Island welding production line and production method for the middle trough / hydraulic support structure of coal mining scraper conveyor
Through the island welding production line mode and intelligent track omnidirectional RGV/trackless AGV trolley, efficient welding of the middle groove/hydraulic support structural parts of coal mining equipment is achieved, solving the problem of excessive length, low flexibility and waste of resources in the existing production line mode. The problem of improving production efficiency and safety.
Patent Information
- Application Number
- CN202010457749.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-05-26
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2040-05-26
AI Technical Summary
The welding production line model of the existing coal mining scraper conveyor middle groove/hydraulic support structural parts has problems such as excessive total length, low flexibility, waste of resources and stuck in the entire production line during failure, mainly due to the assembly station and welding workers One-to-one relationship of bits and lack of automatic recognition capabilities.
Adopt island welding production line mode, including several welding islands, preheating islands and assembly islands, equipped with intelligent track omnidirectional RGV/trackless AGV trolleys and workpiece identification system, realizing a many-to-many welding mode, and separating the welding island from the assembly island , Welding stations can automatically identify and process workpieces of different models, and intelligent track omnidirectional RGV/trackless AGV trolleys are used for efficient material transfer and signal mutual transmission.
It improves the flexibility and resource utilization of the production line, reduces idle welding stations, realizes automated welding, improves safety and production efficiency, saves space and costs, and ensures the flexibility and efficiency of the production line.
Smart Images

Figure CN111634632B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to an island type welding production line and a production method for a middle trough / hydraulic support structural component of a coal mining scraper conveyor, belonging to the technical field of the coal mining machinery industry. Background Art
[0002] Most of the existing welding production lines for products such as the middle trough / hydraulic support structural parts of coal mining scraper conveyors are in a straight line shape. Due to the complexity of the workpiece, it often takes N times of assembly and welding before it can be formed. Therefore, the disadvantage of the production line is that the total length is very long and the flexibility is very low. In addition, most of them are one-to-one welding modes, that is, the parts assembled at the corresponding assembly station can only be transported to the corresponding welding station that has been set in advance for welding, because other welding stations cannot automatically identify the assembly progress of the workpiece and the position that needs to be welded. In other words, the existing mode is that the corresponding assembly station corresponds to a certain welding station. Since the time spent on welding the workpiece at each welding station is different, even if the corresponding production rhythm is calculated very accurately, there will be idle welding stations, resulting in a waste of welding resources. Once a station is under maintenance or a failure occurs, the entire production line may face a stuck state. Summary of the invention
[0003] In order to solve the problems mentioned in the above background technology, the present invention adheres to the concept of saving resources, facilitating production, reasonable and compact layout, small footprint, high flexibility in production and welding, separation of assembly and welding islands, and improved safety, and proposes a new type of island welding production line for the middle trough / hydraulic support structure of coal mining scraper conveyor. N welding stations correspond to N assembly stations, each of which can automatically identify the workpiece from any of the N assembly stations, and automatically perform welding after identification. This island-type intelligent welding production line model has been successfully used in the middle trough welding production line and hydraulic support structure welding production line used in key equipment for coal mining - coal mine underground scraper conveyors and transfer machines.
[0004] The present invention proposes an island welding production line for a middle trough / hydraulic support structural member of a coal mining scraper conveyor, comprising a plurality of welding islands, a plurality of preheating islands and a plurality of assembly islands, a track group 11, an intelligent track omnidirectional RGV / trackless AGV trolley 12 and a control system, wherein the track group 11 is located in the middle of the island welding production line, the plurality of welding islands are located on one side of the track group 11, the preheating island and the assembly island are located on the other side of the track group 11, the intelligent track omnidirectional RGV / trackless AGV trolley 12 moves along the track group 11, and is used to transport welding structural members between islands, a workpiece identification system is provided on each welding station of the plurality of welding islands, and the workpiece identification system is used to identify the workpiece model and welding position, and the control system controls the movement of the intelligent track omnidirectional RGV / trackless AGV trolley 12, the signal transmission between the stations and the central overall control of the production line.
[0005] Preferably, the welding island and preheating island are unmanned operation areas, and operators are mainly active in the assembly island area.
[0006] Preferably, a safety passage 1 is arranged around the island welding production line of the middle trough / hydraulic support structure of the coal mining scraper conveyor.
