A rail transit bearing life enhancement test system
By designing a rail transit bearing life enhancement test system to simulate the working environment of high-speed rail bearings, the quality and reliability problems of domestic bearings have been solved, the performance testing of high-speed and high-load bearings has been achieved, and the accuracy and reliability of test data have been ensured. control.
Patent Information
- Application Number
- CN202010382063.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-05-08
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2040-05-08
AI Technical Summary
The gaps in the design concepts, manufacturing processes and testing equipment of domestic high-speed rail bearings result in the inability to guarantee their quality and reliability. The bearings have low fatigue life and cannot meet the performance requirements of high speed and high load.
Design a rail transit bearing life enhancement test system, including a frame, test head components, cooling system, transmission components, monitoring system and loading system. By simulating the working environment of rail transit bearings, it can test 300km/h level double rows. Tapered roller bearings use water cooling and air cooling systems to reduce ambient temperature and ensure data accuracy.
It realizes the performance test of large bearings to meet their load and speed requirements, relieves stress problems through flexible connections, improves the accuracy and controllability of test data, and ensures the reliability of test results.
Smart Images

Figure CN111426476B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of bearing strengthening tests, and in particular to a life strengthening test system for large heavy-duty rail transit bearings. Background Technology
[0002] Despite significant progress in my country's high-speed rail bearings, many challenges remain in the research and development process, such as gaps in design concepts, manufacturing processes, and testing equipment. These gaps result in the inability to guarantee the quality and reliability of domestically produced bearings, leading to low bearing fatigue life. Summary of the Invention
[0003] The purpose of this invention is to address the shortcomings of existing technologies by providing a rail transit bearing life enhancement test system. This system can test axle box bearings of high-speed trains, all of which are double-row tapered roller bearings. The test bearings are rated for speeds up to 300 km / h, and the average speed of the bearing is approximately 1730 r / min based on the average wheel speed. Each system can bear a load of 68.7 kN. This test system can effectively simulate the operating environment and ensure the accuracy of the test data.
[0004] The objective of this invention is achieved through the following technical solution: a rail transit bearing life enhancement test system. This system includes: a frame, a test head component, a cooling system component, a transmission component, a monitoring system component, a loading system component, and a working plate; wherein the working plate is fixed on the frame, the test head component and the transmission component are connected via a transmission square shaft and mounted on the working plate; the loading system component acts on a radial cylinder on the test head component; the monitoring system component controls the operation of the entire test system and monitors and records the measured data.
[0005] The test head component has three sets of bearings, with the test bearing in the middle and the auxiliary bearings on both sides. The three sets of bearings are on the same shaft system. The test bearing in the middle does not contact the cavity, while the auxiliary bearings on both sides contact the cavity. The load is applied directly to the test bearing in the middle, and the reaction force is borne by the auxiliary bearings on both sides.
[0006] The cooling system consists of a water cooling system and an air cooling system. The water cooling system forms a loop through water pipes, a water tank, and a water pump to achieve water cooling of the system. The air cooling system delivers natural air into the cavity of the test head component and exhausts the hot air generated during the test to the outside of the equipment to achieve air cooling of the system.
[0007] Furthermore, the test head component includes a test chamber and a test head;
[0008] The test chamber includes a front panel, an axial panel, a radial cylinder plate, a connecting panel, a base plate, fixing screws, an axial positioning plate, a tie rod, radial shims, and shim seats. The front panel, axial panel, radial cylinder plate, connecting panel, and base plate are fixed to form a rectangular chamber. The shim seats are fixed on the radial cylinder plate. The axial positioning plate is placed inside the axial panel. The fixing screws are screwed into the center of the axial panel and act on the axial positioning plate.
[0009] The test head includes a radial plug, a right-hand lock nut, a test shaft, a test bearing, a spacer ring, a test bearing, a left-hand lock nut, a middle load body, and an end load body. The test bearing and the test bearing are installed on the test shaft. The test bearing is installed in the middle of the test shaft, and the test bearings are installed at both ends of the test shaft. A spacer ring is installed between the test shaft and the test bearing to separate the test shaft and the test bearing. The spacer ring is tightened by the left-hand lock nut and the right-hand lock nut. Then, the test shaft passes through the middle load body, and the end load bodies are installed at both ends. The entire test head is then hoisted into the test chamber.
