Pipeline network system based on rainwater and sewage separation
By setting up interception facilities and regulating and storage facilities in the municipal drainage system, the diversion of rainwater and sewage is realized, which solves the problem of high treatment pressure in combined communities on rainy days and drying up of rivers on sunny days, and improves the service life of sewage treatment facilities and the efficiency of river water level replenishment.
Patent Information
- Application Number
- CN202010228647.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-03-27
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2040-03-27
AI Technical Summary
In the existing municipal drainage technology, the treatment facilities in the combined drainage system in residential areas have high processing pressure and overload operation on rainy days, and have a short service life. Moreover, the rivers dry up frequently on sunny days, and the rainwater and sewage diversion is not realized, resulting in insufficient capacity of the sewage treatment plant and no water replenishment in the rivers. question.
Design a pipe network system based on rainwater and sewage diversion. Interception facilities are set up between the combined branch pipes and sewage branch pipes to intercept sewage to buffer facilities for storage. During the rainfall period, the first rain will be diverted to the first rain storage facility, and the middle and later rainwater will be diverted. The water is diverted to online treatment facilities for processing. During non-rainfall periods, the initial rain is processed through diversion facilities to ensure river water level replenishment.
It effectively reduces the treatment pressure of sewage treatment facilities, extends the service life, prevents rivers from drying up, realizes the diversion of rainwater and sewage, reduces transformation costs, and improves water resource utilization efficiency.
Smart Images

Figure CN111424788B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of municipal drainage, and in particular relates to a pipe network system based on rainwater and sewage separation. Background Art
[0002] The municipal drainage system in a city is mainly divided into a combined drainage system and a separate drainage system. The earliest combined drainage system mixed sewage, industrial wastewater and rainwater in the same pipe and directly discharged it into the nearby water body without any treatment, which easily caused serious pollution to the receiving water body. The separate drainage system is a system that discharges domestic sewage, industrial wastewater and rainwater in two or more independent pipes.
[0003] At present, in the existing municipal drainage technology, most combined sewer communities have the following problems:
[0004] (1) On rainy days, rainwater is divided into initial rain and mid- and late-stage rain according to the duration method, water quality method, or liquid level method. The discharge method for initial rain is generally to divert the initial rain directly to the municipal sewage pipe and reuse it after treatment in the sewage treatment plant. However, the transportation capacity of the sewage pipe is limited and it cannot accommodate a large amount of mixed water of sewage and rainwater. If the sewage pipe is to be modified, it will inevitably cause too high a cost. The mixed water of sewage and initial rain is sent to the sewage treatment plant for treatment due to its large amount, which will also cause insufficient capacity of the sewage treatment plant or waste of treatment resources. In addition, on sunny days, since the initial rain has been treated and discharged on rainy days, the water treatment and discharge volume only involves domestic sewage. In this way, due to the insufficient water treatment discharge volume during long-term sunny days, it is very easy to cause a situation where there is no water replenishment along the river channel, resulting in river drying up.
[0005] (2) Since the drainage system in the combined sewer community does not separate the discharge of sewage and rainwater, on the one hand, on rainy days, a large amount of sewage is mixed in the rainwater flowing out of the combined branch pipe. If this part of sewage is transported to the municipal rainwater pipe, it is very easy to cause the natural water body connected to the municipal rainwater pipe to be polluted; on the other hand, there is continuous sewage and rainwater flowing into the combined branch pipe. At this time, the sewage is diluted by the rainwater, but the concentration of pollutants in it is still relatively high. Therefore, the middle and late rainwater flowing out of the combined branch pipe is also sewage. If the middle and late rainwater flows into the municipal rainwater pipe, it will still cause the natural water body to be polluted. When the middle and late rainwater is transported to the municipal sewage pipe, the amount of middle and late rainwater is large and the capacity of the municipal sewage pipe is limited. It cannot accommodate the middle or late rainwater. If the municipal sewage pipe is renovated, it will inevitably result in too high a cost. If the amount of middle or late rainwater mixed with domestic sewage is large and sent to the sewage treatment plant for treatment, it will also cause insufficient capacity of the sewage treatment plant or waste of treatment resources.
[0006] It can be seen that in the existing municipal drainage technology, the treatment and discharge of rainwater in combined sewer communities on rainy days do not achieve rainwater and sewage separation, resulting in great treatment pressure on the treatment facilities, overload operation of the treatment facilities, and reduced service life of the treatment facilities. In addition, on sunny days, insufficient water treatment discharge can easily lead to a lack of water replenishment along the river, resulting in the technical defect of river drying up. Summary of the invention
[0007] The technical problems to be solved by the present invention are that the processing pressure of the processing facilities is very high and the processing facilities are overloaded on rainy days, the service life of the processing facilities is extremely short, and the river channel is very likely to dry up on sunny days.
[0008] In order to solve the above technical problems, in a first aspect, the present invention provides a pipe network system based on rainwater and sewage separation, which is used in a drainage system, wherein the drainage system comprises a combined branch pipe, a sewage branch pipe and a rainwater inlet, wherein the combined branch pipe is respectively connected to the sewage branch pipe and the rainwater inlet, and the pipe network system comprises:
[0009] The interception facility is arranged between the combined branch pipe and the sewage branch pipe, and is used to intercept the sewage in the sewage branch pipe during the rainy period;
[0010] a buffer facility, connected to the interception facility;
[0011] A first flow diversion facility is connected to the confluent branch pipe and is located downstream of the confluent branch pipe;
[0012] an initial rain storage facility, connected to the first diversion facility;
[0013] A sewage interception pipe, connected to the first diversion facility and the municipal sewage pipe, respectively, to intercept sewage entering the first diversion facility from the sewage branch pipe and the combined branch pipe in sequence;
[0014] The second diversion facility is connected to the municipal stormwater pipe;
[0015] Among them, during the rainy period, the interception facility intercepts the sewage in the sewage branch pipe, and the sewage is intercepted by the interception facility and stored in the buffer facility. At the initial stage of rainfall, the first diversion facility diverts the initial rain transported in the combined branch pipe to the initial rain storage facility for storage, and the first diversion facility diverts the middle and late rain transported in the combined branch pipe to the online treatment facility for treatment through the second diversion facility; and during the non-rainy period, the initial rain is diverted to the online treatment facility through the first diversion facility and the second diversion facility in turn for treatment, and then flows into the natural water body or downstream pipeline, and during the non-rainy period, the interception facility releases the sewage in the sewage branch pipe, so that the sewage in the buffer facility or the sewage branch pipe flows into the sewage treatment facility through the interception pipe and the municipal sewage pipe in turn for treatment.
