Boiler tail gas transformation air inlet volume interlock online detection device
By adding a connecting sleeve and sealing gasket at the connection between the fixed pipe and the air duct of the boiler exhaust modification device, the rotary rod drives the air duct and the pressure ring to move upward, the convenient connection between the air duct and the fixed pipe and the high sealing performance is achieved, and the solution is to solve the problem of The problem of troublesome operation of multiple bolts in the prior art is caused.
Patent Information
- Application Number
- CN202010453634.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-05-26
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2040-05-26
AI Technical Summary
The existing boiler exhaust gas transformation device requires multiple bolts to be fixed when connecting the air duct to the fixed pipe, which is troublesome to operate and inconvenient assembly.
A boiler exhaust gas modification air inlet volume interlocking online detection device is designed. By installing a connecting sleeve on the outside of the connection between the fixed pipe and the air duct, and using a rotary rod to drive the connecting sleeve to rotate. The air duct and the pressure ring pass through the sealing gasket and the sealing ring. A seal is achieved, avoiding the use of multiple bolts to fix it.
The connection process between the air duct and the fixed pipe is simplified, the connection sealing is improved, and the staff is able to assemble the boiler exhaust gas transformation device, reducing operation difficulty and improving sealing effect.
Smart Images

Figure CN111503652B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of boiler tail gas modification, and in particular relates to an online detection device for interlocking air intake volume of boiler tail gas modification. Background Art
[0002] The current boiler combustion of nitrogen oxides does not meet environmental protection requirements. Direct emissions will pollute the air environment, cause acid rain, and affect the physical and mental health of the people. The boiler tail gas needs to be modified and purified. Through the line detector and the tail gas recycling air intake interlock, the nitrogen oxide content of the boiler tail gas emissions can meet the environmental protection standards. The connection between the air duct and the fixed pipe in the existing boiler tail gas modification device needs to be fixed by multiple bolts, which is troublesome to operate and brings inconvenience to the staff assembling the boiler tail gas modification device. For this reason, we propose a boiler tail gas modification air intake interlock online detection device. Summary of the invention
[0003] The purpose of the present invention is to provide an online detection device for interlocking the air intake volume of a boiler tail gas modification, so as to solve the problems raised in the above-mentioned background technology.
[0004] To achieve the above-mentioned purpose, the present invention provides the following technical scheme: an online detection device for air intake interlocking of boiler tail gas transformation, comprising a boiler, a burner is arranged at one end of the boiler, a natural gas pipeline is arranged at the top of the burner, a preheating boiler is arranged at the other end of the boiler, an air preheater is arranged on one side of the preheating boiler, a water preheater is arranged on one side of the air preheater, a chimney is arranged on one side of the water preheater, an online nitrogen oxide monitor is arranged on the top of one side of the chimney, a blower is arranged on the top of the air preheater, an FGR mixing box is arranged at the outlet of the blower, an FGR pipeline is arranged at the bottom of the FGR mixing box, and the An adjusting damper switch is arranged on one side of the FGR pipeline, the boiler, preheating boiler, air preheater, water preheater and chimney are all connected through a flue, the bottom end of the FGR pipeline is located at the top end of the flue, the FGR pipeline and the flue are interconnected, the bottom end of the FGR pipeline is located between the air preheater and the water preheater, fixed pipes are arranged at the bottom ends of the burner and the air preheater, an air duct is arranged between the two fixed pipes, a connecting sleeve is arranged on the outside of the connection between the air duct and the fixed pipe, a connecting ring is arranged on the outside of the bottom end of the fixed pipe, the connecting ring is located at the top end of the inner side of the connecting sleeve, and a sealing gasket is arranged between the air duct and the fixed pipe.
[0005] Preferably, a pressure ring is provided on the outer side of the top end of the air duct, a first pressure groove is provided on the top surface of the pressure ring and the bottom surface of the connecting ring, a first sealing ring is provided between the pressure ring and the connecting ring, the first sealing ring is located inside the first pressure groove, a second pressure groove is provided on the outer side of the top end of the connecting ring, a second sealing ring is provided between the connecting ring and the connecting sleeve, and the second sealing ring is located inside the second pressure groove.
[0006] Preferably, the two fixed pipes are fixedly connected to the burner and the air preheater respectively, and the sealing gasket is fixedly connected to the air duct.
[0007] Preferably, the connecting ring is fixedly connected to the fixed pipe, and the connecting sleeve is fixedly connected to the air duct via threads.
[0008] Preferably, the blower is fixedly connected to the air preheater via a connecting pipe, the blower is fixedly connected to the FGR mixing box, the FGR mixing box is fixedly connected to the flue via an FGR pipeline, and the nitrogen oxide online monitor is fixedly connected to the chimney.
