Pipe clamp support structure and construction method for long-distance pumping of machine-made sand concrete
By using pipe card support structure and specific machine sand concrete formula and construction methods during long-distance pumping, the problem of pipe blockage caused by the viscosity and stone powder content of machine sand concrete during pumping is solved, and the concrete is efficient Fluidity and strength, suitable for large distance construction.
Patent Information
- Application Number
- CN202010770747.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-08-04
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2040-08-04
AI Technical Summary
During long-distance pumping, the mechanical sand concrete is prone to blockage at the pipe nodes due to large viscosity and stone powder content, which affects the concrete performance, and the existing technology is difficult to effectively solve.
A pipe card support structure is adopted, including an elliptical material pipe and transition pipe card driven by a servo motor. The vector twisting stirring process avoids the layering and drying of cement mortar, combined with specific machine sand concrete formulas and construction methods, prolongs the stirring. Time, control the content of stone powder and sand rate to ensure the flowability and strength of concrete.
It effectively avoids the risk of pipeline blockage, ensures the flowability and strength of machined sand concrete during long-distance pumping, and is suitable for construction with a distance of more than 300 meters, meeting design regulations and durability requirements.
Smart Images

Figure CN111877764B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of concrete pumping, and in particular to a pipe clamp support structure and a construction method for long-distance pumping of machine-made sand concrete. Background Art
[0002] In recent years, with the rapid increase in engineering construction and the scarcity of natural sand resources, the use of machine-made sand instead of natural sand has become imperative. After investigation, Anhui Province has rich reserves of limestone, granite and other mineral resources, and they are easy to mine. Therefore, limestone machine-made sand is often used as fine aggregate in highway and water transport projects. The scientific and reasonable use of machine-made sand can not only improve the working performance and mechanical properties of concrete, but also greatly reduce the project cost. Therefore, construction units in Anhui Province gradually use machine-made sand instead of natural sand for highway and water transport project construction.
[0003] However, compared with natural sand, the particles of machine-made sand are coarser and contain a certain amount of stone powder, which makes the machine-made sand concrete more viscous, which will affect the actual performance of the machine-made sand concrete during long-distance pumping. Therefore, it is of great practical significance to study and analyze the application of machine-made sand concrete in long-distance pumping technology and improve the many problems in the application of machine-made sand concrete in long-distance pumping technology.
[0004] To overcome this problem, the company organized experts and technicians for projects such as the S11 Wuhu to Huangshan Expressway WHLJ-01 Contract Section and the S11 Wuhu to Huangshan Expressway WHLJ-07 Contract Section, based on the projects. Through analysis and testing of the working performance and mechanical properties of machine-made sand concrete, the technical difficulties of long-distance pumping concrete were effectively solved. At the same time, a new type of pipe clamp support structure was combined to improve the problem of easy blockage at the nodes of long-distance pumping pipelines. Summary of the invention
[0005] The purpose of the present invention is to solve the shortcomings of the prior art and to propose a pipe clamp support structure and a construction method for long-distance pumping of machine-made sand concrete.
[0006] In order to achieve the above object, the present invention adopts the following technical solutions:
[0007] The pipe clamp support structure includes a support platform arranged at a position below the node of the pumping pipeline, a first hydraulic rod and a second hydraulic rod are vertically arranged on the upper surface of the support platform, a servo motor is fixedly connected to the top of the first hydraulic rod, an arc-shaped slide groove is fixedly connected to the top of the servo motor housing, a groove portion on the upper surface of the arc-shaped slide groove is slidably matched with the lower part of the input pipe wall, the servo motor is provided with a driving shaft, a bearing seat sleeved with the driving shaft is provided at the top of the second hydraulic rod, a driving gear is fixedly connected to the middle of the driving shaft, a gear ring is meshed with the driving gear, and the gear ring is fixedly arranged on the outer ring of the input pipe clamp;
[0008] The input pipe is connected with an elliptical material pipe I through an input pipe clamp. One end of the input pipe close to the elliptical material pipe I is provided with a non-hole flange ring, and one end of the elliptical material pipe I close to the input pipe is provided with a pin hole flange ring. The input pipe clamp is composed of angle irons at both ends and an annular bar in the middle. The two angle irons of the input pipe clamp are fitted and connected by fastening bolts. The inner arc surface of the annular bar of the input pipe clamp is provided with two groups of annular grooves, one group of which is sleeve-matched with the non-hole flange ring, and the other group of annular grooves is sleeve-matched with the pin hole flange ring. The annular bar of the input pipe clamp is not provided with a hole at a position close to one end face of the input pipe, and the annular bar of the input pipe clamp is provided with a flange hole at a position close to one end face of the elliptical material pipe I. The pin hole flange ring at one end of the elliptical material pipe I is fixed in the flange hole by fastening bolts, and the gear ring is fixed on the outer ring of the annular bar of the input pipe clamp;
[0009] The output pipe is connected to the tail oval material pipe II through the output pipe clamp. The output pipe is also provided with a non-hole flange ring at one end close to the oval material pipe II. The output pipe clamp is also composed of angle irons at both ends and an annular strip in the middle. The two angle irons of the output pipe clamp are fitted and connected by fastening bolts. The inner arc surface of the annular strip of the output pipe clamp is provided with two groups of annular grooves, one group of which is sleeve-matched with the non-hole flange ring, and the other group of annular grooves is sleeve-matched with the pin hole flange ring. The annular strip of the output pipe clamp is not provided with a hole near one end face of the output pipe, and the annular strip of the output pipe clamp is provided with a flange hole near one end face of the oval material pipe II. The pin hole flange ring at one end of the oval material pipe II is fixed in the flange hole by fastening bolts.