[0016] Optionally, also include:
[0017] The sewage receiving facility is arranged between the intercepting facility and the sewage branch pipe.
[0018] Optionally, the intercepting facility and the buffer facility are combined into a storage pool with an integrated structure, a partition is provided inside the storage pool, and the intercepting facility and the buffer facility are respectively located on both sides of the partition.
[0019] Optionally, the interception facility is one of a diversion well, an interception well, a discarding well, a buffer gallery or an installation well.
[0020] and / or,
[0021] The buffer facility is a pool structure or a tank structure with storage space;
[0022] and / or,
[0023] The initial rain storage facility is a low-lying land or lake in the unit area or a reservoir arranged in the unit area.
[0024] Optionally, also include:
[0025] A first water switch is arranged at the water outlet of the first diversion facility in the direction of the municipal rainwater pipe;
[0026] as well as,
[0027] The second hydraulic switch is arranged at the water outlet of the first diversion facility in the direction of the initial rain storage facility.
[0028] Optionally, also include:
[0029] The third hydraulic switch is arranged at the water outlet of the first diversion facility in the direction of the sewage interception pipe.
[0030] Optionally, also include:
[0031] The fourth hydraulic switch is arranged at the water outlet of the intercepting facility in the direction of the confluent branch pipe.
[0032] Optionally, also include:
[0033] The fifth hydraulic switch is arranged at the water outlet of the intercepting facility in the direction of the buffer facility.
[0034] Optionally, the system further includes:
[0035] The first pump is arranged in the initial rain regulating and storing facility to pump the initial rain from the initial rain regulating and storing facility to the municipal rainwater pipe or the second diversion facility.
[0036] Optionally, the system further includes:
[0037] A transmitter, for receiving an identification instruction of a current period, wherein the identification instruction includes one of the following instructions: a first identification instruction for characterizing a non-raining period, a second identification instruction for characterizing that the rainwater in the raining period is initial rain, and a third identification instruction for characterizing that the rainwater in the raining period is mid- to late-stage rain;
[0038] A controller is respectively connected to the transmitter, the first water switch, the second water switch, the third water switch, the fourth water switch and the fifth water switch, and the controller includes a memory and a processor, wherein the memory stores a computer program, and when the program is executed by the processor, the following steps can be implemented:
[0039] receiving an identification instruction sent by the transmitter;
[0040] According to the identification instruction, the first water switch, the second water switch, the third water switch, the fourth water switch and the fifth water switch are switched on and off, and the switching specifically includes:
[0041] When the identification instruction is the first identification instruction, the first water switch and the second water switch are controlled to be turned on respectively, so that the initial rain in the regulating and storing facility is sequentially diverted to the online treatment facility through the first diversion facility and the second diversion facility; or the first water switch is controlled to be closed, the second water switch is controlled to be closed, the third water switch is controlled to be turned on, the fourth water switch is controlled to be turned on, and the fifth water switch is controlled to be turned on, so that the sewage in the buffer facility is sequentially transported to the sewage treatment facility through the first diversion facility, the intercepting pipe, and the municipal sewage pipe for treatment; or the first water switch is controlled to be closed, the second water switch is controlled to be closed, the third water switch is controlled to be turned on, the fourth water switch is controlled to be turned on, and the fifth water switch is controlled to be closed, so that the sewage in the sewage branch pipe is sequentially transported to the sewage treatment facility through the intercepting facility, the combined branch pipe, the first diversion facility, the intercepting pipe, and the municipal sewage pipe for treatment;
[0042] When the identification instruction is not the first identification instruction, the third water switch and the fourth water switch are controlled to be closed; and,
[0043] When the identification instruction is the second identification instruction, the first water switch is controlled to be closed and the second water switch is controlled to be opened, so that the initial rain in the confluent branch pipe is diverted to the initial rain regulating and storing facility through the first diversion facility for storage;
[0044] When the identification instruction is the third identification instruction, the first hydraulic switch is controlled to be turned on and the second hydraulic switch is controlled to be turned off, so that the middle and late rain in the combined branch pipe is diverted to the online treatment facility through the first diversion facility and the second diversion facility in turn for treatment.
[0045] Beneficial effects:
[0046] The pipe network system based on rainwater and sewage diversion provided by the present invention connects the combined branch pipe with the rainwater inlet and arranges an interception facility between the combined branch pipe and the sewage branch pipe to intercept sewage during the rainy period, and connects the buffer facility with the interception facility so that the sewage during the interception period by the interception facility flows to the buffer facility for storage, thereby making only rainwater exist in the combined branch pipe, so that the initial rain in the rainy period is diverted by the first diversion facility to the initial rain storage facility for storage, effectively avoiding the technical defects caused by the initial rain being directly transported to the municipal sewage pipe and then transported by the municipal sewage pipe to the sewage treatment facility for treatment, effectively reducing the treatment pressure of the sewage treatment facility during the rainy period and alleviating its over-watering. The load-operating working state also increases the service life of the sewage treatment facilities and reduces the cost of transformation; at the same time, in the non-rainy period, the initial rain is diverted to the online treatment facility through the first diversion facility and the second diversion facility in turn for treatment, and then flows into the natural water body or the downstream pipeline, effectively avoiding the technical defect of river drying up caused by only treating and discharging sewage in the non-rainy period, and achieving the technical effect of timely replenishment of river water; or in the non-rainy period, the sewage in the buffer facility or the sewage branch pipe is released through the interception facility, so that the sewage flows to the sewage treatment facility through the interception pipe and the municipal sewage pipe in turn for treatment and discharge, effectively realizing the diversion of rainwater and sewage in the rainy period, and has the characteristics of wide applicability.