[0007] Preferably, it is applied to the welding of the middle trough structure of the coal mining scraper conveyor, and several welding islands include a primary welding station island 2, a secondary welding station island 3 and a tertiary welding station island 4, each welding island contains several welding stations, several preheating islands include a primary preheating station island 10 and a secondary preheating station island 7, and several assembly islands include a secondary assembly station island 8 and a primary assembly station island 9. The island welding production line applied to the middle trough structure of the coal mining also includes a unloading station island 5 and an inspection / repair welding station island 6. The primary welding station island 2, the secondary welding station island 3 and the tertiary welding station island 4 are arranged in sequence and are located on one side of the track group 11. The primary preheating station island 10, the primary assembly station island 9, the secondary assembly station island 8, the secondary preheating station island 7 and the inspection / repair welding station island 6 are arranged in sequence and are located on the other side of the track group 11. The unloading station island 5 is located on the right side of the tertiary welding station island 4 and the inspection / repair welding station island 6.
[0008] Preferably, the primary welding station island 2 and the secondary welding station island 3 are used for middle plate bottoming, middle plate filling, bottom plate welding or rack seat welding, the tertiary welding station island 4 is used for welding, the secondary assembly station island 8 is used for bottom plate assembly, and the primary assembly station island 9 is used for assembly of shovel plate groove sides, baffle groove sides, middle plates and rack seats.
[0009] Preferably, it is applied to the welding of hydraulic support structural parts, and several welding islands include 1-5 welding flexible robot welding station island a14 and 1-5 welding flexible robot welding station island b16, the preheating island includes 1 preheating station island 22 and 2-5 preheating station island 19, the assembly island includes 1 splicing station island 21, 2-3 splicing station island 20 and 4-5 splicing station island 18, and the island welding production line applied to hydraulic support structural parts also includes a central control room 13, a repair welding island 15 and 6 splicing / welding station island 17, the 1-5 welding flexible robot welding station island a14 and the 1-5 welding flexible robot welding station island b16 are linearly arranged on the hydraulic support On one side of the frame structure island welding production line, the 1st preheating station island 22, the 1st splicing station island 21, the 2-3 splicing station island 20, the 2-5th preheating station island 19 and the 4-5th splicing station island 18 are arranged in sequence and are located on the other side of the hydraulic support structure island welding production line. The repair welding island 15 and the 6th splicing / welding station island 17 run through the upper and lower sides of the hydraulic support structure island welding production line. The repair welding island 15 is located between the 1-5th welding flexible robot welding station island a14 and the 1-5th welding flexible robot welding station island b16, and the 6th splicing / welding station island 17 is located on the right side of the 1-5th welding flexible robot welding station island b16.
[0010] Preferably, the 1-5 welding flexible robot welding station island a14 is arranged relative to the 1-preheating station island 22, the 1-stitching station island 21 and the 2-3-stitching station island 20, and the 1-5 welding flexible robot welding station island b16 is arranged relative to the 2-5-preheating station island 19 and the 4-5-stitching station island 18.
[0011] Preferably, the island welding production line used for hydraulic support structural parts also includes an AGV trolley motion track 26 and an AGV trolley 23. The AGV trolley motion track 26 transversely runs through the edge of the island welding production line. The AGV trolley 23 moves along the AGV trolley motion track 26 to transfer materials to the assembly island. The central control room 13 controls the movement of the intelligent track omnidirectional RGV / trackless AGV trolley 12 and the AGV trolley 23 and the signal interconnection of each workstation.
[0012] Preferably, the 1st splicing station island 21, the 2nd-3rd splicing station island 20 and the 4th-5th splicing station island 18 include an AGV transfer table 24 and a welding table.
[0013] The coal mining scraper conveyor middle trough / hydraulic support structure island welding production line described in the present invention is used for the layout of welding production of a series of equipment. This invention has been successfully used in the middle trough welding production line and hydraulic support structure welding production line used in the scraper conveyor and transfer machine in the coal mine, and the effect is obvious, including the following effects:
[0014] 1. The island welding production line for the middle trough / hydraulic support structure of the coal mining scraper conveyor of the present invention has a separated assembly island and a welding island, and the welding island is unmanned, which is highly efficient and safe.
[0015] 2. The welding island and assembly island of the island welding production line for the middle trough / hydraulic support structure of the coal mining scraper conveyor described in the present invention are in a many-to-many relationship, which has stronger flexibility, a many-to-many welding mode (multiple welding stations correspond to multiple assembly stations), and high resource utilization.
[0016] 3. The welding island area of the island welding production line for the middle trough / hydraulic support structure of the coal mining scraper conveyor described in the present invention is equipped with a visual recognition system, which can automatically judge different types of workpieces and call in corresponding welding procedures, thereby improving the level of automation.
[0017] 4. Any workstation in the welding island of the island welding production line for the middle trough / hydraulic support structure of the coal mining scraper conveyor described in the present invention can weld any type of workpiece, with high flexibility. One workstation can weld multiple workpieces, which greatly improves the utilization rate of robots. One assembly station can also assemble multiple workpieces, thereby improving the utilization rate of the site.