[0010] There are 2-13 groups of oval material tubes III between the oval material tubes I and II. The vertical sections of the oval material tubes III are all oval, the oblique sections at both ends are all perfect circles, and the oblique sections at both ends are symmetrically arranged. Both ends of the oval material tube III are provided with non-hole flange rings, and the non-hole flange rings are fixed at the oblique sections. A transition pipe clamp is provided between adjacent non-hole flange rings. The transition pipe clamp is also composed of angle irons at both ends and an annular bar in the middle. The two angle irons of the transition pipe clamp are fitted and connected by fastening bolts. The inner arc surface of the annular bar of the transition pipe clamp is provided with two groups of annular grooves that are sleeved with the pin hole flange ring.
[0011] The outer wall of the oval material pipe III located in the middle is sleeved with a circular support ring, a spring rod is fixedly connected to the bottom of the outer ring of the circular support ring, a horizontal fixed rod and an inclined swing rod are riveted to one end of the spring rod away from the circular support ring, one end of the horizontal fixed rod away from the spring rod is vertically fixed to the movable rod section of the second hydraulic rod, and one end of the inclined swing rod away from the spring rod is vertically fixed to the outer ring of the output pipe clamp annular strip;
[0012] A third hydraulic rod is riveted between the horizontal fixed rod and the tilted swing rod, and the horizontal fixed rod, the tilted swing rod and the third hydraulic rod form a deformable triangle.
[0013] Preferably, the inner side walls of the annular grooves of the input pipe clamp, transition pipe clamp and output pipe clamp are all smoothed, and the non-hole flange ring and pin hole flange ring are all smoothed to ensure water tightness and prevent a large amount of muddy water from seeping into the gaps of each pipe clamp.
[0014] Preferably, a sealing rubber ring is provided between adjacent non-porous flange rings to increase friction and cushioning properties, thereby facilitating torque force transmission efficiency between transition pipe clamps.
[0015] Preferably, a smooth sealing sheet is provided between the non-hole flange ring and the pin hole flange ring to improve the sealing and friction damage resistance of the input pipe clamp and the output pipe clamp.
[0016] Preferably, the servo motor is a forward and reverse low-speed motor, and the elliptical material pipe I, the elliptical material pipe II and the elliptical material pipe III form a twistable node elbow. When in use, the servo motor is rotated forward half a circle and then reversed half a circle, and forward and reverse rotation are performed alternately to achieve torque transmission between the elliptical material pipe I, the elliptical material pipe II and the elliptical material pipe III, and realize a vector twisting stirring process, which can enable the cement mortar to be fully stirred in the node elbow, avoiding the risk of cement mortar stratification, precipitation or even drying up at the node to cause pipeline blockage.
[0017] Based on the aforementioned pipe clamp support structure, the present invention also proposes a construction method for long-distance pumping of machine-made sand concrete, comprising the following steps:
[0018] a. Selection of raw materials for machine-made sand concrete: according to the strength requirements, select appropriate amounts of cement, water, fly ash, machine-made sand, crushed stone and admixtures. The machine-made sand is fine aggregate crushed by mechanism from limestone or granite, of which cement is silicate cement, the stone powder content in the machine-made sand is 0-20%, crushed stone and fly ash do not have alkali activity, and the water reduction rate of the admixture should not be less than 16%;
[0019] b. Configuration of machine-made sand concrete: According to the strength requirements, the most suitable stone powder content in the machine-made sand used in C30 machine-made sand concrete is 10%-15%, the most suitable stone powder content in the machine-made sand used in C40 machine-made sand concrete is 5%-12%, the most suitable stone powder content in the machine-made sand used in C50 machine-made sand concrete is 5%-7%, and the most suitable stone powder content in the machine-made sand used in C60 machine-made sand concrete should not exceed 5%. The sand ratio should be appropriately increased by 2-4% compared with natural sand;
[0020] c. Transportation of machine-made sand concrete: Use a high-pressure pump to put the raw materials of the machine-made sand concrete in step b into the mixer in the transport vehicle. During the transportation process, stir continuously at a speed of 1 to 3 revolutions per minute. Before unloading at the site, the mixing drum should be stirred for 1 to 2 minutes before unloading;
[0021] d. Pumping of machine-made sand concrete: The delivery pipe should be laid straight, short and flat, the horizontal pipe at the inlet of the delivery pump should be at least 15m, and the delivery pipe should be fixed every 3m; during summer construction, the delivery pipe must be covered with sacks and watered to cool it down;
[0022] The aforementioned pipe clamp support structure is arranged at the node of the conveying pipe, and the machine-made sand concrete is introduced into the conveying pipe by using the output pump pipe. When the flow rate at the outlet drops sharply, stratification, drying or blockage occurs, the servo motor is turned on to drive the rotation of the input pipe clamp to generate torque, and the torque is transmitted to the elliptical material pipe I through the pin hole flange ring, and then the torque is transmitted to the elliptical material pipe II and the elliptical material pipe III through the non-hole flange ring, so as to form a node elbow structure that can be twisted and deformed, and the entire torque is transmitted, so as to realize a vector twisting mixing process, so that the cement mortar can be fully stirred in the node elbow, and the risk of stratification, precipitation and even drying of the cement mortar at the node causing pipeline blockage is avoided, and the power input of the pipe clamp support structure is used to realize the dredging process at the conveying pipe node;
[0023] e. Vibration of machine-made sand concrete: When transported to the site, machine-made sand concrete should be mechanically vibrated. The vibration time of each vibration point should be controlled within 20-30 seconds according to the consistency of the mixture and the vibration location. The vibration time should be controlled to 20-30 seconds, and the concrete should not sink, bubble, have a flat surface, or have floating slurry. Machine-made sand concrete is more likely to liquefy and segregate than natural sand concrete with the same slump. Over-vibration or missed vibration should be avoided.