[0047] The above description is only an overview of the technical solution of the present invention. In order to more clearly understand the technical means of the present invention, it can be implemented according to the contents of the specification. In order to make the above and other purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are listed below. BRIEF DESCRIPTION OF THE DRAWINGS
[0048] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0049] Figure 1 Schematic diagram of the pipe network system structure based on rainwater and sewage separation provided in the first embodiment of the present invention Figure 1 ;
[0050] Figure 2 Schematic diagram of the pipe network system structure based on rainwater and sewage separation provided in the first embodiment of the present invention Figure 2 . DETAILED DESCRIPTION
[0051] The pipe network system based on rainwater and sewage diversion provided by the present invention connects the combined branch pipe with the rainwater inlet and arranges an interception facility between the combined branch pipe and the sewage branch pipe to intercept sewage during the rainy period, and connects the buffer facility with the interception facility so that the sewage during the interception period by the interception facility flows to the buffer facility for storage, thereby making only rainwater exist in the combined branch pipe, so that the initial rain in the rainy period is diverted to the initial rain regulating and storing facility through the first diversion facility for storage, effectively avoiding the technical defects caused by directly conveying the initial rain to the municipal sewage pipe and then conveying it to the sewage treatment facility for treatment by the municipal sewage pipe, effectively reducing the treatment pressure of the sewage treatment facility during the rainy period and alleviating its over-watering. The load-operating working state also increases the service life of the sewage treatment facilities and reduces the cost of transformation; at the same time, in the non-rainy period, the initial rain is diverted to the online treatment facility through the first diversion facility and the second diversion facility in turn for treatment, and then flows into the natural water body or the downstream pipeline, effectively avoiding the technical defect of river drying up caused by only treating and discharging sewage in the non-rainy period, and achieving the technical effect of timely replenishment of river water; or in the non-rainy period, the sewage in the buffer facility or the sewage branch pipe is released through the interception facility, so that the sewage flows to the sewage treatment facility through the interception pipe and the municipal sewage pipe in turn for treatment and discharge, effectively realizing the diversion of rainwater and sewage in the rainy period, and has the characteristics of wide applicability.
[0052] The following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. All other embodiments obtained by ordinary technicians in this field based on the embodiments of the present invention belong to the scope of protection of the present invention; the "and / or" keyword involved in this implementation represents both and, or. In other words, A and / or B mentioned in the embodiments of the present invention represent both A and B, and A or B, and describe the three states of A and B. For example, A and / or B means: only A is included but not B; only B is included but not A; both A and B are included.
[0053] At the same time, in the embodiments of the present invention, when a component is referred to as being "fixed to" another component, it may be directly on the other component or there may also be a centered component. When a component is considered to be "connected or communicated" with another component, it may be directly connected to the other component or there may be a centered component at the same time. When a component is considered to be "set on" another component, it may be directly set on the other component or there may be a centered component at the same time. The terms "vertical", "horizontal", "left", "right" and similar expressions used in the embodiments of the present invention are for illustrative purposes only and are not intended to limit the present invention.
[0054] It should be noted that, in order to explain the present invention in more detail so that those skilled in the art can understand the present invention more clearly and understandably, and further support the technical problems to be solved by the present invention and the corresponding technical effects that can be achieved, before introducing the present invention, the following explanations are given for the terminology involved:
[0055] A combined branch pipe is a pipe used to transport rainwater, sewage, or a mixture of rainwater and sewage in a unit area pipe; a sewage branch pipe is a pipe used to transport sewage in a unit area pipe; a municipal rainwater pipe is a pipe used to transport rainwater in a municipal pipe; and a municipal sewage pipe is a pipe used to transport sewage in a municipal pipe.
[0056] Those skilled in the art can understand that the above-mentioned "rainwater", "sewage" and "mixed water" are not limitations on the functions of "branch pipes", and "municipal rainwater" and "municipal sewage" are not limitations on the functions of "pipes", but are only used to distinguish. In other words, the combined branch pipe, sewage branch pipe, municipal rainwater pipe, and municipal sewage pipe can all use the same pipe, or different pipes, or partially the same and partially different pipes. The present invention does not limit this. As long as the pipe can realize liquid transportation, it is applicable to the present invention and is within the protection scope of the present invention.
[0057] According to whether rainfall occurs, the period involved in the present invention can be divided into rainfall period and non-rainfall period, wherein the rainfall period refers to the period when rainfall occurs, which can be understood as a rainy day; the non-rainfall period is a period opposite to the rainfall period, which refers to the period when no rainfall occurs, which can be understood as a sunny day. Alternatively, according to the amount of rainfall, the period involved in the present invention can also be divided into rainfall period and non-rainfall period, wherein the rainfall period refers to the period when the rainfall reaches a certain rainfall threshold, which can be understood as a period when the rainfall is slightly heavier; the non-rainfall period is a period opposite to the rainfall period, which refers to the period when the rainfall is less than the rainfall threshold, which can be understood as a period when there is no rainfall or the rainfall is relatively small.
[0058] In the present invention, it is not limited to which of the above methods is used to determine the rainfall period and the non-rainfall period, and it can be selected and determined according to actual operation requirements; in other words, any of the above methods for determining the rainfall period and the non-rainfall period is applicable to the present invention. As for how to judge whether rainfall occurs and how to judge whether the rainfall reaches a certain rainfall threshold, the judgment method of the prior art can be adopted. The present invention no longer limits the judgment method for whether rainfall occurs and the judgment method for whether rainfall reaches a certain rainfall threshold. As long as the judgment method can achieve the judgment result of whether rainfall occurs or whether rainfall reaches a certain rainfall threshold, it is applicable to the present invention.
[0059] Furthermore, with respect to the rainfall period, the rain can be divided into initial rain and middle and late rain, and the division method can adopt the time method, water quality method or liquid level method in the prior art. For example, when the time method is adopted, the rain corresponding to the rainfall period is the initial rain, and the rain corresponding to the middle and late rainfall period is the middle and late rain; for example, when the water quality method is adopted, when the rainwater concentration is higher than a certain concentration threshold, the rainwater is the initial rain, and when the rainwater concentration is lower than a certain concentration threshold, the rainwater is the middle and late rain; for example, when the liquid level method is adopted, when the rainwater liquid level is lower than a certain liquid level threshold, the rainwater is the initial rain, and when the rainwater liquid level is higher than a certain liquid level threshold, the rainwater is the middle and late rain.
[0060] Similarly, there is no limitation on which of the above methods is used to determine the initial rain or mid-to-late rain, and it can be determined according to actual operational requirements; in other words, any of the above methods for determining the initial rain or mid-to-late rain is applicable to the present invention.
[0061] Of course, those skilled in the art should understand that since certain errors are allowed in the discharge of rainwater and / or sewage during actual operations, there may be certain errors in the specific division of each period. For example, there may be inaccurate division nodes between initial rain and mid- and late-stage rain, resulting in mid- and late-stage rain mixed with initial rain, or a small amount of sewage mixed with initial rain / mid- and late-stage rain, etc. The operational impact caused by this error does not affect the implementation effect of the entire technical solution of the present invention and can be ignored, and should not be considered to be beyond the protection scope of the present invention.
