[0033] Fig.11 for Fig.10 A partial enlarged schematic diagram of the structure at D in the middle;
[0034] Fig.12 for Fig.10 A partial enlarged schematic diagram of the structure at C in the middle;
[0035] Fig.13 It is a schematic cross-sectional view of the roadbed transition structure in the bb direction according to an embodiment of the present invention;
[0036] Fig.14 Schematic diagram of a cone slope according to an embodiment of the present invention.
[0037] Description of Reference Numerals
[0038] 1- non-transitional roadbed, 2-transitional roadbed, 3-filling roadbed, 31-filling roadbed subgrade surface layer, 32-filling roadbed subgrade bottom layer, 33-filling roadbed body, 4-retaining board, 41-first side, 42-second side, 5-box roadbed, 51-top plate, 52-support, 53-bottom plate, 61-first reinforcement rib, 62-second reinforcement rib, 63-third reinforcement rib, 64-fourth reinforcement rib, 65-fifth reinforcement rib, 66-sixth reinforcement rib, 67-seventh reinforcement rib, 7-conical slope, Q-bridge abutment, S-foundation, i-slope, L1-vertical height of slope, L2-horizontal width of slope, D1-spacing of support, D2-width of retaining board DETAILED DESCRIPTION
[0039] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0040] The various specific technical features described in the specific embodiments can be combined in any suitable manner without contradiction, for example, different embodiments and technical solutions can be formed by combining different specific technical features. In order to avoid unnecessary repetition, various possible combinations of the specific technical features in the present invention will not be described separately.
[0041] In the following description, the terms "first\second\..." are only used to distinguish different objects, and do not mean that the objects have the same or related points. It should be understood that the directions "above" and "below" are the directions in normal use. The extension direction refers to the length direction of the component.
[0042] It should be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or device including the element.
[0043] The roadbed transition structure provided in the embodiment of the present invention can play a role of transition and connection between different types of roadbeds or between roadbeds and structures, and can be used for connection between railway roadbeds or other roadbeds. It should be noted that the application scenario type in the present invention does not limit the present invention.
[0044] like Figure 1As shown, taking the railway roadbed transition structure as an example, the working principle of the roadbed transition structure is exemplified for the transition section composed of the transition roadbed 2 and the abutment Q. The roadbed transition structure may include a non-transition roadbed 1, a transition roadbed 2 and an abutment Q. The surface of the foundation S is roughly flat, and the non-transition roadbed 1 is arranged on the surface of the foundation S. The non-transition roadbed 1 may be a filler roadbed or a box-type roadbed. Along the extension direction of the length of the non-transition roadbed 1, the two side end faces of the non-transition roadbed 1 are surfaces with a certain inclination angle, which is called the side slope along the non-transition roadbed 1. The side slope structure can ensure the overall stability of the non-transition roadbed 1. The side slope has a certain slope. It should be noted that the side slope gradient i refers to the ratio of the vertical height L1 of the side slope to the horizontal width L2, which can also be expressed as 1:m, where m is the slope coefficient, which is the reciprocal of the side slope gradient i. The specific side slope gradient i value is set according to the actual needs of the project.
[0045] Along the length extension direction of the non-transitional roadbed 1, at a certain distance from the side slope of the non-transitional roadbed 1, abutments Q are set. It should be noted that abutments Q refer to buildings located at both ends of the bridge, supporting the upper structure of the bridge and connected to the roadbed. The upper top surface of abutment Q is roughly flush with the upper surface of the non-transitional roadbed 1. The transitional roadbed 2 is set in the space between abutment Q and the non-transitional roadbed 1, playing the role of filling the transition. Its own gravity can compact the side slope of the non-transitional roadbed 1. The upper surface of the transitional roadbed 2 is roughly flush with the upper top surface of abutment Q to achieve a smooth connection between abutment Q and the non-transitional roadbed 1. The end face of abutment Q close to the transitional roadbed 2 is perpendicular to the surface of the foundation S, and the vertical end face is in contact with the end face of the transitional roadbed 2. The end face of abutment Q away from the transitional roadbed 2 is an inclined surface. Abutment Q forms a structure with a heavy bottom and a light top, making the lower foundation of abutment Q more stable and not easy to overturn. Since the materials of the non-transition roadbed 1 and the transition roadbed 2 can be backfill or filler, their own properties are relatively loose and prone to deformation and displacement. The non-transition roadbed 1 can transfer the pressure of the backfill or filler to the transition roadbed 2, and the transition roadbed 2 further transfers the pressure to the abutment. The volume and weight of the abutment Q itself are very large, and together with the transition roadbed 2, it forms a transition section of the roadbed transition structure. The abutment Q leans against one side of the transition roadbed 2 to withstand the pressure of the transition roadbed 2 behind the abutment and the backfill or filler transferred from the non-transition roadbed 1 to the transition roadbed 2, preventing the non-transition roadbed 1 and the transition roadbed 2 from deforming and displacing along the extension direction of the roadbed length, thereby stabilizing the bridgehead roadbed and connecting the bridgehead roadbed and the roadbed on the bridge smoothly and reliably.