[0024] f. Maintenance of machine-made sand concrete: After on-site vibration, machine-made sand concrete should strengthen early moisturizing maintenance, and water-retaining maintenance should be adopted for the exposed surface. After demolding, spraying and uniform watering can be used for maintenance. The maintenance time should be no less than 7d. When constructing machine-made sand concrete in winter, direct watering is not allowed when the ambient temperature is below 5℃.
[0025] Compared with the prior art, the present invention has the following beneficial effects:
[0026] 1. Aiming at the problem that the nodes of the existing long-distance pumping pipelines are prone to blockage, the present invention first proposes a pipe clamp support structure, which respectively forms a node elbow structure that can be twisted and deformed with an elliptical material pipe I, an elliptical material pipe II and an elliptical material pipe III through an input pipe clamp, a transition pipe clamp and an output pipe clamp, thereby realizing a vector twisting stirring process; when in use, the input pipe clamp and the elliptical material pipe I can be rotated through an external force gear transmission, and the entire torque is transmitted, so that the cement mortar can be fully stirred in the node elbow, avoiding the risk of stratification, precipitation and even drying of the cement mortar at the node causing pipeline blockage, and playing a role in realizing the dredging process at the node of the conveying pipe through the power input of the pipe clamp support structure.
[0027] 2. In view of the problem that the nodes of existing long-distance pumping pipelines are prone to blockage, the present invention also proposes a screening and mixing process for the machine-made sand concrete formula, and proposes different transportation, pumping, vibration and maintenance plans for this special formula to form a unique construction method. The construction method studies the influence of machine-made sand and stone powder on concrete mixtures through experimental analysis, and formulates concrete that meets the design requirements for strength and durability and the pumpability requirements of machine-made sand.
[0028] 3. The construction method of the present invention adopts a series of measures such as extending the mixing time of machine-made sand concrete, reasonably controlling the sand ratio, and controlling the stone powder content to ensure that the concrete mixture fills the pipe and is easy to flow, has sufficient cohesiveness, and does not segregate or bleed during pumping.
[0029] 4. The construction method of the present invention adopts pipeline cleaning waste recycling technology. When pumping is about to end, 2~3m mortar is pumped to push out the concrete, and then water is pumped to push out the mortar, and the mortar is pumped into the waste mortar box. The water and part of the sand and stone in the pipe flow back to the pump truck with the water, and the filtered sand and stone are transported back to the concrete supply station, so as to save natural resources and keep the site clean, which meets the requirements of green construction.
[0030] 5. The present invention improves many problems of long-distance pumping pipeline technology by adjusting the machine-made sand concrete formula and the pumping structure, and completely solves the problem of long-distance pumping of concrete. It is especially suitable for the construction process of machine-made sand concrete with a pumping distance greater than 300 meters, and is worthy of promotion. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 This is the main structural diagram of the pipe clamp support structure proposed by the present invention;
[0032] Figure 2 This is a schematic diagram of the gear connection of the input pipe clamp in the pipe clamp support structure proposed by the present invention;
[0033] Figure 3 This is a schematic diagram of the connection of the circular support ring in the pipe clamp support structure proposed by the present invention;
[0034] Figure 4 It is a schematic diagram of the assembly structure of accessories of the node elbow structure in the present invention.
