A method for reinforcing the bottom of the riverbed at the top of a shallow buried tunnel
By laying a replacement layer and a reinforced concrete hardened layer at the bottom of the river, the problems of difficulty in constructing a shallow-buried tunnel under the river and the risk of water seepage were solved, thereby reducing the risk of tunnel collapse and improving construction safety.
Patent Information
- Application Number
- CN202010658551.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-07-09
- Publication Date
- 2024-10-18
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
When a shallow-buried underground tunnel crosses a river, it is difficult to construct due to poor geology and severe corrosion of the river bed. There are risks such as river bed water seepage and tunnel collapse. It is difficult for existing technology to effectively guarantee the safety and reliability of construction.
Lay a replacement fill layer at the bottom of the river, create a rectangular groove inside the existing retaining wall, lay a gravel layer and waterproof board, extend the steel mesh into the groove, pour concrete to form a hardened layer on the river bottom, and build a retaining wall to reduce Water seepage risk.
By changing the geological structure of the river channel, the probability of water seepage at the top of the tunnel is reduced, the risk of collapse and mud inrush is eliminated, construction safety is improved, the structure is stable, the cost is low, and it has high practicability and popularization.
Smart Images

Figure CN111794183B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a method for reinforcing the bottom of a riverbed at the top of a shallow buried dark excavated tunnel, and is particularly suitable for reinforcing the bottom of a river channel under a shallow buried tunnel, and belongs to the field of construction engineering. Background Art
[0002] At present, when shallow buried tunnels are built under rivers in China, due to the poor geology of such areas, the bottom of the river is seriously silted all year round, and the continuous scouring of domestic sewage and industrial wastewater has caused serious corrosion at the bottom of the riverbed. In addition, the distance between the tunnel and the riverbed surface is relatively close, making the construction difficult. During the construction process, there are risks such as riverbed seepage, tunnel collapse, and surface collapse. In order to reduce the risks of tunnel construction, the more advanced methods in China are: (1) using grouting to strengthen the surrounding rock grade at the bottom of the riverbed; (2) changing the river channel to avoid interference with construction; (3) using large-diameter light pipes to divert river water. These methods can only reduce the risk of water leakage during tunnel construction, but cannot well ensure the safety and reliability of tunnel construction. Summary of the invention
[0003] The present invention provides a method for reinforcing the bottom of the riverbed at the top of a shallow buried dark excavation tunnel, so as to solve the problems of high risk and difficulty in the construction of a shallow buried dark excavation tunnel under a river channel, water seepage at the bottom of the riverbed affecting tunnel construction, and possible collapse of the tunnel.
[0004] In order to achieve the above-mentioned purpose, it is proposed to adopt a shallow buried tunnel top and riverbed bottom reinforcement structure. After dredging the riverbed, a replacement layer is laid at the bottom of the river channel to level the riverbed. The bottom of the existing retaining walls on both sides of the river channel is located on the upper side of the replacement layer and a groove is opened toward the inner side of the existing retaining wall. A crushed stone layer is laid above the replacement layer. Waterproof boards are laid on the existing retaining walls on both sides, the inner wall of the groove on the upper side of the crushed stone layer, and the crushed stone layer in the groove. A steel mesh is also laid on the crushed stone layer, and both ends of the steel mesh extend to the grooves opened at the bottom of the existing retaining walls on both sides. Concrete is poured at the steel mesh to form a hardened layer of the riverbed.
[0005] In the aforementioned riverbed bottom reinforcement structure, the waterproof board laid on the gravel layer extends 0.5m inwardly of the river channel;
[0006] In the aforementioned riverbed bottom reinforcement structure, a retaining wall is also built in the middle of the river channel along the water flow direction to facilitate the subsequent riverbed hardening construction;
[0007] In the aforementioned riverbed bottom reinforcement structure, the crushed stone used in the crushed stone layer has a particle size of 2-3 cm, and the thickness after laying and compaction is 8-15 cm;
[0008] In the above-mentioned riverbed bottom reinforcement structure, the groove is a rectangular groove with a depth of 15-30 cm and a height of 25-40 cm. The lower part of the groove is flush with the upper end of the replacement layer, and the upper part of the groove is flush with the upper end surface of the riverbed hardening layer.