[0046] In the embodiment of the present invention, Figure 2As shown, the roadbed transition structure includes a filler roadbed 3. Specifically, the filler roadbed 3 may include: a filler roadbed subgrade surface layer 31, a filler roadbed subgrade bottom layer 32 and a filler roadbed body 33 are sequentially arranged from top to bottom in a direction perpendicular to the surface of the foundation S. It should be noted that the subgrade includes a subgrade surface layer and a subgrade bottom layer, and its range refers to the depth range below the railway subgrade surface that is affected by the dynamic load of the train and the hydrological and climatic changes in four seasons. The thickness of the filler roadbed 3 is the sum of the thickness of the filler roadbed subgrade surface layer 31, the filler roadbed subgrade bottom layer 32 and the filler roadbed body 33. The subgrade load borne by the filler roadbed 3 includes static load and dynamic load. The load is transmitted to the subgrade through the roadbed surface. Under the action of long-term load, the subgrade is prone to damage or excessive harmful deformation, thereby affecting normal railway transportation. Reasonable subgrade thickness design can provide the packing roadbed 3 with sufficient strength to resist dynamic stress, and can also make the plastic cumulative deformation of the packing roadbed 3 small to avoid uneven settlement. At the same time, it can also make its elastic deformation small to meet the safety and comfort of high-speed driving. The structure of the subgrade can be divided into two types: one is a two-layer system, which uses a roadbed directly connected to the soil subgrade, called a soil subgrade. It should be noted that the roadbed refers to the stone ballast cushion layer laid on the roadbed surface under the railway sleepers. The soil subgrade has high construction requirements and needs to be filled with high-quality fillers. The other is a multi-layer system, which uses a transition layer between the roadbed and the soil subgrade, also known as the subgrade surface layer, that is, the packing roadbed subgrade surface layer 31, which serves as a protective layer to improve the bearing capacity of the subgrade and eliminate subgrade diseases. The bottom layer 32 of the packing roadbed subgrade supports the surface layer 31 of the packing roadbed subgrade, and the roadbed load is transmitted step by step through each layer of the subgrade. The filler roadbed body 33 serves as the foundation of the filler roadbed 3, and its thickness is greater than the thickness of the filler roadbed subgrade surface layer 31 and the filler roadbed subgrade bottom layer 32, so as to provide a solid and stable support. Along the extension direction of the length of the filler roadbed 3, a side slope is provided at the end of the filler roadbed 3, and the side slope gradient i is 1:m. In an exemplary embodiment, the side slope gradient i can be 1:2.
[0047] like Figure 2As shown, the roadbed transition structure also includes a transition roadbed 2, which is arranged at one end of the filling roadbed 3 along the length extension direction of the filling roadbed 3. The end face of one end of the transition roadbed 2 contacts the end face of one end of the filling roadbed 3. The end face is the slope of the filling roadbed 3, that is, the transition roadbed 2 is arranged adjacent to the slope of the filling roadbed 3. The upper surface of the transition roadbed 2 is roughly flush with the upper surface of the filling roadbed 3 to achieve a smooth connection. The end face of the transition roadbed 2 that contacts the slope of the filling roadbed 3 is an inclined end face. The slope of the inclined end face is the same as the slope i of the filling roadbed 3. It can match the slope of the filling roadbed 3 to form a tight fit. The transition roadbed 2 compacts the slope of the filling roadbed 3 with its own gravity to prevent the slope of the filling roadbed 3 or the filling roadbed 3 from being deformed and displaced by the roadbed load. The other end face of the transition roadbed 2 away from the filling roadbed 3 is a vertical end face perpendicular to the surface of the foundation S, which is used to connect the retaining plate.