[0035] In the figure: support platform 1, first hydraulic rod 2, second hydraulic rod 3, servo motor 4, arc chute 5, input pipeline 6, drive shaft 7, driving gear 8, gear ring 9, input pipe clamp 10, angle iron 101, annular bar 102, annular clamping groove 103, flange hole 104, elliptical material pipe I 11, non-hole flange ring 12, pin hole flange ring 13, output pipeline 14, output pipe clamp 15, transition pipe clamp 16, circular support ring 17, spring rod 18, horizontal fixed rod 19, tilt swing rod 20, third hydraulic rod 21, elliptical material pipe II 22, elliptical material pipe III 33. DETAILED DESCRIPTION
[0036] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0037] Reference Figure 1-4The pipe clamp support structure includes a support platform 1 arranged at a position below the node of the pumping pipeline. A first hydraulic rod 2 and a second hydraulic rod 3 are vertically arranged on the upper surface of the support platform 1. A servo motor 4 is fixedly connected to the top of the first hydraulic rod 2. An arc-shaped slide 5 is fixedly connected to the top of the servo motor 4 housing. The groove portion on the upper surface of the arc-shaped slide 5 is slidably matched with the lower part of the wall of the input pipe 6. The servo motor 4 is provided with a driving shaft 7. A bearing seat sleeved with the driving shaft 7 is provided at the top of the second hydraulic rod 3. A driving gear 8 is fixedly connected to the middle of the driving shaft 7. The driving gear 8 is meshed with a gear ring 9. The gear ring 9 is fixedly arranged on the outer ring of the input pipe clamp 10. The input pipe 6 passes through the input pipe clamp 1 0 is connected with an elliptical material pipe I11, an end of the input pipe 6 close to the elliptical material pipe I11 is provided with a non-hole flange ring 12, and an end of the elliptical material pipe I11 close to the input pipe 6 is provided with a pin hole flange ring 13, the input pipe clamp 10 is composed of angle irons 101 at both ends and an annular bar 102 in the middle, the two angle irons 101 of the input pipe clamp 10 are fitted and connected by fastening bolts, and the inner arc surface of the annular bar 102 of the input pipe clamp 10 is provided with two groups of annular grooves 103, one group of annular grooves 103 is sleeved with the non-hole flange ring 12, and the other group of annular grooves 103 is sleeved with the pin hole flange ring 13, and the annular grooves of the input pipe clamp 10 are sleeved with the pin hole flange ring 13. The strip block 102 has no hole at one end face position near the input pipe 6, and the annular strip block 102 of the input pipe clamp 10 has a flange hole 104 at one end face position near the elliptical material pipe I11. The pin hole flange ring 13 at one end of the elliptical material pipe I11 is fixed in the flange hole 104 by fastening bolts, and the gear ring 9 is fixed on the outer ring of the annular strip block 102 of the input pipe clamp 10; the output pipe 14 is connected to the elliptical material pipe II22 at the tail through the output pipe clamp 15, and the output pipe 14 is also provided with a non-hole flange ring 12 at one end near the elliptical material pipe II22. The output pipe clamp 15 is also composed of angle irons 101 at both ends and the annular strip block 102 in the middle. The two angle irons 101 of the outlet pipe clamp 15 are fitted and connected by fastening bolts. The inner arc surface of the annular block 102 of the outlet pipe clamp 15 is provided with two groups of annular grooves 103, one group of which is sleeved with the non-hole flange ring 12, and the other group of which is sleeved with the pin hole flange ring 13. The annular block 102 of the outlet pipe clamp 15 is not provided with a hole at one end surface position close to the outlet pipe 14, and the annular block 102 of the outlet pipe clamp 15 is provided with a flange hole 104 at one end surface position close to the elliptical material pipe II22. The pin hole flange ring 13 at one end of the elliptical material pipe II22 is fixed in the flange hole 104 by fastening bolts;There are 2-13 groups of elliptical material tubes III33 between the elliptical material tubes I11 and the elliptical material tubes II22. The vertical sections of the elliptical material tubes III33 are all elliptical, the oblique sections at both ends are all perfect circles, and the oblique sections at both ends are symmetrically arranged. Both ends of the elliptical material tubes III33 are provided with non-hole flange rings 12, and the non-hole flange rings 12 are fixed at the oblique sections. A transition pipe clamp 16 is provided between adjacent non-hole flange rings 12. The transition pipe clamp 16 is also composed of angle irons 101 at both ends and an annular strip 102 in the middle. The two angle irons 101 of the transition pipe clamp 16 are fitted and connected by fastening bolts. The inner arc surface of the annular strip 102 of the transition pipe clamp 16 Two groups of annular grooves 103 are provided to be sleeved with the pin hole flange ring 13; the outer wall of the elliptical material tube III33 located in the middle is sleeved with a circular support ring 17, and a spring rod 18 is fixed to the bottom of the outer ring of the circular support ring 17. The end of the spring rod 18 away from the circular support ring 17 is riveted with a horizontal fixed rod 19 and a tilted swing rod 20. The end of the horizontal fixed rod 19 away from the spring rod 18 is vertically fixed to the movable rod section of the second hydraulic rod 3, and the end of the tilted swing rod 20 away from the spring rod 18 is vertically fixed to the outer ring of the annular bar 102 of the output pipe clamp 15; a third hydraulic rod 21 is riveted between the horizontal fixed rod 19 and the tilted swing rod 20, and the horizontal fixed rod 19, the tilted swing rod 20 and the third hydraulic rod 21 form a deformable triangle. ;
[0038] Reference Figure 4 The inner side walls of the annular groove 103 of the input pipe clamp 10, the transition pipe clamp 16 and the output pipe clamp 15 are all smoothed, and the non-hole flange ring 12 and the pin hole flange ring 13 are all smoothed to ensure water tightness and prevent a large amount of muddy water from seeping into the gaps of each pipe clamp.
[0039] Reference Figure 4 A sealing rubber ring is provided between adjacent non-porous flange rings 12 to improve friction and buffering properties and facilitate the torque force transmission efficiency between the transition pipe clamps 16.
[0040] Reference Figure 4 A smooth sealing sheet is provided between the non-hole flange ring 12 and the pin hole flange ring 13 to improve the sealing performance and friction damage resistance of the input pipe clamp 10 and the output pipe clamp 15.