[0009] Preferably, rotating rods are provided at both ends of the outer side of the connecting sleeve, one end of the rotating rod is located inside the connecting sleeve, and the rotating rod is fixedly connected to the connecting sleeve via threads.
[0010] Preferably, the air duct is sealed and connected to the fixed pipe via a sealing gasket, and the connecting ring is sealed and connected to the connecting sleeve via a second pressure groove and a second sealing ring.
[0011] Preferably, the pressure ring is fixedly connected to the air duct, and the pressure ring is sealingly connected to the connecting ring via a first pressure groove and a first sealing ring.
[0012] Compared with the prior art, the present invention has the following beneficial effects:
[0013] (1) By installing a connecting sleeve on the outside of the connection between the fixed pipe and the air duct, when it is necessary to connect the fixed pipe with the connecting sleeve, move the air duct and align the top of the air duct with the inside of the connecting sleeve. When the outer thread of the air duct contacts the inner thread of the connecting sleeve, hold the air duct and then turn the rotating rod. The connecting sleeve is driven by the rotating rod to rotate. The air duct continuously moves upward under the action of the thread. The air duct mobilizes the sealing gasket to move upward. At the same time, the air duct drives the pressure ring to move upward. The pressure ring drives the first sealing ring to move upward through the first pressure groove until the rotating rod cannot be turned. At this time, the sealing gasket is tightly in contact with the bottom end of the fixed pipe, the first sealing ring is tightly in contact with the pressure ring and the connecting ring, and the second sealing ring is tightly in contact with the connecting ring and the connecting sleeve. The operation is completed without the need to fix with multiple bolts, which is convenient for the staff to connect the air duct with the fixed pipe and to assemble the boiler exhaust gas modification device.
[0014] (2) By respectively opening a first pressing groove at the top of the pressure ring and the bottom of the connecting ring, and opening a second pressing groove at one side of the top of the connecting ring, the contact area between the first sealing ring and the connecting ring and the pressure ring is increased under the action of the first pressing groove, and the sealing of the connection between the pressure ring and the connecting ring is improved. Under the action of the second pressing groove, the contact area between the second sealing ring and the connecting ring is increased, and the sealing of the connection between the connecting ring and the connecting sleeve is improved, thereby improving the sealing of the connection between the air duct and the fixed pipe. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic structural diagram of a boiler tail gas transformation device of the present invention;
[0016] Figure 2 for Figure 1 The enlarged structural diagram at a in FIG.
[0017] Figure 3 It is a schematic diagram of the cross-sectional structure of the connecting sleeve of the present invention;
[0018] Figure 4 for Figure 3 The enlarged structural diagram at b in FIG.
[0019] In the figure: 1. boiler; 2. burner; 3. preheating boiler; 4. air preheater; 5. water preheater; 6. chimney; 7. nitrogen oxide online monitor; 8. FGR pipeline; 9. damper switch; 10. FGR mixing box; 11. blower; 12. natural gas pipeline; 13. air duct; 14. fixing pipe; 15. connecting sleeve; 16. rotating rod; 17. pressure ring; 18. first pressure groove; 19. first sealing ring; 20. second pressure groove; 21. second sealing ring; 22. connecting ring. DETAILED DESCRIPTION
[0020] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0021] See also Figure 1-Figure 4The present invention provides a technical solution: an online detection device for interlocking the air intake volume of a boiler tail gas modification, comprising a boiler 1, a burner 2 is arranged at one end of the boiler 1, a natural gas pipeline 12 is arranged at the top of the burner 2, a preheating boiler 3 is arranged at the other end of the boiler 1, an air preheater 4 is arranged at one side of the preheating boiler 3, a water preheater 5 is arranged at one side of the air preheater 4, a chimney 6 is arranged at one side of the water preheater 5, a nitrogen oxide online monitor 7 is arranged at the top of one side of the chimney 6, a blower 11 is arranged at the top of the air preheater 4, an FGR mixing box 10 is arranged at the outlet of the blower 11, an FGR pipeline 8 is arranged at the bottom of the FGR mixing box 10, and a FGR pipeline 8 is arranged at one side of the FGR pipeline 8 There is an adjustable damper switch 9, the boiler 1, the preheating boiler 3, the air preheater 4, the water preheater 5 and the chimney 6 are all connected through the flue, the bottom end of the FGR pipe 8 is located at the top of the flue, the FGR pipe 8 and the flue are interconnected, the bottom end of the FGR pipe 8 is located between the air preheater 4 and the water preheater 5, the bottom end of the burner 2 and the bottom end of the air preheater 4 are both provided with fixed pipes 14, an air duct 13 is provided between the two fixed pipes 14, a connecting sleeve 15 is provided on the outside of the connection between the air duct 13 and the fixed pipe 14, a connecting ring 22 is provided on the outside of the bottom end of the fixed pipe 14, the connecting ring 22 is located on the top of the inner side of the connecting sleeve 15, and a sealing gasket is provided between the air duct 13 and the fixed pipe 14.