[0062] Embodiment 1
[0063] Please refer to Figure 1 , which is a schematic diagram of the overall structure of a pipe network system based on rainwater and sewage diversion provided in Example 1 of the present invention when applied to a drainage system. The drainage system includes a combined branch pipe 1, a sewage branch pipe 2, and a rainwater inlet 3; the pipe network system based on rainwater and sewage diversion specifically includes: a sewage interception pipe 6, a first diversion facility 4, an initial rain storage facility 5, a second diversion facility 7 and an interception facility 15.
[0064] Among them, the combined branch pipe 1, the sewage branch pipe 2, the rainwater inlet 3 and the interception facility 15 can all be set in the unit area, which is an area where sewage and rainwater need to be treated, and can be a residential area, a school, an administrative area, etc. Of course, in the actual setting process, in order to connect with the municipal pipeline, some branches extend outside the unit area or to the municipal road, which is also applicable to the present invention, and the present invention does not limit this. The combined branch pipe 1 is connected to the rainwater inlet 3 for transporting rainwater, so that the initial rain, middle and late rain in the rainfall period are transported after being merged into the combined branch pipe 1 through the rainwater inlet 3. It can be understood that the number of rainwater inlets 3 can be multiple, and the distribution positions of multiple rainwater inlets 3 in the unit area can be arbitrary. In the actual process, they can be reasonably set according to the actual rainfall direction, and the present invention does not limit this. The sewage branch pipe 2 is connected to the municipal sewage pipe 10, so that the sewage in the unit area is first collected in the sewage branch pipe 2, and then the sewage branch pipe 2 transports the sewage to the combined branch pipe 1, and then enters the municipal sewage pipe 10; the municipal sewage pipe 10 can be connected to a sewage treatment facility 12 (such as a sewage treatment plant), and the sewage is treated by the sewage treatment facility 12 before being discharged.
[0065] Among them, the embodiment of the present invention is provided with an interception facility 15 between the sewage branch pipe 2 and the municipal sewage pipe 10, so as to intercept the sewage in the sewage branch pipe 2 through the interception facility 15, for example, during the rainy period, intercept the sewage so that it does not flow into the combined branch pipe, thereby realizing the rainwater and sewage diversion in the combined branch pipe during the rainy period, and during the non-rainy period, release the sewage to flow into the combined branch pipe 1. At the same time, the buffer facility 16 is connected to the interception facility 15, so that the sewage during the interception period is intercepted and stored in the buffer facility 16 through the interception facility 15, thereby achieving that even during the interception process during the rainy period, the normal discharge of sewage in the unit area is not affected.
[0066] As an embodiment, the interception facility and the buffer facility can be a storage pool combined into an integrated structure, a partition is provided inside the storage pool, and the interception facility and the buffer facility are respectively located on both sides of the partition. As another embodiment, the interception facility is a diversion well, an interception well, a discarded well, a buffer gallery or an installation well, and the buffer facility is a pool structure or a tank structure with a storage space; the two are independent of each other.
[0067] Of course, those skilled in the art will understand that the interception facility 15 and the buffer facility 16 may select which of the above-mentioned embodiments to use to intercept and store sewage according to actual operational requirements; in other words, the present invention does not specifically limit the specific structure of the interception facility 15 and the buffer facility 16. The above-mentioned two embodiments, as well as similar embodiments in the prior art, are all applicable to the present invention as long as they can achieve the technical effect of intercepting sewage in the sewage branch pipe 2 and storing it in the buffer facility 16, and are also within the scope of protection of the present invention.
[0068] In addition, the present invention is provided with a first diversion facility 4 and an initial rain storage facility 5 at the downstream position of the combined branch pipe 1, the first diversion facility 4 is respectively connected to the combined branch pipe 1 and the municipal rainwater pipe 11, and the initial rain storage facility 5 is connected to the first diversion facility 4. It can be understood that the first diversion facility 4 is provided with a connection structure of at least one water inlet and three water outlets, that is, the first diversion facility 4 is connected to the combined branch pipe 1 through the water inlet, and is respectively connected to the initial rain storage facility 5, the municipal rainwater pipe 11 and the sewage interception pipe 6 through the three water outlets.
[0069] In this way, during the rainy period, the sewage in the sewage branch pipe 2 is intercepted by the intercepting facility 15, and the intercepted sewage flows to the buffer facility 16 for storage, and the initial rain in the rainy period in the combined branch pipe 1 is diverted by the first diversion facility 4, and the initial rain is stored by the initial rain regulating and storing facility 5 after being diverted by the first diversion facility 4. Of course, at this time, the starting time of intercepting the sewage in the sewage branch pipe 2 by the intercepting facility 15 and the starting time of diverting the initial rain in the rainy period in the combined branch pipe 1 by the first diversion facility 4 can be the same time, that is, the two are carried out at the same time, or the intercepting facility 15 can intercept the sewage in the sewage branch pipe 2 first, and the first diversion facility 4 can divert the initial rain in the rainy period in the combined branch pipe 1 The present invention does not limit the control sequence. As long as the interception facility 15 can be used to intercept the sewage in the sewage branch pipe 2 during the rainy period, and the first diversion facility 4 can be used to divert the initial rain in the combined branch pipe 1 during the rainy period, the control method is applicable to the present invention and is within the protection scope of the present invention. This effectively avoids the defects of excessive pressure on the sewage treatment facility and waste of resources caused by the initial rain being directly transported to the municipal sewage pipe and then transported to the sewage treatment facility by the municipal sewage pipe, effectively reduces the treatment pressure of the sewage treatment facility during the rainy period, alleviates its overloaded working state, and also increases the service life of the sewage treatment facility, reducing the cost of sewage pipe reconstruction. For the non-rainy period, the initial rain is diverted to the online treatment facility 13 for treatment through the first diversion facility 4 and the second diversion facility 7 in the non-rainy period, and then flows into the natural water body or downstream pipeline, effectively avoiding the technical defects of river drying caused by only treating and discharging sewage during the non-rainy period, and effectively replenishing the river water.
[0070] As an implementation method for realizing the diversion action of the first diversion facility 4, the embodiment of the present invention may include a first hydraulic switch and a second hydraulic switch. The first hydraulic switch is arranged at the outlet of the first diversion facility 4 in the direction of the municipal rainwater pipe 11; the second hydraulic switch is arranged at the outlet of the first diversion facility 4 in the direction of the initial rain storage facility 5. By controlling the first hydraulic switch to be closed and the second hydraulic switch to be opened during the rainfall period, the initial rain in the combined branch pipe 1 is diverted to the initial rain storage facility 5 through the first diversion facility 4 for storage, and for the middle and late rain, by controlling the first hydraulic switch to be opened and the second hydraulic switch to be closed, the middle and late rain in the combined branch pipe 1 is diverted to the online treatment facility 13 for treatment in turn through the first diversion facility 4 and the second diversion facility 7. During the non-rainfall period, the first hydraulic switch is controlled to be turned on, and the second hydraulic switch is controlled to be turned on. At this time, the initial rain stored in the initial rain storage facility 5 is diverted to the online treatment facility 13 through the first diversion facility 4 and the second diversion facility 7 in turn, and then discharged into the natural water body after treatment, thereby realizing the storage of the initial rain during the rainfall period, reducing the processing pressure of the treatment facilities, and avoiding waste of resources. At the same time, it can also realize the replenishment of the water level in the natural water body during the non-rainfall period.