[0018] 5. The island welding production line for the middle trough / hydraulic support structure of the coal mining scraper conveyor described in the present invention can replace any workstation if it fails or needs maintenance, and the overall operation will not be affected. It has high flexibility and adaptability in handling faults.
[0019] 6. The intelligent track omnidirectional RGV / trackless AGV trolley of the coal mining scraper conveyor middle trough / hydraulic support structural member island welding production line described in the present invention can freely transform longitudinally and transversely without waiting or transfer, thereby improving work efficiency.
[0020] 7. The intelligent track omnidirectional RGV / trackless AGV trolley of the island welding production line of the middle trough / hydraulic support structure of the coal mining scraper conveyor described in the present invention has a reduced number of intelligent track omnidirectional RGV / trackless AGV trolleys compared to the main and branch line (vertical and horizontal) RGV trolleys, which reduces the cost of the entire system, saves resources and improves efficiency.
[0021] 8. The island-type welding production line for the middle trough / hydraulic support structure of the coal mining scraper conveyor described in the present invention has concentrated areas and a clear and reasonable layout.
[0022] 9. The overall layout length of the island welding production line for the middle trough / hydraulic support structure of the coal mining scraper conveyor of the present invention is reduced by half, saving space and reducing the travel distance of the intelligent track omnidirectional RGV / trackless AGV trolley
[0023] 10. The area of the island welding production line for the middle trough / hydraulic support structure of the coal mining scraper conveyor described in the present invention is clearly divided, and is surrounded by observation areas, which is convenient for the management of 6S in the factory.
[0024] 11. The island type welding production line for the middle trough / hydraulic support structure of the coal mining scraper conveyor described in the present invention can realize automated welding and improve product quality.
[0025] 12. The island-type welding production line for the middle trough / hydraulic support structure of the coal mining scraper conveyor described in the present invention is surrounded by viewing passages, which is safe and reliable.
[0026] 13. The island welding production line for the middle trough / hydraulic support structure of the coal mining scraper conveyor described in the present invention adopts a workpiece recognition system, which automatically calls into the program for welding after recognition, greatly increasing the technological content, recognizing a series of parts and components, and also identifying and judging which process the recognized workpiece will proceed to.
[0027] 14. The control room of the island welding production line for the middle trough / hydraulic support structure of the coal mining scraper conveyor described in the present invention is uniformly deployed and commands are issued one by one in sequence, so that the entire line can proceed in an orderly manner.
[0028] 15. The island welding production line for the middle trough / hydraulic support structure of the coal mining scraper conveyor described in the present invention is separated from the assembly and welding, which improves safety and is more user-friendly.
[0029] 16. The island welding production line for the middle trough / hydraulic support structure of the coal mining scraper conveyor of the present invention does not require waiting, transfer and other operations during the workpiece transportation process, thus improving efficiency BRIEF DESCRIPTION OF THE DRAWINGS
[0030] The drawings constituting a part of this application are used to provide a further understanding of the present invention. The illustrative embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.
[0031] In the attached picture:
[0032] Figure 1 It is a schematic structural diagram of a middle trough used in the scraper conveyor and transfer machine in an underground coal mine according to the present invention;
[0033] Figure 2 It is a schematic diagram of the structure of the existing domestic scraper conveyor middle trough production line in a straight line shape described in the present invention;
[0034] Figure 3 It is a structural schematic diagram of a middle trough island welding production line of a specific implementation mode 1 of a middle trough / hydraulic support structural member island welding production line of a coal mining scraper conveyor according to the present invention;
[0035] Figure 4 It is a schematic diagram of the structure of a workpiece assembled from a top beam of a hydraulic support structure according to the present invention;
[0036] Figure 5 It is a schematic diagram of the structure of the top beam of the hydraulic support structure of the present invention;
[0037] Figure 6 It is a schematic diagram of the three-piece structure of the top beam of the hydraulic support structural member of the present invention;
[0038] Figure 7 It is a schematic diagram of the structure of the four-piece top beam of the hydraulic support structure of the present invention;
[0039] Figure 8 It is a schematic diagram of the structure of the five-piece top beam of the hydraulic support structure of the present invention;
[0040] Fig. 9 It is a schematic diagram of the structure of the six-piece top beam of the hydraulic support structure of the present invention;
[0041] Fig.10 This is a schematic diagram of the finished structure of the top beam after welding according to the present invention;
[0042] Fig.11 It is a schematic diagram of the structure of the existing hydraulic support structural parts production line in China in the form of a straight line;
[0043] Fig.12 It is a structural schematic diagram of a hydraulic support structure island welding production line of a specific implementation method 2 of a coal mining scraper conveyor middle trough / hydraulic support structure island welding production line of the present invention;
[0044] In the figure: 1-safety channel; 2-primary welding station island; 3-secondary welding station island; 4-tertiary welding station island; 5-unloading station island; 6-inspection / repair welding station island; 7-secondary preheating station island; 8-secondary assembly station island; 9-primary assembly station island; 10-primary preheating station island; 11-track group; 12-intelligent track omnidirectional RGV / trackless AGV trolley; 13-central control room; 14-1~5 times welding flexible machine Robot welding station island a; 15-repair welding island; 16-1~5 welding flexible robot welding station island b; 17-6 splicing / welding station island; 18-4-5 splicing station island; 19-2-5 preheating station island; 20-2-3 splicing station island; 21-1 splicing station island; 22-1 preheating station island; 23-AGV trolley; 24-AGV transfer table; 25-splicing table; 26-AGV trolley movement route. DETAILED DESCRIPTION
[0045] The specific implementation of the present invention is further described in detail below with reference to the accompanying drawings:
[0046] The following takes the middle trough welding production line used in underground scraper conveyors and transfer machines in coal mines and the key equipment in coal mining - the top beam welding production line of hydraulic support structures, to explain the application of this invention - the island-type intelligent welding production line model in the welding production line of comprehensive mechanized mining equipment in coal mines, and explains in detail the regional composition and the operating principle of the entire line.