[0022] By installing an online nitrogen oxide detector 7 and an adjustable damper switch 9 on the chimney pipe, a portion of the low-temperature flue gas is extracted in front of the air preheater of the boiler and directly mixed with the supply air before being sent into the furnace. This can not only reduce the combustion temperature, but also reduce the oxygen concentration, thereby reducing the NOx emission concentration. The effect of reducing NOx emissions by the flue gas recirculation method is related to the fuel type and flue gas recirculation. When the flue gas recirculation rate is 10-15%, the NOx emission concentration of the combustion furnace can be reduced by more than 40%. The reduction of NOx increases with the increase of the flue gas recirculation rate. And it is related to the fuel type and combustion temperature. The higher the combustion temperature, the greater the impact of the flue gas recirculation rate on the NOX reduction rate. The flue gas recirculation rate of gas boilers is generally controlled at 10-20%. When a higher flue gas recirculation rate is used, the combustion will be unstable and the heat loss of incomplete combustion will increase.
[0023] In order to improve the sealing performance of the connection between the air duct 13 and the fixed tube 14, in the present embodiment, preferably, a pressure ring 17 is provided on the outer side of the top end of the air duct 13, and a first pressure groove 18 is provided on the top surface of the pressure ring 17 and the bottom surface of the connecting ring 22, a first sealing ring 19 is provided between the pressure ring 17 and the connecting ring 22, and the first sealing ring 19 is located inside the first pressure groove 18, a second pressure groove 20 is provided on the outer side of the top end of the connecting ring 22, a second sealing ring 21 is provided between the connecting ring 22 and the connecting sleeve 15, and the second sealing ring 21 is located inside the second pressure groove 20.
[0024] In order to facilitate fixing of the fixed pipe 14 , in this embodiment, preferably, the two fixed pipes 14 are fixedly connected to the burner 2 and the air preheater 4 respectively, and the sealing gasket is fixedly connected to the air duct 13 .
[0025] In order to facilitate fixing of the connecting ring 22 , in this embodiment, preferably, the connecting ring 22 is fixedly connected to the fixing pipe 14 , and the connecting sleeve 15 is fixedly connected to the air duct 13 via threads.
[0026] To facilitate the installation of the blower 11, in this embodiment, preferably, the blower 11 is fixedly connected to the air preheater 4 via a connecting pipe, the blower 11 is fixedly connected to the FGR mixing box 10, the FGR mixing box 10 is fixedly connected to the flue via the FGR pipe 8, and the nitrogen oxide online monitor 7 is fixedly connected to the chimney 6.
[0027] In order to facilitate the removal of the rotating rod 16, in this embodiment, preferably, rotating rods 16 are provided at both ends of the outer side of the connecting sleeve 15, one end of the rotating rod 16 is located inside the connecting sleeve 15, and the rotating rod 16 is fixedly connected to the connecting sleeve 15 by threads.
[0028] In order to improve the sealing performance of the connection between the connecting ring 22 and the connecting sleeve 15 , in this embodiment, preferably, the air duct 13 is sealedly connected to the fixed tube 14 via a sealing gasket, and the connecting ring 22 is sealedly connected to the connecting sleeve 15 via a second pressure groove 20 and a second sealing ring 21 .
[0029] In order to facilitate fixing of the pressure ring 17 , in this embodiment, preferably, the pressure ring 17 is fixedly connected to the air duct 13 , and the pressure ring 17 is sealedly connected to the connecting ring 22 via the first pressure groove 18 and the first sealing ring 19 .
[0030] The working principle and use process of the present invention are as follows: after the device is completed, a connecting sleeve 15 is installed on the outside of the connection between the fixed tube 14 and the air duct 13. When the fixed tube 14 needs to be connected with the connecting sleeve 15, the air duct 13 is moved, and the top of the air duct 13 is aligned with the inside of the connecting sleeve 15. When the outer thread of the air duct 13 contacts the inner thread of the connecting sleeve 15, the air duct 13 is held, and then the rotating rod 16 is rotated. The connecting sleeve 15 is rotated by the rotating rod 16. The air duct 13 continuously moves upward under the action of the thread. The air duct 13 mobilizes the sealing gasket to move upward. At the same time, the air duct 13 drives the pressure ring 17 to move upward. The pressure ring 17 drives the first sealing ring 19 to move upward through the first pressure groove 18 until the rotating rod 16 cannot be rotated. At this time, the sealing gasket is tightly in contact with the bottom end of the fixed tube 14, and the first sealing ring 19 is tightly in contact with the pressure ring 17 and the connecting ring 22. The two sealing rings 21 are in tight contact with the connecting ring 22 and the connecting sleeve 15, and the operation is completed without the need for fixing with multiple bolts, which makes it convenient for the staff to connect the air duct 13 with the fixed pipe 14, and facilitates the staff to assemble the boiler exhaust gas modification device. By respectively opening a first pressure groove 18 at the top of the pressure ring 17 and the bottom of the connecting ring 22, and opening a second pressure groove 20 at one side of the top of the connecting ring 22, under the action of the first pressure groove 18, the contact area between the first sealing ring 19 and the connecting ring 22 and the pressure ring 17 is increased, and the connection sealing between the pressure ring 17 and the connecting ring 22 is improved. Under the action of the second pressure groove 20, the contact area between the second sealing ring 21 and the connecting ring 22 is increased, and the connection sealing between the connecting ring 22 and the connecting sleeve 15 is improved, thereby improving the connection sealing between the air duct 13 and the fixed pipe 14.