[0071] As another implementation method of realizing the diversion action of the first diversion facility 4, the embodiment of the present invention may also include a first pump; the first pump is arranged in the initial rain storage facility 5 to pump the initial rain from the initial rain storage facility 5 to the municipal rainwater pipe 11 or the second diversion facility 7. Also in this implementation method, the embodiment of the present invention also includes a first hydraulic switch arranged at the outlet of the first diversion facility 4 in the direction of the municipal rainwater pipe 11, and a second hydraulic switch arranged at the outlet of the first diversion facility 4 in the direction of the initial rain storage facility 5. Specifically, during the rainy period, the first hydraulic switch is controlled to be closed and the second hydraulic switch is controlled to be closed, so that the initial rain in the combined branch pipe 1 is diverted to the initial rain storage facility 5 through the first diversion facility 4 for storage, and for the middle and late rain, the first hydraulic switch is controlled to be closed and the second hydraulic switch is controlled to be opened, so that the middle rain or late rain in the combined branch pipe 1 is diverted to the online treatment facility 13 for treatment through the first diversion facility 4 and the second diversion facility 7 in sequence. During the non-rainfall period, the first hydraulic switch is controlled to be turned on, and the second hydraulic switch is controlled to be turned on. At this time, the initial rain stored in the initial rain storage facility 5 is diverted to the online treatment facility 13 through the first diversion facility 4 and the second diversion facility 7 in turn for treatment and then discharged to the natural water body, thereby realizing the storage of the initial rain during the rainfall period, reducing the treatment pressure of the treatment facility, and avoiding waste of resources. At the same time, it can also realize the replenishment of the water level in the natural water body during the non-rainfall period, and when the drainage demand is very large, the first pump is controlled to synchronously pump the initial rain in the initial rain storage facility 5 back to the second diversion facility 7 or the online treatment facility 13, so as to solve the situation that the current water supply cannot be met by only turning on the second hydraulic switch, or the first hydraulic switch can also be closed when the initial rain in the initial rain storage facility 5 is pumped back by the first pump.
[0072] Those skilled in the art will understand that it can be understood that the initial rain in the initial rain storage facility 5 is transported to the second diversion facility 7 or the online processing facility 13 by one of the above-mentioned implementation modes, and the control can be selected according to actual operational needs; in other words, the present invention does not specifically limit the method of transporting the initial rain in the initial rain storage facility 5, and the above-mentioned two transportation methods, as well as similar transportation methods in the prior art, are all applicable to the present invention as long as they can achieve the technical effect of remotely transporting the initial rain in the initial rain storage facility 5 to the second diversion facility 7 or the online processing facility 13, and are also within the protection scope of the present invention.
[0073] Furthermore, with regard to the sewage entering the combined branch pipe 1 from the sewage branch pipe 2, since it may exist both during rainy periods and non-rainy periods, in the two implementation modes of the diversion action of the first diversion facility 4 mentioned above, a third hydraulic switch may be provided at the water outlet of the first diversion facility 4 in the direction of the sewage interception pipe 6, a fourth hydraulic switch may be provided at the water outlet of the interception facility 15 in the direction of the combined branch pipe 1, and a fifth hydraulic switch may be provided at the water outlet of the interception facility 15 in the direction of the buffer facility 16.
[0074] Specifically, during the rainy period, the fourth water conservancy switch is controlled to be closed and the fifth water conservancy switch is controlled to be opened throughout the whole process, so as to realize the rainwater and sewage diversion during the rainy period, and then the third water conservancy switch is controlled to be closed while the first water conservancy switch is controlled to be closed and the second water conservancy switch is controlled to be opened, so that the initial rain in the combined branch pipe 1 is diverted to the initial rain regulating and storing facility 5 through the first diversion facility 4 for storage. For the middle and late rain, the third water conservancy switch is controlled to be closed while the first water conservancy switch is controlled to be opened and the second water conservancy switch is closed, so that the middle and late rain in the combined branch pipe 1 is diverted to the online treatment facility 13 through the first diversion facility 4 and the second diversion facility 7 in sequence for treatment. Or when the amount of rainwater in the middle and late rain is large, the third water conservancy switch is controlled to be opened while the first water conservancy switch is controlled to be opened and the second water conservancy switch is controlled to be closed, so that part of the middle and late rain in the combined branch pipe 1 is diverted to the online treatment facility 13 through the first diversion facility 4 and the second diversion facility 7 in sequence for treatment and discharge; the other part is transported to the sewage treatment facility through the intercepting pipe 6 and the municipal sewage pipe 10 in sequence for treatment and discharge, so as to reduce the treatment capacity of the treatment facility.
[0075] During the non-rainfall period, when the initial rain in the initial rain storage facility 5 needs to be discharged, the fourth hydraulic switch is controlled to be closed, and then the first hydraulic switch is controlled to be opened, and while the second hydraulic switch is opened, the third hydraulic switch is controlled to be closed. At this time, the initial rain stored in the initial rain storage facility 5 is diverted to the online treatment facility 13 through the first diversion facility 4 and the second diversion facility 7 in turn, and then discharged to the natural water body after treatment, thereby replenishing the water level in the natural water body during the non-rainfall period.
[0076] Those skilled in the art will understand that the initial rain in the initial rain regulating and storage facility 5 is transported by which of the above-mentioned control methods, and the control can be selected according to actual operational needs; in other words, the present invention does not specifically limit the control and transportation method of the initial rain in the initial rain regulating and storage facility 5. The above-mentioned multiple transportation control methods, as long as they can achieve the storage of a portion of the initial rain at the initial stage of rainfall, thereby reducing the processing pressure of the processing facilities during the entire rainfall cycle, and achieving the technical effect of replenishing the water level in the natural water body during the non-rainfall period, are all applicable to the present invention and are within the scope of protection of the present invention.
[0077] For further information, please refer to Figure 2 , the embodiment of the present invention also includes: a transmitter 8 and a controller 9.