[0009] The construction method is as follows:
[0010] 1) Setting of single-side closed retaining wall
[0011] Along the flow direction of the river, sandbags were used to block the centerline of the river and 10m upstream and downstream of the tunnel top, forming a closed loop with three sandbag surfaces and the existing retaining wall on one side;
[0012] Use pumps to drain the river water from the enclosed area;
[0013] A trench is excavated along the inner side of the sandbag surface, and a retaining wall is built along the trench and cast with concrete. After a retaining wall is built that is closed to the existing retaining wall, the sandbags are removed and the retaining wall is higher than the river water depth at that location;
[0014] 2) Desilting and hardening of the riverbed on one side
[0015] A small excavator is transported and hoisted to the inner side of the retaining wall to remove the silt at the bottom of the river channel, and then the bottom is leveled to form a replacement layer;
[0016] At the bottom of the existing retaining wall, a rectangular groove is excavated perpendicular to the existing retaining wall;
[0017] Use crushed stone with a particle size of 2-3cm to lay a crushed stone layer at the bottom of the river channel on this side, and compact it with excavator tracks to a compaction thickness of 8-15cm;
[0018] On the gravel layer, a steel mesh is laid, with the steel mesh extending into the groove;
[0019] A waterproof sheet is laid along the inner wall of the groove above the gravel layer and the side wall of the existing retaining wall above the groove, the bottom waterproof sheet is laid on the gravel layer in the groove, and the upper end of the waterproof sheet laid at the side wall of the existing retaining wall extends out to the river surface;
[0020] Concrete is poured above the crushed stone layer to form a river bottom hardening layer, and the upper surface of the river bottom hardening layer is higher than the upper side of the groove or flush with the upper side of the groove;
[0021] 3) Setting of closed retaining wall on the other side
[0022] When the hardened river channel on one side can meet the water flow requirements, the upstream and downstream retaining walls in the vertical direction of the river flow will be removed, and at the upstream and downstream hardened ends of the river channel on the other side, the retaining wall in the center and the existing retaining wall on the other side will be surrounded by sandbags to form a closed loop;
[0023] 4) Desilting and hardening of the riverbed on the other side
[0024] Follow step 2) to desilt and harden the bottom of the riverbed on the other side;
[0025] 5) Removal of retaining wall
[0026] Remove all the sandbags in the enclosure on the other side and the retaining wall in the center to ensure normal water flow.
[0027] In step 4), when hardening the bottom of the riverbed on the other side, the replacement layer, gravel layer and riverbed hardening layer on both sides are made flush with each other.
[0028] Compared with the traditional positioning method, the present invention changes the geological structure of the top of the river channel, allowing normal river water to flow through the concrete structure surface. The retaining walls on both sides of the river channel are treated with water seepage prevention, reducing the probability of water seepage at the top of the tunnel and eliminating the risks of tunnel collapse, sudden mud and water gushing, etc. It has a stable structure, low production cost, and is easy to implement on site. It has high construction safety and has good practicality and promotion in similar shallow buried tunnels under existing rivers. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 is a cross-sectional view of the river channel after reinforcement according to the present invention;
[0030] Figure 2 It is a schematic diagram of the structure of the waterproof board at the bottom of the existing retaining wall;
[0031] Figure 3 It is a structural diagram of the steel mesh. DETAILED DESCRIPTION
[0032] In order to make the objectives, technical solutions and advantages of the present invention more clear, the present invention will be further described in detail below in conjunction with the accompanying drawings. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0033] Example
[0034] Reference Figures 1 to 3, wherein reference numeral 8 represents the secondary lining of the tunnel, 9 represents the primary support of the tunnel, and 10 represents the surrounding rock. This embodiment provides a reinforcement structure for the bottom of the riverbed at the top of a shallow buried tunnel. After the riverbed is dredged, a replacement layer 1 is laid at the bottom of the river channel to level the riverbed. The bottoms of the existing retaining walls 2 on both sides of the river channel are located on the upper side of the replacement layer 1, and a groove 21 is opened toward the inner side of the existing retaining wall 2. The groove 21 is a rectangular groove with a depth of 15-30 cm and a height of 25-40 cm. The lower part of the groove 21 is flush with the upper end of the replacement layer 1. A crushed stone layer 3 is laid above the replacement layer 1. The crushed stone particle size used in the crushed stone layer 3 is 2-3 cm, and it is laid and The thickness after compaction is 8-15cm. Waterproof boards 4 are laid on the existing retaining walls 2 on both sides, the inner wall of the groove 21 on the upper side of the gravel layer 3, and the gravel layer 3 in the groove 21. The waterproof boards 4 laid on the gravel layer 3 extend 0.5m in the inner direction of the river channel. A steel mesh 5 is also laid on the gravel layer 3, and both ends of the steel mesh 5 extend to the groove 21 opened at the bottom of the existing retaining walls 2 on both sides. Concrete is poured at the steel mesh 5 to form a river bottom hardening layer 6. The upper end surface of the river bottom hardening layer 6 is flush with or higher than the upper part of the groove 21.