[0010] Furthermore, the cooling system components include a water-cooling system and an air-cooling system;
[0011] The water cooling system includes: a water pipe connector, a water tank, a return water pipe, an air cooler, a water pump, an inlet water pipe, and a outlet water pipe; the water pipe connector is fixed to the front panel, the water pump is installed on the panel of the water tank, and the water pump is connected to the water pipe connector through the inlet water pipe; the outlet water pipe connects the air cooler and the water pipe connector through the outlet water pipe; the return water pipe connects the water tank and the air cooler through the return water pipe, forming a circulating water cooling system;
[0012] The air-cooling system includes: a fan bracket, a fan, an air duct, and a blower; the fan is fixed on the fan bracket, the fan bracket is fixed above the test chamber, the blower is installed inside the frame and connected to the lower air outlet of the bottom plate of the test chamber through the air duct; the fan sends natural air into the chamber, and the blower exhausts the hot air generated during the test to the outside of the equipment, forming an air-cooling system.
[0013] Furthermore, the transmission components include: a square spindle, a left connecting sleeve, an elastic element, a right connecting sleeve, a transmission shaft seat, a motor plate, a motor, pulleys, a belt, a speed sensor, and a transmission shaft; the transmission shaft seat and the motor plate are mounted above the work plate, the motor is mounted on the motor plate, the transmission shaft is mounted in the transmission shaft seat, pulleys are mounted on the output shaft of the motor and the right end of the transmission shaft, the two pulleys are connected by a belt, the left end of the transmission shaft is connected to the right connecting sleeve, the left connecting sleeve is connected to the square spindle, the left connecting sleeve and the right connecting sleeve are flexibly connected by an elastic element, the square spindle is connected to the test shaft, and the test shaft reaches the corresponding speed by driving the motor.
[0014] Furthermore, the monitoring system components include: a temperature sensor, a vibration sensor, a speed sensor, a display, an industrial computer, and a high-voltage control cabinet; the temperature sensor and vibration sensor are installed on the test head and directly contact the test bearing; the speed sensor is installed on the right end of the drive shaft near the pulley and is used to test the speed of the drive shaft; the temperature sensor, vibration sensor, and speed sensor are connected to a signal processor, which is connected to the industrial computer via a digital-to-analog signal line, and the measured data is displayed on the display.
[0015] Furthermore, the loading system components include: a pump station, an accumulator, an electric contact pressure gauge, a shut-off valve, a pressure regulating valve, a pressure gauge, a pressure transmitter, a solenoid directional valve, and a hydraulic cylinder; the pump station includes: a filter, a motor, an oil pump, a relief valve, a check valve, and a one-way solenoid directional valve; the output shaft of the motor is connected to the oil pump, the oil pump inlet is connected to the oil tank pipeline through the filter, the oil pump outlet is connected to one end of the pipeline of the check valve and the relief valve respectively, the other end of the relief valve is connected to the oil tank pipeline, the other end of the check valve is connected to one end of the accumulator, and a one-way solenoid directional valve is installed on the pipeline between the check valve and the accumulator. The other end of the solenoid directional valve is connected to the oil tank pipeline, and the other end of the accumulator is connected to the shut-off valve. An electric contact pressure gauge is connected to the pipeline connecting the accumulator and the shut-off valve. The other end of the shut-off valve is connected to one end of the pressure regulating valve, and the other end of the pressure regulating valve is connected to the P port of the solenoid directional valve. A pressure gauge and a pressure transmitter are connected to the pipeline connecting the shut-off valve and the pressure regulating valve. The A port of the solenoid directional valve is connected to the front port of the hydraulic cylinder, and the B port of the solenoid directional valve is connected to the rear port of the hydraulic cylinder. The hydraulic cylinder is mounted on a radial cylinder plate, and a weight hook is installed below the pressure regulating valve. The secondary oil pressure of the pressure regulating valve is adjusted by adjusting the mass of the weight.