[0078] In detail, the transmitter 8 is used to receive an identification instruction for the current period, and the identification instruction includes one of the following instructions: a first identification instruction for characterizing a non-rainfall period, a second identification instruction for characterizing that the rain is initial rain in a rainfall period, and a third identification instruction for characterizing that the rain is mid- and late-stage rain in a rainfall period; the controller 9 is respectively communicated with the transmitter 8, the first water switch, the second water switch, the third water switch, the fourth water switch, the fifth water switch and / or the first pump, and is used to control the actions of the first water switch, the second water switch, the third water switch and / or the first pump according to the monitoring results of the transmitter 8.
[0079] The controller 9 includes a memory and a processor, wherein the memory stores a computer program, and when the program is executed by the processor, the following steps can be implemented:
[0080] Receive the identification instruction sent by the transmitter; according to the identification instruction, switch the first water switch, the second water switch, the third water switch, the fourth water switch and the fifth water switch on and off, wherein the switching specifically includes:
[0081] When the identification instruction is the first identification instruction, the first water switch and the second water switch are controlled to be turned on respectively, so that the initial rain is diverted to the online treatment facility through the first diversion facility and the second diversion facility in sequence; or the first water switch is controlled to be closed, the second water switch is controlled to be closed, the third water switch is controlled to be turned on, the fourth water switch is controlled to be turned on, and the fifth water switch is controlled to be turned on, so that the sewage in the buffer facility is transported to the sewage treatment facility through the first diversion facility and the municipal sewage pipe in sequence for treatment; or the first water switch is controlled to be closed, the second water switch is controlled to be closed, the third water switch is controlled to be turned on, the fourth water switch is controlled to be turned on, and the fifth water switch is controlled to be closed, so that the sewage in the sewage branch pipe is transported to the sewage treatment facility through the intercepting facility, the combined branch pipe, the first diversion facility, the intercepting pipe and the municipal sewage pipe in sequence for treatment;
[0082] Specifically, when the identification instruction is the first identification instruction, it means that the current period is a non-rainfall period, and at this time there are at least the following three control modes A1.1, A1.2 and A1.3;
[0083] A1.1, when the rainwater stored in the initial rain storage tank is discharged to the online treatment facility;
[0084] In the A1.1 control mode, there are at least two control modes, A1.1.1 and A1.1.2:
[0085] A1.1.1 The initial rain is diverted to the municipal rainwater pipe through the first diversion facility;
[0086] At this time, the first water switch and the second water switch are controlled to be turned on, the third water switch can be turned off, the fourth water switch can be turned off, and the fifth water switch can be turned on. The initial rain is sequentially diverted to the online treatment facility through the first diversion facility and the second diversion facility. During this period, the sewage in the sewage branch pipe is intercepted by the interception facility and stored in the buffer facility.
[0087] A1.1.2 Initial rain is not diverted to the municipal stormwater pipe via the first diversion facility;
[0088] That is, at this time, the initial rain is directly pumped back to the municipal stormwater pipe and / or online treatment facility through the first pump. At this time, the first hydraulic switch can be controlled to be closed, the second hydraulic switch can be controlled to be closed, the third hydraulic switch can be controlled to be opened, the fourth hydraulic switch can be controlled to be opened, and the fifth hydraulic switch can be controlled to be opened. Therefore, at this time, the initial rain is directly pumped back to the municipal stormwater pipe and / or online treatment facility through the first pump. Then for the combined branch pipe, it can receive sewage discharged from the sewage branch pipe or the buffer facility in sequence through the intercepting facility, and the sewage flows into the sewage treatment facility for treatment through the combined branch pipe, the first diversion facility and the sewage interception pipe in sequence.
[0089] Of course, those skilled in the art will understand that the control method for discharging the rainwater stored in the initial rain storage tank to the online treatment facility is specifically through the above-mentioned A1.1.1 control method or the A1.1.2 control method, which can be selected according to actual operational needs; in other words, the present invention does not specifically limit the control method for discharging the rainwater stored in the initial rain storage tank to the online treatment facility. The above two control methods or other control methods for the first water switch, the second water switch, the third water switch, the fourth water switch and the fifth water switch, as long as they can realize the discharge of the rainwater stored in the initial rain storage tank to the online treatment facility at the initial stage of rainfall, and do not affect the storage or discharge of sewage in the sewage branch pipe. The technical effect of the control method is applicable to the present invention and is also within the protection scope of the present invention.
[0090] A1.2, discharge the sewage from the buffer facility;
[0091] In the A1.2 control mode, the first water switch is controlled to be closed, the second water switch is controlled to be closed, the third water switch is controlled to be opened, the fourth water switch is controlled to be opened, and the fifth water switch is controlled to be opened, so that the sewage in the buffer facility is transported to the sewage treatment facility for treatment through the first diversion facility and the municipal sewage pipe in sequence.
[0092] A1.3, the sewage in the sewage branch pipe is discharged directly after passing through the interception facilities;
[0093] In the A1.3 control mode, the first water switch is controlled to be closed, the second water switch is controlled to be closed, the third water switch is controlled to be opened, the fourth water switch is controlled to be opened, and the fifth water switch is controlled to be closed, so that the sewage in the sewage branch pipe is sequentially transported to the sewage treatment facility through the interception facility, the combined branch pipe, the first diversion facility, the interception pipe, and the municipal sewage pipe for treatment;
[0094] Of course, those skilled in the art can understand that when the current identification instruction is the first identification instruction, the controller specifically executes one of the above-mentioned control methods for control, and the control can be selected according to actual operational requirements; in other words, the present invention does not specifically limit the control method of the controller when the current identification instruction is the first identification instruction. The above three control methods or other control methods for turning on the first water switch, turning on the second water switch, turning off the third water switch, turning off the fourth water switch, and turning on the fifth water switch, as long as they can achieve the technical effect of reasonably discharging sewage or stored initial rain when the first identification instruction is received, are applicable to the present invention and are within the protection scope of the present invention.
[0095] Furthermore, in the embodiment of the present invention, the three control modes A1.1, A1.2 and A1.3 may also be executed according to a preset priority, for example, A1.1 or A1.2 is executed first, and then A1.3 is executed.