[0048] like Figure 2 As shown, the roadbed transition structure also includes a retaining plate 4, which is arranged at the other end opposite to one end of the transition roadbed 2 and is fixedly connected to the end face of the other end. That is, the retaining plate 4 is fixedly connected to the vertical end face of the transition roadbed 2. The upper top surface of the retaining plate 4 is roughly flush with the upper surface of the transition roadbed 2 to achieve a smooth connection. The contact surface between the retaining plate 4 and the transition roadbed 2 is roughly the same as the area of the vertical end face of the transition roadbed 2 to cover the vertical end face of the transition roadbed 2. The retaining plate 4 has a certain thickness to meet the strength and rigidity design requirements to withstand the transition roadbed 2 on one side of the retaining plate 4 and the fill or filling pressure transmitted from the filling roadbed 3 to the transition roadbed 2, so as to prevent the transition roadbed 2 and the filling roadbed 3 from deforming, shifting or even collapsing along the extension direction of the roadbed length.
[0049] like Figure 2 As shown, the roadbed transition structure also includes a box-type roadbed 5, which is arranged adjacent to the retaining plate 4. The box-type roadbed 5 is arranged on the surface of the foundation S along the extension direction of the roadbed length, and its end close to the retaining plate 4 abuts against the end face of the retaining plate 4, and the upper top surface of the box-type roadbed 5 is roughly flush with the upper top surface of the retaining plate 4. The end face of the retaining plate 4 close to the transition roadbed 2 is subjected to the pressure of the backfill or filler. When the pressure is too large, the retaining plate 4 may overturn and lose the function of resisting the backfill or filler. The box-type roadbed 5 is arranged at the other end face of the retaining plate 4 away from the transition roadbed 2. The box-type roadbed 5 structure itself has greater strength and rigidity, and is not easily deformed by external forces. The box-type roadbed 5 can transfer its own tension to the retaining plate 4 along the length direction of the roadbed, forming an opposite force to the backfill or filler pressure, providing a support point for the retaining plate 4 to resist the backfill or filler pressure from the transition roadbed 2 and from the filler roadbed 3 to the transition roadbed 2.
[0050] like Figure 1As shown, the abutment Q structure in the relevant roadbed transition structure is very large in size and weight, with large engineering workload and high cost. It is mainly applicable to the connection between the bridge deck roadbed and other roadbeds, and is not universal. The retaining plate of the embodiment of the present invention is small in size, light in weight, easy to construct, and can be applied to various types of roadbed connections, with good universality.
[0051] The embodiment of the present invention arranges a filling roadbed 3, a transition roadbed 2, a retaining plate 4 and a box-type roadbed 5 on the surface of the foundation S, wherein the transition roadbed 2 and the retaining plate 4 are arranged between the filling roadbed 3 and the box-type roadbed 5, and the transition roadbed 2 and the retaining plate 4 are combined to form a transition section of the roadbed transition structure, thereby realizing the connection and transition between the filling roadbed 3 and the box-type roadbed 5. The retaining plate 4 is small in size, light in weight, and easy to construct, so that the transition section structure has a small engineering volume and a low cost, and can also improve the universality of the roadbed transition structure.
[0052] In some embodiments, Figure 3 As shown, the box-type roadbed 5 includes a top plate 51 and at least two support members 52, wherein the top plate 51 is connected to the top ends of the support members 52; wherein the retaining plate 4 is adjacent to both the end faces of the top plate 51 and the end faces of the support members 52. Specifically, the number of the support members 52 is arbitrary, such as Figure 3 The box-type roadbed 5 structure with two spaced support members 52 is shown. Figure 4 The box-type roadbed 5 structure shown is a structure with three support members 52 arranged at intervals. Preferably, the embodiment of the present invention uses the following Figure 3 The box-type roadbed 5 with two supporting members 52 shown will be described later. Figure 3 and Figure 5 As shown, the upper surface of the top plate 51 is arranged to be roughly flush with the top surface of the retaining plate 4 and parallel to the surface of the foundation S. Optionally, the width of the top plate 51 can be roughly the same as the spacing between the two support members 52, or slightly larger than the spacing between the two support members 52, that is, the two sides of the top plate 51 are appropriately extended in the width direction, which can meet the flexibility required to widen the roadbed surface and reduce the reinforcement requirements for the foundation. The upper end surface of the support member 52 is fixedly connected to the lower surface of the top plate 51, and the side surface of the support member 52 is perpendicular to the top surface of the top plate 51. The top plate 51, the support member 52 and the surface of the foundation S form an enclosed space, and the support member 52 can provide a stable support for the top plate 51. The length of the top plate 51 is roughly the same as the length of the support member 52. The end surface of the top plate 51 is roughly flush with the end surface of the support member 52, and abuts against the side surface of the retaining plate 4, providing a support point for the reaction force of the retaining plate 4.