[0016] The beneficial effects of this invention are: it can test large double-row tapered roller bearings, meeting their load and speed performance requirements; the flexible transmission connection design eliminates stress issues; and the water-cooling and air-cooling systems effectively reduce the ambient temperature of the test bearings, resulting in more accurate performance testing. The design of the rail transit bearing life enhancement test system provided by this invention ensures that the actual operating speed, load, and temperature of rail transit bearings are simulated. Selecting bearings of the same model as test bearings ensures the accuracy of the test bearing data during the testing process. A circulating water circuit is provided within the test chamber, and the water-cooling and air-cooling systems ensure the controllability of the test environment and can be activated at any time according to the test conditions. Attached Figure Description
[0017] Figure 1 A schematic diagram of the components of a rail transit bearing life enhancement test system;
[0018] Figure 2 Schematic diagram of the test component;
[0019] Figure 3 Schematic diagram of the cooling system (water cooling and air cooling);
[0020] Figure 4 This is a schematic diagram of the transmission system components;
[0021] Figure 5 This is a schematic diagram of the monitoring system test.
[0022] Figure 6 This is a schematic diagram of the loading system components;
[0023] Figure 7 This is a schematic diagram of the monitoring system;
[0024] In the diagram: 1. Sheet metal frame component; 2. Test head component; 3. Cooling system component; 4. Transmission component; 5. Monitoring system component; 6. Loading system component; 7. Work plate; 8. Front panel; 9. Axial panel; 10. Radial cylinder plate; 11. Radial shim; 12. Connecting panel; 13. Base plate; 14. Fixing screw; 15. Axial positioning plate; 16. Right-hand lock nut; 17. Test shaft; 18. Accompanying bearing; 19. Isolation ring; 20. Test bearing; 21. Left-hand lock nut; 22. Tie rod; 23. Radial shim; 24. Shim seat; 25. Medium load body; 26. End load body; 27. Temperature sensor; 28. Vibration sensor; 29. Water pipe connector; 30. Water tank; 31. Return water pipe; 32. Air cooler; 33. Water. 33. Pump, 34. Water inlet pipe, 35. Water outlet pipe, 36. Fan bracket, 37. Fan, 38. Air duct, 39. Blower, 40. Square spindle, 41. Left coupling sleeve, 42. Elastic element, 43. Right coupling sleeve, 44. Drive shaft seat, 45. Motor board, 46. Motor, 47. Pulley, 48. Belt, 49. Speed sensor, 50. Drive shaft, 51. Pump station, 52. Accumulator, 53. Electrical contact pressure gauge, 54. Shut-off valve, 55. Pressure regulating valve, 56. Pressure gauge, 57. Pressure transmitter, 58. Solenoid directional valve, 59. Hydraulic cylinder, 60. Filter, 61. Electric motor, 62. Oil pump, 63. Overflow valve, 64. Check valve, 65. One-way solenoid directional valve, 66. Display, 67. Industrial computer, 68. Power control cabinet. Detailed Implementation
[0025] The present invention will now be described in further detail with reference to the accompanying drawings and specific embodiments.
[0026] Based on the operating conditions of rail transit bearings, in order to more accurately test their lifespan, the main technical parameters designed in this invention are as follows: rotational speed of 500-5000 r / min (stepless speed regulation); maximum radial load of 250 kN, with an error of ≤ ±2%; cooling system including water-cooled circulation system and air-cooled system; measurement and control method of computer automatic monitoring, automatic alarm shutdown and automatic recording; monitoring program controls the forward and reverse rotation of the test bearing; measurement parameters include bearing speed, vibration and inner ring temperature.
[0027] like Figure 1 As shown, this invention discloses a rail transit bearing life enhancement test system for testing the life of rail transit bearings. The system includes: a frame sheet metal component 1, a test head component 2, a cooling system component 3, a transmission component 4, a monitoring system component 5, a loading system component 6, and a working plate 7. The working plate 7 is fixed to the frame 1. The test head component 2 and the transmission component 4 are connected via a transmission square shaft and mounted on the working plate 7. The loading system 6 acts on a radial hydraulic cylinder on the test head component 2. The monitoring system component 5 controls the operation of the entire test system and monitors and records the measured data.