[0096] Specifically, for the initial rain stored in the initial rain regulating and storage facilities, and the sewage stored in the buffer facilities, an initial rain level meter and a sewage level meter can be respectively set in the two facilities, and an initial rain level threshold for characterizing the initial rain capacity and a sewage level threshold for characterizing the sewage capacity can be set, and the initial rain level data signal of the initial rain level meter and the sewage level data signal of the sewage level meter are received in real time through the sensor, and transmitted to the controller in real time. When the initial rain level data signal shows that the initial rain level exceeds the initial rain level threshold, the A1.1 control mode is executed; when the sewage level data signal shows that the sewage level exceeds the sewage level threshold, the A1.2 control mode is executed; when the initial rain level data signal shows that the initial rain level is lower than the initial rain level threshold, and when the sewage level data signal shows that the sewage level is lower than the sewage level threshold, the A1.3 control mode is executed.
[0097] Similarly, those skilled in the art can understand that the execution order of the current A1.1, A1.2 and A1.3 can be selected according to the actual operation requirements. In addition to the execution order of A1.1 or A1.2 first, and then A1.3, it can also be the execution of A1.1 and A1.2 at the same time, and then A1.3, or the execution of A1.1, A1.2 and A1.3 at the same time. In other words, the present invention does not specifically limit the execution order of A1.1, A1.2 and A1.3. As long as it can be achieved, when the first identification instruction is received, the technical effect of reasonably discharging sewage or stored initial rain is applicable to the present invention and is within the protection scope of the present invention.
[0098] When the identification instruction is not the first identification instruction, the third water switch and the fourth water switch are controlled to be closed, that is, the sewage in the sewage branch pipe is intercepted by the interception facility. At the same time, in order to prevent rainwater in the first diversion facility from seeping into the sewage interception pipe, the third water switch can also be controlled to be closed; wherein, the identification instruction being not the first identification instruction can be understood as the identification instruction being the second identification instruction, or the third identification instruction or other identification instructions described below, which is not limited by the present invention. When the identification instruction is not the first identification instruction, specifically:
[0099] When the identification instruction is the second identification instruction, the first water switch is controlled to be closed and the second water switch is controlled to be opened, and the third water switch is controlled to be closed and the fourth water switch is controlled to be closed, so that the initial rain in the combined branch pipe is diverted to the initial rain regulating and storing facility through the first diversion facility for storage;
[0100] When the identification instruction is the third identification instruction, the first water switch is controlled to be turned on and the third water switch is controlled to be turned off, and the second water switch is controlled to be turned off and the fourth water switch is controlled to be turned off, so that the mid-term rainwater or late rainwater in the combined branch pipe is diverted to the online treatment facility through the first diversion facility and the second diversion facility in sequence.
[0101] It should be noted that, in the embodiment of the present invention, the transmitter 8 is used to receive and transmit the identification instruction of the current period, that is, to directly obtain the identification instruction for controlling the controller. The instruction can be directly input manually, or another terminal device or a remote terminal can transmit the identification instruction, and transmit it to the controller after receiving the identification instruction. No action is taken on how to obtain this identification instruction. In other words, how to judge whether rainfall occurs, and how to judge whether the rain in the rainfall period is the first rain or the middle and late rain, the judgment method of the prior art can be adopted. The present invention no longer makes a limitation on the judgment method. As long as it can achieve the method of obtaining the first identification instruction for characterizing the non-rainfall period, the second identification instruction for characterizing the rain as the first rain in the rainfall period, and the third identification instruction for characterizing the rain as the middle and late rain in the rainfall period, or the judgment method, it is applicable to the present invention.
[0102] In this way, when the transmitter 8 receives the second identification instruction, it transmits it to the controller 9, and the controller 9 controls the fourth water switch to be closed and the fifth water switch to be opened, and controls the first water switch to be closed, the second water switch to be opened, and the third water switch to be closed, so that the initial rain in the combined branch pipe 1 is diverted to the initial rain storage facility 5 through the first diversion facility 4 for storage. And when the transmitter 8 receives the third identification instruction, it transmits it to the controller 9, and the controller 9 also controls the fourth water switch to be closed, and controls the first water switch to be opened, the second water switch to be closed, and the third water switch to be closed, so that the middle and late rain in the combined branch pipe 1 is diverted to the online treatment facility 13 for treatment in sequence through the first diversion facility 4 and the second diversion facility 7. Alternatively, while controlling the first hydraulic switch to be turned on and the second hydraulic switch to be turned off, the third hydraulic switch is controlled to be turned on, so that a part of the middle and late rain in the combined branch pipe 1 is diverted to the online treatment facility 13 through the first diversion facility 4 and the second diversion facility 7 in sequence for treatment and discharge; the other part is transported to the sewage treatment facility through the intercepting pipe 6 and the municipal sewage pipe 10 in sequence for treatment and discharge, so as to avoid overload of the treatment facility due to heavy rainfall in the middle and late rain, thereby increasing its life cycle.
[0103] When the transmitter 8 receives the first identification instruction, it transmits it to the controller 9. At this time, the controller 9 controls and executes it according to the three control modes A1.1, A1.2 and A1.3 mentioned above, which will not be repeated here.
[0104] In the embodiment of the present invention, the initial rain storage facility 5 is a low-lying land or a lake in the unit area or a reservoir arranged in the unit area.
[0105] In the embodiment of the present invention, the online treatment facility 13 is an ecological retention pond, or a biological filter, or a physicochemical treatment facility, or a biochemical treatment facility, or an oxidation pond, or an artificial wetland.
[0106] In the embodiment of the present invention, the system further comprises: a return branch pipe 14, which is connected to the primary rain regulating and storing facility 5 and is used for reusing the upper clear liquid in the primary rain regulating and storing facility as reclaimed water.
[0107] In the embodiment of the present invention, the system further comprises: a sewage receiving facility 17 for receiving sewage in the sewage branch pipe 2. As an implementation method, the receiving facility 17 may be a septic tank.
[0108] In the embodiment of the present invention, the interception facility 15 is used to realize rainwater and sewage diversion during the rainy period, that is, rainwater and sewage are separated, and the fourth water conservancy switch can be closed during the rainy period. The interception facility, the first diversion facility, and the second diversion facility can be any one of a diversion well, an interception well, a discarded well, a buffer corridor, or an installation well.