[0041] Reference Figure 1The servo motor 4 is specifically a forward and reverse low-speed motor. The elliptical material pipe I11, the elliptical material pipe II22 and the elliptical material pipe III33 form a twistable node elbow. When in use, the servo motor 4 is rotated forward half a circle and then reversed half a circle, and the forward and reverse rotations are performed alternately to realize the torque transmission between the elliptical material pipe I11, the elliptical material pipe II22 and the elliptical material pipe III33, and realize a vector twisting stirring process, so that the cement mortar can be fully stirred in the node elbow, avoiding the risk of stratification, precipitation and even drying of the cement mortar at the node to cause pipeline blockage.
[0042] Based on the aforementioned pipe clamp support structure, the present invention also proposes a construction method for long-distance pumping of machine-made sand concrete, comprising the following steps:
[0043] a. Selection of raw materials for machine-made sand concrete: according to the strength requirements, select appropriate amounts of cement, water, fly ash, machine-made sand, crushed stone and admixtures. The machine-made sand is fine aggregate crushed by mechanism from limestone or granite, of which cement is silicate cement, the stone powder content in the machine-made sand is 0-20%, crushed stone and fly ash do not have alkali activity, and the water reduction rate of the admixture should not be less than 16%;
[0044] b. Configuration of machine-made sand concrete: According to the strength requirements, the most suitable stone powder content in the machine-made sand used in C30 machine-made sand concrete is 10%-15%, the most suitable stone powder content in the machine-made sand used in C40 machine-made sand concrete is 5%-12%, the most suitable stone powder content in the machine-made sand used in C50 machine-made sand concrete is 5%-7%, and the most suitable stone powder content in the machine-made sand used in C60 machine-made sand concrete should not exceed 5%. The sand ratio should be appropriately increased by 2-4% compared with natural sand;
[0045] c. Transportation of machine-made sand concrete: Use a high-pressure pump to put the raw materials of the machine-made sand concrete in step b into the mixer in the transport vehicle. During the transportation process, stir continuously at a speed of 1 to 3 revolutions per minute. Before unloading at the site, the mixing drum should be stirred for 1 to 2 minutes before unloading;
[0046] d. Pumping of machine-made sand concrete: The delivery pipe should be laid straight, short and flat, the horizontal pipe at the inlet of the delivery pump should be at least 15m, and the delivery pipe should be fixed every 3m; during summer construction, the delivery pipe must be covered with sacks and watered to cool it down;
[0047] The aforementioned pipe clamp support structure is arranged at the node of the conveying pipe, and the machine-made sand concrete is introduced into the conveying pipe by using the output pump pipe. When the flow rate at the outlet drops sharply, stratification, drying or blockage occurs, the servo motor 4 is turned on to drive the rotation of the input pipe clamp 10 to generate torque, and the torque is transmitted to the elliptical material pipe I11 through the pin hole flange ring 13, and then the torque is transmitted to the elliptical material pipe II22 and the elliptical material pipe III33 through the non-hole flange ring 12, so as to form a twistable and deformable node elbow structure, and cause the entire torque to be transmitted, so as to realize a vector twisting mixing process, so that the cement mortar can be fully stirred in the node elbow, and the risk of stratification, precipitation or even drying of the cement mortar at the node causing pipeline blockage is avoided, and the power input of the pipe clamp support structure is used to realize the dredging process at the conveying pipe node;
[0048] e. Vibration of machine-made sand concrete: When transported to the site, machine-made sand concrete should be mechanically vibrated. The vibration time of each vibration point should be controlled within 20-30 seconds according to the consistency of the mixture and the vibration location. The vibration time should be controlled to 20-30 seconds, and the concrete should not sink, bubble, have a flat surface, or have floating slurry. Machine-made sand concrete is more likely to liquefy and segregate than natural sand concrete with the same slump. Over-vibration or missed vibration should be avoided.
[0049] f. Maintenance of machine-made sand concrete: After on-site vibration, machine-made sand concrete should strengthen early moisturizing maintenance, and water-retaining maintenance should be adopted for the exposed surface. After demolding, spraying and uniform watering can be used for maintenance. The maintenance time should be no less than 7d. When constructing machine-made sand concrete in winter, direct watering is not allowed when the ambient temperature is below 5℃.
[0050] The process principle of machine-made sand concrete:
[0051] 1. Referring to Table 1, as the stone powder content in the machine-made sand increases, the corresponding pumped concrete no longer has the problem of bleeding and segregation, and the workability is significantly improved, while the slump is also greatly improved. However, the optimal control amount of stone powder content in the machine-made sand is suitable to be around 10%. Once its content is >15%, it will increase the amount of water in the pumped concrete and significantly reduce its slump; the increase in stone powder content improves the strength of the pumped concrete to a certain extent. If the content is too high, it will reduce its strength value. This is mainly because the cement hydration plays a nucleation role in the formation of CSH and calcium hydroxide in the early stage, changing its early strength and the packing density of the machine-made sand particles, thereby improving the strength of the pumped concrete it constitutes. If the stone powder content in the machine-made sand is relatively high, the densest stacking structure in the concrete will be destroyed, affecting the concrete's cement-to-bone ratio and reducing its strength value; with the continuous increase of the stone powder content in the machine-made sand, the corresponding shrinkage of the pumped concrete will show a trend of first decreasing and then increasing. This is because the stone powder in the machine-made sand contains many fine particles with filling effects. While the tortuosity of the concrete capillary pores increases, its pore structure is refined. Using stone powder in an appropriate amount can inhibit the shrinkage of the pumped concrete formed to a certain extent. Therefore, it is concluded that in the mixing process of machine-made sand concrete, the stone powder content in the corresponding machine-made sand is appropriately controlled at about 10%, which can effectively improve its workability, increase the compressive strength of the concrete mixed with it, and reduce its shrinkage performance, so that machine-made sand concrete that meets the requirements of concrete pumping can be mixed.