[0028] like Figure 2 As shown, the test head component 2 comprises a test chamber and a test head. The test chamber includes a front panel 8, an axial panel 9, a radial cylinder plate 10, a connecting panel 12, a base plate 13, fixing screws 14, an axial positioning plate 15, a pull rod 22, a radial shim 23, and a shim seat 24. The five panels are fixed together by screws to form a rectangular cavity. The shim seat 24 is fixed to the radial cylinder plate 10 by screws. The axial positioning plate 15 is placed inside the axial panel 9, and the fixing screws 14 are screwed into the center of the axial panel 9, applying force to the axial fixing plate 15. The test head includes... The test head assembly consists of a radial plug 11, a right-hand locking nut 16, a test shaft 17, auxiliary bearings 18, an isolation ring 19, a test bearing 20, a left-hand locking nut 21, a middle load body 25, and an end load body 26. The test bearings 20 and 18 are mounted on the test shaft 17, with the test bearing 20 in the middle and the 18 on either side, separated by the isolation ring 19. The left-hand locking nut 21 and the right-hand locking nut 16 are then tightened. The test shaft 17 is then passed through the middle load body 25, and the end load bodies 26 are installed at both ends. The entire test head is then hoisted into the test cavity. The test head assembly 2 has three sets of bearings: the test bearing 20 in the middle and the 18 on either side. All three sets of bearings are on the same shaft system. The middle test bearing 20 does not contact the cavity, while the 18 on either side do. The load acts directly on the middle test bearing 20, and the reaction force is borne by the 18 on either side.
[0029] like Figure 3As shown, the cooling system component 3 includes a water-cooled system and an air-cooled system; the water-cooled system includes: a water pipe connector 29, a water tank 30, a return water pipe 31, an air cooler 32, a water pump 33, an inlet water pipe 34, and a outlet water pipe 35; the water pipe connector 29 is fixed on the front panel 8, the water pump 33 is mounted on the panel of the water tank 30, the inlet water pipe 34 connects the water pump 33 and the water pipe connector 29; the outlet water pipe 35 connects the air cooler 32 and the water pipe connector 29; the return water pipe 31 connects the air cooler 32 and the water... Box 30; thus forming a recirculating water cooling system; the air cooling system includes: fan bracket 36, fan 37, air duct 38 and blower 39; the fan 37 is fixed on the fan bracket 36, and then together they are fixed above the test chamber, the blower 39 is installed on the internal frame, and connected to the lower air outlet of the bottom plate 13 of the test chamber through the air duct 38; the fan 37 sends cool air into the chamber, and the blower 39 exhausts the hot air generated by the test to the outside of the equipment, forming an air cooling system.
[0030] like Figure 4 As shown, the transmission component 4 includes: a square shaft 40, a left connecting sleeve 41, an elastic element 42, a right connecting sleeve 43, a transmission shaft seat 44, a motor plate 45, a motor 46, a pulley 47, a belt 48, a speed sensor 49, and a transmission shaft 50; the transmission shaft seat 44 and the motor plate 45 are mounted above the working plate 7, the motor 46 is mounted on the motor plate 45, the transmission shaft 50 is mounted in the transmission shaft seat 44, the right end of the motor 46 and the transmission shaft 50 is equipped with a pulley 47, and is connected and driven by a belt 48, the left end of the transmission shaft 50 is connected to the right connecting sleeve 43, the left connecting sleeve 41 is connected to the square shaft 40, the left connecting sleeve 41 and the right connecting sleeve (43) are flexibly connected by an elastic element 42, the square shaft 40 is connected to the test shaft 17, and the test shaft 17 reaches the corresponding speed by driving the motor 46.
[0031] like Figure 5 and 7 As shown, the monitoring system component 5 includes: a temperature sensor 27, a vibration sensor 28, a speed sensor 49, a display 66, an industrial control computer 67, and a high-voltage control cabinet 68. The temperature sensor 27 and vibration sensor 28 are mounted on the test head and directly contact the test bearing 20. The speed sensor 49 is mounted on the right end of the drive shaft 50 near the pulley 47 and is used to test the speed of the drive shaft 50. The temperature sensor 27, vibration sensor 28, and speed sensor 49 are connected to the signal processor, which is connected to the industrial control computer 67 via a digital-to-analog signal line. The measured data is displayed on the display 66.