[0109] In summary, the pipe network system based on rainwater and sewage diversion provided by the present invention connects the combined branch pipe with the rainwater inlet and sets an interception facility between the combined branch pipe and the sewage branch pipe to intercept sewage during the rainy period, and connects the buffer facility with the interception facility so that the sewage during the interception period by the interception facility flows to the buffer facility for storage, thereby making only rainwater exist in the combined branch pipe, so that the initial rain in the rainy period is diverted by the first diversion facility to the initial rain storage facility for storage, effectively avoiding the technical defects caused by the initial rain being directly transported to the municipal sewage pipe and then transported by the municipal sewage pipe to the sewage treatment facility for treatment, effectively reducing the treatment pressure of the sewage treatment facility during the rainy period and alleviating Its overloaded working state also increases the service life of sewage treatment facilities and reduces renovation costs; at the same time, in non-rainy periods, the initial rain is diverted to the online treatment facility through the first diversion facility and the second diversion facility in turn for treatment, and then flows into natural water bodies or downstream pipelines, effectively avoiding the technical defect of river channel drying up caused by only treating and discharging sewage in non-rainy periods, and achieving the technical effect of timely replenishment of river water; or in non-rainy periods, the sewage in the buffer facility or sewage branch pipe is released through the interception facility, so that the sewage flows to the sewage treatment facility through the interception pipe and the municipal sewage pipe in turn for treatment and discharge, effectively realizing the diversion of rainwater and sewage in the rainy period, and has the characteristics of wide applicability.
[0110] Finally, it should be noted that although the preferred embodiments of the present invention have been described, those skilled in the art may make additional changes and modifications to these embodiments once they are aware of the basic creative concepts. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention. Obviously, those skilled in the art may make various changes and modifications to the embodiments of the present invention without departing from the spirit and scope of the embodiments of the present invention. Thus, if these modifications and variations of the embodiments of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A pipe network system based on rainwater and sewage separation, used for a drainage system, the drainage system comprising a combined The combined branch pipe is connected to the sewage branch pipe and the rainwater outlet, and the combined branch pipe is connected to the sewage branch pipe and the rainwater outlet respectively. It is characterized in that The pipe network system comprises: The interception facility is arranged between the combined branch pipe and the sewage branch pipe, and is used to intercept the sewage in the sewage branch pipe during the rainy period; a buffer facility, connected to the interception facility; A first flow diversion facility is connected to the branch confluence pipe and is located downstream of the branch confluence pipe; an initial rain storage facility, connected to the first diversion facility; A sewage interception pipe, connected to the first diversion facility and the municipal sewage pipe respectively, so as to intercept the sewage entering the first diversion facility from the sewage branch pipe and the combined branch pipe in sequence; The second diversion facility is connected to the municipal stormwater pipe; Wherein, during the rainy period, the interception facility intercepts the sewage in the sewage branch pipe, and the sewage is intercepted by the interception facility and stored in the buffer facility. At the initial stage of rainfall, the first rain transported in the combined branch pipe is diverted to the first rain storage facility for storage through the first diversion facility, and the middle and late rain transported in the combined branch pipe is diverted to the online treatment facility for treatment through the first diversion facility through the second diversion facility; and during the non-rainy period, the first rain is diverted to the online treatment facility for treatment through the first diversion facility and the second diversion facility in turn, and then flows into the natural water body or downstream pipeline, and during the non-rainy period, the interception facility releases the sewage in the sewage branch pipe, so that the sewage in the buffer facility or the sewage branch pipe flows into the sewage treatment facility through the interception pipe and the municipal sewage pipe in turn for treatment; A first water switch is arranged at the water outlet of the first diversion facility in the direction of the municipal rainwater pipe; as well as, A second water switch is arranged at the water outlet of the first diversion facility in the direction of the initial rain regulating and storing facility; A third water switch is arranged at the water outlet of the first diversion facility in the direction of the sewage interception pipe; A fourth water switch is arranged at the outlet of the intercepting facility in the direction of the confluent branch pipe; A fifth water switch is arranged at the water outlet of the intercepting facility in the direction of the buffer facility; a first pump, arranged in the primary rain regulating and storing facility, to pump the primary rain from the primary rain regulating and storing facility to the municipal rainwater pipe or the second diversion facility; A transmitter, for receiving an identification instruction of a current period, wherein the identification instruction includes one of the following instructions: a first identification instruction for characterizing a non-raining period, a second identification instruction for characterizing that the rainwater in the raining period is initial rain, and a third identification instruction for characterizing that the rainwater in the raining period is mid- to late-stage rain; A controller is respectively connected to the transmitter, the first water switch, the second water switch, the third water switch, the fourth water switch and the fifth water switch, and the controller includes a memory and a processor, wherein the memory stores a computer program, and when the program is executed by the processor, the following steps can be implemented: receiving an identification instruction sent by the transmitter; According to the identification instruction, the first water switch, the second water switch, the third water switch, the fourth water switch and the fifth water switch are switched on and off, and the switching specifically includes: When the identification instruction is the first identification instruction, the first water switch and the second water switch are controlled to be turned on respectively, so that the initial rain in the regulating and storing facility is sequentially diverted to the online treatment facility through the first diversion facility and the second diversion facility; or the first water switch is controlled to be closed, the second water switch is controlled to be closed, the third water switch is controlled to be turned on, the fourth water switch is controlled to be turned on, and the fifth water switch is controlled to be turned on, so that the sewage in the buffer facility is sequentially transported to the sewage treatment facility through the first diversion facility, the intercepting pipe, and the municipal sewage pipe for treatment; or the first water switch is controlled to be closed, the second water switch is controlled to be closed, the third water switch is controlled to be turned on, the fourth water switch is controlled to be turned on, and the fifth water switch is controlled to be closed, so that the sewage in the sewage branch pipe is sequentially transported to the sewage treatment facility through the intercepting facility, the combined branch pipe, the first diversion facility, the intercepting pipe, and the municipal sewage pipe for treatment; When the identification instruction is not the first identification instruction, the third water switch and the fourth water switch are controlled to be closed; and, When the identification instruction is the second identification instruction, the first water switch is controlled to be closed and the second water switch is controlled to be opened, so that the initial rain in the confluent branch pipe is diverted to the initial rain regulating and storing facility through the first diversion facility for storage; When the identification instruction is the third identification instruction, the first hydraulic switch is controlled to be turned on and the second hydraulic switch is controlled to be turned off, so that the middle and late rain in the combined branch pipe is diverted to the online treatment facility through the first diversion facility and the second diversion facility in turn for treatment.
2. The pipe network system according to claim 1, It is characterized in that Also includes: The sewage receiving facility is arranged between the intercepting facility and the sewage branch pipe.
3. The pipe network system according to claim 1, Features: The intercepting facility and the buffer facility are combined into a storage pool with an integrated structure. A partition is provided inside the storage pool. The intercepting facility and the buffer facility are respectively located on both sides of the partition.
4. The pipe network system according to claim 1, Features: The interception facility is one of a diversion well, an interception well, a discarding well, a buffer gallery or an installation well. and / or, The buffer facility is a pool structure or a tank structure with storage space; and / or, The initial rain storage facility is a lake or pond within the unit area or a reservoir arranged within the unit area.