[0047] 1. Middle trough welding production line used in scraper conveyors and transfer machines in coal mines
[0048] The middle trough is mainly used for scraper conveyors and transfer machines in coal mines. The middle trough is the body of the scraper conveyor, which is welded by the middle plate, trough side, bottom plate, rack rail seat and other main components. The upper trough transports coal, and the lower trough is used for the return of the scraper chain. Its structure is as follows: Figure 1 shown.
[0049] The existing middle groove production line in China is in the shape of a straight line. In 2014, Harbin Welding Research Institute Co., Ltd. developed a middle groove welding production line for Ningxia Tiandi Benniu Industrial Group Co., Ltd. Figure 2 shown.
[0050] There are several disadvantages: 1. The bus line is too long, up to more than 120 meters; 2. There are many RGV vehicles on the main and branch lines (vertical and horizontal), and the flexibility is low; 3. The assembly and welding stations are one-to-one, and the welding process is not flexible; 3. If a fault occurs in an individual station, it will affect the production of the entire line; 4. The assembly island and the welding island are not concentrated, but relatively scattered.
[0051] Specific implementation method 1: See Figure 1-Figure 3 The present embodiment is described. The island welding production line for the middle trough / hydraulic support structure of the coal mining scraper conveyor described in the present embodiment includes a plurality of welding islands, a plurality of preheating islands and a plurality of assembly islands, a track group 11, an intelligent track omnidirectional RGV / trackless AGV trolley 12 and a control system. The track group 11 is located in the middle of the island welding production line, the plurality of welding islands are located on one side of the track group 11, the preheating island and the assembly island are located on the other side of the track group 11, the intelligent track omnidirectional RGV / trackless AGV trolley 12 moves along the track group 11, and is used to transport the welding structure between the islands. A workpiece identification system is provided on each welding station of the plurality of welding islands, and the workpiece identification system is used to identify the workpiece model and welding position. The control system controls the movement of the intelligent track omnidirectional RGV / trackless AGV trolley 12, the signal transmission between the stations and the central overall control of the production line. The control system is a central control room 13.
[0052] The welding island and preheating island are unmanned operation areas, and operators are mainly active in the assembly island area.
[0053] A safety passage 1 is arranged around the island type welding production line of the middle trough / hydraulic support structure of the coal mining scraper conveyor.
[0054] An island welding production line applied to the middle trough structure of a coal mining scraper conveyor, wherein several welding islands include a primary welding station island 2, a secondary welding station island 3 and a tertiary welding station island 4, each welding island contains several welding stations, several preheating islands include a primary preheating station island 10 and a secondary preheating station island 7, several assembly islands include a secondary assembly station island 8 and a primary assembly station island 9, and an island welding production line applied to the middle trough structure of coal mining also includes a discharge station island 5 and an inspection / repair welding station island 6, the primary welding station island 2, the secondary welding station island 3 and the tertiary welding station island 4 are arranged in sequence and are located on one side of a track group 11, the primary preheating station island 10, the primary assembly station island 9, the secondary assembly station island 8, the secondary preheating station island 7 and the inspection / repair welding station island 6 are arranged in sequence and are located on the other side of the track group 11, and the discharge station island 5 is located on the right side of the tertiary welding station island 4 and the inspection / repair welding station island 6.