[0053] In some embodiments, Figure 5As shown, the first side surface 41 of the retaining plate 4 is in contact with the end surface of the top plate 51 and the end surface of the support member 52, and the first side surface 41 is perpendicular to the upper surface of the top plate 51. Specifically, the first side surface 41 is the side of the retaining plate 4 close to the box-type roadbed 5. As mentioned above, the upper surface of the top plate 51 is parallel to the surface of the foundation S, that is, the first side surface 41 is also perpendicular to the surface of the foundation S. The first side surface 41 is roughly parallel to the end surface of the top plate 51 and the end surface of the support member 52, and is in close contact. On the one hand, a smooth transition is achieved at the top connection, and on the other hand, the box-type roadbed 5 can provide firm support for the retaining plate 4 in the horizontal direction, so that the reaction force is directly transmitted to the retaining plate in the direction perpendicular to the first side surface 41, effectively resisting the pressure of the fill or fill material.
[0054] In some embodiments, Figure 5 As shown, the retaining plate 4 has a second side surface 42 that fits the transition roadbed 2, and the second side surface 42 is parallel to the first side surface 41. Specifically, the second side surface 42 is the side of the retaining plate 4 away from the box-type roadbed 5. It has been mentioned above that the other end surface of the transition roadbed 2 away from the filling roadbed 3 is a vertical end surface perpendicular to the surface of the foundation S, and it is also mentioned that the first side surface 41 is perpendicular to the surface of the foundation S, that is, the second side surface 42 is parallel to the vertical end surface of the transition roadbed 2 to form a tight connection to provide support for the transition roadbed 2.
[0055] In some embodiments, Figure 6 As shown, the roadbed transition structure also includes a first reinforcing rib 61, which is arranged in the retaining plate 4 and the top plate 51; a second reinforcing rib 62, which is arranged in the retaining plate 4, and the extension direction of the second reinforcing rib 62 is perpendicular to the extension direction of the first reinforcing rib 61, and is fixedly connected to the end of the first reinforcing rib 61. Specifically, along the vertical direction, a number of first reinforcing ribs 61 are arranged in the top plate 51, and the length direction of the first reinforcing rib 61 is roughly the same as the length direction of the top plate, and one end of the first reinforcing rib 61 is horizontally embedded in the retaining plate 4. On the one hand, through the connection effect of the first reinforcing rib 61, the retaining plate 4 can be firmly fixed on the box-type roadbed 5, and the top plate 51 transmits its own tension to the retaining plate 4 through the first reinforcing rib 61, to resist the fill or filler pressure on the retaining plate 4, and prevent the retaining plate 4 from shifting due to the roadbed load. On the other hand, the top plate 51 of the box-type roadbed 5 has a large area, and the first reinforcing rib 61 is arranged in the top plate 51 to improve the strength and rigidity of the top plate 51 and withstand a larger roadbed load. The length, thickness and spacing of each first reinforcing rib 61 can be roughly the same, so that the transmission force of the entire top plate 51 is roughly equal, and the depth of the first reinforcing rib 61 embedded in the retaining plate 4 is roughly the same, so as to avoid irreversible damage caused by uneven force on the end of the retaining plate 4. The arrangement spacing between the first reinforcing ribs 61 can be appropriately increased to provide a more stable support for the retaining plate 4.
[0056] like Figure 6 and Figure 7 As shown, a number of second reinforcing ribs 62 can be arranged in the retaining plate 4 along the thickness direction and the width direction of the retaining plate 4, and connected to the end of the first reinforcing rib 61 embedded in the retaining plate 4. On the one hand, through the connection between the first reinforcing rib 61 and the second reinforcing rib 62, the retaining plate 4 is fixed to one end of the box-type roadbed 5, and forms a whole with the box-type roadbed 5. The box-type roadbed 5 itself is large in size, which can prevent the retaining plate 4 from shifting when resisting the pressure of the fill or filler. On the other hand, the second reinforcing rib 62 can also improve the strength and rigidity of the retaining plate 4, which not only effectively resists the pressure of the fill or filler, but also improves the ability of its top surface to withstand the roadbed load.