[0052] Table 1. Effect of stone powder content on the performance of concrete mixtures of different strength grades
[0053]
[0054] 2. Refer to Table 2. Since machine-made sand is affected by production equipment and parent rock material, its particles are coarse, generally medium-coarse sand. If the sand ratio is too small, the configured concrete will be rough, prone to water seepage, segregation, and difficult to mix, vibrate, and pump. The poured concrete will easily have a honeycombed surface, with many bubbles and a rough surface. If the sand ratio is too high, the concrete strength will be low and uneven, with large shrinkage and easy cracks on the surface. Through many tests, it is found that when configuring machine-made sand concrete with the same water-cement ratio as natural sand concrete, the sand ratio should be increased by 2-4% for the best effect.
[0055] Table 2. Selection of sand ratio of machine-made sand concrete under different water-binder ratios
[0056]
[0057] Quality control standards for machine-made sand concrete in the present invention: The construction method of the present invention mainly complies with the current specifications, regulations and standards:
[0058] 1. Ready-mixed concrete, GB / T 14902.
[0059] 2 "Construction sand" GB / T 14684,
[0060] 3. Code for Design of Concrete Structures GB 50010,
[0061] 4 "Standard for test methods of ordinary concrete mixture performance" GB / T50080,
[0062] 5 "Standard for test methods of mechanical properties of ordinary concrete" GB / T 50081,
[0063] 6 "Standard for test methods of long-term performance and durability of ordinary concrete" GB / T50082,
[0064] 7 "Concrete Quality Control Standard" GB 50164,
[0065] 8 "Concrete Structure Engineering Construction Quality Acceptance Code" GB 50204,
[0066] 9 "Concrete Structure Durability Design Code" GB / T 50476,
[0067] 10 "Concrete Structure Engineering Construction Code" GB 50666,
[0068] 11 Technical Specification for Concrete Pumping Construction JGJT 10,
[0069] 12 "Standard for quality and inspection methods of sand and stone for ordinary concrete" JGJ 52,
[0070] 13 "Ordinary Concrete Mix Design Code" JGJ 55,
[0071] 14 "Technical Specifications for Application of Artificial Sand Concrete" JGJ / T241,
[0072] 15 "Concrete Strength Test and Evaluation Standard" GB / T 50107,
[0073] 16 "Highway Engineering Aggregate Test Code" JTG E42,
[0074] 17 Technical Code for Anti-corrosion of Concrete Structures in Highway Engineering, JTG / T B07-01,
[0075] 18 Technical Specifications for Highway Bridge and Culvert Construction JTG / TF 50,
[0076] 19 Technical Specifications for Highway Tunnel Construction JTG / T F60,
[0077] 20. Highway Engineering Quality Inspection and Assessment Standard JTG F80-1.
[0078] Quality assurance measures for machine-made sand concrete in the present invention:
[0079] 1. Strictly control the measurement accuracy;
[0080] 2. Increase the testing frequency of particle size distribution, fineness modulus, and stone powder content (including methylene blue test) of machine-made sand;
[0081] 3. When taking out the machine-made sand and coarse aggregate from the stockpile, take measures to prevent segregation;
[0082] 4. Strictly measure the moisture content of machine-made sand and coarse aggregate, and adjust the weighing of machine-made sand, coarse aggregate and mixing water in time according to the change of moisture content to ensure the consistency of the laboratory mix ratio and construction mix ratio of concrete;
[0083] 5 When mixing machine-made sand concrete, if the machine-made sand and stone powder content and MB value change greatly, the sand ratio and the amount of water reducer should be adjusted in time to ensure the fluidity and workability of the concrete mixture.
[0084] 6. For machine-made sand concrete transported by a mixer truck, it is advisable to mix it evenly by rotating it at high speed for 20 seconds after it arrives at the site. When the slump loss is large and cannot meet the construction requirements, an appropriate amount of water reducer with the same composition as the original mix ratio can be added to the tank of the truck, and mixed evenly by rotating it rapidly. It should not be pumped or poured until the required working performance is achieved. The amount of water reducer added should be determined in advance by testing and should be recorded.
[0085] 7 The particle size distribution of machine-made sand fluctuates greatly. Bumping during transportation can easily aggravate the segregation and stratification of machine-made sand concrete mixtures. During the transportation of concrete, the mixing tank should be continuously stirred at a slow speed of 2 to 4 r / min. Before unloading the concrete, the mixing tank should be rotated at a high speed of more than 30 seconds in a fast gear before unloading to ensure that the concrete is not stratified or segregated. The time from the machine-made sand concrete leaving the machine to the pouring into the mold shall not be greater than the initial setting time of the machine-made sand concrete.
[0086] 8 Since the workability of machine-made sand concrete is poor, it is advisable to evenly distribute the material in layers when pouring machine-made sand concrete for vertical components. The layer thickness should be reduced from 500mm specified for natural sand concrete to 300~400mm.
[0087] 9 For machine-made sand concrete constructed by pumping, its transportation should be able to ensure continuous pumping of concrete and should comply with the provisions of the current industry standard "Technical Code for Concrete Pumping Construction" JGJ / T10.