[0055] The primary welding station island 2 and the secondary welding station island 3 are used for middle plate bottoming, middle plate filling, bottom plate welding or rack seat welding, the tertiary welding station island 4 is used for hollowing welding, the secondary assembly station island 8 is used for bottom plate assembly, and the primary assembly station island 9 is used for assembly of shovel plate groove sides, baffle plate groove sides, middle plates and rack seats.
[0056] The total length of the island welding production line used for the middle groove structural parts is shortened by nearly half. In the figure, there are safety passages 1 all around, which is convenient for visitors to inspect from all directions and angles. In the middle of the work area is the trolley channel (that is, track group 11) of the intelligent track omnidirectional RGV / trackless AGV trolley. The intelligent track omnidirectional RGV / trackless AGV trolley 12 can move freely in the assembly island, preheating island, and welding island because it can freely switch directions horizontally and vertically, which greatly improves efficiency. The number of vehicles is also reduced by 3 / 4, reducing investment costs.
[0057] The upper side of the intelligent track omnidirectional RGV / trackless AGV trolley 12 is the middle and bottom plate welding island and the hollow welding island, and the lower side is the preheating island and assembly island. The operators are mainly active in the assembly island, and the welding island and preheating island are unmanned, which greatly improves safety and makes factory 6S management relatively easy.
[0058] The production process is as follows: the assembled workpieces in the primary assembly station island 9 are hoisted into or automatically sent to the waiting station of the primary preheating station island 10. The track of the primary preheating station island 10 automatically sends the workpiece into the furnace. After it reaches the preheating temperature, the conveying track of the primary preheating station island 10 transports the workpiece out and connects with the intelligent track omnidirectional RGV / trackless AGV trolley 12 for receiving materials, rolls the workpiece onto the trolley, and the trolley then sends the workpiece to any idle welding station in the middle plate welding island 2. The workpiece is identified by the workpiece recognition system, the position to be welded is determined, and the program is automatically transferred. Since the workpiece is a series (many models, different sizes), and each series must be assembled 2 to 3 times, the total program volume is also large. Welding is carried out after judgment. The welded workpiece is then transported to the secondary assembly station island 8 by the intelligent track omnidirectional RGV / trackless AGV trolley 12 through the control of the central control room 13 for automatic assembly (due to the secondary assembly The installed base plate is hot, and considering safety, it is an automated assembly). The assembled workpiece is then transported by the intelligent track omnidirectional RGV / trackless AGV trolley 12 to the primary welding station island 2 or the secondary welding station island 3 for welding. The primary welding station island 2 or the secondary welding station island 3 first identifies the workpiece, identifies and determines which type of base plate of the workpiece to be welded, and then calls in the program for welding. After the base plate is welded, the workpiece is then transported to the welding station island 4 by the intelligent track omnidirectional RGV / trackless AGV trolley 12 through the control of the central control room 13. First, the workpiece is judged to determine which type of workpiece it is, and the corresponding program is called in for welding. After the welding, the intelligent track omnidirectional RGV / trackless AGV trolley 12 is controlled by the central control room 13 to the inspection / repair welding 6. After the inspection / repair welding, it is directly unloaded or transported to the unloading station island 5 by the intelligent track omnidirectional RGV / trackless AGV trolley.
[0059] 2. Key equipment for coal mining - hydraulic support structure top beam welding production line
[0060] Hydraulic support is a device that uses hydraulic power to achieve lifting, forward movement and other movements to support the roof. It is a key equipment for comprehensive mechanized mining in coal mines and an important link in modern coal mines to achieve full mechanization of all processes such as coal mining, transportation and support. It is of great significance to modern coal mine production. The top beam is a component of the hydraulic support. The following is a detailed introduction to the application of the island-type intelligent production line model in its production:
[0061] The welding process of the top beam requires six assemblies and six weldings to weld the required workpiece. The previous production line was in a straight line, from left to right, respectively, the first assembly area, the first preheating area, the first welding area, the second assembly area, the second preheating area, the second welding area, the third assembly area, the third preheating area, the third welding area, the fourth assembly area, the fourth preheating area, the fourth welding area, the fifth assembly area, the fifth preheating area, the fifth welding area, the sixth assembly area and the sixth welding area. The total length is nearly 200 meters. The straight line production line is as follows: Fig.11 As shown in the figure, there are many disadvantages, such as: (1) the assembly and welding are in the same area, which is a safety issue; (2) a workpiece can only be welded at one welding station, resulting in a waste of resources; (3) if a welding station or assembly station is repaired or fails, the entire production line will be stuck; (4) the assembly and welding flexibility is too poor; (5) the bus is too long; (6) due to the long bus, there are too many transport vehicles and preheating stations, resulting in a waste of resources and increased costs. Figure 4-Figure 9 As shown in the figure, one of the parts is to assemble the workpiece shape, add some ribs, and weld the top beam. Fig.10 shown.