[0057] In some embodiments, Figure 8 As shown, the box-type roadbed 5 also includes a bottom plate 53, and the bottom ends of at least two support members 52 are connected to the bottom plate 53. Specifically, the upper and lower surfaces of the bottom plate 53 are roughly planar, the bottom plate 53 is arranged on the surface of the foundation S, the support members 52 are arranged between the top plate 51 and the bottom plate 53, and the bottom end of the support member 52 is fixedly connected to the bottom plate 53, so that the top plate 51, the support member 52 and the bottom plate 53 form a whole, and jointly bear the effect of the roadbed load. Compared with directly setting the bottom end of the support member 52 on the surface of the foundation S, the support member 52 and the surface of the foundation S do not form a whole, and the support member 52 may be deflected when bearing the roadbed load, resulting in failure of the roadbed function of the box-type roadbed 5.
[0058] In some embodiments, Fig. 9 As shown, the roadbed transition structure also includes a third reinforcing rib 63 and a fourth reinforcing rib 64. The third reinforcing rib 63 is arranged along the height direction of the retaining plate 4 at one end of the retaining plate 4 and in the bottom plate 53; the fourth reinforcing rib 64 is arranged along the height direction of the retaining plate 4 at the other end opposite to one end of the retaining plate 4 and in the top plate 51. Specifically, one end of the third reinforcing rib 63 is horizontally embedded in the lower end of the retaining plate 4, and one end of the fourth reinforcing rib 64 is horizontally embedded in the upper end of the retaining plate 4. The third reinforcing rib 63 and the fourth reinforcing rib 64 are arranged in a similar manner to the first reinforcing rib 61, and will not be described in detail here. On the one hand, through the joint action of the third reinforcing rib 63 and the fourth reinforcing rib 64, the upper and lower ends of the retaining plate 4 are connected to the box-type roadbed 5, so that the retaining plate 4 is more firmly fixed on the box-type roadbed 5, the top plate 51 transmits its own tension to the retaining plate 4 through the fourth reinforcing rib 64, and the bottom plate 53 transmits its own tension to the retaining plate 4 through the third reinforcing rib 63, and jointly resists the backfill or filler pressure on the retaining plate 4, and prevents the retaining plate 4 from shifting due to the roadbed load. On the other hand, the fourth reinforcing rib 64 is provided in the top plate 51 to improve the strength and rigidity of the top plate 51, and the third reinforcing rib 63 is provided in the bottom plate 53 to improve the strength and rigidity of the bottom plate 53, and further improves the overall ability of the box-type roadbed 5 to withstand the roadbed load.
[0059] In some embodiments, Fig.10 As shown, the roadbed transition structure also includes a fifth reinforcing rib 65, which is arranged in the retaining plate 4, connecting the third reinforcing rib 63 and the fourth reinforcing rib 64, and the extension direction of the fifth reinforcing rib 65 is perpendicular to the extension directions of the third reinforcing rib 63 and the fourth reinforcing rib 64; a sixth reinforcing rib 66, which is arranged in the retaining plate 4, located at one end of the retaining plate 4, and fixedly connected to the end of the third reinforcing rib 63; a seventh reinforcing rib 67, which is arranged in the retaining plate 4, located at the other end of the retaining plate 4, and fixedly connected to the end of the fourth reinforcing rib 64. Specifically, along the thickness direction of the retaining plate 4, a number of fifth reinforcing ribs 65 can be arranged in the retaining plate 4, and the length thereof is substantially the same as the height of the retaining plate 4, the upper end of the fifth reinforcing rib 65 is fixedly connected to the end of the fourth reinforcing rib 64 embedded in the retaining plate 4, and the lower end of the fifth reinforcing rib 65 is fixedly connected to the end of the third reinforcing rib 63 embedded in the retaining plate 4, so as to further strengthen the connection between the retaining plate 4 and the box-type roadbed 5.
[0060] like Fig.11 As shown, a number of sixth reinforcing ribs 66 are provided at the lower end of the retaining plate 4 along the extension direction of the roadbed. The length of the sixth reinforcing ribs 66 is substantially the same as the width of the retaining plate 4 and is fixedly connected to the end of the third reinforcing rib 63 embedded in the retaining plate 4, so as to further strengthen the connection between the lower end of the retaining plate 4 and the base plate 53, thereby improving the connection between the retaining plate 4 and the box-type roadbed 5 as a whole.