[0035] The construction method is as follows:
[0036] 1) Setting of single-side closed retaining wall
[0037] Along the flow direction of the river, sandbags are used to block the centerline of the river and 10m upstream and downstream of the tunnel top to form a closed loop with three sandbag surfaces and the existing retaining wall 2 on one side;
[0038] Use pumps to drain all the river water in the enclosed area;
[0039] A trench with a depth of 0.5m and a width of 0.3m is excavated along the inner side of the sandbag surface, and a retaining wall 7 with a height of 1m is built along the trench. The retaining wall 7 is cast in one time with C20 concrete, and the length of the retaining wall 7 cast in one time is 5m;
[0040] After building a retaining wall 7 that is closed with the existing retaining wall 2 on one side, all the sandbags are removed to prevent them from being washed away by the river water and affecting the water flow in the downstream river channel;
[0041] 2) Desilting and hardening of the riverbed on one side
[0042] A small excavator is transported to the inner side of the retaining wall 7, and all the silt at the bottom of the river channel is removed, and then transported to the specified abandoned soil field by a slag truck, and then the bottom is flattened to form a replacement layer 1, and the replacement layer 1 can be filled with soil or sand and gravel;
[0043] At the bottom of the existing retaining wall 2, a rectangular groove 21 with a depth of 20 cm and a height of 30 cm is excavated perpendicular to the existing retaining wall 2 for laying the waterproof board 4;
[0044] Use crushed stone with a particle size of 2-3 cm to lay a crushed stone layer 3 with a thickness of 10 cm at the bottom of the river channel on this side, and compact it with an excavator crawler;
[0045] On the gravel layer 3, a steel mesh 5 is laid;
[0046] A waterproof board 4 is laid along the inner wall of the groove 21 above the gravel layer 3 and the side wall of the existing retaining wall 2 above the groove 21. The bottom waterproof board 4 is laid on the gravel layer 3 and extends 0.5m out of the groove. The upper end of the waterproof board 4 laid on the side wall of the existing retaining wall 2 is flush with the upper end of the retaining wall 7.
[0047] C20 concrete is used to pour the steel mesh at 5 locations to form a riverbed hardening layer 6 with a thickness of 20 cm, poured every 5 m;
[0048] 3) Setting of closed retaining wall on the other side
[0049] When the hardened river channel on one side can meet the water flow requirements, the upstream and downstream retaining walls 7 in the vertical direction of the river flow are removed, and at the upstream and downstream hardened ends of the river channel on the other side, the retaining wall 7 at the center and the existing retaining wall 2 on the other side are surrounded by sandbags to form a closed loop;
[0050] 4) Desilting and hardening of the riverbed on the other side
[0051] The dredging and hardening of the riverbed bottom on the other side can be carried out according to step 2), and the replacement layer 1, the gravel layer 3 and the riverbed hardening layer 6 on both sides are made flush with each other;
[0052] 5) Removal of retaining wall
[0053] The sandbags in the enclosure on the other side and the retaining wall 7 at the center are completely removed to make the water flow surface normal.
[0054] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for reinforcing the bottom of the riverbed at the top of a shallow buried tunnel. It is characterized in that The specific construction steps are as follows: 1) Setting of single-side closed retaining wall Along the flow direction of the river, sandbags are used to block the centerline of the river and 10m upstream and downstream of the tunnel top to form a closed loop with three sandbag surfaces and the existing retaining wall 2 on one side; Use pumps to drain the river water from the enclosed area; A trench is excavated along the inner side of the sandbag surface, and a retaining wall (7) is built along the trench and cast with concrete. After a retaining wall (7) is built that is closed to the existing retaining wall (2), the sandbags are removed, and the retaining wall (7) is higher than the depth of the river water at that location; 2) Desilting and hardening of the riverbed on one side A small excavator is transported and hoisted to the inner side of the retaining wall (7), the silt at the bottom of the river channel is removed, and then the bottom is leveled to form a replacement layer (1); A rectangular groove (21) is excavated at the bottom of the existing retaining wall (2) perpendicular to the existing retaining wall (2); Using crushed stone with a particle size of 2-3 cm, a crushed stone layer (3) is laid at the bottom of the river channel on this side, and compacted with an excavator crawler to a compaction thickness of 8-15 cm; A steel mesh (5) is laid on the gravel layer (3), and the steel mesh (5) extends into the groove (21); A waterproof board (4) is laid along the inner wall of the groove (21) above the gravel layer (3) and the side wall of the existing retaining wall (2) above the groove (21), the bottom waterproof board (4) is laid on the gravel layer (3) in the groove (21), and the upper end of the waterproof board (4) laid on the side wall of the existing retaining wall (2) extends out to the river surface; Concrete is poured above the gravel layer (3) to form a riverbed hardened layer (6), wherein the upper surface of the riverbed hardened layer (6) is higher than the upper side of the groove (21) or is flush with the upper side of the groove (21); 3) Setting of closed retaining wall on the other side When the hardened river channel on one side can meet the water flow requirements, the upstream and downstream retaining walls (7) in the direction perpendicular to the river flow are removed, and at the upstream and downstream hardened ends of the river channel on the other side, the retaining wall (7) at the center and the existing retaining wall (2) on the other side are surrounded by sandbags to form a closed loop; 4) Desilting and hardening of the riverbed on the other side Follow step 2) to desilt and harden the bottom of the riverbed on the other side; 5) Removal of retaining wall The sandbags in the enclosure on the other side and the water retaining wall (7) at the center are completely removed to make the water flow surface normal.
2. According to the method for reinforcing the bottom of the riverbed at the top of a shallow buried tunnel as described in claim 1, Features: In step 4), when hardening the bottom of the riverbed on the other side, the replacement layer (1), the crushed stone layer (3) and the riverbed hardening layer (6) on both sides are made flush with each other.
Citation Information
Patent Citations
Shallow-buried underground-excavated tunnel top riverbed bottom reinforcing structure
CN212477607U