Test method for improving response speed of hot-rolled laminar cooling water valve
A technology of response speed and test method, applied in workpiece cooling devices, metal rolling, length measuring devices, etc., can solve the problems of low strip coiling temperature compliance rate, uneven response time, and uneven strip cooling. Achieve the effect of improving statistical efficiency and valve maintenance cycle, reducing accident rate and reducing errors
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2020-08-25
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to a test method for improving the response speed of a laminar flow cooling water valve in hot rolling, which is mainly used for accurate testing and efficient optimization of the response time of the water valve in a production line that uses laminar flow cooling water to control the final rolling temperature of strip steel in various steel mills. Thereby improving product quality. Background technique
[0002] At present, the laminar flow cooling system is used in the hot rolling production lines of domestic and foreign iron and steel enterprises. Its main function is to quickly cool the finish rolling outlet according to the target temperature set by coiling, so as to achieve the target set value to ensure the product quality of the strip. performance.
[0003] With the increase of the hot-rolled 2250mm output of the rare earth steel plate factory, the quality of hot-rolled products has also become higher, and the requirements...
Examples
Embodiment Construction
[0021] Further illustrate technical scheme of the present invention below in conjunction with accompanying drawing:
[0022] A test method for improving the response speed of a hot-rolled laminar flow cooling water valve, which mainly includes the following steps:
[0023] a. Line connection, connect the prepared end to the power line of the test handle and the terminal box of the laminar flow cooling water valve to collect the signal of the handle to the inside of the system;
[0024] b. Fix the line to avoid disconnection caused by dragging the handle during the retest process, which will affect the test effect;
[0025] c. Lay the line, lay the line of the connection number to the first group of water valves of the laminar flow cooling water, and reserve a sufficiently long (about 20 meters) line.
[0026] 2. The computer-operated terminal setting of the present invention mainly includes the following steps:
[0027] a. Set the spray mode to Auto in the secondary operatio...