[0032] like Figure 6As shown, the loading system component 6 includes: a pump station 51, an accumulator 52, an electric contact pressure gauge 53, a shut-off valve 54, a pressure regulating valve 55, a pressure gauge 56, a pressure transmitter 57, a solenoid directional valve 58, and a hydraulic cylinder 59; the pump station 51 includes: a filter 60, a motor 61, an oil pump 62, an overflow valve 63, a check valve 64, and a one-way solenoid directional valve 65; the output shaft of the motor 61 is connected to the oil pump 62, the oil inlet of the oil pump 62 is connected to the oil tank pipeline through the filter 60, the oil outlet of the oil pump 62 is connected to the pipelines of the check valve 64 and the overflow valve 63 respectively, the other end of the overflow valve 63 is connected to the oil tank pipeline, the other end of the check valve 64 is connected to one end of the accumulator 52, and a one-way solenoid directional valve is installed on the pipeline between the check valve 64 and the accumulator 52. 58. The other end of the one-way solenoid directional valve 58 is connected to the oil tank pipeline, and the other end of the accumulator 52 is connected to the shut-off valve 54. An electric contact pressure gauge 53 is connected to the pipeline connecting the accumulator 52 and the shut-off valve 54. The other end of the shut-off valve 54 is connected to one end of the pressure regulating valve 55. The other end of the pressure regulating valve 55 is connected to the P port of the solenoid directional valve 58. A pressure gauge 56 and a pressure transmitter 57 are connected to the pipeline connecting the shut-off valve 54 and the pressure regulating valve 55. The A port of the solenoid directional valve 58 is connected to the front port of the hydraulic cylinder 59, and the B port of the solenoid directional valve 58 is connected to the rear port of the hydraulic cylinder 59. The hydraulic cylinder 59 is mounted on the radial cylinder plate 10. A weight hook is installed below the pressure regulating valve 55. The secondary oil pressure of the pressure regulating valve 55 is adjusted by adjusting the mass of the weight.
[0033] The specific experimental procedure is as follows:
[0034] (1) First, install the test bearing 20 and two sets of auxiliary test bearings 18 onto the test shaft 17 using a press-fit method. Place the test bearing 20 in the middle position and the auxiliary test bearings 18 on both sides. Separate the bearings with a spacer ring 19. Then, lock them with a left-hand lock nut 21 and a right-hand lock nut 16. Then, pass the test shaft 17 with the bearings installed through the intermediate load body 25. The outer diameter of the test bearing 20 fits with the inner hole of the intermediate load body 25, and the outer diameter of the auxiliary test bearings 18 on both sides fits with the inner hole of the end load body 26. This completes the test head assembly.
[0035] (2) Hoist the assembled test head fixture into the test chamber as a whole. Screw the pull rod 22 into the radial shim 23. Adjust the tooling position. First, fasten the radial plug 11 to the radial cylinder plate 10 with screws. The radial plug 11 should be in flat contact with the side of the end load body 26. Place the radial shim 23 in the shim seat 24. Use an Allen wrench to tighten the fixing screw 14 to push the axial positioning plate (10) to contact the end face of the end load body 26. Then, turn the fixing screw back 1 / 2 turn to eliminate the axial force. Insert the temperature sensor 27 into the temperature hole of the load body and contact the outer ring of the bearing. Install the vibration sensor 28 on the intermediate load body. Fix the fan 37 on the fan bracket 36 and then fix the fan bracket 36 above the test chamber.
[0036] (3) Connect the test shaft 17 and the left coupling sleeve 41 with the square mandrel 40. Connect the left coupling sleeve 41 and the right coupling sleeve 43 with the elastic element 42 placed in the middle. This connection structure is a flexible connection. Install the speed sensor 49 on the transmission shaft seat 44 so that it is close to the magnet on the pulley 47. Finally, press the start button of the power control cabinet 68. At this time, the cooling system starts to work.
[0037] (4) Based on the performance parameters of the test bearing 20, determine the load magnitude and test speed of the test plan, write the test program in the industrial control computer 67, set the execution time and execution frequency of the test bearing 20, and start the test system. The input frequency value is fed back to the frequency converter to control the speed of the drive motor 46. After the test system is running, turn on the loading button of the high-voltage control cabinet 68, then open the shut-off valve 54 and adjust the pressure regulating valve 55 to make the loading component 6 start to operate. The hydraulic cylinder 59 starts to push the radial pad 23 forward to contact the intermediate load body 25, so that the test bearing is subjected to force. In the first 2 hours of operation, the weights are added to the weight hook in 3 times, and finally added to the load-bearing capacity value of the test bearing 20. The vibration sensor 28, temperature sensor 27 and speed sensor 49 collect data and display it on the display 66 through the industrial control computer 67 to complete the life test of the test bearing 20.