[0031] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. An online detection device for air volume interlocking of boiler tail gas transformation, comprising a boiler (1), characterized in that: A burner (2) is provided at one end of the boiler (1), a natural gas pipeline (12) is provided at the top of the burner (2), a preheating boiler (3) is provided at the other end of the boiler (1), an air preheater (4) is provided at one side of the preheating boiler (3), a water preheater (5) is provided at one side of the air preheater (4), a chimney (6) is provided at one side of the water preheater (5), a nitrogen oxide online monitor (7) is provided at the top of one side of the chimney (6), a blower (11) is provided at the top of the air preheater (4), an FGR mixing box (10) is provided at the outlet of the blower (11), an FGR pipeline (8) is provided at the bottom of the FGR mixing box (10), a damper switch (9) is provided at one side of the FGR pipeline (8), and the boiler (1), the preheating boiler (3) and the preheating boiler (3) are provided at the same time. The furnace (3), the air preheater (4), the water preheater (5) and the chimney (6) are all connected through a flue, the bottom end of the FGR pipe (8) is located at the top end of the flue, the FGR pipe (8) and the flue are interconnected, the bottom end of the FGR pipe (8) is located between the air preheater (4) and the water preheater (5), the bottom end of the burner (2) and the bottom end of the air preheater (4) are both provided with a fixed pipe (14), an air duct (13) is provided between the two fixed pipes (14), a connecting sleeve (15) is provided on the outside of the connection between the air duct (13) and the fixed pipe (14), a connecting ring (22) is provided on the outside of the bottom end of the fixed pipe (14), the connecting ring (22) is located at the top end of the inner side of the connecting sleeve (15), and a sealing gasket is provided between the air duct (13) and the fixed pipe (14); A pressure ring (17) is arranged on the outer side of the top end of the air duct (13); a first pressure groove (18) is provided on the top surface of the pressure ring (17) and the bottom surface of the connecting ring (22); a first sealing ring (19) is arranged between the pressure ring (17) and the connecting ring (22); the first sealing ring (19) is located inside the first pressure groove (18); a second pressure groove (20) is arranged on the outer side of the top end of the connecting ring (22); a second sealing ring (21) is arranged between the connecting ring (22) and the connecting sleeve (15); the second sealing ring (21) is located inside the second pressure groove (20); The connecting ring (22) is fixedly connected to the fixed pipe (14), and the connecting sleeve (15) is fixedly connected to the air duct (13) via threads; The pressure ring (17) is fixedly connected to the air duct (13), and the pressure ring (17) is sealedly connected to the connecting ring (22) via a first pressure groove (18) and a first sealing ring (19).
2. The boiler tail gas transformation air intake interlock online detection device according to claim 1 is characterized by: The two fixed pipes (14) are fixedly connected to the burner (2) and the air preheater (4) respectively, and the sealing gasket is fixedly connected to the air duct (13).
3. The boiler tail gas transformation air intake interlock online detection device according to claim 1 is characterized by: The blower (11) is fixedly connected to the air preheater (4) via a connecting pipe, the blower (11) is fixedly connected to the FGR mixing box (10), the FGR mixing box (10) is fixedly connected to the flue via an FGR pipeline (8), and the nitrogen oxide online monitor (7) is fixedly connected to the chimney (6).
4. The boiler tail gas transformation air intake interlock online detection device according to claim 1 is characterized by: Rotating rods (16) are provided at both ends of the outer side of the connecting sleeve (15), one end of the rotating rod (16) is located inside the connecting sleeve (15), and the rotating rod (16) is fixedly connected to the connecting sleeve (15) via threads.
5. The boiler tail gas transformation air intake interlock online detection device according to claim 1 is characterized by: The air duct (13) is sealedly connected to the fixed pipe (14) via a sealing gasket, and the connecting ring (22) is sealedly connected to the connecting sleeve (15) via a second pressing groove (20) and a second sealing ring (21).