[0088] 10 Machine-made sand concrete should be vibrated mechanically. The vibration time at each vibration point should be controlled within 20s to 30s according to the consistency of the mixture and the vibration location. The vibration time should be controlled to a level surface with no bubbles overflowing. Over-vibration and under-vibration are strictly prohibited.
[0089] 11. Early moisturizing maintenance should be strengthened for machine-made sand concrete, and water-retaining maintenance should be adopted for the exposed surface. After demolding, spraying and uniform watering can be used for maintenance. The maintenance time should be no less than 7 days. When constructing machine-made sand concrete in winter, direct watering is not allowed when the ambient temperature is below 5°C.
[0090] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A pipe clamp support structure, comprising a support platform (1) arranged below a node of a pumping pipeline, characterized in that: A first hydraulic rod (2) and a second hydraulic rod (3) are vertically arranged on the upper surface of the support platform (1); a servo motor (4) is fixedly connected to the top of the first hydraulic rod (2); an arc-shaped slide groove (5) is fixedly connected to the top of the housing of the servo motor (4); a groove portion on the upper surface of the arc-shaped slide groove (5) is slidably matched with the lower part of the wall of the input pipe (6); the servo motor (4) is provided with a driving shaft (7); a bearing seat sleeved with the driving shaft (7) is provided at the top of the second hydraulic rod (3); a driving gear (8) is fixedly connected to the middle of the driving shaft (7); the driving gear (8) is meshed with a gear ring (9); the gear ring (9) is fixedly arranged on the outer ring of the input pipe clamp (10); The input pipe (6) is connected to an elliptical material pipe I (11) through an input pipe clamp (10); a non-hole flange ring (12) is provided at one end of the input pipe (6) close to the elliptical material pipe I (11); a pin hole flange ring (13) is provided at one end of the elliptical material pipe I (11) close to the input pipe (6); the input pipe clamp (10) is composed of angle irons (101) at both ends and an annular bar (102) in the middle; the two angle irons (101) of the input pipe clamp (10) are closely connected by fastening bolts; the inner arc surface of the annular bar (102) of the input pipe clamp (10) is provided with two groups of annular grooves (103), one group of which is The annular groove (103) is sleeved with a non-hole flange ring (12), and another group of the annular grooves (103) is sleeved with a pin hole flange ring (13). The annular strip (102) of the input pipe clamp (10) is not provided with a hole at an end surface position close to the input pipe (6). The annular strip (102) of the input pipe clamp (10) is provided with a flange hole (104) at an end surface position close to the elliptical material pipe I (11). The pin hole flange ring (13) at one end of the elliptical material pipe I (11) is fixed in the flange hole (104) by fastening bolts. The gear ring (9) is fixed on the outer ring of the annular strip (102) of the input pipe clamp (10); The output pipe (14) is connected to the tail elliptical material pipe II (22) through an output pipe clamp (15). The output pipe (14) is also provided with a non-hole flange ring (12) at one end close to the elliptical material pipe II (22). The output pipe clamp (15) is also composed of angle irons (101) at both ends and an annular bar (102) in the middle. The two angle irons (101) of the output pipe clamp (15) are closely connected by fastening bolts. The inner arc surface of the annular bar (102) of the output pipe clamp (15) is provided with two groups of annular grooves (103), one of which is provided with a plurality of annular grooves (103). The annular groove (103) is sleeved with a flange ring without a hole (12), and another group of the annular grooves (103) is sleeved with a flange ring with a pin hole (13). The annular strip (102) of the output pipe clamp (15) is not provided with a hole at an end surface position close to the output pipe (14), and the annular strip (102) of the output pipe clamp (15) is provided with a flange hole (104) at an end surface position close to the elliptical material pipe II (22). The pin hole flange ring (13) at one end of the elliptical material pipe II (22) is fixed in the flange hole (104) by fastening bolts. 2-13 groups of oval material pipes III (33) are arranged between the oval material pipe I (11) and the oval material pipe II (22), and 2-13 groups of oval material pipes III (33) are arranged between the oval material pipe I (11) and the oval material pipe II (22), and the vertical sections of the oval material pipes III (33) are all oval, and the oblique sections at both ends are all perfect circles, and the oblique sections at both ends are symmetrically arranged, and both ends of the oval material pipe III (33) are provided with non-hole flange rings (12), and the non-hole flange rings (12) A transition pipe clamp (16) is fixedly arranged at the oblique cross section and arranged between adjacent non-hole flange rings (12). The transition pipe clamp (16) is also composed of angle irons (101) at both ends and an annular bar (102) in the middle. The two angle irons (101) of the transition pipe clamp (16) are closely connected by fastening bolts. The inner arc surface of the annular bar (102) of the transition pipe clamp (16) is provided with two groups of annular grooves (103) which are sleeved and matched with the pin hole flange ring (13). The outer wall of the oval material pipe III (33) located in the middle is sleeved with a circular support ring (17), the bottom of the outer ring of the circular support ring (17) is fixedly connected with a spring rod (18), and the end of the spring rod (18) away from the circular support ring (17) is riveted with a horizontal fixing rod (19) and an inclined swing rod (20), the end of the horizontal fixing rod (19) away from the spring rod (18) is vertically fixed to the movable rod section of the second hydraulic rod (3), and the end of the inclined swing rod (20) away from the spring rod (18) is vertically fixed to the outer ring of the annular bar (102) of the output pipe clamp (15); A third hydraulic rod (21) is riveted between the horizontal fixed rod (19) and the tilted swing rod (20); the horizontal fixed rod (19), the tilted swing rod (20) and the third hydraulic rod (21) form a deformable triangle.