[0038] (5) After the test runs are stable, the measured temperature, vibration and rotation speed values can be seen on the display 66 interface. If the out-of-range shutdown value is entered in the control system, the test system can be safely operated without human intervention.
[0039] The industrial control computer 67 described in this invention only serves to transmit frequency signals to the frequency converter and display the data collected by the vibration sensor 28, temperature sensor 27 and speed sensor 49 on the display 66. This is a common technical means in the field and is not the inventive point of this invention.
[0040] The above embodiments are used to explain and illustrate the present invention, but not to limit the present invention. Any modifications and changes made to the present invention within the spirit and scope of the claims shall fall within the protection scope of the present invention.
Claims
1. A rail transit bearing life enhancement test system, characterized in that: The system comprises: a frame (1), a test head component (2), a cooling system component (3), a transmission component (4), a monitoring system component (5), a loading system component (6) and a working plate (7); wherein the working plate (7) is fixed on the frame (1); the test head component (2) and the transmission component (4) are connected via a transmission square shaft and mounted on the working plate (7); the loading system component (6) acts on a radial cylinder on the test head component (2); and the monitoring system component (5) controls the operation of the entire test system and monitors and records the measured data; The test head component (2) has three sets of bearings, the test bearing (20) is in the middle, and the test bearings (18) are provided on both sides of the test bearing. The three sets of bearings are in the same shaft system. The test bearing (20) in the middle does not contact the cavity, and the test bearings (18) on both sides contact the cavity. The load acts directly on the test bearing (20) in the middle, and the reaction force formed is borne by the test bearings (18) on both sides. The test head component (2) comprises a test cavity and a test head; The test cavity comprises a front panel (8), an axial panel (9), a radial cylinder plate (10), a connecting panel (12), a bottom plate (13), fixing screws (14), an axial positioning plate (15), a pull rod (22), a radial washer (23) and a washer seat (24); the front panel (8), the axial panel (9), the radial cylinder plate (10), the connecting panel (12) and the bottom plate (13) are fixed to form a rectangular cavity; the washer seat (24) is fixed on the radial cylinder plate (10); the axial positioning plate (15) is placed on the inner side of the axial panel (9); the fixing screws (14) are screwed into the center of the axial panel (9) and act on the axial positioning plate (15); The test head comprises a radial plug iron (11), a right-handed locking nut (16), a test shaft (17), a test bearing (18), a spacer ring (19), a test bearing (20), a left-handed locking nut (21), a middle load body (25) and an end load body (26); the test bearing (20) and the test bearing (18) are mounted on the test shaft (17), the test bearing (20) is mounted in the middle of the test shaft (17), the test bearing (18) is mounted at both ends of the test shaft (17), a spacer ring (19) is mounted between the test shaft (17) and the test bearing (18), the test shaft (17) and the test bearing (18) are spaced apart, and the left-handed locking nut (21) and the right-handed locking nut (16) are tightened, and then the test shaft (17) passes through the middle load body (25), the end load bodies (26) are mounted at both ends, and the entire test head is hoisted into the test cavity as a whole; The cooling system component (3) is composed of a water cooling system and an air cooling system; the water cooling system forms a cycle through a water pipe, a water tank (30) and a water pump (33) to achieve water cooling of the system; the air cooling system sends natural air into the cavity of the test head component (2) and exhausts the hot air generated by the test to the outside of the equipment to achieve air cooling of the system.
2. According to claim 1, the rail transit bearing life enhancement test system is characterized in that: The cooling system components (3) include a water cooling system and an air cooling system; The water cooling system comprises: a water pipe joint (29), a water tank (30), a return pipe (31), an air cooler (32), a water pump (33), an upper water pipe (34) and a lower water pipe (35); the water pipe joint (29) is fixed on the front panel (8), the water pump (33) is installed on the panel of the water tank (30), the water pump (33) is connected to the water pipe joint (29) via the upper water pipe (34); the lower water pipe (35) is connected to the air cooler (32) and the water pipe joint (29) via the lower water pipe (35); the return pipe (31) and the water tank (30) are connected to the air cooler (32) via the return pipe (31), thereby forming a circulatory water cooling system; The air cooling system comprises: a fan bracket (36), a fan (37), an air duct (38) and a blower (39); the fan (37) is fixed on the fan bracket (36), the fan bracket (36) is fixed above the test chamber, the blower (39) is installed inside the frame (1), and is connected to the lower air outlet of the bottom plate (13) of the test chamber through the air duct (38); the fan (37) sends natural air into the chamber, and the blower (39) exhausts the hot air generated by the test to the outside of the equipment, thereby forming an air cooling system.