[0062] Specific implementation method 2: See Figure 4-Figure 12 Describe this embodiment. The coal mining scraper conveyor middle trough / hydraulic support structural member island welding production line described in this embodiment is applied to the welding of hydraulic support structural members, and several welding islands include 1-5 welding flexible robot welding station island a14 and 1-5 welding flexible robot welding station island b16, the preheating island includes 1 preheating station island 22 and 2-5 preheating station island 19, the assembly island includes 1 splicing station island 21, 2-3 splicing station island 20 and 4-5 splicing station island 18, and the island welding production line applied to hydraulic support structural members also includes a central control room 13, a repair welding island 15 and 6 splicing / welding station island 17, the 1-5 welding flexible robot welding station island a14 and 1-5 welding flexible robot welding station island b16, the preheating island includes 1 preheating station island 22 and 2-5 preheating station island 19, the assembly island includes 1 splicing station island 21, 2-3 splicing station island 20 and 4-5 splicing station island 18, and the island welding production line applied to hydraulic support structural members also includes a central control room 13, a repair welding island 15 and 6 splicing / welding station island 17, the 1-5 welding flexible robot welding station island a14 and 1-5 welding flexible robot welding station island b16 The connecting station island b16 is linearly arranged on one side of the hydraulic support structural member island welding production line, the 1st preheating station island 22, the 1st splicing station island 21, the 2-3rd splicing station island 20, the 2-5th preheating station island 19 and the 4-5th splicing station island 18 are arranged in sequence and are located on the other side of the hydraulic support structural member island welding production line, the repair welding island 15 and the 6th splicing / welding station island 17 run through the upper and lower sides of the hydraulic support structural member island welding production line, the repair welding island 15 is located between the 1st to 5th welding flexible robot welding station island a14 and the 1st to 5th welding flexible robot welding station island b16, and the 6th splicing / welding station island 17 is located on the right side of the 1st to 5th welding flexible robot welding station island b16.
[0063] The 1-5 welding flexible robot welding station island a14 is arranged relative to the 1 preheating station island 22, the 1 splicing station island 21 and the 2-3 splicing station island 20, and the 1-5 welding flexible robot welding station island b16 is arranged relative to the 2-5 preheating station island 19 and the 4-5 splicing station island 18.
[0064] The island welding production line for hydraulic support structural parts also includes an AGV trolley motion track 26 and an AGV trolley 23. The AGV trolley motion track 26 runs horizontally through the lower part of the island welding production line, and the AGV trolley 23 moves along the AGV trolley motion track 26 to transfer materials to the splicing area. The central control room 13 controls the movement of the intelligent track omnidirectional RGV / trackless AGV trolley 12 and the AGV trolley 23 and the signal interconnection of each workstation.
[0065] The 1st splicing station island 21, the 2nd-3rd splicing station island 20 and the 4th-5th splicing station island 18 include an AGV transfer table 24 and a welding table.
[0066] The island welding production line used in hydraulic support structural parts uses the middle intelligent track omnidirectional RGV / trackless AGV car as the dividing line. On one side are various welding islands, and on the other side are the assembly preheating island, assembly island and welding island separated, which is safer and more user-friendly.
[0067] The production process is as follows: first, the workpiece is spliced on the 1st splicing island 21, and then hoisted into the 1st preheating island 22 by a crane for preheating. After preheating, it is hoisted to the transfer table, and then the intelligent track omnidirectional RGV / trackless AGV trolley (the so-called track omnidirectional trolley is a trolley that can switch freely in the horizontal and vertical directions, and can switch freely through the lifting mechanism to complete the walking in two directions) is controlled by the central control room 13 to transport it to any workstation in the 1-5th welding flexible robot welding island a14. After the recognition system recognizes the workpiece, the robot automatically calls the corresponding program for welding. Since the workpiece is serialized (many models, different sizes), and each series must be assembled 5 to 6 times, the total number of programs is as many as NX6. The welded workpiece sends a signal to the intelligent track omnidirectional RGV / trackless AGV trolley 11 through the master control. After receiving the command, the intelligent track omnidirectional RGV / trackless AGV trolley 12 transports the workpiece to the secondary splicing island 20 for assembly. The assembled workpiece is then sent a signal to the intelligent track omnidirectional RGV / trackless AGV trolley 12 by the central control room 13. The intelligent track omnidirectional RGV / trackless AGV trolley 12 sends the secondary assembled workpiece to the 2-5 preheating station island 19 for preheating under the control of the central control room 13 After preheating, the central control room 13 controls the intelligent track omnidirectional RGV / trackless AGV trolley 12 to transport the workpiece to an idle welding station without workpieces. The recognition system automatically recognizes the model of the workpiece and the welding step to be performed. After that, the robot automatically transfers the welding program for welding. In other words, any welding station in the welding island can weld any workpiece assembled by any welding island, so that any welding island corresponds to N splicing islands, and the final splicing and welding process is completed in this way.