2. The pipe clamp support structure according to claim 1, characterized in that: The inner side walls of the annular clamping grooves (103) of the input pipe clamp (10), the transition pipe clamp (16) and the output pipe clamp (15) are all smoothed, and the non-hole flange ring (12) and the pin hole flange ring (13) are all smoothed to ensure water tightness and prevent a large amount of muddy water from seeping into the gaps of each pipe clamp.
3. The pipe clamp support structure according to claim 1, characterized in that: Sealing rubber rings are provided between adjacent non-porous flange rings (12) to improve friction and buffering properties, thereby facilitating the torque transmission efficiency between transition pipe clamps (16).
4. The pipe clamp support structure according to claim 1, characterized in that: A smooth sealing sheet is provided between the non-hole flange ring (12) and the pin hole flange ring (13) to improve the sealing performance and friction damage resistance of the input pipe clamp (10) and the output pipe clamp (15).
5. The pipe clamp support structure according to claim 1, characterized in that: The servo motor (4) is specifically a forward and reverse low-speed motor. The elliptical material pipe I (11), the elliptical material pipe II (22) and the elliptical material pipe III (33) form a twistable node bend pipe. When in use, the servo motor (4) is rotated forward half a circle and then reversed half a circle, and the forward and reverse rotations are performed alternately to achieve torque transmission between the elliptical material pipe I (11), the elliptical material pipe II (22) and the elliptical material pipe III (33), thereby realizing a vector twisting stirring process, so that the cement mortar can be fully stirred in the node bend pipe, avoiding the risk of cement mortar stratification, precipitation or even drying up at the node causing pipeline blockage.
6. A construction method for long-distance pumping of machine-made sand concrete, using the pipe clamp support structure according to any one of claims 1 to 5, characterized in that: The following steps are involved: a. Selection of raw materials for machine-made sand concrete: according to the strength requirements, select appropriate amounts of cement, water, fly ash, machine-made sand, crushed stone and admixtures. Machine-made sand is fine aggregate crushed by limestone or granite, of which cement is silicate cement, the stone powder content in machine-made sand is 0-20%, crushed stone and fly ash are not alkali-active, and the water-reducing rate of admixture is not less than 16%; b. Configuration of machine-made sand concrete: According to the strength requirements, the stone powder content of the machine-made sand used in C30 machine-made sand concrete is 10% to 15%, the stone powder content of the machine-made sand used in C40 machine-made sand concrete is 5% to 12%, the stone powder content of the machine-made sand used in C50 machine-made sand concrete is 5% to 7%, and the stone powder content of the machine-made sand used in C60 machine-made sand concrete does not exceed 5%. The sand rate is 2 to 4% higher than that of natural sand; c. Transportation of machine-made sand concrete: Use a high-pressure pump to put the raw materials of the machine-made sand concrete in step b into the mixer in the transport vehicle. During transportation, stir them continuously at a speed of 1 to 3 rpm. Before unloading at the site, stir the mixing drum for 1 to 2 minutes before unloading; d. Pumping of machine-made sand concrete: The delivery pipe should be laid straight, short and flat, the horizontal pipe at the inlet of the delivery pump should be at least 15m, and the delivery pipe should be fixed every 3m; during summer construction, the delivery pipe should be covered with sacks and watered to cool it down; The pipe clamp support structure as claimed in claim 1 is arranged at the node of the conveying pipe, and the machine-made sand concrete is introduced into the conveying pipe by using an output pump pipe. When the flow at the outlet decreases sharply, stratification, drying or blockage occurs, the servo motor (4) is turned on to drive the rotation of the input pipe clamp (10) to generate torque, and the torque is transmitted to the elliptical material pipe I (11) through the pin hole flange ring (13), and then the torque is transmitted to the elliptical material pipe II (22) and the elliptical material pipe III (33) through the non-hole flange ring (12), so as to form a twistable and deformable node elbow structure, and cause the entire torque to be transmitted, so as to realize a vector twisting mixing process, so that the cement mortar can be fully stirred in the node elbow, and the risk of stratification, precipitation or even drying of the cement mortar at the node causing pipeline blockage is avoided, and the power input of the pipe clamp support structure is used to realize the dredging process at the conveying pipe node; e. Vibration of machine-made sand concrete: When transported to the site, machine-made sand concrete is mechanically vibrated. The vibration time of each vibration point is controlled within 20 to 30 seconds according to the consistency of the mixture and the vibration location. The vibration time is controlled to be within 20 to 30 seconds, and the concrete is not sinking, does not bubble, has a flat surface, and is slurry. Machine-made sand concrete is more likely to liquefy and segregate than natural sand concrete with the same slump. Over-vibration or missed vibration should be avoided. f. Maintenance of machine-made sand concrete: After on-site vibration, the exposed surface shall be maintained with water retention. After demolding, spraying and uniform watering shall be used for maintenance. The maintenance time shall not be less than 7 days. When constructing machine-made sand concrete in winter, direct watering is not allowed when the ambient temperature is below 5°C.