[0061] like Fig.12 As shown, a number of seventh reinforcing ribs 67 are provided at the upper end of the retaining plate 4 along the extension direction of the roadbed. The length of the seventh reinforcing rib 67 is substantially the same as the width of the retaining plate 4 and is fixedly connected to the end of the fourth reinforcing rib 64 embedded in the retaining plate 4, so as to further strengthen the connection between the upper end of the retaining plate 4 and the top plate 51, thereby improving the connection between the retaining plate 4 and the box-type roadbed 5 as a whole.
[0062] In some embodiments, Fig.13 As shown, the width D2 of the first side surface 41 is greater than the distance D1 between the two most distant support members 52. Specifically, D1 is the distance between the central cross-sections of the support members 52 along the extension direction of the roadbed. D2 is greater than D1, which facilitates the end face of the support member 52 to abut against the first side surface 41 of the retaining plate 4, providing support for the retaining plate 4.
[0063] In some embodiments, Fig.14As shown, the roadbed transition structure also includes a cone slope 7, which is located at one end of the box-type roadbed 5 along the extension direction perpendicular to the box-type roadbed 5, and is arranged adjacent to the retaining plate 4 and the box-type roadbed 5. Specifically, the cone slope 7 is located at the junction of the retaining plate 4 and the box-type roadbed 5, and is arranged on both sides of the roadbed. The slope i of the cone slope is 1:n. In an exemplary embodiment, the slope i of the cone slope can be 1:1.25. Protect the stability of both sides of the roadbed and prevent scouring.
[0064] The above description is only a preferred embodiment of the present invention and is not intended to limit the protection scope of the present invention.
Claims
1. A roadbed transition structure, characterized in that: include: Filling roadbed; A transition roadbed is arranged at one end of the filling roadbed along the length extension direction of the filling roadbed, and an end surface of one end of the transition roadbed contacts an end surface of the one end of the filling roadbed; A retaining plate is arranged at the other end opposite to the one end of the transition roadbed and is fixedly connected to the end surface of the other end; A box-type roadbed is arranged adjacent to the retaining plate; The box-type roadbed comprises a top plate and at least two support members, wherein the top plate is connected to the top ends of the support members; wherein the retaining plate is adjacent to both the end faces of the top plate and the end faces of the support members; The width of the top plate is greater than the distance between the two support members; The first side surface of the retaining plate is in contact with the end surface of the top plate and the end surface of the support member, and the first side surface is perpendicular to the upper surface of the top plate; The retaining plate has a second side surface that is in contact with the transition roadbed, and the second side surface is parallel to the first side surface.
2. The roadbed transition structure according to claim 1, characterized in that: The roadbed transition structure also includes: A first reinforcing rib is arranged in the retaining plate and the top plate; The second reinforcing rib is arranged in the retaining plate, the extension direction of the second reinforcing rib is perpendicular to the extension direction of the first reinforcing rib, and the second reinforcing rib is fixedly connected to the end of the first reinforcing rib.
3. The roadbed transition structure according to claim 1, characterized in that: The box-type roadbed also includes a bottom plate, and the bottom ends of the at least two support members are connected to the bottom plate.
4. The roadbed transition structure according to claim 3, characterized in that: The roadbed transition structure also includes: A third reinforcing rib is arranged along the height direction of the retaining plate and in one end of the retaining plate and in the bottom plate; The fourth reinforcing rib is arranged along the height direction of the retaining plate at the other end opposite to the one end of the retaining plate and in the top plate.
5. The roadbed transition structure according to claim 4, characterized in that: The roadbed transition structure also includes: A fifth reinforcing rib is arranged in the retaining plate, connecting the third reinforcing rib and the fourth reinforcing rib, and the extension direction of the fifth reinforcing rib is perpendicular to the extension directions of the third reinforcing rib and the fourth reinforcing rib; a sixth reinforcing rib, arranged in the retaining plate, located at the one end of the retaining plate, and fixedly connected to the end of the third reinforcing rib; The seventh reinforcing rib is arranged in the retaining plate, is located at the other end of the retaining plate, and is fixedly connected to the end of the fourth reinforcing rib.
6. The roadbed transition structure according to claim 1, characterized in that: The width of the first side surface is greater than the distance between two of the support members that are farthest apart.
7. The roadbed transition structure according to any one of claims 1 to 5, characterized in that: The roadbed transition structure also includes a tapered slope, which is located at one end of the box-type roadbed along an extension direction perpendicular to the box-type roadbed and is arranged adjacent to both the retaining plate and the box-type roadbed.