3. The rail transit bearing life enhancement test system according to claim 1 is characterized in that: The transmission component (4) comprises: a square spindle (40), a left coupling sleeve (41), an elastic element (42), a right coupling sleeve (43), a transmission shaft seat (44), a motor plate (45), a motor (46), a pulley (47), a belt (48), a speed sensor (49) and a transmission shaft (50); the transmission shaft seat (44) and the motor plate (45) are mounted above the working plate (7), the motor (46) is mounted on the motor plate (45), and the transmission shaft (50) is mounted on the transmission shaft seat (4 4), the output shaft of the motor (46) and the right end of the transmission shaft (50) are both equipped with pulleys (47), the two pulleys (47) are connected by a belt (48), the left end of the transmission shaft (50) is connected to the right coupling sleeve (43), the left coupling sleeve (41) is connected to the square shaft (40), the left coupling sleeve (41) and the right coupling sleeve (43) are flexibly connected by an elastic element (42), the square shaft (40) is connected to the test shaft (17), and the test shaft (17) reaches a corresponding rotation speed by driving the motor (46).
4. The rail transit bearing life enhancement test system according to claim 1 is characterized in that: The monitoring system components (5) include: a temperature sensor (27), a vibration sensor (28), a rotation speed sensor (49), a display (66), an industrial computer (67) and a high-voltage control cabinet (68); the temperature sensor (27) and the vibration sensor (28) are installed on the test head and directly contact the test bearing (20); the rotation speed sensor (49) is installed at the right end of the transmission shaft (50) near the pulley (47) and is used to test the rotation speed of the transmission shaft (50); the temperature sensor (27), the vibration sensor (28) and the rotation speed sensor (49) are connected to a signal processor, and the signal processor is connected to the industrial computer (67) via a digital-to-analog signal line, and the measured data is displayed on the display (66).
5. The rail transit bearing life enhancement test system according to claim 1 is characterized in that: The loading system components (6) include: a pump station (51), an accumulator (52), an electric contact pressure gauge (53), a stop valve (54), a pressure regulating valve (55), a pressure gauge (56), a pressure transmitter (57), an electromagnetic reversing valve (58) and a hydraulic cylinder (59); the pump station (51) includes: a filter (60), an electric motor (61), an oil pump (62), a relief valve (63), a check valve (64) and a check electromagnetic reversing valve (65). The output shaft of the motor (61) is connected to the oil pump (62); the oil inlet of the oil pump (62) is connected to the oil tank pipeline through the filter (60); the oil outlet of the oil pump (62) is connected to the pipelines of the one-way valve (64) and the overflow valve (63) respectively; the other end of the overflow valve (63) is connected to the oil tank pipeline; the other end of the one-way valve (64) is connected to one end of the accumulator (52); a one-way valve (64) is installed on the pipeline between the one-way valve (64) and the accumulator (52); The one-way electromagnetic reversing valve (65) is connected to the oil tank pipeline, the other end of the accumulator (52) is connected to the stop valve (54), the electric contact pressure gauge (53) is connected to the pipeline connecting the accumulator (52) and the stop valve (54), the other end of the stop valve (54) is connected to one end of the pressure regulating valve (55), the other end of the pressure regulating valve (55) is connected to the P interface of the electromagnetic reversing valve (58), and the stop valve (54) is connected to the pressure regulating valve (55). A pressure gauge (56) and a pressure transmitter (57) are connected to the pipeline of the pressure regulating valve (55); an A interface of the electromagnetic reversing valve (58) is connected to the front port of the hydraulic cylinder (59); and a B interface of the electromagnetic reversing valve (58) is connected to the rear port of the hydraulic cylinder (59); the hydraulic cylinder (59) is mounted on the radial cylinder plate (10); a weight hook is mounted below the pressure regulating valve (55); and the secondary oil pressure of the pressure regulating valve (55) is adjusted by adjusting the mass of the weight.