[0068] The specific embodiments described above further illustrate the purpose, technical solutions and beneficial effects of the present invention. It should be understood that the above description is only a specific embodiment of the present invention and is not intended to limit the present invention. It can also be a reasonable combination of the features recorded in the above embodiments. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. An island welding production line for the middle trough / hydraulic support structure of a coal mining scraper conveyor, characterized in that: The invention comprises a plurality of welding islands, a plurality of preheating islands and a plurality of assembly islands, a track group (11), an intelligent track omnidirectional RGV / trackless AGV trolley (12) and a control system, wherein the track group (11) is located in the middle of the island-type welding production line, the plurality of welding islands are located on one side of the track group (11), the preheating island and the assembly island are located on the other side of the track group (11), the intelligent track omnidirectional RGV / trackless AGV trolley (12) moves along the track group (11) and is used to transfer welding structural parts between the islands, each welding station of the plurality of welding islands is provided with a workpiece identification system, the workpiece identification system is used to identify the workpiece model and welding position, and the control system controls the movement of the intelligent track omnidirectional RGV / trackless AGV trolley (12), the signal transmission between the stations and the central overall control of the production line; The welding island and preheating island are unmanned operation areas, and operators mainly work in the assembly island area; A safety passage (1) is arranged around the island welding production line of the middle trough / hydraulic support structure of the coal mining scraper conveyor; The invention is applied to the welding of the middle slot structure of the coal mining scraper conveyor. The plurality of welding islands include a primary welding station island (2), a secondary welding station island (3) and a tertiary welding station island (4). Each welding island contains a plurality of welding stations. The plurality of preheating islands include a primary preheating station island (10) and a secondary preheating station island (7). The plurality of assembly islands include a secondary assembly station island (8) and a primary assembly station island (9). The island-type welding production line applied to the middle slot structure of the coal mining also includes a discharge station island (5) and an inspection / repair welding station. The first welding station island (2), the second welding station island (3) and the third welding station island (4) are arranged in sequence and located on one side of the track group (11); the first preheating station island (10), the first assembly station island (9), the second assembly station island (8), the second preheating station island (7) and the inspection / repair welding station island (6) are arranged in sequence and located on the other side of the track group (11); and the unloading station island (5) is located on the right side of the third welding station island (4) and the inspection / repair welding station island (6).
2. The island welding production line for the middle trough / hydraulic support structure of the coal mining scraper conveyor according to claim 1 is characterized in that: The primary welding station island (2) and the secondary welding station island (3) are used for middle plate bottoming, middle plate filling, bottom plate welding or rack rail seat welding, the tertiary welding station island (4) is used for hollowing welding, the secondary assembly station island (8) is used for bottom plate assembly, and the primary assembly station island (9) is used for assembling the shovel plate groove side, baffle plate groove side, middle plate and rack rail seat.
3. The island welding production line for the middle trough / hydraulic support structure of the coal mining scraper conveyor according to claim 1 is characterized in that: The invention is applied to the welding of hydraulic support structural parts. The plurality of welding islands include a 1-5 times welding flexible robot welding station island a (14) and a 1-5 times welding flexible robot welding station island b (16). The preheating island includes a 1-time preheating station island (22) and a 2-5 times preheating station island (19). The assembly island includes a 1-time splicing station island (21), a 2-3 times splicing station island (20) and a 4-5 times splicing station island (18). The island-type welding production line applied to hydraulic support structural parts also includes a central control room (13), a repair welding island (15) and a 6-time splicing / welding station island (17). The 1-5 times welding flexible robot welding station island a (14) and the 1-5 times welding flexible robot welding station island b (16) are linearly arranged on the hydraulic support structure. The invention relates to a hydraulic support structure component island welding production line, wherein the first preheating station island (22), the first splicing station island (21), the 2-3 splicing station island (20), the 2-5 preheating station island (19) and the 4-5 splicing station island (18) are arranged in sequence and located on the other side of the hydraulic support structure component island welding production line, and the repair welding island (15) and the 6-splicing / welding station island (17) run through the upper and lower sides of the hydraulic support structure component island welding production line, the repair welding island (15) is located between the 1-5 welding flexible robot welding station island a (14) and the 1-5 welding flexible robot welding station island b (16), and the 6-splicing / welding station island (17) is located on the right side of the 1-5 welding flexible robot welding station island b (16).
4. The island welding production line for the middle trough / hydraulic support structure of the coal mining scraper conveyor according to claim 3 is characterized in that: The 1-5 welding flexible robot welding station island a (14) is arranged relative to the 1-preheating station island (22), the 1-splicing station island (21) and the 2-3-splicing station island (20), and the 1-5 welding flexible robot welding station island b (16) is arranged relative to the 2-5-preheating station island (19) and the 4-5-splicing station island (18).
5. The island welding production line for the middle trough / hydraulic support structure of the coal mining scraper conveyor according to claim 3 is characterized in that: The island welding production line applied to hydraulic support structural parts also includes an AGV trolley motion track (26) and an AGV trolley (23). The AGV trolley motion track (26) runs horizontally through the edge of the island welding production line. The AGV trolley (23) moves along the AGV trolley motion track (26) to transfer materials to the assembly island. The central control room (13) controls the movement of the intelligent track omnidirectional RGV / trackless AGV trolley (12) and the AGV trolley (23) and the signal interconnection of each workstation. The 1st splicing workstation island (21), the 2nd to 3rd splicing workstation island (20) and the 4th to 5th splicing workstation island (18) include an AGV material transfer table (24) and a welding table.
6. A production method for an island welding production line for a middle trough / hydraulic support structure of a coal mining scraper conveyor as claimed in any one of claims 1 to 2, characterized in that: The specific steps include: Step 1: The workpiece assembled in the primary assembly station island (9) is hoisted or automatically sent to the primary preheating station island (10) waiting station. The primary preheating station island (10) track automatically sends the workpiece into the furnace. Step 2: After the preheating temperature is reached, the workpiece is transported out by the conveying track of the primary preheating station island (10), connected with the intelligent track omnidirectional RGV / trackless AGV trolley (12) for receiving materials, and the workpiece is rolled onto the intelligent track omnidirectional RGV / trackless AGV trolley (12). Step 3: The intelligent track omnidirectional RGV / trackless AGV trolley (12) sends the workpiece to any idle welding station in the primary welding station island (2) through the control of the central control room (13), identifies the workpiece through the workpiece recognition system, and welds after determining the position to be welded. Step 4: The welded workpiece is then transported to the secondary assembly station island (8) by the intelligent track omnidirectional RGV / trackless AGV trolley (12) under the control of the central control room (13) for automatic assembly. The assembled workpiece is then transported to the primary welding station island (2) or the secondary welding station island (3) by the intelligent track omnidirectional RGV / trackless AGV trolley (12) under the control of the central control room (13) for welding. The primary welding station island (2) or the secondary welding station island (3) first identifies the workpiece and determines which type of workpiece base plate is to be welded. Step 5: After the bottom plate is welded, the workpiece is transported to the tertiary welding station island (4) by the intelligent track omnidirectional RGV / trackless AGV trolley (12) under the control of the central control room (13). The workpiece is first judged to determine which type of workpiece it is to be welded. After the welding, the workpiece is transported to the inspection / repair welding station island (6) by the intelligent track omnidirectional RGV / trackless AGV trolley (12) under the control of the central control room (13). After the inspection / repair welding, the workpiece is directly unloaded or transported to the unloading station island (5) by the intelligent track omnidirectional RGV / trackless AGV trolley.
7. A production method for an island welding production line for a middle trough / hydraulic support structure of a coal mining scraper conveyor as claimed in any one of claims 3 to 5, characterized in that: The specific steps include: Step 1: First, the workpiece is spliced in the primary splicing station island (21), and then hoisted or transported to the primary preheating station island (22) for preheating. After preheating, it is hoisted or transported to the transfer table. Step 2: After that, the intelligent track omnidirectional RGV / trackless AGV trolley (12) controls the central control room (13) to move the workpiece to any one of the 1-5 times welding flexible robot welding station islands a (14). The workpiece is identified by the recognition system, and the welded workpiece is sent to the intelligent track omnidirectional RGV / trackless AGV trolley (12) through the master control. After receiving the command, the intelligent track omnidirectional RGV / trackless AGV trolley (12) transports the workpiece to the 2-3 times splicing station island (20) for assembly. Step 3: The assembled workpieces are then sent a signal by the central control room (13) to the intelligent track omnidirectional RGV / trackless AGV trolley (12). The intelligent track omnidirectional RGV / trackless AGV trolley (12) sends the workpieces assembled twice to the 2nd to 5th preheating station island (19) for preheating under the control of the central control room (13). After preheating, the central control room (13) controls the intelligent track omnidirectional RGV / trackless AGV trolley (12) to transport the workpieces to an idle welding station without workpieces. The recognition system automatically recognizes which model of the workpiece is to be welded, and the final splicing and welding process is completed by analogy.